SlideShare a Scribd company logo
WORK AREAS
• Sewerage Treatment Plants
• Desalination Plants

Appendix-I    Dammam City Sewerage Treatment Plant, Eastern
              Province, Kingdom of Saudi Arabia.
Appendix-II   Al-Khobar City Sewerage Treatment Plant, Eastern
              Province, Kingdom of Saudi Arabia.
Appendix-III Al-Azizia Desalination Plant, Al-Khobar, Eastern
              Province, Kingdom of Saudi Arabia.
Appendix-IV   Al-Jubail   Desalination   Plant,   Al-Jubail,   Eastern
              Province, Kingdom of Saudi Arabia.
Appendix-V    PTA Combined Effluent Treatment Plant, Korangi
              Tanneries, Korangi Industrial Area, Karachi
              Pakistan.
Appendix-I
                                                                     Appendix-I-1
                    DAMMAM CITY SEWERAGE TREATMENT PLANT
                         Eastern Province, Saudi Arabia
                                   Broader view
260 10’ 39.06’’ N
500 12’ 35.54’’ E

Inlet Structure =1
Aeration Tanks (Carousels) = 8
Clarifiers=8
Sludge Thichners =2
Screw Pump Stations = 4




Sea out-fall discharges = 250,000 m3/day    Discharge BOD Loadings: 20-25mg/l O2

    •   Wastewater Treatment by Aeration Lagoons aborted since 1982-83 . The
        plant was designed and constructed by Ballast BV of Netherlands.
    •   Advance Wastewater Treatment by Activated Sludge System was
        commissioned in late 1982 which was designed and constructed by Metcalf
        and Eddy Incorp, Waikfield, Mass, USA.
Appendix-I-2
                      DAMMAM SEWERAGE TREATMENT PLANT
                         Eastern Province, Saudi Arabia


260 10’ 39.06’’ N
500 12’ 35.54’’ E
                                    Bird Eye view
                                    STP Dammam




    •   Wastewater Treatment by Aeration Lagoons aborted since 1982-83 . The
        plant was designed and constructed by Ballast BV of Netherlands.
    •   Advance     Wastewater   Treatment   by     Activated   Sludge   System   was
        commissioned in late 1982 which was designed and constructed by Metcalf
        and Eddy Incorp, waikfield, Mass, USA.
Appendix-I-3
                    DAMMAM SEWERAGE TREATMENT PLANT
                       Eastern Province, Saudi Arabia


260 10’ 39.06’’ N
500 12’ 35.54’’ E

                           Tertiary Wastewater Treatment
             Largest continuous flow Sand Filtration Facility in the world




Recently Equipped with 216 DynaSand® filters, will make Dammam the world's
largest continuous operated sand filter plant for tertiary treatment.
Appendix-I-4
                    DAMMAM SEWERAGE TREATMENT PLANT
                       Eastern Province, Saudi Arabia


260 10’ 39.06’’ N
500 12’ 35.54’’ E

                    Lagooning System of Wastewater Treatment
                                Aborted 1982-83




Sea Out-fall discharges = 200,000m3/day (before 1983)
Average BOD loading = 20 -25mg/litre O2


                             Aborted Lagoons
Appendix-I-5
                    DAMMAM SEWERAGE TREATMENT PLANT
                       Eastern Province, Saudi Arabia


260 10’ 39.06’’ N
500 12’ 35.54’’ E

                                 Front view of Plant
                      Right corner Jubail-Ras Tanura Highway




Sea Out-fall Discharges = 250,000m3/day
Average BOD discharge loading = 20 -25mg/litre O2

    •   Wastewater Treatment by Aeration Lagoons aborted since 1982-83 . The
        plant was designed and constructed by Ballast BV of Netherlands.
    •   Advance Wastewater Treatment by Activated Sludge System was
        commissioned in late 1982 which was designed and constructed by Metcalf
        and Eddy Incorp, waikfield, Mass, USA.
Appendix-I-6
                    DAMMAM CITY SEWERAGE TREATMENT PLANT
                         Eastern Province, Saudi Arabia
260 10’ 39.06’’ N
500 12’ 35.54’’ E
                               Sludge Drying Beds
                                   Left corner




