SlideShare a Scribd company logo
1 of 126
Service Center Team


         -
-


Team Service Center




                          -
1.

2.

3.




     -
Team Service
1.           PM
Shelf Life
2.
3.                               Team
   Service
4.
5.

6.

                                        -
1.   PM
          Shelf Life




                       -
2.




-           -
-
-    Drop   -   9

-           -
                -
3.                        Team
          Service
                    Team
Service




                             -
Team Service

Team
            3
                                           3
                         BU+
                TEAM A                     TEAM B

                          /                       /           /
    A            B                 C
-       /                      -       /   Slat
-       /                      -       /          Control, Sensor,
-       /                      -       /
-       /                      -       /
                                                         -
Team Service

                                                                                   Center
    A                 B                            3
                                     C
                                                       2       :                    +
                       10
 5         2          km.                D
km.
                                                   :               A
          km.
                           15
                          km.
                                         E         :               B
                           3
        Center            km.
                            11                     :               E
                           km.           F
                            6                              /           3       :
 7           8             km.
                       12                G
km.         km.                              ***
                      km.


J                 I              H           Service
                                                                           -
3.                  Team
     Service
     Team Service




                           -
1.

2.         Box
     Alignment




                 -
-
-      Shelf   -
life
-              -
-
               -

-                  -
1.




     -
2.




     -
3.




-    Alignment

-
-
                 -
Nipple

1.




              -
Nipple

2.

     -
                      line
     -

     -




                  -
1.   Main Auger




                  -
2.


     -   Hoper

     -   Pan
     -
                 line
     -

     -

     -
                        -
-   Hoper

-   Pan
-
            line
-

-

-
                   -
Alignment




                         EVAP



Action :
                 Action :

                 Action :
                 Shelflife

                 Action :
                 Shelflife
                             Auto
           cm.
                                      Alignment


                                      Alignment


                                                  -
……                                  ……
                                                                                                   ………                              ….


                                          VOLT       AMP       POWER ROUND




    ........................................................                 ....................................................
                                                                             ....
(                                                              )             (
                                                                             )

                                                                                                                                    -
(               )

                                     1
    ********


1              MF-001-01
2              MF-001-01
3              MF-001-01
4              MF-001-01
5              MF-001-01
6              MF-001-01
7              MF-001-01
8              MF-001-01
9              LT-001-01




                         ........................................................       ....................................................
                                                                                        ....
                     (                                                              )   (
                                                                                        )

                                                                                                                                         -
4.




     Team
       A


     Team
       B




            -
4.



           Team
             A
           Team
             B

     MDB




                  -
5.




     -
6.




     -
12341234123412341234123412341234




                           -
Team Service

PM    MDB    PM




     PM       PM




                           -
Team Service Center




                      -
-
–

-
-
1.

2.

3.

4.       ,




     -
/
             #2

   /
        #1        ,

slat/



                      -
,




    -
1   +         ,
                                          +
                                                    1                 Detergent            +

                                      +   +                                           +
                                                                                 5
                                              7                      7-14   m3
                           115   m3
2                      +
                                  +       Cooling
                                                    2            +    +
                                                                                +      +

                                  +       +                                          +Cooling+
                   +       +                                     +     +
                                              9                             33             7
        115   m3                                                      7-14 m
3
                                              7
                                                                              2
                           115 m3                                             1  /
                                                                            317-
                                                        331m3/              -
+    +                    Detergent           +
1                      +                        1
                                    7                                +
                    115    m3                                                5
                                +           +                  +
                                                         7-14 m3         +
2                  +                            2   +    +
               +               +                         +Cooling+
                                    7                                        5
    115   m3               +            +                7-14   m3
3                                               3
                                    7                                        5
                   +115 m3 +                             7-14 + 3
                                                              m              +
4                                   9           4       +
    115   m3
                                                                             7
                                                            1
                                                         7-14  /m3
5
                                    7                     519-547 m3/
                    115    m3                                    -
115
   3           5
       4
                   ,


           3
                       4
       23


m3 /
           5

       37
                             -
,
,


              Y 80

    -            50

    -   115m3/
    -

    -     4



                          -
-
-
833   /   ,             154   /
              987   /

                                  -
-

-

-
    -
-
-
                              5.5 kW
    60        1
                  -                         150
4        m3
                      bar 2
                  -               4
                                               75
                      bar
                  .           2        1.
                                            30 lite
                                       2.




