Srinath
Dot Net Application Developer
Professional Summary:
 Over 8 years of IT Experience in complete Software Development life cycle (SDLC)
including requirement analysis, design, development, implementation, testing, integration,
deployment, documentation and maintenance of Web Applications, Windows Applications,
Client/Server, N-Tier Applications in .NET framework 3.0/3.5/4.0/4.5 using Vb.net, C#,
ASP.NET, ADO.NET, AJAX, Web Services, IIS 7.0/6.0/5.0, SQL Server
2000/2005/2008/2012, LINQ, MVC 4.5/4.0, Entity Framework, WCF 4.5, WPF.TFS
(Team foundation server),
 Thorough knowledge of all phases of software development life cycle (SDLC), including
Requirement Gathering, Analysis, Design, Development and Testing of applications.
 Utilized current and upcoming industry trends and practices to create Sitecore CMS
websites. Developed, coded worked on multi threading and reviewed Sitecore CMS web
programs.
 Solid Experience with Data Accessing using Data Adapter, Data Reader and Dataset in
ADO.NET and Language Integrated Query (LINQ) Providers for data manipulation
 Strong understanding of OOP Concepts and good knowledge of common Design Patterns.
 Expert in Healthcare/Pharmacy Billing solutions
 Experienced with using Source Code Version Control Systems like CVS, MS Visual
Source Safe (VSS) and TFS (Team Foundation Server).
 Experience in creating test cases and performing Unit Testing, NUNIT, Integration
Testing and Functional Testing.
 Experience of creating and Integrating RESTFUL API / Web Services for Websites.
 Optimized code development, securing the application and re-factoring the code.
 Hands-on experience in using different software methodologies like Waterfall, Agile,
Scrum and Test-driven.
 Hands on experience as DB2, DBA for mainframes and AIX environments
 Good Knowledge of WPF Applications using XAML.
 Experience in using Master page, CSS, CSS3 and HTML, HTML5, JavaScript and
JQuery to maintain uniform look and feel of the web application.
 Good knowledge over message queue (MQ) processing on windows.
 Worked on SAAS (Software as A Service) systems.
 Strong Experience in using SOA/Web Services and WCF.
 Experience in developing applications using WPF, Win forms and Web forms.
 Experience developing software with ASP.NET and MVC.
 Experience with data access using Entity Framework.
Srinath
Dot Net Application Developer
 Well know the business and also has knowledge on E-commerce.
 Good knowledge over MS dynamic CRM metrics.
 Experience in Oracle supplied packages, Dynamic SQL, Records and PL/SQL Tables
 Experience in database design and server-side programming in SQL-Server and Oracle.
 Extensively worked with stored procedures, triggers in SQL Server 2005/2008/2012 and
Oracle database servers.
 Experience in leading and supporting team, offshore co-ordination, customer and client
relationship.
 Goal oriented team player, Self-motivated, hardworking professional, quick learner and
communication skills.
 Able to manage multiple projects simultaneously in an organized manner, work on tight
schedules and deliver high quality applications on time.
TECHNICAL SKILLS:
Languages C, C++, C#.Net (4.5/4.0/3.5/3.0), VB.Net (11.0/10.0/9.0/8.0)
Microsoft
technologies .Net Framework 1.0, 2.0, 3.0, 4.0 and 4.5, C#.NET, ASP.NET, ADO.NET
Reporting Tools
Microsoft SQL Server Reporting Services(SSRS), Crystal Reports 8.5/9.0/10/11/12
Tools & IDE
Microsoft Visual Studio 2002/2003/2005/2008/2010/2012/2013, Microsoft SQL
Server Management Studio
Web Technologies
HTML, CSS, CSS3, DHTML, HTML5, XML, XSD, XSL/XSLT, JavaScript,
Angular JS, JSON, JQuery, Bootstrap, Kendo UI, AJAX, Silver light, ASP.NET
Framework 1.0/1.1/2.0/3.5/4.0/5.0, WCF and LINQ-XML, LINQ-SQL, MVC 3/4/5.
.Net Technologies
ASP.NET, MVC, ADO.NET, Win Forms, Web forms, Web Services, WPF, WCF,
and LINQ.
Middle Ware
ADO.NET 4.0/3.5/3.0/2.0, Web services, WCF, ADO.NET Entity Framework, Web
API
Platforms/OS Windows 8, Windows 7, Vista, Windows XP, Windows 2003/2008 Servers, Android.
DBMS/RDBMS Microsoft SQL Server 2012/2008R2/2008/2005/2000, Oracle10g/11g.
Web/Application
Servers
IIS 5.0/6.0/7.0, SharePoint Server.
Version controls Visual source safe (VSS), Team Foundation Server (TFS), SVN and GIT Hub.
