Warren County Economic
         Development Corp.
“The Southern Gateway to the Greater Des Moines
             Metropolitan Region”

Iowa DOT Commission Meeting | June 12, 2012
Warren
County, Iowa
WARREN COUNTY IS GROWTH
Fourth fastest growing county in the state with a population
growth of almost 15% from 2000 – 2011. (40,671 to 46,732)

W.C. Median Household Income ranks 2nd in the state and is 20.5%
higher than the national average. W.C. MHI grew 24.5% from
2000-2010 ($51,000 to $64,371)

Job Growth over the next 10 years is estimated at 33.18%
(2% higher than national estimated growth)

Unemployment rate in Warren County is 4.9% (slightly lower than the
state rate at 5.1%, and 3% lower than the national rate of 8.1%)
WARREN COUNTY IS GROWTH
              (CONT.)
Students enrolled in Warren County Schools have a graduation
rate of 96.24% (9.24%higher than the state average and 26.24%
higher than the national average)

Simpson College has approx. 1,400 full time students & 600
participating in Evening & Weekend Graduate Program

The top 20 companies in W.C. had $690,000,000 in sales last year
(an estimated 38% increase in ten years)
Projects
 US Hwy 92 (Indianola R-57 to
  I-35)
 US Hwy 65/69 Corridor
  Traffic Study
 US Hwy 5/65 Interstate Re-
  Designation
 Southwest Connector &
  Arterial
US Hwy 92
(Indianola R-57 to I-35)
US Hwy-92 Enhancement




• Approximately $10M has been approved for construction & right-of-way
  acquisition for U.S. Highway 92 (4 miles)
• Funding for this portion is committed through FY 2013 & is listed within the Iowa
  DOT’s five-year construction program
• Construction documents are being completed now and work is
  scheduled to begin in the spring of 2014.
Next Stage for US Highway 92

                                 Next
                                 Stage
                                  complete
                               enhancement
                               from Indianola
                                   R-57 to
                                Interstate 35




US Highway 92 Reconstruction
US Hwy 65/69
Corridor Traffic Study
US Hwy 65/69 Corridor Traffic
                        Study
  Indianola desires to correct disparate elevation levels
     along Highway 65/69 within the corporate limits.
• Traffic volume & accidents continue to increase as growth occurs.

• Commuter traffic that drives to & from Des Moines along this route

• Recent developments will increase traffic (Theisen’s, Mercy Medical
  Clinic, Iowa Health clinic, assistant/independent living center, YMCA
  (2013)in addition to two existing car dealerships)
Study
  Corridor
 South of Hillcrest
 North Corp Limits
    ½ mile North
     of Hayes St.




       US Hwy 65/69
       Corridor Traffic Study
Existing
 Conditions
 Roadway
 4 lane divided, “rural” facility
 50’-62’ wide median varies
 Access points– established locations
 4-5 feet of vertical difference exists between the northbound
  & southbound profile at three major access points
 45mph at South end, 55mph North of Hillcrest


US Hwy 65/69 Corridor Traffic Study
Traffic
  Growth
     History
          1984 to 2008 approx. 3% per year
       Trip Generation Potential
          Summercrest (if 100% developed)
              12,000 total trips per day added
              900 trips AM peak hr / 1,200 trips PM peak hr added
          Northwest Development (if 25% developed)
              3,900 trips AM peak hr / 560 trips PM peak hr added


US Hwy 65/69 Corridor Traffic Study
Forecast Traffic US 65/69
         Daily Traffic (Two way total)
            2008 Existing = 19,000 vehicles per day
            2020 Proposed = 29,000 vehicles per day
         Peak Hour (Two way total)
            2008 Existing = 1,900 vehicles per hour
            2020 Proposed = 2,900 vehicles per hour
         50% potential Increase

US Hwy 65/69 Corridor Traffic Study
Future Roadway Cross
 Section Needs
   Basic Lane
       Two lanes each direction plus auxiliary turn lanes
       Long term possible three lanes each direction
    Narrower Median Width
       Reduce to 30’ wide
       Accommodate single or dual lefts
    Turn Lanes
       Positive offset left turn lanes
       Right turn declaration lanes
US Hwy 65/69 Corridor Traffic Study
Request
  The total cost to correct the elevation levels may reach
  $10.3 million. The City of Indianola would request that
  this project be a local, state and federal partnership to
  reduce the city’s cost liability




