Validation Testing

                                    Saranya.V
                                      AP/CSE,
Sri Vidya College of Engineering & Technology,
                                 Virudhunagar
• Validation succeeds when software functions
  in a manner (expected by the customer).
Validation Test Criteria:
• Achieved through series of black box testing.
• Test plan & Test procedure are designed to
  check:
  – Requirements are satisfied or not
  – All behavioral characteristics are achieved or not
  – All performance requirements are attained or
    not
  – Document is correct or not.
Configuration Review
• Check all elements of software configuration
  have been properly developed or not.
• This phase also known as “Audit”.
Alpha and Beta Testing
• Alpha Test: Conducted at the developers site
  by customer.
  – controlled environment
• Beta Test: Conducted at one or more
  customers site by end user.
  – Environment cannot be controlled by developer.

Validation testing

  • 1.
    Validation Testing Saranya.V AP/CSE, Sri Vidya College of Engineering & Technology, Virudhunagar
  • 2.
    • Validation succeedswhen software functions in a manner (expected by the customer). Validation Test Criteria: • Achieved through series of black box testing. • Test plan & Test procedure are designed to check: – Requirements are satisfied or not – All behavioral characteristics are achieved or not – All performance requirements are attained or not – Document is correct or not.
  • 3.
    Configuration Review • Checkall elements of software configuration have been properly developed or not. • This phase also known as “Audit”.
  • 4.
    Alpha and BetaTesting • Alpha Test: Conducted at the developers site by customer. – controlled environment • Beta Test: Conducted at one or more customers site by end user. – Environment cannot be controlled by developer.