Presentation details before / after results when this Project Manager revived a twice-failed program implementation. NOTE: Presenter Notes explaining slides are not viewable in this version.
Goals:
1. Increase flexible Work Options for Corporate staff to reduce staff attrition due to not having Flexible Work Options.
2. Effective roll-out of six (6) Corporate Departments without compromising and overtaxing thinly staffed IT support.
Project was delivered to customer needs and requirements two (2) weeks ahead of Belk CEO (Tim Belk) deadline mandate.
Presentation details before / after results when this Project Manager revived a twice-failed program implementation. NOTE: Presenter Notes explaining slides are not viewable in this version.
Goals:
1. Increase flexible Work Options for Corporate staff to reduce staff attrition due to not having Flexible Work Options.
2. Effective roll-out of six (6) Corporate Departments without compromising and overtaxing thinly staffed IT support.
Project was delivered to customer needs and requirements two (2) weeks ahead of Belk CEO (Tim Belk) deadline mandate.
Conocer los metodos de desalojos de una edificación que se encuentra bajo amenaza de incendios, medidas de prevención que se deben tomar a la hora de un accidente y métodos que se aplican en situaciones de este tipo.
The aim is to design and develop a control system based an electronically controlled automotive rain operated motor
The sensor is used to detect the rain or water flow
Conocer los metodos de desalojos de una edificación que se encuentra bajo amenaza de incendios, medidas de prevención que se deben tomar a la hora de un accidente y métodos que se aplican en situaciones de este tipo.
The aim is to design and develop a control system based an electronically controlled automotive rain operated motor
The sensor is used to detect the rain or water flow