          Sludge Drying Beds        Aeration Tanks
Appendix-II
                                                          Appendix-II-1

                AL-KHOBAR CITY SEWERAGE TREATMENT PLANT
                       Eastern Province, Saudi Arabia

260 14’ 48.27’’ N
500 12’ 33.20’’ E
                             BROADER VIEW

Inlet Structure =1
Aeration Tanks (Carousels) = 6
Clarifiers=6
Sludge Thichners =2
Screw Pump Stations = 3




Sea Out-fall Discharges = 150,000m3/day
Average BOD discharge loading = 20 -25mg/litre O2
AL-KHOBAR SEWERAGE TREATMENT PLANT
                         Eastern Province, Saudi Arabia
                                                               Appendix-II-2
  0   ’      ’’
26 14 48.27 N
500 12’ 33.20’’ E

                    Lagooning System of Wastewater Treatment
                                Aborted 1982-83




Sea Out-fall Discharges = 120,000m3/day (before 1983)
Average BOD discharge loading = 20 -25mg/litre O2
AL-KHOBAR SEWERAGE TREATMENT PLANT
                         Eastern Province, Saudi Arabia
                                                                        Appendix-II-3
  0     ’     ’’
26 14 48.27 N
500 12’ 33.20’’ E
                                       Zoom-in View




Sea Out-fall Discharges = 150,000m3/day
Average BOD discharge loading = 20 -25mg/litre O2
Aborted Lagoons

                                     Sludge Thickner
      Screw Pump Station                               Aeration Tanks

                           Final Clarifier
AL-KHOBAR SEWERAGE TREATMENT PLANT
                         Eastern Province, Saudi Arabia
                                                          Appendix-II-4
  0   ’      ’’
26 14 48.27 N
500 12’ 33.20’’ E

                                 Sludge Drying Beds




Sea Out-fall Discharges = 150,000m3/day
Average BOD loading = 20 -25mg/litre O2




                    Sludge Drying Beds
AL-KHOBAR SEWERAGE TREATMENT PLANT
                         Eastern Province, Saudi Arabia
                                                           Appendix-II-5


260 14’ 48.27’’ N
500 12’ 33.20’’ E
                                 FRONT VIEW

Inlet Structure =1
Aeration Tanks (Carousels) = 6
Clarifiers=6
Sludge Thichners =2
Screw Pump Stations = 3




                                              Clarifiers
Aeration Tanks (Carousels)

Sea Out-fall Discharges = 150,000m3/day
Average BOD discharge loading = 20 -25mg/litre O2

More Related Content

Similar to Work Areas App I

Robert Noronio CV
Robert Noronio CVRobert Noronio CV
Robert Noronio CV
Roberto Noronio
 
Fama Shipyards & Offshore Support Base
Fama Shipyards & Offshore Support BaseFama Shipyards & Offshore Support Base
Fama Shipyards & Offshore Support Base
andreastzortzis
 
Sylgard HVIC+ at DGNP SS
Sylgard HVIC+ at DGNP SSSylgard HVIC+ at DGNP SS
Sylgard HVIC+ at DGNP SS
Project Sales Corp
 
Sylgard Hvic+ At Dgnp Ss
Sylgard Hvic+ At Dgnp SsSylgard Hvic+ At Dgnp Ss
Sylgard Hvic+ At Dgnp Ss
Project Sales Corp
 
Introducing Process Group
Introducing Process GroupIntroducing Process Group
Introducing Process Group
process group
 
The Gas Recovery Systems - Sphere Decontamination Presentation
The Gas Recovery Systems - Sphere Decontamination PresentationThe Gas Recovery Systems - Sphere Decontamination Presentation
The Gas Recovery Systems - Sphere Decontamination Presentation
GulfCoastConsulting
 
