Software Project Management


          Popescu Lavinia
          AN IV, CTI
 Proiectul
          software realizat reprezinta
 lucrarea mea de licenta.

 Subiectul  a fost ales datorita popularitatii
 utilizarii bazelor de date spatiale in aplicatii
 de geolocatie, alaturi de pasiunea personala
 pentru natura si intelegerea avantajelor
 realizarii unei planificari corespunzatoare
 inainte de orice excursie.
 Software    roles
    Technical Coordinator: Prof. Ing. Jian Ionel
    Analyst, developer, tester: Popescu Lavinia
 Principala   constrangere este data de predare
 a lucrarii.

 Proiectultrebuie finalizat tinand cont de
 perioade de inactivitate
 (sesiune, vacante), posibile issues (defectiuni
 software/hardware), indisponibilitatea
 coordonatorului tehnic, etc.
 Definirea proiectului
 Instalarea tool-urilor
 Implementare
 Testare
 Documentatie
 Sustinere
Hardware Setup:

Am ajuns la concluzia ca dotarile tehnice nu se ridicau la nivelul
necesitatilor. Prin urmare, a fost necesar upgrade netbook -> laptop.
Adaugare puncte de interes:

Punctele de interes pentru aceasta aplicatie:
Cabane, Lacuri, Trasee, Locuri unice de interes
(pesteri, manastiri, etc), Drum national

Implementarea interogari spatiale:

Se tine cont de anumite conditii
(interdictii, durata, dificultate, preferinte legate de
pret, cazare, transport). Se tine cont de distantele minime intre 2 sau
mai multe puncte.
Mi-am setat 2 evenimente milestone, in care este consultat
coordonatorul tehnic, si care vor action precum momente de
review si update pentru aplicatie si documentatie.
 Planificareaa fost realizata cu Microsoft
 Project, un tool util pentru vizualizarea
 comfortabila si intuitiva a perioadelor de
 lucru si repaus.

 Analizareasi impartirea pe task-uri ajuta la
 intelegerea si controlarea unui proiect.

More Related Content

Viewers also liked

Toypsweden2012 111218153015-phpapp02
Toypsweden2012 111218153015-phpapp02Toypsweden2012 111218153015-phpapp02
Toypsweden2012 111218153015-phpapp02TOYPSweden
 
Chemtrails 10 0529 ghent (1)
Chemtrails 10 0529 ghent (1)Chemtrails 10 0529 ghent (1)
Chemtrails 10 0529 ghent (1)LovingTruth
 
Chemtrails hearing EU parliament
Chemtrails hearing EU parliamentChemtrails hearing EU parliament
Chemtrails hearing EU parliamentLovingTruth
 
Chemtrails hearing EU Parliament, Brussels, 9 April 2013
Chemtrails hearing EU Parliament, Brussels, 9 April 2013Chemtrails hearing EU Parliament, Brussels, 9 April 2013
Chemtrails hearing EU Parliament, Brussels, 9 April 2013LovingTruth
 
English class 1º anos
English class   1º anosEnglish class   1º anos
English class 1º anosIsabel Araujo
 

Viewers also liked (10)

ISO 9000
ISO 9000ISO 9000
ISO 9000
 
Toypsweden2012 111218153015-phpapp02
Toypsweden2012 111218153015-phpapp02Toypsweden2012 111218153015-phpapp02
Toypsweden2012 111218153015-phpapp02
 
Chemtrails 10 0529 ghent (1)
Chemtrails 10 0529 ghent (1)Chemtrails 10 0529 ghent (1)
Chemtrails 10 0529 ghent (1)
 
Chemtrails hearing EU parliament
Chemtrails hearing EU parliamentChemtrails hearing EU parliament
Chemtrails hearing EU parliament
 
Chemtrails hearing EU Parliament, Brussels, 9 April 2013
Chemtrails hearing EU Parliament, Brussels, 9 April 2013Chemtrails hearing EU Parliament, Brussels, 9 April 2013
Chemtrails hearing EU Parliament, Brussels, 9 April 2013
 
Askeb IV Patologi
Askeb IV PatologiAskeb IV Patologi
Askeb IV Patologi
 
Esp sanda craina
Esp sanda crainaEsp sanda craina
Esp sanda craina
 
How to say
How to sayHow to say
How to say
 
How to say
How to sayHow to say
How to say
 
English class 1º anos
English class   1º anosEnglish class   1º anos
English class 1º anos
 

Sistem informatic geografic

  • 1. Software Project Management Popescu Lavinia AN IV, CTI
  • 2.  Proiectul software realizat reprezinta lucrarea mea de licenta.  Subiectul a fost ales datorita popularitatii utilizarii bazelor de date spatiale in aplicatii de geolocatie, alaturi de pasiunea personala pentru natura si intelegerea avantajelor realizarii unei planificari corespunzatoare inainte de orice excursie.
  • 3.  Software roles  Technical Coordinator: Prof. Ing. Jian Ionel  Analyst, developer, tester: Popescu Lavinia
  • 4.  Principala constrangere este data de predare a lucrarii.  Proiectultrebuie finalizat tinand cont de perioade de inactivitate (sesiune, vacante), posibile issues (defectiuni software/hardware), indisponibilitatea coordonatorului tehnic, etc.
  • 5.  Definirea proiectului  Instalarea tool-urilor  Implementare  Testare  Documentatie  Sustinere
  • 6.
  • 7. Hardware Setup: Am ajuns la concluzia ca dotarile tehnice nu se ridicau la nivelul necesitatilor. Prin urmare, a fost necesar upgrade netbook -> laptop.
  • 8. Adaugare puncte de interes: Punctele de interes pentru aceasta aplicatie: Cabane, Lacuri, Trasee, Locuri unice de interes (pesteri, manastiri, etc), Drum national Implementarea interogari spatiale: Se tine cont de anumite conditii (interdictii, durata, dificultate, preferinte legate de pret, cazare, transport). Se tine cont de distantele minime intre 2 sau mai multe puncte.
  • 9. Mi-am setat 2 evenimente milestone, in care este consultat coordonatorul tehnic, si care vor action precum momente de review si update pentru aplicatie si documentatie.
  • 10.
  • 11.  Planificareaa fost realizata cu Microsoft Project, un tool util pentru vizualizarea comfortabila si intuitiva a perioadelor de lucru si repaus.  Analizareasi impartirea pe task-uri ajuta la intelegerea si controlarea unui proiect.