Srinath
Dot Net Application Developer
PROFESSIONAL EXPERIENCE:
Charter Communications, Stamford, CT Apr 2015 – Till Date
Sr.NET Developer
Responsibilities:
• Developed web application included team members from other countries using TFS in
Agile/Scrum environment for collaboration.
• Creating applications using VB.NET and enhancing projects for .NET applications
• Designing data modeling for .NET applications of new projects and reviewing high and low
level designs
• Extensively used web technologies like ASP.NET, C#, JavaScript, XML and HTML in
designing and developing the web projects.
• Involved in evaluating visual design mocks and usability wireframes for feasibility of
responsive HTML5/CSS3 conversion.
• Developed, coded and reviewed Sitecore CMS web programs and designed .Net application
features and also managed MS dynamics CRM systems throughout project lifecycle.
• Designed and developed several mappings to load data from Source systems to ODS and then
to Data Mart.
• Worked directly with the Azure Product team in tracking and resolving defects.
• Deep knowledge of Angular JS, designing WPF Forms, Win Forms, Custom Controls
and User Controls using XAML language for UI and Dynamic Web Parts.
• Implemented ASP.NET validation controls, JavaScript, jQuery, CSS for server and client
side validations respectively.
• Coding of custom WordPress theme and template files using HTML, CSS, PHP and
Bootstrap 3 frame work.
• Developed WordPress MU based web services, and customized plugin and built new plugins
and integrated WordPress based websites with other websites.
• Integrating RESTFUL API & Web services on Word Press and other PHP based Websites.
• Creation and maintenance of SQL tables related to enrollment, billing, and group set
up in QNXT.
• Managed session state using SQL Server.
• Creation of database objects like tables, views, materialized views, procedures and
packages using oracle tool like PL/SQL Developer
Srinath
Dot Net Application Developer
• Performance tuning of Oracle Databases and User applications.
• Administered DB2 subsystems in Prod, Qual, Test and Development regions and experience
working with the e commerce tools of IBM’s Web sphere.
• Good knowledge on MQ series on windows and program-to-program messaging across
multiple platforms.
• Designed the front end user interface by using Asp.Net, HTML and Telerik RAD Ajax
controls.
• Used Model View Controller (MVC) architectural Design Patterns and multi threading for
the development of the product and IIS Management.
• Worked with WCF Instance Modes, Security, Service, Data, and Operation Contracts.
• Implemented CRUD functionality with Entity framework in ASP.NET MVC and
implemented sorting, filtering and paging with Entity framework in MVC.
• Created Database objects like Tables, Stored Procedures and Triggers in SQL Server.
• Used ADO.NET objects such as Data Reader, Data Adapter and Data Set to object data
source fetch and handle user data.
• Entity framework ORM at data access layer. Developed Store procedures where complexity
is high and executed using Entity framework
• Created DAL (Data Access Layers) to establish database connectivity and data
manipulation.
• Word Press and Umbraco CMS packages for gathering and analyzing the Business, Users,
and System Requirements for several dynamic websites.
• Have implemented LINQ to SQL, Database and XML.
• Worked on the legacy applications utilizing VC++ modules.
• Responsible for deployment of the Application in UAT and also worked on NUNIT testing
resolving any post-deployment issues.
• Used XML/XSLT for data transformation and worked on windows forms.
• Designed and developed reports using SSRS depending upon the input parameters.
Environment: .Net Framework 4.5, Visual Studio 2013, ASP.NET 4.0, VB.NET, C#, HTML, CSS,
JavaScript, WCF, XML, XSD, XSLT, SQL Server, PL/SQL Toad for Oracle, Crystal Reports,
AJAX, TFS, Infragistics controls, Agile/scrum methodology.
Transunion, Chicago, IL Aug 2013- Mar 2015
Sr.NET Developer
Responsibilities:
Srinath
Dot Net Application Developer
• Product development is an Agile (SCRUM) methodology, where progress and task
assignment is discussed in everyday meetings.
• MVC (model-view-controller) architecture based development and create views and Partial
Views – UI and middle tier for various modules using C#, MVC (Razor View Engine),
jQuery, HTML, CSS.
• Used AJAX for Partial Page Updating, Invisible Data Retrieval, Constant Updating, Smooth
Interfaces, Simplicity and Rich Functionality.
• Created Forms that provide Asynchronous operations using AJAX Helper Class to provide
functionalities like Partial Page Rendering, Client Side Validations, Error Handling and
Auto Complete to optimize UI.
• Designed CRM technologies for marketing of organization products allowing effective
communication with customers
• Designed RESTFUL APIs that allow sophisticated, effective and low cost application
integration.