US Hwy 65/69 Corridor Traffic Study
US Hwy 5/65
    Interstate Re-
      Designation
(Purple Heart Highway)
Hwy 5/65 Interstate Re-Designation
     (Purple Heart Highway)
                      •   The Iowa DOT is completing
                          a Safety Assessment (SA)
                          and Operational Assessment
                          (OA) at a cost in excess of
                          $90,000.
                      •   The Iowa DOT’s initial
                          estimates also indicate that
                          new signage could cost as
                          much as $1,000,000.
                      •   Additionally, due to
                          increased speeds, the DOT
                          estimates that there will be
                          costs associated with
                          upgrading the highway from
                          a 4-lane divided highway to
                          interstate highway.
Hwy 5/65 Interstate Re-Designation
     (Purple Heart Highway)
 The Purple Heart Highway Collaborative is a group of community
 and county representatives working together to promote economic
 development along the highway and create awareness for the loop
 of opportunity.

         Altoona                     Warren County
         Carlisle                    Warren County
        Des Moines                      Economic
         Norwalk                      Development
       Pleasant Hill                  Corporation
      West Des Moines              East Polk Regional
                                      Development
Hwy 5/65 Interstate Re-Designation
     (Purple Heart Highway)
          Cost Breakdown for DOT Study
          • Final reports to be completed summer of 2012.
          • Estimated Total: Less than $100,000
               • DOT Share - $50,000
               • Local Share - $42,000
          Purple Heart Highway Facts
          • The first section of the PHH opened in 1995, the final section opened
             in 2002.
          • Four-lane, 25-mile highway
          • 2008 Traffic Counts are 20,000-26,000 vehicles per day
               • Expected to reach 30,700 by 2020
          Landscaping
          • Worked with the DOT in summer/fall 2011 to research options
          • Determined most efficient and cost-effective scenarios
          • Result: DOT – design, let and invest in landscape along PHH
               • Purple plants and/or shrubs to enhance branding
          • Currently underway – Spring 2012
Hwy 5/65 Interstate Re-Designation
     (Purple Heart Highway)
 Request:

 Once the study is completed, federal highway
 dollars will be needed to complete signage and
 upgrading.

   * The Des Moines MPO will be sharing the findings of the
           study with the DOT Commission soon *
Southwest Connector
     & Arterial
Southwest Connector & Arterial
                          Secured $539K
                         from the Federal
                              Highway
                          Administration
                            to finish an
                          environmental
                               impact
                            statement &
                         start preliminary
                            engineering
Southwest Connector & Other
     Regional Projects
Cumming Interchange
Cumming Interchange




 $13 million approved, which
  includes:
     New wider and longer
      bridge & approach
      pavement
     Grading & paving new
      interstate ramps
     Side road construction
 Complements plans for
  Southwest Connector and
Warren County Trail
     System
Central
 Iowa
 Trail
System
Warren
County
 Trail
System
Questions?
         Warren County
     Economic Development
          Corporation
111 North Buxton | Indianola, Iowa 50125
     (515) 961-1067 | www.wcedc.com

More Related Content

Similar to Iowa DOT Commission Presentation

Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of CountywideDialogue on Transportation:Project SelectionA Si...Continuation of CountywideDialogue on Transportation:Project SelectionA Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...Fairfax County
 
Charlotte Capital Improvement Program Proposal
Charlotte Capital Improvement Program ProposalCharlotte Capital Improvement Program Proposal
Charlotte Capital Improvement Program ProposalCharlotte Chamber
 
LTC, Jack R. Widmeyer Transportation Research Conference, 11/04/2010
LTC, Jack R. Widmeyer Transportation Research Conference, 11/04/2010LTC, Jack R. Widmeyer Transportation Research Conference, 11/04/2010
LTC, Jack R. Widmeyer Transportation Research Conference, 11/04/2010LTC @ CSUSB
 
Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)Fairfax County
 
Maumee Valley Planning Organization Regional Transportation Planning Overview
Maumee Valley Planning Organization Regional Transportation Planning OverviewMaumee Valley Planning Organization Regional Transportation Planning Overview
Maumee Valley Planning Organization Regional Transportation Planning OverviewRPO America
 
Naples_Chamber_Cover Story_Roads
Naples_Chamber_Cover Story_RoadsNaples_Chamber_Cover Story_Roads
Naples_Chamber_Cover Story_RoadsRob Esmond
 
