Social Networking Website Project  Guide: Mr. Rohit Rastogi Project  Team: Sumit Kumar  (Team Leader) Vinod Kr. Nigam(Team Member) “ Friendsworld.co.in”
Problem Definition Problem Statement: Friendsworld.co.in is an online social network service  by which user can establish a network among the people residing in all over the world. All the information can be easily accessed and shared among the people. This system provides users to register their various types of profile like social, personal, general, professional. send a scrap message, images, and music files to their friends.
User can maintain the scrap book whatever scraps he has send to users. upload the photos so that user can maintain own album & many more.
Need OF The Software: This software is developed keeping in mind the above-mentioned problems. The needs and requirements of the end users are also kept in mind while designing this software. This software will enable its users to maintain their friend list and user can update their friend list as well as we want to establish a network among the people residing in all over the world. All the information can be easily accessed and shared among the people.
Objective & Scope of The Project T he objective of this software is to completely automate the following processes: The main objective of the project is to establish a network among the people residing in all over the world. All the information can be easily accessed and shared among the people. This system provides users to register their various types of profile like social, personal, general, professional. This system provides users to send a scrap message, images, and music files to their friends. User can maintain the scrap book whatever scraps he has send to users.
The system provides users to upload the photos so that user can maintain own album. This system provides user to join the communities according to their scenario. This system provides the user to maintain their friend list and user can update their friend list. This system provides user to send invitation to another friend to join the Friendworld.co.in and can add to their friend list  for future.
WORK BREAKDOWN STRUCTURE Application Software Requirement specification Design Code Testing Document Database  Part Graphical Interface  Part Database Part Graphical Interface Part
ROLES & RESPONSIBILITY
F E A S I B I L I T Y  A N A L Y S I S Technical Feasibility: MS-SQL Server can manage large amount of data and is  simple and secure. Using ASP.NET helps us to design the look of our application and its windows. ASP.NET  full open database connectivity (ODBC)  with MS-SQL Server . Data accessibility, response and output require less time.
Behavioral Feasibility: Money is saved as paper work is minimized. Records are easily entered and retrieved. Time is saved as all the work can be done by a simple mouse click. The proposed system is fully automated and hence easy to use. Since benefits out base the cost, hence our project is economically feasible.
System Specification Hardware Specification: Suggested Configuration of Windows clients:-   Processor  :  Pentium-4 class processor or Above Ram  :  128 MB of RAM or Above Hard Disk  :  3.5 gigabytes (GB) on installation drive, which  Includes  10  GB on system drive. CD ROM Drive  :  52 X CD ROM Drive
Software Specification: Operating System  : Windows  XP Back End  : Microsoft Sql Server 2005 Front End   : Microsoft Visual Studio.NET with C#
 

Social Networking Website

  • 1.
    Social Networking WebsiteProject Guide: Mr. Rohit Rastogi Project Team: Sumit Kumar (Team Leader) Vinod Kr. Nigam(Team Member) “ Friendsworld.co.in”
  • 2.
    Problem Definition ProblemStatement: Friendsworld.co.in is an online social network service by which user can establish a network among the people residing in all over the world. All the information can be easily accessed and shared among the people. This system provides users to register their various types of profile like social, personal, general, professional. send a scrap message, images, and music files to their friends.
  • 3.
    User can maintainthe scrap book whatever scraps he has send to users. upload the photos so that user can maintain own album & many more.
  • 4.
    Need OF TheSoftware: This software is developed keeping in mind the above-mentioned problems. The needs and requirements of the end users are also kept in mind while designing this software. This software will enable its users to maintain their friend list and user can update their friend list as well as we want to establish a network among the people residing in all over the world. All the information can be easily accessed and shared among the people.
  • 5.
    Objective & Scopeof The Project T he objective of this software is to completely automate the following processes: The main objective of the project is to establish a network among the people residing in all over the world. All the information can be easily accessed and shared among the people. This system provides users to register their various types of profile like social, personal, general, professional. This system provides users to send a scrap message, images, and music files to their friends. User can maintain the scrap book whatever scraps he has send to users.
  • 6.
    The system providesusers to upload the photos so that user can maintain own album. This system provides user to join the communities according to their scenario. This system provides the user to maintain their friend list and user can update their friend list. This system provides user to send invitation to another friend to join the Friendworld.co.in and can add to their friend list for future.
  • 7.
    WORK BREAKDOWN STRUCTUREApplication Software Requirement specification Design Code Testing Document Database Part Graphical Interface Part Database Part Graphical Interface Part
  • 8.
  • 9.
    F E AS I B I L I T Y A N A L Y S I S Technical Feasibility: MS-SQL Server can manage large amount of data and is simple and secure. Using ASP.NET helps us to design the look of our application and its windows. ASP.NET full open database connectivity (ODBC) with MS-SQL Server . Data accessibility, response and output require less time.
  • 10.
    Behavioral Feasibility: Moneyis saved as paper work is minimized. Records are easily entered and retrieved. Time is saved as all the work can be done by a simple mouse click. The proposed system is fully automated and hence easy to use. Since benefits out base the cost, hence our project is economically feasible.
  • 11.
    System Specification HardwareSpecification: Suggested Configuration of Windows clients:-   Processor : Pentium-4 class processor or Above Ram : 128 MB of RAM or Above Hard Disk : 3.5 gigabytes (GB) on installation drive, which Includes 10 GB on system drive. CD ROM Drive : 52 X CD ROM Drive
  • 12.
    Software Specification: OperatingSystem : Windows XP Back End : Microsoft Sql Server 2005 Front End : Microsoft Visual Studio.NET with C#