SOP Dismantle Indosat
Redepoyment Scope
2023年12月4日星期
一
Verify link donor
traffic status to our
regional team
Request
confirmation from
Indosat CM
Double confirm to
Indosat SOV make
sure link can be
dismantled
Request NIW
Prepare subcont for
dismantle
Follow up migration
progress to Indosat
(pak Bari Team)
Yes
No
Yes
No
Regional part
Jakarta Part
Carry traffic
Not Carry Traffic
SOP for Dismantle (subcont)
Siapkan Permit untuk akses ke site
Kontak pic Site untuk kunci
Photo kondisi site sebelum dismantle
Matikan IF board dan urut kabel dari
bawah sampai ke antenna
Telpon NOC dan FH ijin sebelum
dismantle
Dismantle Antenna, dan perangkat lainnya, untuk
IDU (confirm ke tim engineer terlebih dahulu)
Konfirmasi kembali ke NOC dan FH,
pastikan tidak ada masalah setelah
dismantle
Photo kondisi site setelah dismantle, isi
form dismantle (material list)
Semua activity di site harus
di bawah monitoring tim
engineer regional
Minta bantuan
engineer monitor dari
U2000, pastikan board
yang dimatikan benar
Collect Capture alarm, pastikan
perangkat yang didismantle tidak faulty
SOP for Dismantle (subcont)
Prepare Permit
Get access by contact site keeper
Check Site Condition and take photo
before enter site
Switch off IF board and Trace IF cable to
Antenna
Contact NOC before entrance Site and
Dismantle link
Dismantle Antenna and ODU part, For IDU please
contact Huawei Engineer follow guidance
Confirm to NOC and FH, make sure no
any service impact after dismantle
Take photo for site condition after
dismantle and make list for material
All Existing Network
Activity must be under
supervise Huawei Engineer
Regional
Contact Huawei
Engineer PIC to monitor
condition from NMS
Collect Existing Alarm and Capture
Cara mematikan IF board
Packing standard Board
2023年12月4日星期
一
Dismantle Grounding Cable
2023年12月4日星期
一
Dismantle Power Cable
Antenna 1.2m
2023年12月4日星期
一
Antenna Packing Box
Antenna 1.2m
2023年12月4日星期
一
Antenna 1.8m
Antenna Packing Box
2023年12月4日星期
一
Antenna 1.8m
2023年12月4日星期
一
Antenna 0.9m
Antenna Packing Box
2023年12月4日星期
一
Antenna 0.3m, 0.6m
2023年12月4日星期
一
Waveguide and Coupler need to dismantle
Thank You

SOP Dismantle For Redeployment Program 30 jan 2020.pptx