Transportation Priorities: Project Timelines and the 2014 Bond Referendum
Transportation Priorities: Project Timelines and the 2014 Bond ReferendumTransportation Priorities: Project Timelines and the 2014 Bond Referendum
Transportation Priorities: Project Timelines and the 2014 Bond ReferendumFairfax County
 
CDOT Presentation given at Statewide Transit Plan MPO Meetings Spring 2014.
CDOT Presentation given at Statewide Transit Plan MPO Meetings Spring 2014.CDOT Presentation given at Statewide Transit Plan MPO Meetings Spring 2014.
CDOT Presentation given at Statewide Transit Plan MPO Meetings Spring 2014.OV Consulting
 
Caltrans: Overview of Public Private Partnerships (P3)
Caltrans: Overview of Public Private Partnerships (P3)Caltrans: Overview of Public Private Partnerships (P3)
Caltrans: Overview of Public Private Partnerships (P3)AGC of California
 
NorthwestNews_1_2015 (1)
NorthwestNews_1_2015 (1)NorthwestNews_1_2015 (1)
NorthwestNews_1_2015 (1)Theresa Pollick
 
Governor's Transportation Summit - Reliable Mass Transportation Importance to...
Governor's Transportation Summit - Reliable Mass Transportation Importance to...Governor's Transportation Summit - Reliable Mass Transportation Importance to...
Governor's Transportation Summit - Reliable Mass Transportation Importance to...Utah Department of Transportation
 
Expanding Clean Transportation & Reducing Wasteful Highways in WI
Expanding Clean Transportation & Reducing Wasteful Highways in WIExpanding Clean Transportation & Reducing Wasteful Highways in WI
Expanding Clean Transportation & Reducing Wasteful Highways in WIShahla Werner
 

Similar to Iowa DOT Commission Presentation (20)

Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of CountywideDialogue on Transportation:Project SelectionA Si...Continuation of CountywideDialogue on Transportation:Project SelectionA Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
 
Charlotte Capital Improvement Program Proposal
Charlotte Capital Improvement Program ProposalCharlotte Capital Improvement Program Proposal
Charlotte Capital Improvement Program Proposal
 
LTC, Jack R. Widmeyer Transportation Research Conference, 11/04/2010
LTC, Jack R. Widmeyer Transportation Research Conference, 11/04/2010LTC, Jack R. Widmeyer Transportation Research Conference, 11/04/2010
LTC, Jack R. Widmeyer Transportation Research Conference, 11/04/2010
 
Where Will the $$ Come From?
Where Will the $$ Come From?Where Will the $$ Come From?
Where Will the $$ Come From?
 
sr 90 sw 8th street at sw 87 avenue pd&e study
sr 90 sw 8th street at sw 87 avenue pd&e studysr 90 sw 8th street at sw 87 avenue pd&e study
sr 90 sw 8th street at sw 87 avenue pd&e study
 
FY2013 Valdosta-Lowndes MPO Annual Report Summary
FY2013 Valdosta-Lowndes MPO Annual Report SummaryFY2013 Valdosta-Lowndes MPO Annual Report Summary
FY2013 Valdosta-Lowndes MPO Annual Report Summary
 
Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)Update of Fairfax County's Transportation Priorities Plan (TPP)
Update of Fairfax County's Transportation Priorities Plan (TPP)
 
Maumee Valley Planning Organization Regional Transportation Planning Overview
Maumee Valley Planning Organization Regional Transportation Planning OverviewMaumee Valley Planning Organization Regional Transportation Planning Overview
Maumee Valley Planning Organization Regional Transportation Planning Overview
 
Freight Planning in Northwest Indiana
Freight Planning in Northwest IndianaFreight Planning in Northwest Indiana
Freight Planning in Northwest Indiana
 
Not Your Grandfather's DOT: The FDOT District 5 and PennDOT Experiences--Bold...
Not Your Grandfather's DOT: The FDOT District 5 and PennDOT Experiences--Bold...Not Your Grandfather's DOT: The FDOT District 5 and PennDOT Experiences--Bold...
Not Your Grandfather's DOT: The FDOT District 5 and PennDOT Experiences--Bold...
 
MDX 2015-2019 Work Program Overview presentation, October 22, 2014
MDX 2015-2019 Work Program Overview presentation, October 22, 2014MDX 2015-2019 Work Program Overview presentation, October 22, 2014
MDX 2015-2019 Work Program Overview presentation, October 22, 2014
 
Chamber November Breakfast Presentation - Otis Rawl "Paving the Way to the Fu...
Chamber November Breakfast Presentation - Otis Rawl "Paving the Way to the Fu...Chamber November Breakfast Presentation - Otis Rawl "Paving the Way to the Fu...
Chamber November Breakfast Presentation - Otis Rawl "Paving the Way to the Fu...
 