CSS Offshore discharge (2012 October)
CSS Offshore discharge (2012 October)CSS Offshore discharge (2012 October)
CSS Offshore discharge (2012 October)
Niclas Karlsson
 
Gas Recovery Systems Vopak VCM Sphere Project
Gas Recovery Systems Vopak VCM Sphere ProjectGas Recovery Systems Vopak VCM Sphere Project
Gas Recovery Systems Vopak VCM Sphere Project
Fred Reyes
 

Similar to Work Areas App I (8)

Robert Noronio CV
Robert Noronio CVRobert Noronio CV
Robert Noronio CV
 
Fama Shipyards & Offshore Support Base
Fama Shipyards & Offshore Support BaseFama Shipyards & Offshore Support Base
Fama Shipyards & Offshore Support Base
 
Sylgard HVIC+ at DGNP SS
Sylgard HVIC+ at DGNP SSSylgard HVIC+ at DGNP SS
Sylgard HVIC+ at DGNP SS
 
Sylgard Hvic+ At Dgnp Ss
Sylgard Hvic+ At Dgnp SsSylgard Hvic+ At Dgnp Ss
Sylgard Hvic+ At Dgnp Ss
 
Introducing Process Group
Introducing Process GroupIntroducing Process Group
Introducing Process Group
 
The Gas Recovery Systems - Sphere Decontamination Presentation
The Gas Recovery Systems - Sphere Decontamination PresentationThe Gas Recovery Systems - Sphere Decontamination Presentation
The Gas Recovery Systems - Sphere Decontamination Presentation
 
CSS Offshore discharge (2012 October)
CSS Offshore discharge (2012 October)CSS Offshore discharge (2012 October)
CSS Offshore discharge (2012 October)
 
Gas Recovery Systems Vopak VCM Sphere Project
Gas Recovery Systems Vopak VCM Sphere ProjectGas Recovery Systems Vopak VCM Sphere Project
Gas Recovery Systems Vopak VCM Sphere Project
 

Recently uploaded

按照学校原版(UofT文凭证书)多伦多大学毕业证快速办理
按照学校原版(UofT文凭证书)多伦多大学毕业证快速办理按照学校原版(UofT文凭证书)多伦多大学毕业证快速办理
按照学校原版(UofT文凭证书)多伦多大学毕业证快速办理
evnum
 
Learnings from Successful Jobs Searchers
Learnings from Successful Jobs SearchersLearnings from Successful Jobs Searchers
Learnings from Successful Jobs Searchers
Bruce Bennett
 
一比一原版美国西北大学毕业证(NWU毕业证书)学历如何办理
一比一原版美国西北大学毕业证(NWU毕业证书)学历如何办理一比一原版美国西北大学毕业证(NWU毕业证书)学历如何办理
一比一原版美国西北大学毕业证(NWU毕业证书)学历如何办理
1wful2fm
 
How to overcome obstacles in the way of success.pdf
How to overcome obstacles in the way of success.pdfHow to overcome obstacles in the way of success.pdf
How to overcome obstacles in the way of success.pdf
Million-$-Knowledge {Million Dollar Knowledge}
 
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
2zjra9bn
 
BUKU PENJAGAAN BUKU PENJAGAAN BUKU PENJAGAAN
BUKU PENJAGAAN BUKU PENJAGAAN BUKU PENJAGAANBUKU PENJAGAAN BUKU PENJAGAAN BUKU PENJAGAAN
BUKU PENJAGAAN BUKU PENJAGAAN BUKU PENJAGAAN
cahgading001
 
官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样
官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样
官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样
2zjra9bn
 
按照学校原版(ArtEZ文凭证书)ArtEZ艺术学院毕业证快速办理
按照学校原版(ArtEZ文凭证书)ArtEZ艺术学院毕业证快速办理按照学校原版(ArtEZ文凭证书)ArtEZ艺术学院毕业证快速办理
按照学校原版(ArtEZ文凭证书)ArtEZ艺术学院毕业证快速办理
evnum
 
