The document discusses renovations to the main dome of Vaux le Vicomte Castle in France. A scaffolding system without supports on the dome will be constructed using a 150 ton Layher scaffold and steel deck. A 19 meter footbridge will be assembled on the ground and lifted into place by crane to provide access. Diagrams show the scaffolding structure and fixation points on the wooden skeleton underneath the dome.
Industrial Products | Transport | Shrink Wrap Services ChristchurchShrink Wrap
Industrial products and transportation products shrink wrap services by Shrink Wrap. Our installation teams are at the heart of our company. Our Staff are experienced and committed. We aim to wrap your product to perfection!
Industrial Products | Transport | Shrink Wrap Services ChristchurchShrink Wrap
Industrial products and transportation products shrink wrap services by Shrink Wrap. Our installation teams are at the heart of our company. Our Staff are experienced and committed. We aim to wrap your product to perfection!
Layher ontving Constructiv om de nieuwste mogelijkheden kenbaar te maken.
Tevens was er aan het bezoek een rondgang in de vestiging te Kontich gekoppeld. Vele nieuwe complete oplossingen werden verduidelijkt.
Layher Allround® Mobile Disco creatie van Total Event Creations - Kruibekebert vanden eynde
tijdelijke mobiele discotheek
hoge draagkracht tot 750kg/m2
snel aanpasbaar, vergroten of verkleinen
prachtig zicht op de Schelde vanuit deze constructie
Layher Kaefer Thv Wijngaard Shoppingcenter K Te Kortrijk Bert Vanden Eynde ...bert vanden eynde
Kaefer nv uit Sint-Niklaas leverde engineering en uitvoering van een ruimte steiger met ondersteuning in. Het shoppingcenter K te Kortrijk moet op snel tempo opgebouwd worden. Kaefer staat met naam erg bekend in bouw en industrie ivm goeddoordachte steigers concepten
Layher ontving Constructiv om de nieuwste mogelijkheden kenbaar te maken.
Tevens was er aan het bezoek een rondgang in de vestiging te Kontich gekoppeld. Vele nieuwe complete oplossingen werden verduidelijkt.
Layher Allround® Mobile Disco creatie van Total Event Creations - Kruibekebert vanden eynde
tijdelijke mobiele discotheek
hoge draagkracht tot 750kg/m2
snel aanpasbaar, vergroten of verkleinen
prachtig zicht op de Schelde vanuit deze constructie
Layher Kaefer Thv Wijngaard Shoppingcenter K Te Kortrijk Bert Vanden Eynde ...bert vanden eynde
Kaefer nv uit Sint-Niklaas leverde engineering en uitvoering van een ruimte steiger met ondersteuning in. Het shoppingcenter K te Kortrijk moet op snel tempo opgebouwd worden. Kaefer staat met naam erg bekend in bouw en industrie ivm goeddoordachte steigers concepten
1. Technical and sales meeting
Vaux le Vicomte Castle
Damien VUILLET Technical and sales meeting – April 2012
2. Main specifications :
-Renovation of the main dome with no support on it
-Castle opened to the visitors
-Access of the working site above the river
-Scaffold with canopy on each face
-Keder roof at the top
Damien VUILLET Technical and sales meeting – April 2012
4. 3D view with only steel deck
Damien VUILLET Technical and sales meeting – April 2012
5. The footbridge access
-Length of 19m
-Assembled on ground then
put in by crane
-7T500 of ballast for the
stability
Damien VUILLET Technical and sales meeting – April 2012
6. Principle of the scaffold
Top view
Creation of 4 scaffolds beams
Damien VUILLET Technical and sales meeting – April 2012
7. Front view Middle view
No support on the dome
Damien VUILLET Technical and sales meeting – April 2012
8. Rear view
Fixation on the wooden
skeleton
Damien VUILLET Technical and sales meeting – April 2012
9. Section in the middle of the dome
Fixation on the wooden
skeleton Last level of anchoring (3 plugs)
Damien VUILLET Technical and sales meeting – April 2012
14. -150t of LAYHER scaffold system
-760kg of wind force by plug
-1160kg on each wooden fixation
-Maximum load per standard : 3580kg