                                  -
3
    1.                                 2.                             3.                               +
-                                  -                                                 Y120
               5.5 kW                             5.5 kW              -
-                        150       -                         150                   5.5 kW
     bar                                bar                                                     low flow
-                 4                -                 4                     150 bar
                             75                                  75                             low flow
     bar .                              bar .                              40 bar
                        15     /                           8.3        -               4
           /                                  /      /                                            75
                                                                           bar .     20 bar
                                                                                          8.3          /
                                                                               /
                                                                                          120     /
                                                                               /




                                                                                     -
150 bar            150 bar
  :                  :
          15   /
                     :
                                 8
  :




                             -
-
    1 m3



           -   detergent




                           -
-       IP 65
    2 set
-     ELCB




                -
-                 60
         4 set
-           VCT
    4X6 sq.mm
    100




           -
-
-
-
-
833   /   ,             154   /
              987   /

                                  -
Y80 3
 set
 m3 /
        m3 /   kW




                -
1                    set




                m3/   m3/   kW
Detergent




                            -
2                    set




                m3/
                      m3/   kW
Detergent




                            -
Pump low flow 8        Y 120




             m3/
                   m3/        kW
Detergent




                              -
-
Y80 3
 set
 m3 /
        m3/   kW




                   -
1
            set


                  pump 2
                    set
                    m3 /
                           m3 /   kW
Detergent




                                   -
2
            set


                  pump 2
                    set
                    m3 /
                           m3 /   kW
Detergent




                                   -
3 Pump low Flow 8            Y 120


            pump 2
              set

            m3/      m3/         kW
Detergent




                                      -
-
1,2



1.Body & Tank          60,000
2.Moter & Pump high   120,000
pressure 2 set
3.                     20,000
ELCB
4.          100 m      20,000
Power plugs
5.                4    30,000
                            -
3



1.Body & Tank         60,000
2.Moter & Pump high   60,000
pressure 2 set
3.                    20,000
ELCB
4.          100 m     20,000
Power plugs
5.                4   30,000
                          -
1




1

1



        -
2




2

2



        -
3
Pump low flow + Y 120




                        -
1
15   /



                  2

                                       /


                       4       /   =
         275,000 x 4

         1,100,000
                           -
2
8   /




                  3

                                      /


                      4       /   =
        275,000 x 4

        1,100,000
                          -
3
              8
/   + Y 120


                            3

                           823 772                 /

                                4       /      =
                  215,000 x 4
                                            860,000


                          = 13
                                    -
-
/
11

         CPF WAY




                   -
THE END


   -
–

-
–       ,



    -
1.

2.

3.

4.       ,




     -
1
10,000
         180


               16

         180

               4
                    1
     1,080

      1,080

20
                        -
10,000




         1080          10       /
10,000           1.5        /

                                -
12
                                              /
                  20        20 X 300 = 6,000
                            ( 6,000/8 X1.5)x1.5=
                            1,688
         10                 1,500 X 10 =15,000
         +                  1,000 X 5 = 5,000
              4        /    2,200 X 4 = 8,800

              /              36,488
36,488                      1        /   1
12                          = 437,856     /
                                                   -
180



                   16
                        6
             180

                   4
     6   1,080              10       2,520

     1,080    /
                            10       4
20                               -
6           /
                         10                                         10




          X       X              x                  X       X                      x
                               x 40                                           x    50
Column x row                   3X4     X2   Column x row                      3X5       X2
                   /            24 ,14                      /                  30 , 14
      ,       /                                 ,       /
          /                   6X24 = 144            /                        6X30 = 240
                                 317                                              528
kg/           2.2 kg./                                                   -
6




          X       X           x     2x         5             X       X       15x     2 x
Column x row                  3X3         X2                                       42
                   /              18 ,8            Column x row               3X4     X2
      ,       /                                                      /         24 , 12
          /                  6X18 = 108                  ,       /

                                  237                        /               6X24 = 144
kg/           2.2 kg./
                                                                                316
                         /        864              kg/       2.2kg./     -
6       /




     (6)


           2,01       5       40,3
     (6)     6                 65


           2,52       4       32,2
             0                 92
     (6)


                          cm2
kg                            -
-
cm2
 kg


                2.2 -2.4
kg.