A Guide to a Winning Interview June 2024
A Guide to a Winning Interview June 2024A Guide to a Winning Interview June 2024
A Guide to a Winning Interview June 2024
Bruce Bennett
 
Community Skills Building Workshop | PMI Silver Spring Chapter | June 12, 2024
Community Skills Building Workshop | PMI Silver Spring Chapter  | June 12, 2024Community Skills Building Workshop | PMI Silver Spring Chapter  | June 12, 2024
Community Skills Building Workshop | PMI Silver Spring Chapter | June 12, 2024
Hector Del Castillo, CPM, CPMM
 
一比一原版(EUR毕业证)鹿特丹伊拉斯姆斯大学毕业证如何办理
一比一原版(EUR毕业证)鹿特丹伊拉斯姆斯大学毕业证如何办理一比一原版(EUR毕业证)鹿特丹伊拉斯姆斯大学毕业证如何办理
一比一原版(EUR毕业证)鹿特丹伊拉斯姆斯大学毕业证如何办理
nguqayx
 
在线办理(UOIT毕业证书)安大略省理工大学毕业证在读证明一模一样
在线办理(UOIT毕业证书)安大略省理工大学毕业证在读证明一模一样在线办理(UOIT毕业证书)安大略省理工大学毕业证在读证明一模一样
在线办理(UOIT毕业证书)安大略省理工大学毕业证在读证明一模一样
yhkox
 
Connect to Grow: The power of building networks
Connect to Grow: The power of building networksConnect to Grow: The power of building networks
Connect to Grow: The power of building networks
Eirini SYKA-LERIOTI
 
0624.speakingengagementsandteaching-01.pdf
0624.speakingengagementsandteaching-01.pdf0624.speakingengagementsandteaching-01.pdf
0624.speakingengagementsandteaching-01.pdf
Thomas GIRARD BDes
 
All Of My Java Codes With A Sample Output.docx
All Of My Java Codes With A Sample Output.docxAll Of My Java Codes With A Sample Output.docx
All Of My Java Codes With A Sample Output.docx
adhitya5119
 
一比一原版(surrey毕业证书)英国萨里大学毕业证成绩单修改如何办理
一比一原版(surrey毕业证书)英国萨里大学毕业证成绩单修改如何办理一比一原版(surrey毕业证书)英国萨里大学毕业证成绩单修改如何办理
一比一原版(surrey毕业证书)英国萨里大学毕业证成绩单修改如何办理
gnokue
 
一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理
一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理
一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理
taqyea
 
办理阿卡迪亚大学毕业证(uvic毕业证)本科文凭证书原版一模一样
办理阿卡迪亚大学毕业证(uvic毕业证)本科文凭证书原版一模一样办理阿卡迪亚大学毕业证(uvic毕业证)本科文凭证书原版一模一样
办理阿卡迪亚大学毕业证(uvic毕业证)本科文凭证书原版一模一样
kkkkr4pg
 
Gabrielle M. A. Sinaga Portfolio, Film Student (2024)
Gabrielle M. A. Sinaga Portfolio, Film Student (2024)Gabrielle M. A. Sinaga Portfolio, Film Student (2024)
Gabrielle M. A. Sinaga Portfolio, Film Student (2024)
GabrielleSinaga
 
体育博彩论坛-十大体育博彩论坛-体育博彩论坛|【​网址​🎉ac55.net🎉​】
体育博彩论坛-十大体育博彩论坛-体育博彩论坛|【​网址​🎉ac55.net🎉​】体育博彩论坛-十大体育博彩论坛-体育博彩论坛|【​网址​🎉ac55.net🎉​】
体育博彩论坛-十大体育博彩论坛-体育博彩论坛|【​网址​🎉ac55.net🎉​】
waldorfnorma258
 

