The document provides standard operating procedures for dismantling Indosat links. It outlines steps such as verifying traffic status, confirming with Indosat that the link can be dismantled, preparing permits and contacting site managers for access. Technicians are instructed to switch off equipment in a certain order, contact network operations centers, and confirm no issues occur after dismantling. Photographs must be taken before and after, and a dismantling report completed. Engineers must supervise all work. Dismantling includes antennas, cables, grounding equipment, and indoor hardware while ensuring alarms are addressed.