            -
2,250   4   /
10,000                   2
                     -
-
-
-
-
-
-
-
-
-
-
-
-
2         17
2
                     2        34

           1         12
1
           2         2        24
           6         12
2
           7         2        24
***
      82       ***        -
5   40,3   686,2              737,2
     65     05      50%        05
                     OT


4   32,2   171,3
            548,9             599,9
     92      60
              64    50%        64
                     OT




                          -
-
6       /

      599,9       1,199,9   20,3    40,6
        64            28     32      64
      599,9       1,199,9   20,3    40,6
        64            28     32      64




                            128,3   256,6
                               49      98




256,698       /                             -
6   /



        256,698   /


691,000


256,698 /691,000 = 3

              -
9
/



          805,702   /


    691,000


     805,702/691,000 = 11

                -
cm2
 kg


                2.2 -2.4
kg.


            -
180



                   16
                        6
             216

                   4
     6   1,080              10       3,360

     1,080    /
                            10       3
20                               -
10                                       10




          X       X              x                    X       X                  x
                               x 40                                         x    50
Column x row                   3X4     X2   Column x row                    3X5       X2
                   /            24 ,14                        /              30 , 14
      ,       /                                   ,       /
          /                   9X24 = 216              /                    8X30 = 240
                                 496                                            552
kg/           2.3 kg./                      kg/       2.3kg./          -
cm2
kg     -
50%
 OT



50%
 OT




      -
805,702   /   -
805,702   /


691,000


 805,702/691,000 = 11

            -
-
20    /

8   /            295,200
        9




                           -
Problem

        1.
        2.    &
/




                  -
&
                                                                         6




          X       X           x     2x         5             X       X           15x     2 x
Column x row                  3X3         X2                                           42
                   /              18 ,8            Column x row                   3X4     X2
      ,       /                                                      /             24 , 12
          /                  6X18 = 108                  ,       /

                                  237                        /                   6X24 = 144
kg/           2.2 kg./
                                                                                    316
                         /        864              kg/       2.2kg./         -
-

          X       X           x    2x    5

           /                      18
      /           /       6 X 18 = 108
                               860
                               237.6
kg/
                      X       2.25 X 5

              /                   8

                                  1.9
          10 kg/                  1.8
                          -
-
-

              X       X    15x     2 x
                                 42
              /                24
      /               /   6 X 24 = 144
                              1,280
                               317
kg/
                           2.4 X 7.6
X
                  /            12

                               3.8
          10 kg/               2.8
                           -
-


28,800          /

3,000       /

31,800          /

82      /

2,607,600           /
                        -
-
THE END


   -

More Related Content

Similar to Team service center engineering

App Credit Card Top Up
App Credit Card Top UpApp Credit Card Top Up
App Credit Card Top Upguest9a5535
 
4 g9x engine_manual
4 g9x engine_manual4 g9x engine_manual
4 g9x engine_manualdonlenzb
 
dte_q404irpack
dte_q404irpackdte_q404irpack
dte_q404irpackfinance41
 
dte_q404irpack
dte_q404irpackdte_q404irpack
dte_q404irpackfinance41
 
foss4g2009tokyo_Takasu_rtklib
foss4g2009tokyo_Takasu_rtklibfoss4g2009tokyo_Takasu_rtklib
foss4g2009tokyo_Takasu_rtklibOSgeo Japan
 

Similar to Team service center engineering (7)

dte_Q12005b
dte_Q12005bdte_Q12005b
dte_Q12005b
 
Acc
AccAcc
Acc
 
App Credit Card Top Up
App Credit Card Top UpApp Credit Card Top Up
App Credit Card Top Up
 
4 g9x engine_manual
4 g9x engine_manual4 g9x engine_manual
4 g9x engine_manual
 
dte_q404irpack
dte_q404irpackdte_q404irpack
dte_q404irpack
 
dte_q404irpack
dte_q404irpackdte_q404irpack
dte_q404irpack
 
foss4g2009tokyo_Takasu_rtklib
foss4g2009tokyo_Takasu_rtklibfoss4g2009tokyo_Takasu_rtklib
foss4g2009tokyo_Takasu_rtklib
 

Recently uploaded

DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamUiPathCommunity
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsNanddeep Nachan
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...apidays
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...apidays
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Victor Rentea
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityWSO2
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxRemote DBA Services
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesrafiqahmad00786416
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...apidays
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWERMadyBayot
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024The Digital Insurer
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...apidays
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businesspanagenda
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 

Recently uploaded (20)

DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 

Team service center engineering

  • 4. Team Service 1. PM Shelf Life 2. 3. Team Service 4. 5. 6. -
  • 5. 1. PM Shelf Life -
  • 6. 2. - - - - Drop - 9 - - -
  • 7. 3. Team Service Team Service -
  • 8. Team Service Team 3 3 BU+ TEAM A TEAM B / / / A B C - / - / Slat - / - / Control, Sensor, - / - / - / - / -
  • 9. Team Service Center A B 3 C 2 : + 10 5 2 km. D km. : A km. 15 km. E : B 3 Center km. 11 : E km. F 6 / 3 : 7 8 km. 12 G km. km. *** km. J I H Service -
  • 10. 3. Team Service Team Service -
  • 11. 1. 2. Box Alignment -
  • 12. -
  • 13. - Shelf - life - - - - - -
  • 14. 1. -
  • 15. 2. -
  • 16. 3. - Alignment - - -
  • 18. Nipple 2. - line - - -
  • 19. 1. Main Auger -
  • 20. 2. - Hoper - Pan - line - - - -
  • 21. - Hoper - Pan - line - - - -
  • 22. Alignment EVAP Action : Action : Action : Shelflife Action : Shelflife Auto cm. Alignment Alignment -
  • 23. …… …… ……… …. VOLT AMP POWER ROUND ........................................................ .................................................... .... ( ) ( ) -
  • 24. ( ) 1 ******** 1 MF-001-01 2 MF-001-01 3 MF-001-01 4 MF-001-01 5 MF-001-01 6 MF-001-01 7 MF-001-01 8 MF-001-01 9 LT-001-01 ........................................................ .................................................... .... ( ) ( ) -
  • 25. 4. Team A Team B -
  • 26. 4. Team A Team B MDB -
  • 27. 5. -
  • 28. 6. -
  • 30. Team Service PM MDB PM PM PM -
  • 32. -
  • 33. – -
  • 34. -
  • 35. 1. 2. 3. 4. , -
  • 36. / #2 / #1 , slat/ -
  • 37. , -
  • 38. 1 + , + 1 Detergent + + + + 5 7 7-14 m3 115 m3 2 + + Cooling 2 + + + + + + +Cooling+ + + + + 9 33 7 115 m3 7-14 m 3 7 2 115 m3 1 / 317- 331m3/ -
  • 39. + + Detergent + 1 + 1 7 + 115 m3 5 + + + 7-14 m3 + 2 + 2 + + + + +Cooling+ 7 5 115 m3 + + 7-14 m3 3 3 7 5 +115 m3 + 7-14 + 3 m + 4 9 4 + 115 m3 7 1 7-14 /m3 5 7 519-547 m3/ 115 m3 -
  • 40. 115 3 5 4 , 3 4 23 m3 / 5 37 -
  • 41. , , Y 80 - 50 - 115m3/ - - 4 -
  • 42. -
  • 43. -
  • 44. 833 / , 154 / 987 / -
  • 45. - - - -
  • 46. -
  • 47. - 5.5 kW 60 1 - 150 4 m3 bar 2 - 4 75 bar . 2 1. 30 lite 2. -
  • 48. 3 1. 2. 3. + - - Y120 5.5 kW 5.5 kW - - 150 - 150 5.5 kW bar bar low flow - 4 - 4 150 bar 75 75 low flow bar . bar . 40 bar 15 / 8.3 - 4 / / / 75 bar . 20 bar 8.3 / / 120 / / -
  • 49. 150 bar 150 bar : : 15 / : 8 : -
  • 50. - 1 m3 - detergent -
  • 51. - IP 65 2 set - ELCB -
  • 52. - 60 4 set - VCT 4X6 sq.mm 100 -
  • 53. -
  • 54. -
  • 55. -
  • 56. -
  • 57. 833 / , 154 / 987 / -
  • 58. Y80 3 set m3 / m3 / kW -
  • 59. 1 set m3/ m3/ kW Detergent -
  • 60. 2 set m3/ m3/ kW Detergent -
  • 61. Pump low flow 8 Y 120 m3/ m3/ kW Detergent -
  • 62. -
  • 63. Y80 3 set m3 / m3/ kW -
  • 64. 1 set pump 2 set m3 / m3 / kW Detergent -
  • 65. 2 set pump 2 set m3 / m3 / kW Detergent -
