Venkatesan Resume
RESUME
Venkatesan N Mob:+919901893219
Email:venkatesan306@gmail.com
Experience Summary:
• Currently working with Unisys India Pvt Ltd, Product based company in Bangalore.
• Having 8+ years of experience in Software Testing and Quality Assurance.
• Having good Experience in Leading Team.
• Involved in implementation of Quality Center across all the testing projects.
• Experience in the project lifecycle, Involved in testing a product from inception to final production.
• Worked on Product and Application Testing.
• Worked on Software and Hardware Testing on different browsers and OS.
• Experience in Banking, Ecommerce, Content Management, Storage, Technology, Retail domain.
• Experience in Web based and Client server applications.
• Experience in Integration, Functional, GUI, Regression, Database, XML and Security testing.
• Worked on Network Adapters, Storage Adapters, Secure fabric, Data Lun’s, Datacenter Server apps.
• Good knowledge of using different Test Management Tools, Defect Tracking Tools and Defect Tracking
Process.
• Good understanding of SDLC and STLC processes.
• Excellent Communication and Good Interpersonal skills.
SKILLS:
Operating systems : Windows 2010/MAC/Sles and Rehat versions
Testing Tools : Test Complete,Quality Centre,Bugzilla,Test Director,Testlink
Support Tools : Winscp, Putty, Virtual environments.
Technologies : NIC, HBA, External Storage, Virtual environments, Data Luns, Secure
Fabrics , Data center server monitoring apps (R730,R930,R330)
Databases : SQL Server, Oracle 8i
Version Control Systems: MS Visual Source Safe (VSS),SharePoint, QC
Work Profile:
• Currently working as Engineer in Unisys India Pvt Ltd, Bangalore from September 13 to till date.
• Worked as Senior Functional Test Engineer in CTS, Bangalore from June06 to September 13.
Educational Qualification:
 Completed BE in EEE From Pallavan College of Engineering , Madras University.
Venkatesan Resume
Projects:-
Project :Forward Fabric Manager
Client :UNISYS
Duration :September 2013 to Till date
Description:
CPF System, a multi-platform with S-par firmware supporting heterogeneous operating systems . Forward
Fabric Manager provides platform management, partition life management, guest OS management, guest OS
monitoring. The open source framework that admins used to manage heterogeneous environment ( linux / Windows )
in datacenter.
Specialized Role:
 Extensively worked on different version of Product releases 1.0, 2.0, 3.0.3.1.
 Worked in Agile, played role of Scrum Master across releases.
 Assigned tasks in Utrack, Unisys internal tool for test management operations.
 Ensured tasks are completed within the given schedule with almost quality.
 Worked on NIC, HBA, External storage, Secure fabric, Data Lun’s,
Datacenter apps, Nic Teaming.
 Coordinate with teams across geographic during triage calls.
 Engaged in Knowledge Transition to newly joined engineers in the Team.
 Analyzing the Impediments in the daily scrum updates in standup meetings.
 Metrics on test execution, updated onsite team during weekly meetings.
 Received Recognition for successful releases of Product.
 Played Individual Contributor Role aswell to ensure ontime delivery of Product releases.
Projects:-
Project :Trident Derivatives Confirmation Reporting
Client : Barclays Capital (Barcap)
Duration :June 2012 to September 2013
Description:
Trident is an in-house application, used by Barclays Capital for the OTC Derivatives reporting of
Confirmation document generation for the counterparties. The solution supports event types and market practices in
the financial markets.
Specialized Role:
 Coordinated with Team size of 4 resources ensured deliverables are met.
 Handled Individual modules of the project.
 Involved in Triage calls with Onsite & Dev team in getting the defects to closure.
Venkatesan Resume
 Worked on tools Clearcase, Sharepoint and QC.
 Involved in multiple regression tests on UAT & SIT builds.
Project : JATO Speedwing BTD Phase1.1
Client : JATO
Duration : Jan 2012 to June 2012
Description:
JATO Speeding program directly targets to be the knowledge and analysis platform for the entire lifecycle of
the vehicle and seamlessly integrate all applications to ensure easy flow of data. The system will provide customer
specific views on data and enable the customer to integrate the data from other sources for convenient analysis of the
data.
