This document provides an overview of the 2015 Toyota Avalon sedan. It describes the Avalon's elegant exterior design, luxury interior features, available technology, and performance. Key points include its sculpted body lines, lightweight construction, spacious rear seats, available navigation and app integration, leather upholstery, independent suspension, 268-horsepower V6 engine, and fuel efficient Hybrid model. The document aims to showcase how the Avalon was designed to provide an engaging driving experience and luxury amenities.