This document provides instructions for disassembling and assembling the final drive of an excavator. Key steps include:
1. Removing the final drive assembly and disassembling its internal components like gears, shafts, and housings.
2. Cleaning all parts thoroughly before assembly to prevent dirt from entering mechanisms.
3. Assembling the components in reverse order, applying anti-seize compound and seals using special tools, and setting bearing preload using shims to achieve the correct clearance.
This document provides instructions for disassembling and assembling the final drive of an excavator. It lists the required tools and parts. The multi-step process involves removing components like gears, shafts, seals and housings. Special tools are used to remove retaining rings and install new seals. Cleanliness is emphasized throughout to prevent dirt contamination. Components are to be cleaned, inspected, and new parts replaced if worn. Proper torque and alignment marks are important for reassembly.
This document provides instructions for assembling the final drive of an excavator model 329D L. It lists the required tools and parts. The procedure involves installing bearings in the main housing and motor housing using a press to apply the proper preload. Shims are used to take up any clearance between the housings. Duo-Cone seals are installed in the housings using a special tool. Cleanliness is emphasized throughout the assembly process.
This document provides instructions for disassembling and assembling the final drive of an excavator. It lists the required tools and parts. The multi-step process involves removing components like gears, shafts, seals and housings. Special tools are used to remove retaining rings and install new seals. Proper cleaning and lubrication of parts is emphasized. Torque specifications and alignment marks are noted to ensure correct reassembly.
This document provides instructions for assembling the final drive of an excavator model 329D L. It lists the required tools and parts. The procedure involves installing bearings in the main housing and motor housing using a press to apply the proper preload. Shims are used to take up any clearance between the housings. Duo-Cone seals are installed in the housings using a special tool. Cleanliness is emphasized throughout the assembly process.
This document provides instructions for disassembling and assembling the final drive of an excavator. It lists the required tools and parts. The multi-step process involves removing components like gears, shafts, seals and housings. Special tools are used to remove retaining rings and install new seals. Cleanliness is emphasized throughout to prevent dirt contamination. Components are to be cleaned, inspected, and new parts replaced if worn. Proper torque and alignment marks are important for reassembly.
This document provides instructions for assembling the final drive of an excavator model 329D L. It lists the required tools and parts. The procedure involves installing bearings in the main housing and motor housing using a press to apply the proper preload. Shims are used to take up any clearance between the housings. Duo-Cone seals are installed in the housings using a special tool. Cleanliness is emphasized throughout the assembly process.
Caterpillar cat 324 d l excavator (prefix pyt) service repair manual (pyt0000...fhhsjdkmem
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The multi-step process involves removing components such as gears, shafts, seals and housings. Cleanliness is emphasized. Tools including link brackets and seal installers are listed. Bearings are pressed into place and shim thickness is determined to set proper bearing preload. Seals are installed using a special tool. Anti-seize compound is applied to surfaces.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...f7fujksekmdm8u
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. It lists 37 steps for disassembly, removing components like gears, shafts, seals and housings. It then lists 7 steps for assembly, including installing bearings, determining the correct shim thickness to preload the bearings, and reinstalling components in reverse order of disassembly. Cleanliness is emphasized throughout and tools including various link brackets and eyebolts are listed.
This document provides instructions for disassembling and assembling the final drive of an excavator. It lists the required tools and parts. The multi-step process involves removing components like gears, shafts, seals and housings. Special tools are used to remove retaining rings and install new seals. Cleanliness is emphasized throughout to prevent dirt contamination. Components are to be cleaned, inspected, and new parts replaced if worn. Proper torque and alignment marks are important for reassembly.
This document provides instructions for assembling the final drive of an excavator model 329D L. It lists the required tools and parts. The procedure involves installing bearings in the main housing and motor housing using a press to apply the proper preload. Shims are used to take up any clearance between the housings. Duo-Cone seals are installed in the housings using a special tool. Cleanliness is emphasized throughout the assembly process.
This document provides instructions for disassembling and assembling the final drive of an excavator. It lists the required tools and parts. The multi-step process involves removing components like gears, shafts, seals and housings. Special tools are used to remove retaining rings and install new seals. Proper cleaning and lubrication of parts is emphasized. Torque specifications and alignment marks are noted to ensure correct reassembly.
This document provides instructions for assembling the final drive of an excavator model 329D L. It lists the required tools and parts. The procedure involves installing bearings in the main housing and motor housing using a press to apply the proper preload. Shims are used to take up any clearance between the housings. Duo-Cone seals are installed in the housings using a special tool. Cleanliness is emphasized throughout the assembly process.
This document provides instructions for disassembling and assembling the final drive of an excavator. It lists the required tools and parts. The multi-step process involves removing components like gears, shafts, seals and housings. Special tools are used to remove retaining rings and install new seals. Cleanliness is emphasized throughout to prevent dirt contamination. Components are to be cleaned, inspected, and new parts replaced if worn. Proper torque and alignment marks are important for reassembly.
This document provides instructions for assembling the final drive of an excavator model 329D L. It lists the required tools and parts. The procedure involves installing bearings in the main housing and motor housing using a press to apply the proper preload. Shims are used to take up any clearance between the housings. Duo-Cone seals are installed in the housings using a special tool. Cleanliness is emphasized throughout the assembly process.