• Designed reporting ODS, staging area and data marts for each Line of Business (total of 5) to
deliver Enterprise Data Warehouse (EDW).
• Validated (X) HTML and HTML5 markup to ensure W3C conformance.
• Implemented changes in coding and designs using knowledge of VB .NET
• Developed and tested user-friendly navigators by utilizing JavaScript and VB .NET
• Migrated VB 6.0 to VB.NET. As the existing modules functionality are developed using VB
6.0
• Assisted in designing and development of DB2 and Oracle server and database objects.
• Had good experience working with the MQ on various platforms.
• Expertise in Angular JS controllers, directives, components, factory and service resources,
routings and events.
• Analysis of the current XAML codebase making recommendations for WPF& Silverlight
compatibility and recommendations
• Used Validation Controls, CSS in Web Forms for frontend development.
• Designed and developed UI using ASP.NET, HTML, CSS, jQuery and AJAX.
• Developed style-sheets for UI design and layout and used MVC and MVVM pattern.
• Used multi threading and WCF for creating services for the application.
• Extensively used SOA services and created WSDL’s.
• Worked with IIS and Windows Server during application deployment and worked on cloud
deployment using Site core
• Built client websites with WordPress and also Installed, configured and managed
WordPress installations.
Srinath
Dot Net Application Developer
• Developed Windows console application and MSMQ to create bundle in thread queue.
• Developed an Azure based high performance compute environment and client side
validations were designed using Data Annotations and java script.
• Hands on work experience in MOQ (Mock) unit testing framework using MVC and razor
code in View pages.
• Experience on data integration using SSIS and Developed Log4Net for creating log files.
• Involved in migrating database from oracle 9i to 10g database.
• UsedLINQ,ADO.NET, Entity framework and related data objects such as Data Adapter,
Data Reader, Data Set and Data Table for consistent access to SQL data sources.
• Created Stored Procedures, oracle PL/SQL statements, Functions to manipulate the
databases.
• Developed applications in Test-driven environment-using Unit testing and Performing unit-
testing on logics that are being built.
• Actively participated in project schedule, code reviews and deliveries. Deployed the
application and components on the test and production servers. Used TFS for the purpose
of project tracking and Source Control.
Environment: ASP.NET; C#; Web Services; WCF; MVC; WWF, LINQ; HTML; CSS; IIS, Visual
Studio; Pl/SQL, SQL Server; SQL Server Management Studio; Entity Framework; AJAX;
ADO.NET Framework; VB.NET; MVC Architecture; TFS, SSIS, WPF, XAML Sitecore.
GEICO, Chevy Chase, MD May 2012 - Jul 2013
Sr.NET Developer
Responsibilities:
• Involved in Analysis, System Requirements, Design, development, testing, implementation
and documentation of the system.
• Design components using Visio that includes Class Diagrams and Sequence Diagrams.
• Design Web Pages and build multi-tier system using Visual Studio.NET, C#.NET,
ASP.NET and ADO.NET.
• Worked on Text, HTML, Articles, Links, and Forms Module of Dot Net Nuke.
• Conducted analysis, designing and assembly of software components in Open Text CMS
applications using C# and to create webpages.
• Involved in Web Application Development using Client Script design technologies like
Angular JS, JQuery as well as HTML, CSS, XML java Script.
Srinath
Dot Net Application Developer
• Developed responsive website templates using HTML5, CSS3.
• Managed MS dynamic CRM systems throughout project lifecycle ensuring standards were
maintained.
• Designed, developed and deployed company WordPress site and used specialized plugins for
SEO.
• Involved in Health Care related Systems and Vendor evaluation and User Acceptance
• Consolidated all Team Projects into from TFS 2008 to TFS 2010 Project Collections.
• Maintained technical documentation for CMS Open text applications as per SDLC standards
and procedures.
• Worked on Class, Objects, Methods, Inheritance, Exception and ADO.NET.
• Worked on designing Master Pages, AJAX Toolkit and Cascading Style Sheets.
• Developed User Interface with ASP.NET Controls.
• Creating applications using C# and enhancing projects for .NET applications
• Designed, architected, programmed Win Forms, Web based Application and Libraries.
• Designed GUI using C# and WPF.
• Involved in designing numerous Oracle Forms and Reports by interacting directly with End
Users and Business Analyst.
• Tuned Report performance by exploiting the Oracle’s new built-in functions and rewriting
SQL statements.
• Involved in Developing Rich Interactive GUI using Silverlight 3.0 User
Controls, XAML and Microsoft Expression Blend/Designer
• Developed new user interface components for different modules using Kendo UI
• Extensively worked on the .NET Data Grid controls to display user information.
• Created different UML diagrams using Microsoft Visio.
