Product: EXCAVATOR
Model: M325D L MH EXCAVATOR KAY
Configuration: M325D L Material Handler KAY02000-UP (MACHINE) POWERED BY C7 Engine
Disassembly and Assembly
M325D Material Handler Machine Systems
Media Number -RENR9719-02 Publication Date -01/03/2011 Date Updated -16/03/2011
i02233131
Swing Drive - Assemble
SMCS - 5459-016
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 138-7573 Link Bracket 2
B 5P-5197 Pliers 1
E 138-7574 Link Bracket 2
F 138-7575 Link Bracket 3
G 5P-3931 Anti-Seize Compound 1
H 1U-8846 Gasket Sealant 1
J 9S-3263 Thread Lock Compound 1
K 1P-0520 Driver Gp 1
Note: Cleanliness is an important factor. Before assembly, all parts should be thoroughly cleaned
in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts.
Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If any parts are
worn or damaged, use new parts for replacement.
1/10
M325D L Material Handler KAY02000-UP (MACHINE) POWERED BY C7 Engine(...
2020/11/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. Illustration 1 g01126093
1. Use Tooling (K) to install lip seals (28) and O-ring seal (29) in bearing cage (27) .
Illustration 2 g01126367
Note: Lubricate the seals and the seal surface of the shaft with the lubricant that is being
sealed prior to installation of bearing cage (27) .
2. Install bearing cage (27) on pinion shaft (24) .
2/10
M325D L Material Handler KAY02000-UP (MACHINE) POWERED BY C7 Engine(...
2020/11/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. Illustration 3 g01126373
3. Raise the temperature of bearing (30). Install bearing (30) on pinion shaft (24) .
4. Install spacer (31) .
Illustration 4 g01126447
5. Raise the temperature of bearing (32). Install bearing (32) on pinion shaft (24) .
Illustration 5 g01126490
6. Use Tooling (B ) to install retaining ring (23) on pinion shaft (24) and against bearing (32) .
3/10
M325D L Material Handler KAY02000-UP (MACHINE) POWERED BY C7 Engine(...
2020/11/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. Illustration 6 g01126507
Note: Ensure that bearings (30) and (32) are aligned while pinion shaft (24) is positioned.
7. Apply Tooling (G) to the inside diameter of swing drive housing (25) .
8. Attach Tooling (F) and a suitable lifting device to pinion shaft (24) .
9. Lower the temperature of pinion shaft (24) .
10. Install pinion shaft (24) in swing drive housing (25). The weight of pinion shaft (24) is
approximately 50 kg (110 lb).
11. Remove Tooling (F) and the lifting device from pinion shaft (24). Attach Tooling (E) and a
suitable lifting device to swing drive housing (25). The combined weight of swing drive
housing (25), pinion shaft (24), and bearing cage (27) is approximately 151 kg (333 lb).
12. Lift the swing drive vertically. Use a hammer and a drift to align bearing (30) in the lower
bore of swing drive housing (25). When the bearing is properly aligned in the bore, pinion
shaft (24) will drop into the proper position within swing drive housing (25) .
Illustration 7 g01126601
13. ApplyTooling (H) on the threads of bolts (26) .
14. Install bolts (26) .
4/10
M325D L Material Handler KAY02000-UP (MACHINE) POWERED BY C7 Engine(...
2020/11/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. Illustration 8 g01125682
15. Use two people or a suitable lifting device to install ring gear (22). The weight of ring gear
(22) is approximately 46 kg (102 lb).
Illustration 9 g01125627
Illustration 10 g01125625
5/10
M325D L Material Handler KAY02000-UP (MACHINE) POWERED BY C7 Engine(...
2020/11/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. 16. Install bearings (20) in gear (19) .
17. Position thrust washers (21) on each side of gear (19). Install gear (19) in carrier assembly
(14). Install shaft (18) in carrier assembly (14) and through gear (19). Make sure that the pin
hole in shaft (18) is aligned with the pin hole in the carrier.
18. Install pin (17) in carrier assembly (14) and into shaft (18). Install pin (17) until pin (17) is
even with the outside surface of carrier assembly (14). Orient the split in the pin
horizontally to the carrier assembly. Align the split in the pin to the left or to the right.
Illustration 11 g00513451
19. Make a stake mark on each side of the hole for pin (17). This will prevent pin (17) from
falling out of the pin hole. Each stake mark should be approximately 1.5 mm (0.06 inch)
from the outside diameter of the pin hole.