Caterpillar cat 324 d l excavator (prefix pyt) service repair manual (pyt0000...fhhsjdkmem
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The multi-step process involves removing components such as gears, shafts, seals and housings. Cleanliness is emphasized. Tools including link brackets and seal installers are listed. Bearings are pressed into place and shim thickness is determined to set proper bearing preload. Seals are installed using a special tool. Anti-seize compound is applied to surfaces.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...f7fujksekmdm8u
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. It lists 37 steps for disassembly, removing components like gears, shafts, seals and housings. It then lists 7 steps for assembly, including installing bearings, determining the correct shim thickness to preload the bearings, and reinstalling components in reverse order of disassembly. Cleanliness is emphasized throughout and tools including various link brackets and eyebolts are listed.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...jdkskmdmdm
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The multi-step process involves removing components such as gears, shafts, seals and housings. Cleanliness is emphasized. Tools including link brackets and seal installers are listed. Bearings are pressed into place and shims are used to set proper clearance. Seals are installed using a special tool. Anti-seize compound is applied to surfaces. Proper torque values are specified for fasteners.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...8ufjsekddm8u
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. It lists 37 steps for disassembly, removing components like gears, shafts, seals and housings. It then lists 7 steps for assembly, including pressing bearings into place, determining the correct shim thickness, and installing seals and other components. Cleanliness is stressed as important throughout the process. Required tools include link brackets, retaining ring pliers, and a duo-cone seal installer.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual Instant D...rishang96299
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...ufjksemd8ujd
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual Instant D...shanruliu7360
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual Instant D...kubei069369925
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. It lists 37 steps to fully disassemble the final drive, removing components like gears, shafts, carriers, and housings. It then lists 10 steps to reassemble the final drive, including pressing bearings into place, measuring shim thickness, and installing seals using special tools. Cleanliness is emphasized throughout to prevent damage during reassembly.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...f8uesjdkdmdm
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...prmy389342
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. It lists 37 steps to fully disassemble the final drive, removing components like gears, shafts, carriers, and housings. It then lists 10 steps to reassemble the final drive, including pressing bearings into place, measuring clearances, installing seals, and reattaching housings and gears. Cleanliness is emphasized throughout and special tools are listed.
Caterpillar cat 324 d l excavator (prefix pyt) service repair manual (pyt0000...udjdkdkdmm
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...km7seydwuhdw
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The multi-step process involves removing components such as gears, shafts, seals and housings. Cleanliness is emphasized. Tools including link brackets and seal installers are listed. Bearings are pressed into place and shim thickness is determined to set proper bearing preload. Seals are installed using a special tool. Anti-seize compound is applied to surfaces.
Caterpillar cat 324 d l excavator (prefix pyt) service repair manual (pyt0000...jfksekmmdme
This document provides instructions for assembling the final drive of a 324D L excavator. It outlines 30 steps, including installing bearings and seals, determining the correct shim thickness, and joining the main housing to the motor housing. Cleanliness is emphasized throughout the assembly process to prevent contamination. Various tools are required, and components should be lubricated before assembly.
The document provides instructions for disassembling and assembling the final drive of an excavator. It lists the necessary tools and parts. The 27 step disassembly process removes components like gears, shafts, seals and housings. The 36 step assembly process installs these components in reverse order, noting that cleanliness is important and new seals and shims should be used. Precise alignment of parts and use of press tools is required to reassemble the final drive.
This document provides instructions for assembling the final drive of an excavator model 329D L. It lists the required tools and parts. The procedure involves installing bearings and seals, determining the correct shim thickness, and reassembling components like the main housing, motor housing, and coupling gear. Cleanliness is emphasized throughout to prevent contamination.
The document provides instructions for disassembling and assembling the final drive of an excavator. It lists the necessary tools and parts. The 27 step disassembly process removes components like gears, shafts, seals and housings. The 36 step assembly process installs these components in reverse order, noting that cleanliness is important and new seals and shims should be used. Precise alignment of parts and use of press tools are required to reassemble the final drive.
This document provides instructions for assembling the final drive of an excavator model 329D L. It lists the required tools and parts. The procedure involves installing bearings and seals, determining the correct shim thickness, and reassembling components like the main housing, motor housing, and coupling gear. Cleanliness is emphasized throughout to prevent contamination.
The document provides instructions for disassembling and assembling the final drive of an excavator. It lists the necessary tools and parts. The 27 step disassembly process removes components like gears, shafts, seals and housings. The 36 step assembly process installs these components in reverse order, noting that cleanliness is important and new seals and shims should be used. Precise alignment of parts and use of press tools is required to reassemble the final drive.
Caterpillar Cat 330C FM EXCAVATOR (Prefix B4N) Service Repair Manual Instant ...yan77xunhao
This document provides instructions for servicing components of a Caterpillar 330C FM Excavator engine, including:
- Installing the cylinder head, which involves positioning a new gasket, attaching lifting tools to the cylinder head, applying anti-seize compound to bolts, and tightening bolts in a specific sequence.
- Removing and installing the camshaft, which requires removing other components like the rocker arm first, ensuring timing marks are aligned, and lubricating the camshaft lobes during installation.