Naples_Chamber_Cover Story_Roads
Naples_Chamber_Cover Story_RoadsNaples_Chamber_Cover Story_Roads
Naples_Chamber_Cover Story_Roads
 
Transportation Priorities: Project Timelines and the 2014 Bond Referendum
Transportation Priorities: Project Timelines and the 2014 Bond ReferendumTransportation Priorities: Project Timelines and the 2014 Bond Referendum
Transportation Priorities: Project Timelines and the 2014 Bond Referendum
 
CDOT Presentation given at Statewide Transit Plan MPO Meetings Spring 2014.
CDOT Presentation given at Statewide Transit Plan MPO Meetings Spring 2014.CDOT Presentation given at Statewide Transit Plan MPO Meetings Spring 2014.
CDOT Presentation given at Statewide Transit Plan MPO Meetings Spring 2014.
 
Caltrans: Overview of Public Private Partnerships (P3)
Caltrans: Overview of Public Private Partnerships (P3)Caltrans: Overview of Public Private Partnerships (P3)
Caltrans: Overview of Public Private Partnerships (P3)
 
Hull rpo2012
Hull rpo2012Hull rpo2012
Hull rpo2012
 
NorthwestNews_1_2015 (1)
NorthwestNews_1_2015 (1)NorthwestNews_1_2015 (1)
NorthwestNews_1_2015 (1)
 
Governor's Transportation Summit - Reliable Mass Transportation Importance to...
Governor's Transportation Summit - Reliable Mass Transportation Importance to...Governor's Transportation Summit - Reliable Mass Transportation Importance to...
Governor's Transportation Summit - Reliable Mass Transportation Importance to...
 
Expanding Clean Transportation & Reducing Wasteful Highways in WI
Expanding Clean Transportation & Reducing Wasteful Highways in WIExpanding Clean Transportation & Reducing Wasteful Highways in WI
Expanding Clean Transportation & Reducing Wasteful Highways in WI
 