20. Repeat Steps 16 through 19 in order to install the remaining three gears (19) .
6/10
M325D L Material Handler KAY02000-UP (MACHINE) POWERED BY C7 Engine(...
2020/11/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. Illustration 12 g01125623
21. Use a suitable lifting device to install carrier assembly (14) in ring gear (22). The weight of
carrier assembly (14) is approximately 39 kg (86 lb).
Illustration 13 g01125545
22. Install retaining ring (16) in carrier assembly (14) .
23. Install spacer (15) .
Illustration 14 g01125491
24. Install retaining ring (13) in gear (12) .
7/10
M325D L Material Handler KAY02000-UP (MACHINE) POWERED BY C7 Engine(...
2020/11/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. Illustration 15 g01125481
25. Install gear (12). Install retaining ring (11) .
Illustration 16 g01125464
Illustration 17 g01125347
26. Install bearing (9) in gear (8) .
8/10
M325D L Material Handler KAY02000-UP (MACHINE) POWERED BY C7 Engine(...
2020/11/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. 27. Position thrust washers (10) on each side of gear (8). Install gear (8) and thrust washers (10)
in carrier assembly (4). Install shaft (6) in carrier assembly (4) and through gear (8). Make
sure that the pin hole in shaft (6) is aligned with the pin hole in carrier assembly (4) .
28. Install pin (7) in carrier assembly (4) and into shaft (6). Install pin (7) until pin (7) is even
with the outside surface of carrier assembly (4). Orient the split in pin (7) horizontally to
carrier assembly (4). Align the split in pin (7) to the left or to the right.
Illustration 18 g00513451
29. Make a stake mark on each side of the pin hole in carrier assembly (4). This will prevent
spring (7) from falling out of the pin hole. Each stake mark should be approximately 1.5
mm (0.06 inch) from the outside diameter of the pin hole.
30. Repeat Steps 24 through 29 in order to install the remaining three planetary gears in the
carrier assembly.
31. Install sun gear (5) in carrier assembly (4) .
9/10
M325D L Material Handler KAY02000-UP (MACHINE) POWERED BY C7 Engine(...
2020/11/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
12. Illustration 19 g01125227
32. Use a suitable lifting device or two people to install carrier assembly (4). The weight of
carrier assembly (4) is approximately 23 kg (50 lb).
Illustration 20 g01125185
33. Apply Tooling (H) on the flange surfaces of the ring gear and cover (2) .
34. Use Tooling (A) and a suitable lifting device to position cover (2) on the swing drive.
Illustration 21 g01126965
35. Apply Tooling (J) on the thread of bolts (1). Install bolts (1). Tighten bolts (1) to a torque of
270 ± 40 N·m (200 ± 30 lb ft).
End By: Install the swing drive. Refer to Disassembly and Assembly, "Swing Drive - Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Tue Nov 17 10:13:05 UTC+0800 2020
10/10
M325D L Material Handler KAY02000-UP (MACHINE) POWERED BY C7 Engi...
2020/11/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: M325D L MH EXCAVATOR KAY
Configuration: M325D L Material Handler KAY02000-UP (MACHINE) POWERED BY C7 Engine
Disassembly and Assembly
M325D Material Handler Machine Systems
Media Number -RENR9719-02 Publication Date -01/03/2011 Date Updated -16/03/2011
i02229749
Swing Drive - Install
SMCS - 5459-012
Installation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A
132-8223 Hydraulic Pump and Motor Gp 1
1U-6221 Hydraulic Torque Wrench Gp 1
132-8143 Wrench Link 1
B 138-7573 Link Bracket 2
D 5P-3931 Anti-Seize Compound 1
E 1U-8846 Gasket Sealant 1
F 9S-3263 Thread Lock Compound 1
1. Apply Tooling (D) on the locating pin in the main frame. Also, apply Tooling (D) in the pin
bore in the main frame.
2. Apply Tooling (E) on the mating surface of the main frame and the swing drive housing.
1/2
M325D L Material Handler KAY02000-UP (MACHINE) POWERED BY C7 Engine(...
2020/11/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. Illustration 1 g00900976
Illustration 2 g00518158
3. Attach Tooling (B) and a suitable lifting device to swing drive (2). The weight of swing
drive (2) is approximately 310 kg (683 lb). Use Tooling (B) and the suitable lifting device to
position swing drive (2) on the machine.