- Removing and installing the camshaft gear by pressing it off the camshaft, aligning the keyway, and heating the gear to the proper temperature during installation.
The document provides instructions for disassembling a transmission (power shift) from a 416E Backhoe Loader. It lists required tools and outlines 25 steps to remove the transmission, including draining fluids, disconnecting electrical and hydraulic connections, removing mounting hardware, and lifting the transmission off with a hydraulic jack. The transmission weighs approximately 255 kg (562 lb) and special care must be taken when handling it and containing any fluids.
CASE CX700 CRAWLER EXCAVATOR Service Repair Manual Instant Download.pdfyan77xunhao
CASE/AKCELA hydraulic fluid is recommended for use in the hydraulic system. The specific fluid to use depends on the ambient temperature range. For temperate climates from -20°C to +40°C, use CASE/AKCELA HYDRAULIC EXCAVATOR FLUID. For hot climates from 0°C to +50°C, use CASE/AKCELA AW HYDRAULIC FLUID 68 HV.
This document provides assembly instructions for a transmission in a 434E backhoe loader. It lists required tools and gives step-by-step instructions for assembling major transmission components like gears, shafts, bearings, springs and seals. Proper cleaning and lubrication of parts is emphasized. Safety notes warn of risks from improper handling of spring-loaded components.
The document provides instructions for removing and installing the boom on a 420F Backhoe Loader. It describes:
1) Disconnecting hoses and removing pins/bolts to separate the boom from the loader.
2) Using pullers and lifting devices to remove bearings and the boom cylinder.
3) Reversing the process to install the new or repaired boom by pressing in bearings and reattaching components.
This document provides instructions for removing and installing fuel injection nozzles on a Caterpillar 3054 engine. It describes:
- Removing fuel injection lines before removing nozzles
- Loosening the threaded nut and removing the nozzle and seat washer from the cylinder block
- Cleaning parts and installing a new seat washer before installing the nozzle
- Carefully tightening the nut to the specified torque
More Related Content
Similar to Caterpillar Cat 325D, 325D L and 325D LN Excavator (Prefix PKE) Service Repair Manual Instant Download.pdf
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...jdkskmdmdm
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The multi-step process involves removing components such as gears, shafts, seals and housings. Cleanliness is emphasized. Tools including link brackets and seal installers are listed. Bearings are pressed into place and shims are used to set proper clearance. Seals are installed using a special tool. Anti-seize compound is applied to surfaces. Proper torque values are specified for fasteners.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...8ufjsekddm8u
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. It lists 37 steps for disassembly, removing components like gears, shafts, seals and housings. It then lists 7 steps for assembly, including pressing bearings into place, determining the correct shim thickness, and installing seals and other components. Cleanliness is stressed as important throughout the process. Required tools include link brackets, retaining ring pliers, and a duo-cone seal installer.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual Instant D...rishang96299
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...ufjksemd8ujd
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual Instant D...shanruliu7360
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual Instant D...kubei069369925
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. It lists 37 steps to fully disassemble the final drive, removing components like gears, shafts, carriers, and housings. It then lists 10 steps to reassemble the final drive, including pressing bearings into place, measuring shim thickness, and installing seals using special tools. Cleanliness is emphasized throughout to prevent damage during reassembly.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...f8uesjdkdmdm
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...prmy389342
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. It lists 37 steps to fully disassemble the final drive, removing components like gears, shafts, carriers, and housings. It then lists 10 steps to reassemble the final drive, including pressing bearings into place, measuring clearances, installing seals, and reattaching housings and gears. Cleanliness is emphasized throughout and special tools are listed.
Caterpillar cat 324 d l excavator (prefix pyt) service repair manual (pyt0000...udjdkdkdmm
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The assembly procedure involves 37 steps and requires various tools. Key steps include pressing bearings into housings, measuring bearing preload, installing seals using special tools, and applying anti-seize compound to surfaces. Cleanliness is emphasized throughout to prevent contamination.
Caterpillar Cat 324D L Excavator (Prefix PYT) Service Repair Manual (PYT00001...km7seydwuhdw
This document provides instructions for disassembling and assembling the final drive of a 324D L Excavator. The multi-step process involves removing components such as gears, shafts, seals and housings. Cleanliness is emphasized. Tools including link brackets and seal installers are listed. Bearings are pressed into place and shim thickness is determined to set proper bearing preload. Seals are installed using a special tool. Anti-seize compound is applied to surfaces.
Caterpillar cat 324 d l excavator (prefix pyt) service repair manual (pyt0000...jfksekmmdme
This document provides instructions for assembling the final drive of a 324D L excavator. It outlines 30 steps, including installing bearings and seals, determining the correct shim thickness, and joining the main housing to the motor housing. Cleanliness is emphasized throughout the assembly process to prevent contamination. Various tools are required, and components should be lubricated before assembly.
The document provides instructions for disassembling and assembling the final drive of an excavator. It lists the necessary tools and parts. The 27 step disassembly process removes components like gears, shafts, seals and housings. The 36 step assembly process installs these components in reverse order, noting that cleanliness is important and new seals and shims should be used. Precise alignment of parts and use of press tools is required to reassemble the final drive.