The system needs to deliver quality data in a timely manner to the customers and will enable generation of
customized reports to help the customer make informed decisions. The system will also present a good understanding
of the market events and analysis of the customer behavior.
The new system needs to be scalable, secured and permeable for other internal / external applications for
data exchange.
Specialized Role:
 Coordinated with Team size of 5 resources ensured deliverables are met.
 Handled Individual modules of the project.
 Coordinated with Onsite & Dev team in getting the defects to closure.
 Daily status updates at offshore.
 Worked on new tools Testlink and Bugzilla.
 Knowledge transition to new members of the team.
 Involved in multiple regression tests on UAT & SIT builds.
Project : AutodeskFlexlm QE Support
Client :Autodesk
Duration : July 2011 to Jan2012
Description:
For the network licensing in Centurion project, the existing FLEXlm licensing technologies functionality will be
migrated to the FLEXnet solution. Migrating FLEXlm functionality to the FLEXnet licensing technology means every
workstation installation contains the same licensing components. With all products using the same licensing
components, it is possible for all products to share these components. So the application client in this document
refers to any product workstation which shares these components.
Specialized Role:
 Involved in project from project scoping till execution.
 Estimated project size, test effort.
 Planned environment setup, schedule and resource loading.
 Managed deliverables of Team size 3 resources.
Venkatesan Resume
 Project Tasks are tracked under C2.0.
 Ensured deliverables are delivered as per scheduled.
 Knowledge Transition to the new resources in the team.
 Worked on different OS configurations, Linux & Mac.
 Worked on different network connections IPV4,IPV6
Project : Adobe WB eforms
Client : WB
Duration : Jan 2011 to July 2011
Description:
Earlier project workflow tasks by WB were done manually.
With the introduction of Adobe live cycle manual process was removed and the workflow tasks have been automated.
Specialized Role:
 Analyzed the issues raised during previous cycles project.
 Provided QA efforts for IssuesChange Requests in project.
 Tested on OS:2003, XP, MAC, Browsers:IE6,7,8,Safari and Firefox, Adobe versions 8.0,9.0 and 10.1.
 Involved in Requirement Analysis and known Business process of Telecom and Business Partner forms.
 Involved in Test cases creation and execution.
 Logged issues found during Test execution and ensured issues are moved to closure.
Project : Pricing Tool
Client : NetApp
Duration : August 2010 to Jan 2011
Description:
Pricing Tool is used to calculate cost estimates of Professional services (PS) so that the service is sold for
fair value.
Specialized Role:
 Involved in understanding the requirements of the enhancements & defects.
 Involved in resource planning & work distribution.
 Conducting team meetings, involved in solving the issues raised by the team members.
 Monitoring the entire QA process right from development to Delivery.
 Coordinating with the onsite team for resolving dependencies.
 Involve in preparation of Test Plan.
 Reviewing of Test cases & Enhancing of test cases according to the change requirements
 Responsible for managing bug status.
 Weekly report generation for bug trends.
 Involved in preparation of release notes.
 Keeping control over versions of files.
 Communicating the client with the updated test status.
Venkatesan Resume
Project : Mustang III
Client : NetApp
Duration : May 2009 to August 2010
Description:
STOR – Storage Optimization Report . Reporting changes are needed in content, usability,
delivery, configurability, data refresh rate, and overall look and feel.
Specialized Role:
 Involved in resource planning & work distribution
 Conducting team meetings, involved in solving the issues raised by the team members.
 Involved in understanding the requirements of the enhancements & defects.
 Monitoring the entire QA process right from development to Delivery.
 Coordinating with the onsite team for resolving dependencies.
 Involve in preparation of Test Plan and reviewing of TestPlan prepared by other team members.
 Preparing and executing testcases against the requirement and logging defects.
 Performing SQA audit for every release.
 Performing CM audit once in a month.
 Reviewing of Test cases & Enhancing of test cases according to the change requirements
 Communicating the client with the updated test status.
 Responsible for managing bug status and sending weekly status report to the client.
 Involved in reviewing of release notes.
 Keeping control over versions of files & modification being made.