  • 66. 3 Pump low Flow 8 Y 120 pump 2 set m3/ m3/ kW Detergent -
  • 67. -
  • 68. 1,2 1.Body & Tank 60,000 2.Moter & Pump high 120,000 pressure 2 set 3. 20,000 ELCB 4. 100 m 20,000 Power plugs 5. 4 30,000 -
  • 69. 3 1.Body & Tank 60,000 2.Moter & Pump high 60,000 pressure 2 set 3. 20,000 ELCB 4. 100 m 20,000 Power plugs 5. 4 30,000 -
  • 70. 1 1 1 -
  • 71. 2 2 2 -
  • 72. 3 Pump low flow + Y 120 -
  • 73. 1 15 / 2 / 4 / = 275,000 x 4 1,100,000 -
  • 74. 2 8 / 3 / 4 / = 275,000 x 4 1,100,000 -
  • 75. 3 8 / + Y 120 3 823 772 / 4 / = 215,000 x 4 860,000 = 13 -
  • 76. -
  • 77. / 11 CPF WAY -
  • 78. THE END -
  • 79. – -
  • 80. , -
  • 81. 1. 2. 3. 4. , -
  • 82. 1 10,000 180 16 180 4 1 1,080 1,080 20 -
  • 83. 10,000 1080 10 / 10,000 1.5 / -
  • 84. 12 / 20 20 X 300 = 6,000 ( 6,000/8 X1.5)x1.5= 1,688 10 1,500 X 10 =15,000 + 1,000 X 5 = 5,000 4 / 2,200 X 4 = 8,800 / 36,488 36,488 1 / 1 12 = 437,856 / -
  • 85. 180 16 6 180 4 6 1,080 10 2,520 1,080 / 10 4 20 -
  • 86. 6 / 10 10 X X x X X x x 40 x 50 Column x row 3X4 X2 Column x row 3X5 X2 / 24 ,14 / 30 , 14 , / , / / 6X24 = 144 / 6X30 = 240 317 528 kg/ 2.2 kg./ -
  • 87. 6 X X x 2x 5 X X 15x 2 x Column x row 3X3 X2 42 / 18 ,8 Column x row 3X4 X2 , / / 24 , 12 / 6X18 = 108 , / 237 / 6X24 = 144 kg/ 2.2 kg./ 316 / 864 kg/ 2.2kg./ -
  • 88. 6 / (6) 2,01 5 40,3 (6) 6 65 2,52 4 32,2 0 92 (6) cm2 kg -
  • 89. -
  • 90. cm2 kg 2.2 -2.4 kg. -
  • 91. 2,250 4 / 10,000 2 -
  • 92. -
  • 93. -
  • 94. -
  • 95. -
  • 96. -
  • 97. -
  • 98. -
  • 99. -
  • 100. -
  • 101. -
  • 102. -
  • 103. -
  • 104. 2 17 2 2 34 1 12 1 2 2 24 6 12 2 7 2 24 *** 82 *** -
  • 105. 5 40,3 686,2 737,2 65 05 50% 05 OT 4 32,2 171,3 548,9 599,9 92 60 64 50% 64 OT -
  • 106. -
  • 107. 6 / 599,9 1,199,9 20,3 40,6 64 28 32 64 599,9 1,199,9 20,3 40,6 64 28 32 64 128,3 256,6 49 98 256,698 / -
  • 108. 6 / 256,698 / 691,000 256,698 /691,000 = 3 -
  • 109. 9 / 805,702 / 691,000 805,702/691,000 = 11 -
  • 110. cm2 kg 2.2 -2.4 kg. -
  • 111. 180 16 6 216 4 6 1,080 10 3,360 1,080 / 10 3 20 -
  • 112. 10 10 X X x X X x x 40 x 50 Column x row 3X4 X2 Column x row 3X5 X2 / 24 ,14 / 30 , 14 , / , / / 9X24 = 216 / 8X30 = 240 496 552 kg/ 2.3 kg./ kg/ 2.3kg./ -
  • 113. cm2 kg -
  • 115. 805,702 / -
  • 116. 805,702 / 691,000 805,702/691,000 = 11 -
  • 117. -
  • 118. 20 / 8 / 295,200 9 -
  • 119. Problem 1. 2. & / -
  • 120. & 6 X X x 2x 5 X X 15x 2 x Column x row 3X3 X2 42 / 18 ,8 Column x row 3X4 X2 , / / 24 , 12 / 6X18 = 108 , / 237 / 6X24 = 144 kg/ 2.2 kg./ 316 / 864 kg/ 2.2kg./ -
  • 121. - X X x 2x 5 / 18 / / 6 X 18 = 108 860 237.6 kg/ X 2.25 X 5 / 8 1.9 10 kg/ 1.8 -
  • 122. -
  • 123. - X X 15x 2 x 42 / 24 / / 6 X 24 = 144 1,280 317 kg/ 2.4 X 7.6 X / 12 3.8 10 kg/ 2.8 -
  • 124. - 28,800 / 3,000 / 31,800 / 82 / 2,607,600 / -
  • 125. -
  • 126. THE END -