This document provides instructions for assembling the final drive of an excavator model 329D L. It lists the required tools and parts. The procedure involves installing bearings and seals, determining the correct shim thickness, and reassembling components like the main housing, motor housing, and coupling gear. Cleanliness is emphasized throughout to prevent contamination.
The document provides instructions for disassembling and assembling the final drive of an excavator. It lists the necessary tools and parts. The 27 step disassembly process removes components like gears, shafts, seals and housings. The 36 step assembly process installs these components in reverse order, noting that cleanliness is important and new seals and shims should be used. Precise alignment of parts and use of press tools are required to reassemble the final drive.
This document provides instructions for assembling the final drive of an excavator model 329D L. It lists the required tools and parts. The procedure involves installing bearings and seals, determining the correct shim thickness, and reassembling components like the main housing, motor housing, and coupling gear. Cleanliness is emphasized throughout to prevent contamination.
The document provides instructions for disassembling and assembling the final drive of an excavator. It lists the necessary tools and parts. The 27 step disassembly process removes components like gears, shafts, seals and housings. The 36 step assembly process installs these components in reverse order, noting that cleanliness is important and new seals and shims should be used. Precise alignment of parts and use of press tools is required to reassemble the final drive.
Similar to Caterpillar Cat 325D, 325D L and 325D LN Excavator (Prefix PKE) Service Repair Manual Instant Download.pdf (16)
Caterpillar Cat 330C FM EXCAVATOR (Prefix B4N) Service Repair Manual Instant ...yan77xunhao
This document provides instructions for servicing components of a Caterpillar 330C FM Excavator engine, including:
- Installing the cylinder head, which involves positioning a new gasket, attaching lifting tools to the cylinder head, applying anti-seize compound to bolts, and tightening bolts in a specific sequence.
- Removing and installing the camshaft, which requires removing other components like the rocker arm first, ensuring timing marks are aligned, and lubricating the camshaft lobes during installation.
- Removing and installing the camshaft gear by pressing it off the camshaft, aligning the keyway, and heating the gear to the proper temperature during installation.
The document provides instructions for disassembling a transmission (power shift) from a 416E Backhoe Loader. It lists required tools and outlines 25 steps to remove the transmission, including draining fluids, disconnecting electrical and hydraulic connections, removing mounting hardware, and lifting the transmission off with a hydraulic jack. The transmission weighs approximately 255 kg (562 lb) and special care must be taken when handling it and containing any fluids.
CASE CX700 CRAWLER EXCAVATOR Service Repair Manual Instant Download.pdfyan77xunhao
CASE/AKCELA hydraulic fluid is recommended for use in the hydraulic system. The specific fluid to use depends on the ambient temperature range. For temperate climates from -20°C to +40°C, use CASE/AKCELA HYDRAULIC EXCAVATOR FLUID. For hot climates from 0°C to +50°C, use CASE/AKCELA AW HYDRAULIC FLUID 68 HV.
This document provides assembly instructions for a transmission in a 434E backhoe loader. It lists required tools and gives step-by-step instructions for assembling major transmission components like gears, shafts, bearings, springs and seals. Proper cleaning and lubrication of parts is emphasized. Safety notes warn of risks from improper handling of spring-loaded components.
The document provides instructions for removing and installing the boom on a 420F Backhoe Loader. It describes:
1) Disconnecting hoses and removing pins/bolts to separate the boom from the loader.
2) Using pullers and lifting devices to remove bearings and the boom cylinder.
3) Reversing the process to install the new or repaired boom by pressing in bearings and reattaching components.
This document provides instructions for removing and installing fuel injection nozzles on a Caterpillar 3054 engine. It describes:
- Removing fuel injection lines before removing nozzles
- Loosening the threaded nut and removing the nozzle and seat washer from the cylinder block
- Cleaning parts and installing a new seat washer before installing the nozzle
- Carefully tightening the nut to the specified torque
Caterpillar Cat 345B Series II Excavator (Prefix CCC) Service Repair Manual I...yan77xunhao
The document provides instructions for removing and installing the rocker shaft, pushrods, cylinder head, and related components on a 345B Series II Excavator with a 3176C engine. The removal procedure involves disconnecting sensors, tubes, and wiring before removing bolts and lifting off the cylinder head. The installation procedure specifies cleaning mating surfaces, installing new gaskets and seals, and using guide bolts to position the cylinder head before reconnecting components.
This document provides instructions for removing the cylinder head from a Caterpillar 3054C engine. The steps include:
1. Draining the coolant and engine oil from the engine oil cooler.
2. Removing the air filter hose.
3. Removing any attached components to the cylinder head like the valve cover, rocker arms, pushrods, etc.
4. Removing the cylinder head bolts and removing the cylinder head.
The document provides instructions for disassembling and assembling components of the control valve for an excavator model 385B. It describes 25 steps to disassemble parts like actuators, manifolds, solenoids, valves, seals and more. The assembly section outlines 14 steps and provides warnings to properly install spring-loaded parts to prevent injury. Precautions are noted to clean parts and check for wear before reassembly.