Project : LCDSV2.3
Client : Microsoft
Duration : January 2009 –May 2009
Description:
The LCDS is an easy-to-use authoring environment for designing and developing interactive
e-learning content.
Specialized Role:
 Created Test Plan.
 Created Test scenarios, Test cases and organized using VSS.
 Performed functional testing on different environments.
 Performed localization testing and globalization testing.
 Test execution of application done using virtual machines.
 Prepared Test summary report. Collected defect metrics.
 Extensively used C2.0 for managing tasks and defect tracking.
Project : Hyper-V
Client : Microsoft
Duration : November 2008 –January 2009
Description:
Across Microsoft there are various online learning and certification products which deliver live
Labs to the customers using Microsoft virtualization technology.
Specialized Role:
 Involved in Gray box testing for Test scenarios and Test case creation.
Venkatesan Resume
 Provided Inputs during Test Plan creation.
 Involved in Test estimation and organized Test cases.
 Status Reporting.
Project : ADP WebVehicle2.0
Client : ADP
Duration : June 2006 –September2008
Description:
ADP dealership services is the leading provider of retail solutions for automotive and truck
dealerships and their manufacturers worldwide.
Specialized Role:
 Preparation of the Test Cases based on Functional specification.
 Execution of the Test Cases.
 Performed Black Box Testing.
 Reviewing Test Cases and Test Data.
 Performed Integration Testing.
 Performed System Testing
 Analyzing Test Result and log the Issues in QMS.
 Reporting the Bugs.
 Resolving Issues with Clients.
Venkatesan Resume
 Provided Inputs during Test Plan creation.
 Involved in Test estimation and organized Test cases.
 Status Reporting.
Project : ADP WebVehicle2.0
Client : ADP
Duration : June 2006 –September2008
Description:
ADP dealership services is the leading provider of retail solutions for automotive and truck
dealerships and their manufacturers worldwide.
Specialized Role:
 Preparation of the Test Cases based on Functional specification.
 Execution of the Test Cases.
 Performed Black Box Testing.
 Reviewing Test Cases and Test Data.
 Performed Integration Testing.
 Performed System Testing
 Analyzing Test Result and log the Issues in QMS.
 Reporting the Bugs.
 Resolving Issues with Clients.

Venkatesan Profile.docx

  • 1.
    Venkatesan Resume RESUME Venkatesan NMob:+919901893219 Email:venkatesan306@gmail.com Experience Summary: • Currently working with Unisys India Pvt Ltd, Product based company in Bangalore. • Having 8+ years of experience in Software Testing and Quality Assurance. • Having good Experience in Leading Team. • Involved in implementation of Quality Center across all the testing projects. • Experience in the project lifecycle, Involved in testing a product from inception to final production. • Worked on Product and Application Testing. • Worked on Software and Hardware Testing on different browsers and OS. • Experience in Banking, Ecommerce, Content Management, Storage, Technology, Retail domain. • Experience in Web based and Client server applications. • Experience in Integration, Functional, GUI, Regression, Database, XML and Security testing. • Worked on Network Adapters, Storage Adapters, Secure fabric, Data Lun’s, Datacenter Server apps. • Good knowledge of using different Test Management Tools, Defect Tracking Tools and Defect Tracking Process. • Good understanding of SDLC and STLC processes. • Excellent Communication and Good Interpersonal skills. SKILLS: Operating systems : Windows 2010/MAC/Sles and Rehat versions Testing Tools : Test Complete,Quality Centre,Bugzilla,Test Director,Testlink Support Tools : Winscp, Putty, Virtual environments. Technologies : NIC, HBA, External Storage, Virtual environments, Data Luns, Secure Fabrics , Data center server monitoring apps (R730,R930,R330) Databases : SQL Server, Oracle 8i Version Control Systems: MS Visual Source Safe (VSS),SharePoint, QC Work Profile: • Currently working as Engineer in Unisys India Pvt Ltd, Bangalore from September 13 to till date. • Worked as Senior Functional Test Engineer in CTS, Bangalore from June06 to September 13. Educational Qualification:  Completed BE in EEE From Pallavan College of Engineering , Madras University.