• Involved in developing new modules using JQuery, JQuery UI, JSON
• Develop complex MVC Controller, View Models and Helper methods linked to backend
database.
• Worked on Web Services integration and used SOA services and created WSDL’s.
• Created Schemas, Indexes, Stored Procedures and Views for data storage and retrieval.
• Active role in unit testing, integration testing and code debugging, build and release process
and Bug fixes.
• Involved in Weekly/Monthly Calls with Solution Managers to discuss the status of the above-
mentioned Microsoft systems.
Srinath
Dot Net Application Developer
Environment: .NET framework 4.0, Visual studio 2010, C#, SOA, XML, WPF, Win Forms,
WSDL, SQL Server 2008, Oracle, JavaScript, AJAX, MVC, JQuery, Entity Framework, Web
Services, Microsoft Visio.
BCBS, Jacksonville, FL Feb 2011 – May 2012
Sr.NET Developer
Responsibilities:
• Involved in communicating with the clients, gathering requirements for the development of
different applications.
• Extensively used web technologies like ASP.NET, C#, JavaScript, XML and HTML in
designing and developing the web projects.
• Designed and developed the user interface for various tools and implemented ASP.NET
validation controls, JavaScript, jQuery, CSS for server and client side validations
respectively
• Worked with Type 1 and 2 dimensions, fact tables, star schema design, Operational Data
Store (ODS) and other data warehouse concepts.
• Implemented complex business logic using C# entity-object model in the process of re-
engineering one of the existing modules.
• Designed the front end user interface by using Asp.Net, HTML and Telerik RAD Ajax
controls.
• Built, manipulated, edited and repurpose WordPress plugins in accordance to customer
needs.
• Expert in user interface development WPF and XAML.
• Developed Web Services, which can be used by a number of clients in getting useful data.
• Worked with WCF Service Contracts, Data Contracts, Operation Contracts, Instance Modes
and Security of the services.
• Used Ajax Controls for calendar control and free text box controls on the UI.
• Converted Applications from VB.NET (Win Forms) to Web Forms(C#).
• Created Database objects like Tables, Stored Procedures and Triggers using Oracle 10g.
• Used XML/XSLT for data transformation and worked on windows forms.
• Designed and developed reports using SSRS depending upon the input parameters.
• Responsible for maintaining versions of source code using Team Foundation Server.
Srinath
Dot Net Application Developer
• Have arranged Live Meetings, Conference Calls in case situation demands for resolving
issues.
• Involved in developing small tools using SQL, which would automate certain time, framed
activities (which were earlier done manually) and hence improve the productivity of our
team.
Environment: .Net Framework 4.0 and 3.5, Visual Studio 2010 and 2008, ASP.NET 4.0 and
3.5, C#, HTML, CSS, JavaScript, WCF, XML, XSD, XSLT, PL/SQL Toad for Oracle, Crystal
Reports, VSS, and Infragistics controls.
Met Life, India Mar 2009 – Dec 2010
.NET Developer
Responsibilities:
• Interacted with business analysts in gathering the requirements for the application
• Designed and Developed the Application using ASP.NET.
• Created Web Forms using C#.Net and ASP.NET with Visual Studio.
• Used HTML, DHTML, Cascading Style Sheets, JavaScript and .Net Validation controls.
• Designed user interfaces for the web using XHTML.
• Created and validated Web Pages (Master pages, themes, and Site navigation maps) by using
AJAX.
• Used Cascading Style Sheets (CSS) to accomplish uniformity of all web pages.
• Managed session state using SQL Server.
• Involved in writing the code for the application, Exceptions, Tracing the errors and bug
fixing.
• Used ADO.Net for database connectivity and retrieving data from SQL server.
• Used Dataset, Data Reader, Data Adapter classes of ADO.NET to communicate with SQL
Server.
• Experience working with WordPress and customized WordPress installations using
Dreamweaver.
• Developed application by implementing Model View Control (MVC) design patterns.
• Experience managing enterprise implementations of healthcare information
• Used JavaScript, jQuery for client side animations and validations.
• Had good knowledge on XAML and WPF.
• Developed SQL stored procedures for data manipulation and querying data from SQL
server and involved in UNIT testing.
Srinath
Dot Net Application Developer
• Worked with Web controls, User controls and Custom controls.
• Used SMTP mail class of .NET for the users to send mail with suggestions, receive any
alerts, receive confirmation notice etc.
• Developed custom ad-hoc reports by using SQL Server Reporting Services (SSRS).
• Application framework development and Implementing Interfaces using VB.NET
• Used Team Foundation Server (TFS) for source control and management.
• Involved in unit testing and integration testing of the Application.