Recently uploaded (20)

按照学校原版(UofT文凭证书)多伦多大学毕业证快速办理
按照学校原版(UofT文凭证书)多伦多大学毕业证快速办理按照学校原版(UofT文凭证书)多伦多大学毕业证快速办理
按照学校原版(UofT文凭证书)多伦多大学毕业证快速办理
 
Learnings from Successful Jobs Searchers
Learnings from Successful Jobs SearchersLearnings from Successful Jobs Searchers
Learnings from Successful Jobs Searchers
 
一比一原版美国西北大学毕业证(NWU毕业证书)学历如何办理
一比一原版美国西北大学毕业证(NWU毕业证书)学历如何办理一比一原版美国西北大学毕业证(NWU毕业证书)学历如何办理
一比一原版美国西北大学毕业证(NWU毕业证书)学历如何办理
 
How to overcome obstacles in the way of success.pdf
How to overcome obstacles in the way of success.pdfHow to overcome obstacles in the way of success.pdf
How to overcome obstacles in the way of success.pdf
 
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
在线制作加拿大萨省大学毕业证文凭证书实拍图原版一模一样
 
BUKU PENJAGAAN BUKU PENJAGAAN BUKU PENJAGAAN
BUKU PENJAGAAN BUKU PENJAGAAN BUKU PENJAGAANBUKU PENJAGAAN BUKU PENJAGAAN BUKU PENJAGAAN
BUKU PENJAGAAN BUKU PENJAGAAN BUKU PENJAGAAN
 
官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样
官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样
官方认证美国旧金山州立大学毕业证学位证书案例原版一模一样
 
按照学校原版(ArtEZ文凭证书)ArtEZ艺术学院毕业证快速办理
按照学校原版(ArtEZ文凭证书)ArtEZ艺术学院毕业证快速办理按照学校原版(ArtEZ文凭证书)ArtEZ艺术学院毕业证快速办理
按照学校原版(ArtEZ文凭证书)ArtEZ艺术学院毕业证快速办理
 
A Guide to a Winning Interview June 2024
A Guide to a Winning Interview June 2024A Guide to a Winning Interview June 2024
A Guide to a Winning Interview June 2024
 
Community Skills Building Workshop | PMI Silver Spring Chapter | June 12, 2024
Community Skills Building Workshop | PMI Silver Spring Chapter  | June 12, 2024Community Skills Building Workshop | PMI Silver Spring Chapter  | June 12, 2024
Community Skills Building Workshop | PMI Silver Spring Chapter | June 12, 2024
 
一比一原版(EUR毕业证)鹿特丹伊拉斯姆斯大学毕业证如何办理
一比一原版(EUR毕业证)鹿特丹伊拉斯姆斯大学毕业证如何办理一比一原版(EUR毕业证)鹿特丹伊拉斯姆斯大学毕业证如何办理
一比一原版(EUR毕业证)鹿特丹伊拉斯姆斯大学毕业证如何办理
 
在线办理(UOIT毕业证书)安大略省理工大学毕业证在读证明一模一样
在线办理(UOIT毕业证书)安大略省理工大学毕业证在读证明一模一样在线办理(UOIT毕业证书)安大略省理工大学毕业证在读证明一模一样
在线办理(UOIT毕业证书)安大略省理工大学毕业证在读证明一模一样
 
Connect to Grow: The power of building networks
Connect to Grow: The power of building networksConnect to Grow: The power of building networks
Connect to Grow: The power of building networks
 
0624.speakingengagementsandteaching-01.pdf
0624.speakingengagementsandteaching-01.pdf0624.speakingengagementsandteaching-01.pdf
0624.speakingengagementsandteaching-01.pdf
 
All Of My Java Codes With A Sample Output.docx
All Of My Java Codes With A Sample Output.docxAll Of My Java Codes With A Sample Output.docx
All Of My Java Codes With A Sample Output.docx
 