Caterpillar Cat 385C and 385C L Excavator (Prefix JCM) Service Repair Manual ...yan77xunhao
This document provides instructions for disassembling and assembling the final drive of a 385C excavator. It lists 34 steps for disassembly, removing components like housing covers, gears, shafts and seals. It notes the importance of cleanliness. For assembly, it lists 1 step to reassemble the final drive on a repair stand and cribbing, referring to other assembly instructions. Tools, torque specs and notes on lubrication and seals are provided. The goal is to disassemble, clean, inspect for wear, replace worn parts, and reassemble the final drive while maintaining cleanliness.
This document provides instructions for disassembling and assembling the final drive of a 385B excavator. It describes:
1) Removing over 30 components of the final drive including gears, shafts, housings and seals using various tools.
2) Cleaning and inspecting parts prior to assembly.
3) Assembling the components in reverse order, applying lubricants to bearings and sealing surfaces.
4) Using tools and procedures to properly set bearing preload when installing the main housing.
Caterpillar Cat 385B and 385B L Excavator (Prefix FDL) Service Repair Manual ...yan77xunhao
This document provides instructions for disassembling and assembling the final drive of an excavator model 385B.
The disassembly procedure involves removing 27 parts in a specific sequence, including removing the ring gear, carrier assemblies, gears, shafts and seals. The assembly procedure instructs installing 31 parts in reverse order, and describes determining the correct shim thickness between the bearing cone and coupling gear to achieve proper bearing preload. Special tools are required for several steps.
Caterpillar Cat 374F L Excavator (Prefix AP4) Service Repair Manual Instant D...yan77xunhao
This document provides instructions for disassembling and assembling the final drive of a 374F L Excavator. It lists the required tools and parts. The disassembly process involves removing components like the final drive cover, ring gear, carrier assemblies, gears, shafts and housings. The assembly process specifies cleaning parts, applying sealant, installing bearings and seals, and adjusting bearing preload using shims. Precautions are given for using hydraulic cylinders and puller studs during the assembly process.
This document provides instructions for disassembling and assembling the governor and fuel injection pump housing of a 3306 vehicular engine. It describes removing over 30 individual parts in 12 steps to disassemble the governor. It then describes assembling the governor in 35 steps, noting to clean and oil all parts before assembly.
This document provides instructions for removing and installing various engine components on a Caterpillar 3054C engine, including:
- Lifter group
- Camshaft
- Camshaft bearings
- Engine oil pan
- Piston cooling jets
The instructions include lists of required tools, step-by-step procedures, torque specifications, and cautions to keep parts clean and properly support components.
The document provides instructions for removing and disassembling the transmission of a 428D Backhoe Loader. It describes 19 steps to disassemble the transmission into its major components which include removing valve groups, filters, shafts, seals and gaskets. Special tools are required and cleanliness is important when disassembling the transmission.
The document provides instructions for removing the bank valve from a 420E Backhoe Loader. It is a 19 step process that involves draining fluids, removing floor plates, disconnecting hoses and wiring, and using lifting equipment to remove the heavy bank valve unit. The bank valve is then disassembled into its individual valve components for inspection or replacement.
The document provides instructions for installing a swing frame on a 420E backhoe loader. It outlines 20 steps for the installation, which include lowering bearing temperatures, placing bars through frames, installing pins and bolts, connecting hoses and harnesses, and positioning cylinders. Tools required include levers, drivers, and lifting devices. Safety precautions are provided for working on pressurized hydraulic systems.
The document provides instructions to disassemble an axle housing, axle shaft, and wheel flange from a 420E backhoe loader. It outlines 9 steps to remove components including the axle shaft, retaining rings, locking plates, seals, bearings and bushings. Tools required include a spanner wrench, retaining ring pliers, and a combination puller. The purpose is to disassemble these components for repair or replacement.
The document provides instructions for removing and installing components related to the steering and final drive system of a Caterpillar 420E backhoe loader, including:
- Removing and installing the front tire and rim.
- Removing and installing the tie rod and steering cylinder.
- Removing the final drive planetary by draining oil and removing mounting screws.
- Disassembling the final drive planetary by using retaining ring pliers to remove the retaining ring.
Welcome to ASP Cranes, your trusted partner for crane solutions in Raipur, Chhattisgarh! With years of experience and a commitment to excellence, we offer a comprehensive range of crane services tailored to meet your lifting and material handling needs.
At ASP Cranes, we understand the importance of reliable and efficient crane operations in various industries, from construction and manufacturing to logistics and infrastructure development. That's why we strive to deliver top-notch solutions that enhance productivity, safety, and cost-effectiveness for our clients.
Our services include:
Crane Rental: Whether you need a crawler crane for heavy lifting or a hydraulic crane for versatile operations, we have a diverse fleet of well-maintained cranes available for rent. Our rental options are flexible and can be customized to suit your project requirements.
Crane Sales: Looking to invest in a crane for your business? We offer a wide selection of new and used cranes from leading manufacturers, ensuring you find the perfect equipment to match your needs and budget.
Crane Maintenance and Repair: To ensure optimal performance and safety, regular maintenance and timely repairs are essential for cranes. Our team of skilled technicians provides comprehensive maintenance and repair services to keep your equipment running smoothly and minimize downtime.
Crane Operator Training: Proper training is crucial for safe and efficient crane operation. We offer specialized training programs conducted by certified instructors to equip operators with the skills and knowledge they need to handle cranes effectively.