Iowa DOT Commission Presentation

  • 1. Warren County Economic Development Corp. “The Southern Gateway to the Greater Des Moines Metropolitan Region” Iowa DOT Commission Meeting | June 12, 2012
  • 3. WARREN COUNTY IS GROWTH Fourth fastest growing county in the state with a population growth of almost 15% from 2000 – 2011. (40,671 to 46,732) W.C. Median Household Income ranks 2nd in the state and is 20.5% higher than the national average. W.C. MHI grew 24.5% from 2000-2010 ($51,000 to $64,371) Job Growth over the next 10 years is estimated at 33.18% (2% higher than national estimated growth) Unemployment rate in Warren County is 4.9% (slightly lower than the state rate at 5.1%, and 3% lower than the national rate of 8.1%)
  • 4. WARREN COUNTY IS GROWTH (CONT.) Students enrolled in Warren County Schools have a graduation rate of 96.24% (9.24%higher than the state average and 26.24% higher than the national average) Simpson College has approx. 1,400 full time students & 600 participating in Evening & Weekend Graduate Program The top 20 companies in W.C. had $690,000,000 in sales last year (an estimated 38% increase in ten years)
  • 5. Projects  US Hwy 92 (Indianola R-57 to I-35)  US Hwy 65/69 Corridor Traffic Study  US Hwy 5/65 Interstate Re- Designation  Southwest Connector & Arterial
  • 6. US Hwy 92 (Indianola R-57 to I-35)
  • 7. US Hwy-92 Enhancement • Approximately $10M has been approved for construction & right-of-way acquisition for U.S. Highway 92 (4 miles) • Funding for this portion is committed through FY 2013 & is listed within the Iowa DOT’s five-year construction program • Construction documents are being completed now and work is scheduled to begin in the spring of 2014.
  • 8. Next Stage for US Highway 92 Next Stage complete enhancement from Indianola R-57 to Interstate 35 US Highway 92 Reconstruction
  • 9. US Hwy 65/69 Corridor Traffic Study
  • 10. US Hwy 65/69 Corridor Traffic Study Indianola desires to correct disparate elevation levels along Highway 65/69 within the corporate limits. • Traffic volume & accidents continue to increase as growth occurs. • Commuter traffic that drives to & from Des Moines along this route • Recent developments will increase traffic (Theisen’s, Mercy Medical Clinic, Iowa Health clinic, assistant/independent living center, YMCA (2013)in addition to two existing car dealerships)
  • 11. Study Corridor  South of Hillcrest  North Corp Limits  ½ mile North of Hayes St. US Hwy 65/69 Corridor Traffic Study
  • 12. Existing Conditions  Roadway  4 lane divided, “rural” facility  50’-62’ wide median varies  Access points– established locations  4-5 feet of vertical difference exists between the northbound & southbound profile at three major access points  45mph at South end, 55mph North of Hillcrest US Hwy 65/69 Corridor Traffic Study
  • 13. Traffic Growth  History  1984 to 2008 approx. 3% per year  Trip Generation Potential  Summercrest (if 100% developed)  12,000 total trips per day added  900 trips AM peak hr / 1,200 trips PM peak hr added  Northwest Development (if 25% developed)  3,900 trips AM peak hr / 560 trips PM peak hr added US Hwy 65/69 Corridor Traffic Study
  • 14. Forecast Traffic US 65/69  Daily Traffic (Two way total)  2008 Existing = 19,000 vehicles per day  2020 Proposed = 29,000 vehicles per day  Peak Hour (Two way total)  2008 Existing = 1,900 vehicles per hour  2020 Proposed = 2,900 vehicles per hour  50% potential Increase US Hwy 65/69 Corridor Traffic Study
  • 15. Future Roadway Cross Section Needs  Basic Lane  Two lanes each direction plus auxiliary turn lanes  Long term possible three lanes each direction  Narrower Median Width  Reduce to 30’ wide  Accommodate single or dual lefts  Turn Lanes  Positive offset left turn lanes  Right turn declaration lanes US Hwy 65/69 Corridor Traffic Study
  • 16. Request The total cost to correct the elevation levels may reach $10.3 million. The City of Indianola would request that this project be a local, state and federal partnership to reduce the city’s cost liability US Hwy 65/69 Corridor Traffic Study
  • 17. US Hwy 5/65 Interstate Re- Designation (Purple Heart Highway)
  • 18. Hwy 5/65 Interstate Re-Designation (Purple Heart Highway) • The Iowa DOT is completing a Safety Assessment (SA) and Operational Assessment (OA) at a cost in excess of $90,000. • The Iowa DOT’s initial estimates also indicate that new signage could cost as much as $1,000,000. • Additionally, due to increased speeds, the DOT estimates that there will be costs associated with upgrading the highway from a 4-lane divided highway to interstate highway.
  • 19. Hwy 5/65 Interstate Re-Designation (Purple Heart Highway) The Purple Heart Highway Collaborative is a group of community and county representatives working together to promote economic development along the highway and create awareness for the loop of opportunity. Altoona Warren County Carlisle Warren County Des Moines Economic Norwalk Development Pleasant Hill Corporation West Des Moines East Polk Regional Development
  • 20. Hwy 5/65 Interstate Re-Designation (Purple Heart Highway) Cost Breakdown for DOT Study • Final reports to be completed summer of 2012. • Estimated Total: Less than $100,000 • DOT Share - $50,000 • Local Share - $42,000 Purple Heart Highway Facts • The first section of the PHH opened in 1995, the final section opened in 2002. • Four-lane, 25-mile highway • 2008 Traffic Counts are 20,000-26,000 vehicles per day • Expected to reach 30,700 by 2020 Landscaping • Worked with the DOT in summer/fall 2011 to research options • Determined most efficient and cost-effective scenarios • Result: DOT – design, let and invest in landscape along PHH • Purple plants and/or shrubs to enhance branding • Currently underway – Spring 2012
  • 21. Hwy 5/65 Interstate Re-Designation (Purple Heart Highway) Request: Once the study is completed, federal highway dollars will be needed to complete signage and upgrading. * The Des Moines MPO will be sharing the findings of the study with the DOT Commission soon *
  • 22. Southwest Connector & Arterial
  • 23. Southwest Connector & Arterial Secured $539K from the Federal Highway Administration to finish an environmental impact statement & start preliminary engineering
  • 24. Southwest Connector & Other Regional Projects
  • 26. Cumming Interchange  $13 million approved, which includes:  New wider and longer bridge & approach pavement  Grading & paving new interstate ramps  Side road construction  Complements plans for Southwest Connector and
  • 30. Questions? Warren County Economic Development Corporation 111 North Buxton | Indianola, Iowa 50125 (515) 961-1067 | www.wcedc.com