一比一原版(surrey毕业证书)英国萨里大学毕业证成绩单修改如何办理
一比一原版(surrey毕业证书)英国萨里大学毕业证成绩单修改如何办理一比一原版(surrey毕业证书)英国萨里大学毕业证成绩单修改如何办理
一比一原版(surrey毕业证书)英国萨里大学毕业证成绩单修改如何办理
 
一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理
一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理
一比一原版布拉德福德大学毕业证(bradford毕业证)如何办理
 
办理阿卡迪亚大学毕业证(uvic毕业证)本科文凭证书原版一模一样
办理阿卡迪亚大学毕业证(uvic毕业证)本科文凭证书原版一模一样办理阿卡迪亚大学毕业证(uvic毕业证)本科文凭证书原版一模一样
办理阿卡迪亚大学毕业证(uvic毕业证)本科文凭证书原版一模一样
 
Gabrielle M. A. Sinaga Portfolio, Film Student (2024)
Gabrielle M. A. Sinaga Portfolio, Film Student (2024)Gabrielle M. A. Sinaga Portfolio, Film Student (2024)
Gabrielle M. A. Sinaga Portfolio, Film Student (2024)
 
体育博彩论坛-十大体育博彩论坛-体育博彩论坛|【​网址​🎉ac55.net🎉​】
体育博彩论坛-十大体育博彩论坛-体育博彩论坛|【​网址​🎉ac55.net🎉​】体育博彩论坛-十大体育博彩论坛-体育博彩论坛|【​网址​🎉ac55.net🎉​】
体育博彩论坛-十大体育博彩论坛-体育博彩论坛|【​网址​🎉ac55.net🎉​】
 