Custom Solutions: We understand that every project is unique, which is why we offer custom crane solutions tailored to your specific requirements. Whether you need modifications, attachments, or specialized equipment, we can design and implement solutions that meet your needs.
At ASP Cranes, customer satisfaction is our top priority. We are dedicated to delivering reliable, cost-effective, and innovative crane solutions that exceed expectations. Contact us today to learn more about our services and how we can support your project in Raipur, Chhattisgarh, and beyond. Let ASP Cranes be your trusted partner for all your crane needs!
Fleet management these days is next to impossible without connected vehicle solutions. Why? Well, fleet trackers and accompanying connected vehicle management solutions tend to offer quite a few hard-to-ignore benefits to fleet managers and businesses alike. Let’s check them out!
Implementing ELDs or Electronic Logging Devices is slowly but surely becoming the norm in fleet management. Why? Well, integrating ELDs and associated connected vehicle solutions like fleet tracking devices lets businesses and their in-house fleet managers reap several benefits. Check out the post below to learn more.
What Could Be Behind Your Mercedes Sprinter's Power Loss on Uphill RoadsSprinter Gurus
Unlock the secrets behind your Mercedes Sprinter's uphill power loss with our comprehensive presentation. From fuel filter blockages to turbocharger troubles, we uncover the culprits and empower you to reclaim your vehicle's peak performance. Conquer every ascent with confidence and ensure a thrilling journey every time.
Ever been troubled by the blinking sign and didn’t know what to do?
Here’s a handy guide to dashboard symbols so that you’ll never be confused again!
Save them for later and save the trouble!
The Octavia range embodies the design trend of the Škoda brand: a fusion of
aesthetics, safety and practicality. Whether you see the car as a whole or step
closer and explore its unique features, the Octavia range radiates with the
harmony of functionality and emotion
2. Tool Part Number Part Description Qty
A 1P-2420 Transmission Repair Stand 1
B 138-7573 Link Bracket 2
C 1P-1863 Retaining Ring Pliers 1
D 138-7575 Link Bracket 3
E 4C-8359 Eyebolt 2
F 138-7574 Link Bracket 2
G 138-7576 Link Bracket 2
Start By:
a. Start by removing the final drive. Refer to Disassembly and Assembly, "Final Drive -
Remove".
Note: Cleanliness is an important factor. Before the disassembly procedure, the exterior of
the component should be thoroughly cleaned. This will prevent dirt from entering the
internal mechanism.
1. Put an alignment mark across the sections of the final drive for assembly purposes. The
parts must be reinstalled to the original locations.
Illustration 1 g00892878
2. Use Tooling (G) and a suitable lifting device to position the final drive assembly onto
Tooling (A). The weight of the final drive assembly is approximately 550 kg (1200 lb).
3. Remove bolts (1).
3/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. Illustration 2 g00892883
4. Use Tooling (B) and a suitable lifting device to remove cover (2). The weight of cover (2) is
approximately 32 kg (70 lb).
Illustration 3 g00892888
5. Remove bolts (3) and gear (4). Check plate (6). Replace plate (6) if plate (6) is worn.
Remove plugs (5) from cover (2).
Illustration 4 g00892906
6. Remove O-ring seals (7) from plugs (5).
4/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. Illustration 5 g00892930
7. Remove gear (8) and spacer (9).
Illustration 6 g00892965
8. Use Tooling (C) to remove retaining ring (10). Remove washer (11) and gear (12). Remove
bearing assembly (13) and washer (14).
9. Repeat Step 8 for the other two gear assemblies.
Illustration 7 g00892968
10. Remove retaining ring (15).
5/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. Illustration 8 g00892975
11. Remove carrier assembly (16).
Illustration 9 g01389804
12. Use a suitable press to remove the shafts from carrier assembly (16).
Illustration 10 g00892977
6/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. 13. Remove gear (17) and spacer (18).
Illustration 11 g00892997
14. Use Tooling (D) and a suitable lifting device to remove planetary carrier (19). The weight of
planetary carrier (19) is approximately 48 kg (105 lb).
Illustration 12 g00893019
15. Remove retaining ring (21). Lift planetary carrier (19) off sun gear (20).
Illustration 13 g00896860
16. Drive spring pin (23) into planetary shaft (22).
7/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. Illustration 14 g00893043
17. Remove planetary shaft (22). Use a suitable punch to remove spring pin (23) from planetary
shaft (22).
Illustration 15 g00896863
18. Remove washers (24) and bearing (25) from planetary gear (26).
19. Repeat Steps 16 through 18 for the other two planetary gears.
Illustration 16 g01842853
20. Remove gear (27). Remove spacer (27A).
8/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. Illustration 17 g01842974
21. Use two people to remove carrier assembly (28). The weight of carrier assembly (28) is
approximately 38 kg (85 lb).
Illustration 18 g01843140
22. Drive spring pin (30) into shaft (29).
Illustration 19 g00893658
23. Remove shaft (29). Use a suitable punch to remove spring pin (30) from shaft (29).
9/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. Illustration 20 g00893674
24. Remove washers (31) and bearings (32) from planetary gear (33).
25. Repeat Steps 22 through 24 for the other three planetary gears.
Illustration 21 g01208300
26. Fasten Tooling (E) and a suitable lifting device to ring gear (34), as shown. Remove ring
gear (34) from sprocket housing (35). The weight of ring gear (34) is approximately 66 kg
(146 lb).
