A quick graphic representation of the elementary school configuration options that were considered by the KSD's Keene Elementary Restructuring Steering Committee.
2. Elementary Schools Configuration
(Today)
5 separate schools: All “K-5”
Jonathan
Daniels Franklin Fuller Symonds Wheelock
Preschool
K-5 K-5 K-5 K-5 &
K-5
Over the past ten years, our elementary school costs
have been 24-40% higher than state averages.
3. Elementary Schools Configuration
(September 2014)
Option: Four K-5 Schools
Jonathan
Franklin Fuller Wheelock Symonds
Daniels
Preschool
K-5 K-5 K-5 K-5
only
Estimated savings including cost of renovation bond:
$570,000 per year
4. Elementary Schools Configuration
(September 2014)
Option: Four Narrow Grade Span Partner Schools
Jonathan
Franklin Fuller Wheelock Symonds
Daniels
Preschool
K-1 2-5 K-1 2-5
only
Estimated savings including cost of renovation bond:
$1.3 million per year