4. Apply Tooling (F) on the threads of bolts (1). Install bolts (1). Tighten bolts (1) with
Tooling (A) .
5. Fill swing drive (2) with oil. Refer to Operation and Maintenance Manual, "Swing Drive Oil
- Check".
End By: Install the swing motor. Refer to Disassembly and Assembly, "Swing Motor - Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Tue Nov 17 10:14:01 UTC+0800 2020
2/2
M325D L Material Handler KAY02000-UP (MACHINE) POWERED BY C7 Engine(...
2020/11/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: M325D L MH EXCAVATOR KAY
Configuration: M325D L Material Handler KAY02000-UP (MACHINE) POWERED BY C7 Engine
Disassembly and Assembly
M325D Material Handler Machine Systems
Media Number -RENR9719-02 Publication Date -01/03/2011 Date Updated -16/03/2011
i02291905
Upper Frame and Undercarriage Frame - Separate
SMCS - 4150-076; 7051-076
Separation Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A
8S-7641 Tube 2
8S-8048 Saddle 2
8S-7615 Pin 4
8S-7625 Collar 2
4C-6486 Stand 2
8S-7650 Cylinder As 2
4C-5809 Electric Hydraulic Pump Gp 1
B FT-3013 Link Assembly 1
C FT-2765 Support Beam As 1
D 8S-7641 Tube 2
8S-8048 Saddle 2
8S-7615 Pin 4
4C-5809 Electric Hydraulic Pump Gp 1
8S-7625 Collar 2
4C-6486 Stand 2
1/6
M325D L Material Handler KAY02000-UP (MACHINE) POWERED BY C7 Engine(...
2020/11/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. 8S-7650 Cylinder As 2
E
132-8112 Torque Wrench Gp 1
132-8223 Hydraulic Pump and Motor Gp 1
Start By:
A. Remove the stick. Refer to Disassembly and Assembly, "Stick - Remove".
Note: Put identification marks on all hose assemblies and on all tube assemblies for installation
purposes.
1. Park the machine on level ground. Turn the upper frame to a 90 degree angle from the
undercarriage.
2. Remove the front drive shaft and the rear drive shaft. Refer to Disassembly and Assembly,
"Drive Shaft - Remove and Install".
Illustration 1 g01147594
3. Use the hydraulics of the machine to retract cylinders (1). Use a suitable lifting device to
reposition stick cylinder pin (4) in boom (2). The weight of stick cylinder pin (4) is
approximately 54 kg (120 lb). Install plates (3) .
4. Remove the swivel. Refer to Disassembly and Assembly, "Swivel - Remove".
2/6
M325D L Material Handler KAY02000-UP (MACHINE) POWERED BY C7 Engine(...
2020/11/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. Illustration 2 g01147596
5. Position Tooling (A) below stick cylinder pin (4) .
6. Remove the left side boom cylinder. Refer to Disassembly and Assembly, "Boom Cylinder -
Remove and Install".
Illustration 3 g01147597
7. Use a suitable lifting device to position Tooling (B). The weight of Tooling (B) is
approximately 227 kg (500 lb). Install pin (5). Reposition pin (7) and install plate (6) .
3/6
M325D L Material Handler KAY02000-UP (MACHINE) POWERED BY C7 Engine(...
2020/11/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
18. Illustration 4 g01147599
8. Use a suitable lifting device to position Tooling (C) onto Tooling (D). The weight of
Tooling (C) is approximately 227 kg (500 lb).
Illustration 5 g01147598
9. Position Tooling (C) and Tooling (D) beneath counterweight (8) in order to support
counterweight (8) during the separation procedure.
4/6
M325D L Material Handler KAY02000-UP (MACHINE) POWERED BY C7 Engine(...
2020/11/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
19. Illustration 6 g01147600
10. Disconnect tube assembly (9) .
Illustration 7 g01147601
Note: Note the orientation of bolts (10) for installation purposes.
11. Use Tooling (E) to remove bolts (10) .
Illustration 8 g01147772
5/6
M325D L Material Handler KAY02000-UP (MACHINE) POWERED BY C7 Engine(...
2020/11/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. 12. Use Tooling (C) and Tooling (D) to raise upper frame (11) in 6.4 mm (0.25 inch)
increments. Raise upper frame (11) enough for pinion gear (12) to clear swing bearing (13) .
