Your SlideShare is downloading. ×
GE Business Consulting Challenge Presentation
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

GE Business Consulting Challenge Presentation

417

Published on

A powerpoint I put together for the Miami Business Consulting (MBC) Challenge presenting a new internal organization using an IT interface for a mock home generator product. Received praises from the …

A powerpoint I put together for the Miami Business Consulting (MBC) Challenge presenting a new internal organization using an IT interface for a mock home generator product. Received praises from the General Electric judges for presentation quality and won 3rd place overall.

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
417
On Slideshare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide
  • Home Fuel Cells are clearly profitable. However, you can see that we’re also saving nearly 4 million dollars by switching to an IT Interface system. This estimate was using current levels of late fees. However, more like that rate would rise as the system clogs, and more clerks would have to hired. Therefore, our actual saving would likely be much higher. This is more clearly shown when looking at our total expenses.
  • The lighter area is all the new IT costs. The gold are fax/phone costs, and late fees, our two target areas of reduction. You can see that the increase in IT costs is negligible compared to the reduction in faxing and late fees.
  • Transcript

    • 1. GE MicroGen
      Digitizing
    • 2. Supply Chain Six Step Process
      External
      Small Distributors
      Multinational
      Suppliers
      Distributors
      Interface
      IT Interface
      Internal
      Clerical
      Warehouse
    • 3. Step 1
    • 4. Step 2
    • 5. Step 3
    • 6. Step 4
    • 7. Step 5
    • 8. Step 6
    • 9. IT Interface
    • 10. Oracle Database
    • 11. Location
      Clerks
      Assigned
      Internal Management
    • 12. Internal Management
    • 13. Internal Management
    • 14. Financials
    • 15. Financials
    • 16. Implementation Strategy
      Set up IT System
    • 17. Presentation Credits

    ×