Environment: C#. NET, ASP.NET, VB.NET, ADO.NET, AJAX, HTML, JavaScript, j Query,
CSS, MVC, TFS, SQL Server, Visual Studio, SSRS, IIS, Windows XP, Unit testing.

SRINATH RESUME

  • 1.
    Srinath Dot Net ApplicationDeveloper Professional Summary:  Over 8 years of IT Experience in complete Software Development life cycle (SDLC) including requirement analysis, design, development, implementation, testing, integration, deployment, documentation and maintenance of Web Applications, Windows Applications, Client/Server, N-Tier Applications in .NET framework 3.0/3.5/4.0/4.5 using Vb.net, C#, ASP.NET, ADO.NET, AJAX, Web Services, IIS 7.0/6.0/5.0, SQL Server 2000/2005/2008/2012, LINQ, MVC 4.5/4.0, Entity Framework, WCF 4.5, WPF.TFS (Team foundation server),  Thorough knowledge of all phases of software development life cycle (SDLC), including Requirement Gathering, Analysis, Design, Development and Testing of applications.  Utilized current and upcoming industry trends and practices to create Sitecore CMS websites. Developed, coded worked on multi threading and reviewed Sitecore CMS web programs.  Solid Experience with Data Accessing using Data Adapter, Data Reader and Dataset in ADO.NET and Language Integrated Query (LINQ) Providers for data manipulation  Strong understanding of OOP Concepts and good knowledge of common Design Patterns.  Expert in Healthcare/Pharmacy Billing solutions  Experienced with using Source Code Version Control Systems like CVS, MS Visual Source Safe (VSS) and TFS (Team Foundation Server).  Experience in creating test cases and performing Unit Testing, NUNIT, Integration Testing and Functional Testing.  Experience of creating and Integrating RESTFUL API / Web Services for Websites.  Optimized code development, securing the application and re-factoring the code.  Hands-on experience in using different software methodologies like Waterfall, Agile, Scrum and Test-driven.  Hands on experience as DB2, DBA for mainframes and AIX environments  Good Knowledge of WPF Applications using XAML.  Experience in using Master page, CSS, CSS3 and HTML, HTML5, JavaScript and JQuery to maintain uniform look and feel of the web application.  Good knowledge over message queue (MQ) processing on windows.  Worked on SAAS (Software as A Service) systems.  Strong Experience in using SOA/Web Services and WCF.  Experience in developing applications using WPF, Win forms and Web forms.  Experience developing software with ASP.NET and MVC.  Experience with data access using Entity Framework.
  • 2.
    Srinath Dot Net ApplicationDeveloper  Well know the business and also has knowledge on E-commerce.  Good knowledge over MS dynamic CRM metrics.  Experience in Oracle supplied packages, Dynamic SQL, Records and PL/SQL Tables  Experience in database design and server-side programming in SQL-Server and Oracle.  Extensively worked with stored procedures, triggers in SQL Server 2005/2008/2012 and Oracle database servers.  Experience in leading and supporting team, offshore co-ordination, customer and client relationship.  Goal oriented team player, Self-motivated, hardworking professional, quick learner and communication skills.  Able to manage multiple projects simultaneously in an organized manner, work on tight schedules and deliver high quality applications on time. TECHNICAL SKILLS: Languages C, C++, C#.Net (4.5/4.0/3.5/3.0), VB.Net (11.0/10.0/9.0/8.0) Microsoft technologies .Net Framework 1.0, 2.0, 3.0, 4.0 and 4.5, C#.NET, ASP.NET, ADO.NET Reporting Tools Microsoft SQL Server Reporting Services(SSRS), Crystal Reports 8.5/9.0/10/11/12 Tools & IDE Microsoft Visual Studio 2002/2003/2005/2008/2010/2012/2013, Microsoft SQL Server Management Studio Web Technologies HTML, CSS, CSS3, DHTML, HTML5, XML, XSD, XSL/XSLT, JavaScript, Angular JS, JSON, JQuery, Bootstrap, Kendo UI, AJAX, Silver light, ASP.NET Framework 1.0/1.1/2.0/3.5/4.0/5.0, WCF and LINQ-XML, LINQ-SQL, MVC 3/4/5. .Net Technologies ASP.NET, MVC, ADO.NET, Win Forms, Web forms, Web Services, WPF, WCF, and LINQ. Middle Ware ADO.NET 4.0/3.5/3.0/2.0, Web services, WCF, ADO.NET Entity Framework, Web API Platforms/OS Windows 8, Windows 7, Vista, Windows XP, Windows 2003/2008 Servers, Android. DBMS/RDBMS Microsoft SQL Server 2012/2008R2/2008/2005/2000, Oracle10g/11g. Web/Application Servers IIS 5.0/6.0/7.0, SharePoint Server. Version controls Visual source safe (VSS), Team Foundation Server (TFS), SVN and GIT Hub.