13. Use a properly rated machine to pull undercarriage frame (14) from underneath upper frame
(11) .
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Tue Nov 17 10:14:56 UTC+0800 2020
6/6
M325D L Material Handler KAY02000-UP (MACHINE) POWERED BY C7 Engine(...
2020/11/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
21. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: M325D L MH EXCAVATOR KAY
Configuration: M325D L Material Handler KAY02000-UP (MACHINE) POWERED BY C7 Engine
Disassembly and Assembly
M325D Material Handler Machine Systems
Media Number -RENR9719-02 Publication Date -01/03/2011 Date Updated -16/03/2011
i02292929
Upper Frame and Undercarriage Frame - Connect
SMCS - 4150-077; 7051-077
Connection Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A
8S-7641 Tube 2
8S-8048 Saddle 2
8S-7615 Pin 4
8S-7625 Collar 2
4C-6486 Stand 2
8S-7650 Cylinder As 2
4C-5809 Electric Hydraulic Pump Gp 1
B FT-3013 Link Assembly 1
C FT-2765 Support Beam As 1
D 8S-7641 Tube 2
8S-8048 Saddle 2
8S-7615 Pin 4
4C-5809 Electric Hydraulic Pump Gp 1
8S-7625 Collar 2
4C-6486 Stand 2
1/6
M325D L Material Handler KAY02000-UP (MACHINE) POWERED BY C7 Engine(...
2020/11/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. 8S-7650 Cylinder As 2
E
132-8112 Torque Wrench Gp 1
132-8223 Hydraulic Pump and Motor Gp 1
F 1U-8846 Gasket Sealant 3
G 5P-3931 Anti-Seize Compound 1
Illustration 1 g01147825
1. Apply Tooling (F) to gear and bearing (16). Apply Tooling (G) to dowel hole (15) .
Illustration 2 g01147772
Note: A locating dowel is used to align the upper frame with the undercarriage frame. Make
sure that the dowel is in position in the undercarriage frame prior to installation. Make sure
that pinion gear (12) is properly aligned with swing bearing (13) prior to installation.
2. Use a properly rated machine to pull undercarriage frame (14) under upper frame (11).
3. Use Tooling (C) and Tooling (D) to lower upper frame (11) onto undercarriage frame (14).
Lower upper frame (11) in 6.4 mm (0.25 inch) increments.
2/6
M325D L Material Handler KAY02000-UP (MACHINE) POWERED BY C7 Engine(...
2020/11/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
24. Illustration 3 g01147601
4. Use Tooling (E) to install bolts (10). Tighten bolts (10) to a torque of 900 ± 100 N·m (664 ±
74 lb ft).
Illustration 4 g01147600
5. Connect tube assembly (9) .
3/6
M325D L Material Handler KAY02000-UP (MACHINE) POWERED BY C7 Engine(...
2020/11/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
25. Illustration 5 g01147599
6. Attach a suitable lifting device to Tooling (C). The weight of Tooling (C) is approximately
227 kg (500 lb).
Illustration 6 g01147597
7. Remove pin (5). Remove plate (6). Reposition pin (7). Remove Tooling (B) .
8. Install the right side boom cylinder. Refer to Disassembly and Assembly, "Boom Cylinder -
Remove and Install".
4/6
M325D L Material Handler KAY02000-UP (MACHINE) POWERED BY C7 Engine(...
2020/11/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
26. Illustration 7 g01147596
9. Remove Tooling (A) from stick cylinder pin (4) .
Illustration 8 g01147594
Note: Cylinders (1) were retracted during the separation procedure.
10. Attach a suitable lifting device to stick cylinder pin (4). The weight of stick cylinder pin (4)
is approximately 54 kg (120 lb). Remove stick cylinder pin (4) from boom (2) .
11. Install the swivel. Refer to Disassembly and Assembly, "Swivel - Install".
End By:
a. Install the front drive shaft and the rear drive shaft. Refer to Disassembly and Assembly,
"Drive Shaft - Remove and Install".
b. Install the stick. Refer to Disassembly and Assembly, "Stick - Install".
Tue Nov 17 10:15:52 UTC+0800 2020
5/6
M325D L Material Handler KAY02000-UP (MACHINE) POWERED BY C7 Engine(...
2020/11/17
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...