Work Areas App I

  • 1. WORK AREAS • Sewerage Treatment Plants • Desalination Plants Appendix-I Dammam City Sewerage Treatment Plant, Eastern Province, Kingdom of Saudi Arabia. Appendix-II Al-Khobar City Sewerage Treatment Plant, Eastern Province, Kingdom of Saudi Arabia. Appendix-III Al-Azizia Desalination Plant, Al-Khobar, Eastern Province, Kingdom of Saudi Arabia. Appendix-IV Al-Jubail Desalination Plant, Al-Jubail, Eastern Province, Kingdom of Saudi Arabia. Appendix-V PTA Combined Effluent Treatment Plant, Korangi Tanneries, Korangi Industrial Area, Karachi Pakistan.
  • 2. Appendix-I Appendix-I-1 DAMMAM CITY SEWERAGE TREATMENT PLANT Eastern Province, Saudi Arabia Broader view 260 10’ 39.06’’ N 500 12’ 35.54’’ E Inlet Structure =1 Aeration Tanks (Carousels) = 8 Clarifiers=8 Sludge Thichners =2 Screw Pump Stations = 4 Sea out-fall discharges = 250,000 m3/day Discharge BOD Loadings: 20-25mg/l O2 • Wastewater Treatment by Aeration Lagoons aborted since 1982-83 . The plant was designed and constructed by Ballast BV of Netherlands. • Advance Wastewater Treatment by Activated Sludge System was commissioned in late 1982 which was designed and constructed by Metcalf and Eddy Incorp, Waikfield, Mass, USA.
  • 3. Appendix-I-2 DAMMAM SEWERAGE TREATMENT PLANT Eastern Province, Saudi Arabia 260 10’ 39.06’’ N 500 12’ 35.54’’ E Bird Eye view STP Dammam • Wastewater Treatment by Aeration Lagoons aborted since 1982-83 . The plant was designed and constructed by Ballast BV of Netherlands. • Advance Wastewater Treatment by Activated Sludge System was commissioned in late 1982 which was designed and constructed by Metcalf and Eddy Incorp, waikfield, Mass, USA.
  • 4. Appendix-I-3 DAMMAM SEWERAGE TREATMENT PLANT Eastern Province, Saudi Arabia 260 10’ 39.06’’ N 500 12’ 35.54’’ E Tertiary Wastewater Treatment Largest continuous flow Sand Filtration Facility in the world Recently Equipped with 216 DynaSand® filters, will make Dammam the world's largest continuous operated sand filter plant for tertiary treatment.
  • 5. Appendix-I-4 DAMMAM SEWERAGE TREATMENT PLANT Eastern Province, Saudi Arabia 260 10’ 39.06’’ N 500 12’ 35.54’’ E Lagooning System of Wastewater Treatment Aborted 1982-83 Sea Out-fall discharges = 200,000m3/day (before 1983) Average BOD loading = 20 -25mg/litre O2 Aborted Lagoons
  • 6. Appendix-I-5 DAMMAM SEWERAGE TREATMENT PLANT Eastern Province, Saudi Arabia 260 10’ 39.06’’ N 500 12’ 35.54’’ E Front view of Plant Right corner Jubail-Ras Tanura Highway Sea Out-fall Discharges = 250,000m3/day Average BOD discharge loading = 20 -25mg/litre O2 • Wastewater Treatment by Aeration Lagoons aborted since 1982-83 . The plant was designed and constructed by Ballast BV of Netherlands. • Advance Wastewater Treatment by Activated Sludge System was commissioned in late 1982 which was designed and constructed by Metcalf and Eddy Incorp, waikfield, Mass, USA.
  • 7. Appendix-I-6 DAMMAM CITY SEWERAGE TREATMENT PLANT Eastern Province, Saudi Arabia 260 10’ 39.06’’ N 500 12’ 35.54’’ E Sludge Drying Beds Left corner Sludge Drying Beds Aeration Tanks
  • 8. Appendix-II Appendix-II-1 AL-KHOBAR CITY SEWERAGE TREATMENT PLANT Eastern Province, Saudi Arabia 260 14’ 48.27’’ N 500 12’ 33.20’’ E BROADER VIEW Inlet Structure =1 Aeration Tanks (Carousels) = 6 Clarifiers=6 Sludge Thichners =2 Screw Pump Stations = 3 Sea Out-fall Discharges = 150,000m3/day Average BOD discharge loading = 20 -25mg/litre O2
  • 9. AL-KHOBAR SEWERAGE TREATMENT PLANT Eastern Province, Saudi Arabia Appendix-II-2 0 ’ ’’ 26 14 48.27 N 500 12’ 33.20’’ E Lagooning System of Wastewater Treatment Aborted 1982-83 Sea Out-fall Discharges = 120,000m3/day (before 1983) Average BOD discharge loading = 20 -25mg/litre O2
  • 10. AL-KHOBAR SEWERAGE TREATMENT PLANT Eastern Province, Saudi Arabia Appendix-II-3 0 ’ ’’ 26 14 48.27 N 500 12’ 33.20’’ E Zoom-in View Sea Out-fall Discharges = 150,000m3/day Average BOD discharge loading = 20 -25mg/litre O2 Aborted Lagoons Sludge Thickner Screw Pump Station Aeration Tanks Final Clarifier
  • 11. AL-KHOBAR SEWERAGE TREATMENT PLANT Eastern Province, Saudi Arabia Appendix-II-4 0 ’ ’’ 26 14 48.27 N 500 12’ 33.20’’ E Sludge Drying Beds Sea Out-fall Discharges = 150,000m3/day Average BOD loading = 20 -25mg/litre O2 Sludge Drying Beds
  • 12. AL-KHOBAR SEWERAGE TREATMENT PLANT Eastern Province, Saudi Arabia Appendix-II-5 260 14’ 48.27’’ N 500 12’ 33.20’’ E FRONT VIEW Inlet Structure =1 Aeration Tanks (Carousels) = 6 Clarifiers=6 Sludge Thichners =2 Screw Pump Stations = 3 Clarifiers Aeration Tanks (Carousels) Sea Out-fall Discharges = 150,000m3/day Average BOD discharge loading = 20 -25mg/litre O2