Illustration 22 g01208542
10/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(S...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. 27. Remove O-ring seal (36) from sprocket housing (35).
Illustration 23 g01208553
28. Remove bolts (37) from coupling gear (38).
Illustration 24 g01208572
29. Install suitable forcing bolts (39) in coupling gear (38). Tighten the forcing bolts evenly in
order to loosen coupling gear (38). Remove the coupling gear from the motor housing.
Illustration 25 g01208578
11/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(S...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. Illustration 26 g01208625
30. Remove shims (40) from the motor housing.
Note: Inner cones and outer bearing cones (42) are a slip fit on the motor housing. While
you remove sprocket housing (35) from the motor housing, inner bearing cone (42) may
stay with the sprocket housing or the inner bearing cone may stay on the motor housing.
31. Fasten Tooling (F) and a suitable lifting device to sprocket housing (35). Separate the
sprocket housing from the motor housing. The weight of sprocket housing (35) is
approximately 109 kg (240 lb).
Illustration 27 g01208626
32. Remove the locating pins from the motor housing.
33. Remove Duo-Cone seal (41) from the motor housing.
34. If inner bearing cone (42) remained on the motor housing, then remove the inner bearing
cone.
12/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(S...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
12. Illustration 28 g01208633
35. Remove Duo-Cone seal (43) from the sprocket housing.
36. If inner bearing cone (42) remained on the sprocket housing, then remove the inner bearing
cone.
37. Remove the bearing cups from the sprocket housing.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Fri Jun 19 10:58:39 UTC+0800 2020
13/13
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(S...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 325D EXCAVATOR PKE
Configuration: 325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine
Disassembly and Assembly
324D, 325D, 326D and 329D Excavators and 329D MHPU Mobile Hydraulic Power
Unit Machine Systems
Media Number -RENR8646-22 Publication Date -01/02/2015 Date Updated -12/09/2018
i03949150
Final Drive - Assemble
SMCS - 4050-016
S/N - A3R1-UP
S/N - AZP1-UP
S/N - BFC1-UP
S/N - BYS1-UP
S/N - CZF1-UP
S/N - DBH1-UP
S/N - DJF1-UP
S/N - DTZ1-UP
S/N - EBM1-UP
S/N - EJC1-UP
S/N - GBR1-UP
S/N - GPB1-UP
S/N - GPK1-UP
S/N - JAT1-UP
S/N - JHJ1-UP
S/N - JJG1-UP
1/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. A 1P-2420 Transmission Repair Stand 1
B 138-7573 Link Bracket 2
D 138-7574 Link Bracket 2
G 126-3994 Duo-Cone Seal Installer 1
H 5P-3931 Anti-Seize Compound
F 1U-8846 Gasket Sealant
Note: Cleanliness is an important factor. Before assembly, all parts should be cleaned in
cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry
parts. Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If
any parts are worn or damaged, use new parts for replacement. All disassembly and all
assembly procedures must be performed on a clean work surface and in a clean hydraulic
area. Keep cleaned parts covered and protected at all times.
Note: O-rings, gaskets, and seals should always be replaced. A used O-ring may not have
the same sealing properties as a new O-ring. Use 1U-6396 O-Ring Assembly Compound
during the assembly procedure.
Note: Apply a light film of hydraulic oil to all components before assembly.
1. Install the final drive sprocket if the sprocket was removed from the main housing.
2. Refer to Disassembly and Assembly, "Final Drive Sprocket - Remove and Install".
Illustration 1 g00708215
3. Apply Tooling (H) to the outer diameter of the bearings.
4. Install bearings (32) and (33) in main housing (18) with a suitable press.
5. Make sure that bearing (32) and bearing (33) contact the counterbore in the main housing.
6. Use the following procedure to preload the bearings and determine the correct thickness of
shims.
3/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. Illustration 2 g00713058
a. Fasten Tooling (D) and a suitable lifting device to main housing (18) . Install the main
housing on the motor housing.
b. Put the main housing and the motor housing in a suitable press.
Illustration 3 g00709278
(a) Bearing surface
(b) Housing surface
c. Use a suitable press and a spacer in order to apply a load of 4000 kg (8818.5 lb) on
the bearings. Rotate the housing in order to seat the bearings.
d. Reduce the load on the bearings to 1000 ± 100 kg (2204.6 ± 220.5 lb).
e. Use a depth micrometer in order to measure the step length between the bearing
surface and the housing surface. Take measurements at several different locations
around the housing. Compute the average of the measured dimensions and record the
number. Call this Dimension (Y) .
4/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. Illustration 4 g00709276
f. Use a depth micrometer in order to measure the step length of the coupling gear (26) .
Take measurements at several different locations around the gear. Compute the
average of the measured dimensions and record the number. Call this Dimension (X) .
g. The thickness of the shims is equal to (X - Y) ± 0.05 mm (0.002 inch).
Note: Use no more than two shims. If two shims are required, install the thinner shim
next to the gear.
h. Remove the main housing from the motor housing.