  • 2.
    Venkatesan Resume Projects:- Project :ForwardFabric Manager Client :UNISYS Duration :September 2013 to Till date Description: CPF System, a multi-platform with S-par firmware supporting heterogeneous operating systems . Forward Fabric Manager provides platform management, partition life management, guest OS management, guest OS monitoring. The open source framework that admins used to manage heterogeneous environment ( linux / Windows ) in datacenter. Specialized Role:  Extensively worked on different version of Product releases 1.0, 2.0, 3.0.3.1.  Worked in Agile, played role of Scrum Master across releases.  Assigned tasks in Utrack, Unisys internal tool for test management operations.  Ensured tasks are completed within the given schedule with almost quality.  Worked on NIC, HBA, External storage, Secure fabric, Data Lun’s, Datacenter apps, Nic Teaming.  Coordinate with teams across geographic during triage calls.  Engaged in Knowledge Transition to newly joined engineers in the Team.  Analyzing the Impediments in the daily scrum updates in standup meetings.  Metrics on test execution, updated onsite team during weekly meetings.  Received Recognition for successful releases of Product.  Played Individual Contributor Role aswell to ensure ontime delivery of Product releases. Projects:- Project :Trident Derivatives Confirmation Reporting Client : Barclays Capital (Barcap) Duration :June 2012 to September 2013 Description: Trident is an in-house application, used by Barclays Capital for the OTC Derivatives reporting of Confirmation document generation for the counterparties. The solution supports event types and market practices in the financial markets. Specialized Role:  Coordinated with Team size of 4 resources ensured deliverables are met.  Handled Individual modules of the project.  Involved in Triage calls with Onsite & Dev team in getting the defects to closure.
  • 3.
    Venkatesan Resume  Workedon tools Clearcase, Sharepoint and QC.  Involved in multiple regression tests on UAT & SIT builds. Project : JATO Speedwing BTD Phase1.1 Client : JATO Duration : Jan 2012 to June 2012 Description: JATO Speeding program directly targets to be the knowledge and analysis platform for the entire lifecycle of the vehicle and seamlessly integrate all applications to ensure easy flow of data. The system will provide customer specific views on data and enable the customer to integrate the data from other sources for convenient analysis of the data. The system needs to deliver quality data in a timely manner to the customers and will enable generation of customized reports to help the customer make informed decisions. The system will also present a good understanding of the market events and analysis of the customer behavior. The new system needs to be scalable, secured and permeable for other internal / external applications for data exchange. Specialized Role:  Coordinated with Team size of 5 resources ensured deliverables are met.  Handled Individual modules of the project.  Coordinated with Onsite & Dev team in getting the defects to closure.  Daily status updates at offshore.  Worked on new tools Testlink and Bugzilla.  Knowledge transition to new members of the team.  Involved in multiple regression tests on UAT & SIT builds. Project : AutodeskFlexlm QE Support Client :Autodesk Duration : July 2011 to Jan2012 Description: For the network licensing in Centurion project, the existing FLEXlm licensing technologies functionality will be migrated to the FLEXnet solution. Migrating FLEXlm functionality to the FLEXnet licensing technology means every workstation installation contains the same licensing components. With all products using the same licensing components, it is possible for all products to share these components. So the application client in this document refers to any product workstation which shares these components. Specialized Role:  Involved in project from project scoping till execution.  Estimated project size, test effort.  Planned environment setup, schedule and resource loading.  Managed deliverables of Team size 3 resources.
  • 4.