  • 3.
    Srinath Dot Net ApplicationDeveloper PROFESSIONAL EXPERIENCE: Charter Communications, Stamford, CT Apr 2015 – Till Date Sr.NET Developer Responsibilities: • Developed web application included team members from other countries using TFS in Agile/Scrum environment for collaboration. • Creating applications using VB.NET and enhancing projects for .NET applications • Designing data modeling for .NET applications of new projects and reviewing high and low level designs • Extensively used web technologies like ASP.NET, C#, JavaScript, XML and HTML in designing and developing the web projects. • Involved in evaluating visual design mocks and usability wireframes for feasibility of responsive HTML5/CSS3 conversion. • Developed, coded and reviewed Sitecore CMS web programs and designed .Net application features and also managed MS dynamics CRM systems throughout project lifecycle. • Designed and developed several mappings to load data from Source systems to ODS and then to Data Mart. • Worked directly with the Azure Product team in tracking and resolving defects. • Deep knowledge of Angular JS, designing WPF Forms, Win Forms, Custom Controls and User Controls using XAML language for UI and Dynamic Web Parts. • Implemented ASP.NET validation controls, JavaScript, jQuery, CSS for server and client side validations respectively. • Coding of custom WordPress theme and template files using HTML, CSS, PHP and Bootstrap 3 frame work. • Developed WordPress MU based web services, and customized plugin and built new plugins and integrated WordPress based websites with other websites. • Integrating RESTFUL API & Web services on Word Press and other PHP based Websites. • Creation and maintenance of SQL tables related to enrollment, billing, and group set up in QNXT. • Managed session state using SQL Server. • Creation of database objects like tables, views, materialized views, procedures and packages using oracle tool like PL/SQL Developer
  • 4.
    Srinath Dot Net ApplicationDeveloper • Performance tuning of Oracle Databases and User applications. • Administered DB2 subsystems in Prod, Qual, Test and Development regions and experience working with the e commerce tools of IBM’s Web sphere. • Good knowledge on MQ series on windows and program-to-program messaging across multiple platforms. • Designed the front end user interface by using Asp.Net, HTML and Telerik RAD Ajax controls. • Used Model View Controller (MVC) architectural Design Patterns and multi threading for the development of the product and IIS Management. • Worked with WCF Instance Modes, Security, Service, Data, and Operation Contracts. • Implemented CRUD functionality with Entity framework in ASP.NET MVC and implemented sorting, filtering and paging with Entity framework in MVC. • Created Database objects like Tables, Stored Procedures and Triggers in SQL Server. • Used ADO.NET objects such as Data Reader, Data Adapter and Data Set to object data source fetch and handle user data. • Entity framework ORM at data access layer. Developed Store procedures where complexity is high and executed using Entity framework • Created DAL (Data Access Layers) to establish database connectivity and data manipulation. • Word Press and Umbraco CMS packages for gathering and analyzing the Business, Users, and System Requirements for several dynamic websites. • Have implemented LINQ to SQL, Database and XML. • Worked on the legacy applications utilizing VC++ modules. • Responsible for deployment of the Application in UAT and also worked on NUNIT testing resolving any post-deployment issues. • Used XML/XSLT for data transformation and worked on windows forms. • Designed and developed reports using SSRS depending upon the input parameters. Environment: .Net Framework 4.5, Visual Studio 2013, ASP.NET 4.0, VB.NET, C#, HTML, CSS, JavaScript, WCF, XML, XSD, XSLT, SQL Server, PL/SQL Toad for Oracle, Crystal Reports, AJAX, TFS, Infragistics controls, Agile/scrum methodology. Transunion, Chicago, IL Aug 2013- Mar 2015 Sr.NET Developer Responsibilities:
  • 5.