Illustration 5 g01021370
7. Use Tooling (G) in order to install Duo-Cone seal (31) in main housing (18) . Refer to
Disassembly and Assembly, "Duo-Cone Conventional Seals - Install".
Note: The rubber seals and all surfaces that contact the seals must be clean and dry. After
installation of the seals, put clean SAE 30 oil on the contact surfaces of the metal seals.
5/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
18. Illustration 6 g01021371
8. Use Tooling (G) in order to install Duo-Cone seal (29) in motor housing (28) .
Illustration 7 g00708214
9. Apply Tooling (H) to the surfaces that contact pins (30) .
10. Install alignment pins (30) .
Note: Do not damage the Duo-Cone seals in the main housing or in the motor housing
during the assembly of the two components. After installation of the main housing on the
motor housing, there will be a small gap between the components. The gap is caused by the
Duo-Cone seals. This gap will be eliminated during installation of gear (26) .
6/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
19. Illustration 8 g00713058
11. Fasten Tooling (D) and a suitable lifting device to main housing (18) . Install the main
housing on the motor housing.
Illustration 9 g00708211
12. Install shims (27) that were determined in Step 6.g in the main housing.
Note: If two shims are required, install the thinner shim next to the gear.
7/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. Illustration 10 g00708187
13. Install gear (26) .
14. Install bolts (25) in gear (26) . Install the bolts in an even pattern until the gear is seated
against the bearing. Tighten bolts (25) in a crisscross pattern.
Illustration 11 g00708186
15. Install O-ring seal (24) to main housing (18) .
Illustration 12 g00708175
16. Assemble carrier assembly (15) , as follows.
8/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
21. Illustration 13 g00708220
a. Install bearings (22) in planetary gear (23) .
b. Install thrust washers (21) and planetary gear (23) in the carrier assembly.
c. Use a deburring tool in order to remove the metal burr from the openings in the
carrier. Install planetary shaft (19) in the carrier assembly.
d. Drive spring pin (20) into planetary shaft (19) with a hammer and a punch.
Illustration 14 g00513451
e. Orient the split in spring pin (20) vertically to the carrier. Align the split in the spring
pin to the top or to the bottom. Make a stake mark on each side of the spring pin hole
in the carrier. Each stake mark should be approximately 1.50 mm (0.059 inch) from
the outside diameter of the spring pin hole.
17. Repeat Steps 16.a through 16.e in order to install the remaining planetary gears in the carrier
assembly.
9/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(SE...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. Illustration 15 g00708172
18. Install a lifting sling through the middle of carrier assembly (15) . Fasten a 12.7 mm (0.50
inch) shackle to the suitable lifting device.
19. Install carrier assembly (15) on the final drive. The weight of carrier assembly (15) is
approximately 39 kg (85 lb).
20. Remove the shackle and the suitable lifting device.
Illustration 16 g00713148
21. Apply Tooling (F) to the mating surface of ring gear (17b) .
22. Install ring gear (17a) on ring gear (17b) .
10/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(S...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. Illustration 17 g00708184
23. Fasten a suitable lifting device to ring gears (17) , as shown. Install the ring gears to main
housing (18) . The weight of ring gears (17) is approximately 45 kg (100 lb).
Illustration 18 g00708325
24. Install spacer (16) in the carrier assembly.
Illustration 19 g00708162
11/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(S...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
24. 25. Install sun gear (14) in carrier assembly (15) .
Illustration 20 g01304883
Illustration 21 g00708218
26. Assemble carrier assembly (7) , as follows.
a. Install bearing (12) in planetary gear (13) .
b. Install thrust washers (11) and planetary gear (13) in the carrier assembly.
c. Install planetary shaft (9) in the carrier assembly.
d. Drive spring pin (10) into planetary shaft (9) with a hammer and a punch.
12/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(S...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
25. Illustration 22 g00513451
e. Orient the split in spring pin (10) vertically to the carrier. Align the split in the spring
pin to the top or to the bottom. Make a stake mark on each side of the spring pin hole
in the carrier. Each stake mark should be approximately 1.50 mm (0.059 inch) from
the outside diameter of the spring pin hole.
27. Repeat Steps 26.a through 26.e in order to install the remaining planetary gears in the carrier
assembly.
Illustration 23 g00708092
28. Install carrier assembly (7) in the ring gear. The weight of carrier assembly (7) is
approximately 14 kg (30 lb).
29. Install sun gear (8) in carrier assembly (7) .
30. Install spacer (6) in carrier assembly (7) .
13/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(S...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
26. Suggest:
If the above button click is invalid.
Please download this document
first, and then click the above link
to download the complete manual.
Thank you so much for reading
27. Illustration 24 g00708235
31. Install new O-ring seals (5) on plugs (4) that were in the cover.
Illustration 25 g00708091
32. Install plugs (4) in cover (2) . Tighten plugs (4) to a torque of 80 ± 10 N·m (59 ± 7 lb ft).
33. Install thrust plate (3) in cover (2) .
34. Apply Tooling (F) to the mating surface of the ring gear.
14/15
325D L & LN Excavator PKE00001-UP (MACHINE) POWERED BY C7 Engine(S...
2020/6/19
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...