    Venkatesan Resume  ProjectTasks are tracked under C2.0.  Ensured deliverables are delivered as per scheduled.  Knowledge Transition to the new resources in the team.  Worked on different OS configurations, Linux & Mac.  Worked on different network connections IPV4,IPV6 Project : Adobe WB eforms Client : WB Duration : Jan 2011 to July 2011 Description: Earlier project workflow tasks by WB were done manually. With the introduction of Adobe live cycle manual process was removed and the workflow tasks have been automated. Specialized Role:  Analyzed the issues raised during previous cycles project.  Provided QA efforts for IssuesChange Requests in project.  Tested on OS:2003, XP, MAC, Browsers:IE6,7,8,Safari and Firefox, Adobe versions 8.0,9.0 and 10.1.  Involved in Requirement Analysis and known Business process of Telecom and Business Partner forms.  Involved in Test cases creation and execution.  Logged issues found during Test execution and ensured issues are moved to closure. Project : Pricing Tool Client : NetApp Duration : August 2010 to Jan 2011 Description: Pricing Tool is used to calculate cost estimates of Professional services (PS) so that the service is sold for fair value. Specialized Role:  Involved in understanding the requirements of the enhancements & defects.  Involved in resource planning & work distribution.  Conducting team meetings, involved in solving the issues raised by the team members.  Monitoring the entire QA process right from development to Delivery.  Coordinating with the onsite team for resolving dependencies.  Involve in preparation of Test Plan.  Reviewing of Test cases & Enhancing of test cases according to the change requirements  Responsible for managing bug status.  Weekly report generation for bug trends.  Involved in preparation of release notes.  Keeping control over versions of files.  Communicating the client with the updated test status.
  • 5.
    Venkatesan Resume Project :Mustang III Client : NetApp Duration : May 2009 to August 2010 Description: STOR – Storage Optimization Report . Reporting changes are needed in content, usability, delivery, configurability, data refresh rate, and overall look and feel. Specialized Role:  Involved in resource planning & work distribution  Conducting team meetings, involved in solving the issues raised by the team members.  Involved in understanding the requirements of the enhancements & defects.  Monitoring the entire QA process right from development to Delivery.  Coordinating with the onsite team for resolving dependencies.  Involve in preparation of Test Plan and reviewing of TestPlan prepared by other team members.  Preparing and executing testcases against the requirement and logging defects.  Performing SQA audit for every release.  Performing CM audit once in a month.  Reviewing of Test cases & Enhancing of test cases according to the change requirements  Communicating the client with the updated test status.  Responsible for managing bug status and sending weekly status report to the client.  Involved in reviewing of release notes.  Keeping control over versions of files & modification being made. Project : LCDSV2.3 Client : Microsoft Duration : January 2009 –May 2009 Description: The LCDS is an easy-to-use authoring environment for designing and developing interactive e-learning content. Specialized Role:  Created Test Plan.  Created Test scenarios, Test cases and organized using VSS.  Performed functional testing on different environments.  Performed localization testing and globalization testing.  Test execution of application done using virtual machines.  Prepared Test summary report. Collected defect metrics.  Extensively used C2.0 for managing tasks and defect tracking. Project : Hyper-V Client : Microsoft Duration : November 2008 –January 2009 Description: Across Microsoft there are various online learning and certification products which deliver live Labs to the customers using Microsoft virtualization technology. Specialized Role:  Involved in Gray box testing for Test scenarios and Test case creation.
  • 6.
    Venkatesan Resume  ProvidedInputs during Test Plan creation.  Involved in Test estimation and organized Test cases.  Status Reporting. Project : ADP WebVehicle2.0 Client : ADP Duration : June 2006 –September2008 Description: ADP dealership services is the leading provider of retail solutions for automotive and truck dealerships and their manufacturers worldwide. Specialized Role:  Preparation of the Test Cases based on Functional specification.  Execution of the Test Cases.  Performed Black Box Testing.  Reviewing Test Cases and Test Data.  Performed Integration Testing.  Performed System Testing  Analyzing Test Result and log the Issues in QMS.  Reporting the Bugs.  Resolving Issues with Clients.
  • 7.
    Venkatesan Resume  ProvidedInputs during Test Plan creation.  Involved in Test estimation and organized Test cases.  Status Reporting. Project : ADP WebVehicle2.0 Client : ADP Duration : June 2006 –September2008 Description: ADP dealership services is the leading provider of retail solutions for automotive and truck dealerships and their manufacturers worldwide. Specialized Role:  Preparation of the Test Cases based on Functional specification.  Execution of the Test Cases.  Performed Black Box Testing.  Reviewing Test Cases and Test Data.  Performed Integration Testing.  Performed System Testing  Analyzing Test Result and log the Issues in QMS.  Reporting the Bugs.  Resolving Issues with Clients.