    Srinath Dot Net ApplicationDeveloper • Product development is an Agile (SCRUM) methodology, where progress and task assignment is discussed in everyday meetings. • MVC (model-view-controller) architecture based development and create views and Partial Views – UI and middle tier for various modules using C#, MVC (Razor View Engine), jQuery, HTML, CSS. • Used AJAX for Partial Page Updating, Invisible Data Retrieval, Constant Updating, Smooth Interfaces, Simplicity and Rich Functionality. • Created Forms that provide Asynchronous operations using AJAX Helper Class to provide functionalities like Partial Page Rendering, Client Side Validations, Error Handling and Auto Complete to optimize UI. • Designed CRM technologies for marketing of organization products allowing effective communication with customers • Designed RESTFUL APIs that allow sophisticated, effective and low cost application integration. • Designed reporting ODS, staging area and data marts for each Line of Business (total of 5) to deliver Enterprise Data Warehouse (EDW). • Validated (X) HTML and HTML5 markup to ensure W3C conformance. • Implemented changes in coding and designs using knowledge of VB .NET • Developed and tested user-friendly navigators by utilizing JavaScript and VB .NET • Migrated VB 6.0 to VB.NET. As the existing modules functionality are developed using VB 6.0 • Assisted in designing and development of DB2 and Oracle server and database objects. • Had good experience working with the MQ on various platforms. • Expertise in Angular JS controllers, directives, components, factory and service resources, routings and events. • Analysis of the current XAML codebase making recommendations for WPF& Silverlight compatibility and recommendations • Used Validation Controls, CSS in Web Forms for frontend development. • Designed and developed UI using ASP.NET, HTML, CSS, jQuery and AJAX. • Developed style-sheets for UI design and layout and used MVC and MVVM pattern. • Used multi threading and WCF for creating services for the application. • Extensively used SOA services and created WSDL’s. • Worked with IIS and Windows Server during application deployment and worked on cloud deployment using Site core • Built client websites with WordPress and also Installed, configured and managed WordPress installations.
  • 6.
    Srinath Dot Net ApplicationDeveloper • Developed Windows console application and MSMQ to create bundle in thread queue. • Developed an Azure based high performance compute environment and client side validations were designed using Data Annotations and java script. • Hands on work experience in MOQ (Mock) unit testing framework using MVC and razor code in View pages. • Experience on data integration using SSIS and Developed Log4Net for creating log files. • Involved in migrating database from oracle 9i to 10g database. • UsedLINQ,ADO.NET, Entity framework and related data objects such as Data Adapter, Data Reader, Data Set and Data Table for consistent access to SQL data sources. • Created Stored Procedures, oracle PL/SQL statements, Functions to manipulate the databases. • Developed applications in Test-driven environment-using Unit testing and Performing unit- testing on logics that are being built. • Actively participated in project schedule, code reviews and deliveries. Deployed the application and components on the test and production servers. Used TFS for the purpose of project tracking and Source Control. Environment: ASP.NET; C#; Web Services; WCF; MVC; WWF, LINQ; HTML; CSS; IIS, Visual Studio; Pl/SQL, SQL Server; SQL Server Management Studio; Entity Framework; AJAX; ADO.NET Framework; VB.NET; MVC Architecture; TFS, SSIS, WPF, XAML Sitecore. GEICO, Chevy Chase, MD May 2012 - Jul 2013 Sr.NET Developer Responsibilities: • Involved in Analysis, System Requirements, Design, development, testing, implementation and documentation of the system. • Design components using Visio that includes Class Diagrams and Sequence Diagrams. • Design Web Pages and build multi-tier system using Visual Studio.NET, C#.NET, ASP.NET and ADO.NET. • Worked on Text, HTML, Articles, Links, and Forms Module of Dot Net Nuke. • Conducted analysis, designing and assembly of software components in Open Text CMS applications using C# and to create webpages. • Involved in Web Application Development using Client Script design technologies like Angular JS, JQuery as well as HTML, CSS, XML java Script.
  • 7.
    Srinath Dot Net ApplicationDeveloper • Developed responsive website templates using HTML5, CSS3. • Managed MS dynamic CRM systems throughout project lifecycle ensuring standards were maintained. • Designed, developed and deployed company WordPress site and used specialized plugins for SEO. • Involved in Health Care related Systems and Vendor evaluation and User Acceptance • Consolidated all Team Projects into from TFS 2008 to TFS 2010 Project Collections. • Maintained technical documentation for CMS Open text applications as per SDLC standards and procedures. • Worked on Class, Objects, Methods, Inheritance, Exception and ADO.NET. • Worked on designing Master Pages, AJAX Toolkit and Cascading Style Sheets. • Developed User Interface with ASP.NET Controls. • Creating applications using C# and enhancing projects for .NET applications • Designed, architected, programmed Win Forms, Web based Application and Libraries. • Designed GUI using C# and WPF. • Involved in designing numerous Oracle Forms and Reports by interacting directly with End Users and Business Analyst. • Tuned Report performance by exploiting the Oracle’s new built-in functions and rewriting SQL statements. • Involved in Developing Rich Interactive GUI using Silverlight 3.0 User Controls, XAML and Microsoft Expression Blend/Designer • Developed new user interface components for different modules using Kendo UI • Extensively worked on the .NET Data Grid controls to display user information. • Created different UML diagrams using Microsoft Visio. • Involved in developing new modules using JQuery, JQuery UI, JSON • Develop complex MVC Controller, View Models and Helper methods linked to backend database. • Worked on Web Services integration and used SOA services and created WSDL’s. • Created Schemas, Indexes, Stored Procedures and Views for data storage and retrieval. • Active role in unit testing, integration testing and code debugging, build and release process and Bug fixes. • Involved in Weekly/Monthly Calls with Solution Managers to discuss the status of the above- mentioned Microsoft systems.
  • 8.
    Srinath Dot Net ApplicationDeveloper Environment: .NET framework 4.0, Visual studio 2010, C#, SOA, XML, WPF, Win Forms, WSDL, SQL Server 2008, Oracle, JavaScript, AJAX, MVC, JQuery, Entity Framework, Web Services, Microsoft Visio. BCBS, Jacksonville, FL Feb 2011 – May 2012 Sr.NET Developer Responsibilities: • Involved in communicating with the clients, gathering requirements for the development of different applications. • Extensively used web technologies like ASP.NET, C#, JavaScript, XML and HTML in designing and developing the web projects. • Designed and developed the user interface for various tools and implemented ASP.NET validation controls, JavaScript, jQuery, CSS for server and client side validations respectively • Worked with Type 1 and 2 dimensions, fact tables, star schema design, Operational Data Store (ODS) and other data warehouse concepts. • Implemented complex business logic using C# entity-object model in the process of re- engineering one of the existing modules. • Designed the front end user interface by using Asp.Net, HTML and Telerik RAD Ajax controls. • Built, manipulated, edited and repurpose WordPress plugins in accordance to customer needs. • Expert in user interface development WPF and XAML. • Developed Web Services, which can be used by a number of clients in getting useful data. • Worked with WCF Service Contracts, Data Contracts, Operation Contracts, Instance Modes and Security of the services. • Used Ajax Controls for calendar control and free text box controls on the UI. • Converted Applications from VB.NET (Win Forms) to Web Forms(C#). • Created Database objects like Tables, Stored Procedures and Triggers using Oracle 10g. • Used XML/XSLT for data transformation and worked on windows forms. • Designed and developed reports using SSRS depending upon the input parameters. • Responsible for maintaining versions of source code using Team Foundation Server.
  • 9.
    Srinath Dot Net ApplicationDeveloper • Have arranged Live Meetings, Conference Calls in case situation demands for resolving issues. • Involved in developing small tools using SQL, which would automate certain time, framed activities (which were earlier done manually) and hence improve the productivity of our team. Environment: .Net Framework 4.0 and 3.5, Visual Studio 2010 and 2008, ASP.NET 4.0 and 3.5, C#, HTML, CSS, JavaScript, WCF, XML, XSD, XSLT, PL/SQL Toad for Oracle, Crystal Reports, VSS, and Infragistics controls. Met Life, India Mar 2009 – Dec 2010 .NET Developer Responsibilities: • Interacted with business analysts in gathering the requirements for the application • Designed and Developed the Application using ASP.NET. • Created Web Forms using C#.Net and ASP.NET with Visual Studio. • Used HTML, DHTML, Cascading Style Sheets, JavaScript and .Net Validation controls. • Designed user interfaces for the web using XHTML. • Created and validated Web Pages (Master pages, themes, and Site navigation maps) by using AJAX. • Used Cascading Style Sheets (CSS) to accomplish uniformity of all web pages. • Managed session state using SQL Server. • Involved in writing the code for the application, Exceptions, Tracing the errors and bug fixing. • Used ADO.Net for database connectivity and retrieving data from SQL server. • Used Dataset, Data Reader, Data Adapter classes of ADO.NET to communicate with SQL Server. • Experience working with WordPress and customized WordPress installations using Dreamweaver. • Developed application by implementing Model View Control (MVC) design patterns. • Experience managing enterprise implementations of healthcare information • Used JavaScript, jQuery for client side animations and validations. • Had good knowledge on XAML and WPF. • Developed SQL stored procedures for data manipulation and querying data from SQL server and involved in UNIT testing.
  • 10.
    Srinath Dot Net ApplicationDeveloper • Worked with Web controls, User controls and Custom controls. • Used SMTP mail class of .NET for the users to send mail with suggestions, receive any alerts, receive confirmation notice etc. • Developed custom ad-hoc reports by using SQL Server Reporting Services (SSRS). • Application framework development and Implementing Interfaces using VB.NET • Used Team Foundation Server (TFS) for source control and management. • Involved in unit testing and integration testing of the Application. Environment: C#. NET, ASP.NET, VB.NET, ADO.NET, AJAX, HTML, JavaScript, j Query, CSS, MVC, TFS, SQL Server, Visual Studio, SSRS, IIS, Windows XP, Unit testing.