TOPIC OUTLINE:
Risk.
Risk Management.
Risk management policy.
Risk assessment.
Risk Management Process.
Risk Management Standard.
Case Study
Azhar Aslam (2k15-MeT-36)
Possibility of loss or injury.
The chance of loss; the degree of probability of such loss.
The possibility of financial loss.
A possibility of harm or damage against which something
is insured.
Risks can come from various sources including uncertainty
in financial markets, threats from project failures (at any
phase in design, development, production, and life-cycles),
credit risk, accidents, natural causes etc.
 Risk management is the identification,
evaluation, and prioritization of risks
followed by coordinated and economical
application of resources to minimize,
monitor, and control the probability or
impact of unfortunate events or to
maximize the realization of
opportunities.
 Risks can come from various sources
including uncertainty in financial
markets, threats from project failures
(at any phase in design, development,
production, and life-cycles), credit risk,
accidents, natural causes etc.
Risk management:
Coordinated
activities to direct
and control an
organisation with
regard to risk
 There are two types of
events i.e. negative
events can be classified
as risks while positive
events are classified as
opportunities.
 Several risk management
standards have been
developed including the
Project Management
Institute, the National
Institute of Standards
and Technology, societies,
and ISO standards.
A demonstrable risk
management system
incorporates
• Risk profiles
• Risk assessments
• Treatment plans
• Results of monitoring &
risk reviews
• Evidence of consultation &
communication
• Good documentation /
formal records
 Definitions and goals vary widely according to whether the risk
management method is in the context of project management,
security, engineering, industrial processes, financial portfolios,
actuarial assessments, or public health and safety.
 Adopting good risk management ensures that an organization can
undertake activities in the knowledge that
a) appropriate and adequate measures are in place to maximize
the benefits, and
b) appropriate and adequate measures are in place to minimizing
the negative or unanticipated effects of any of the risks or
opportunities that are presented in the course of achieving
organizational objectives.
Set of components that provide the foundations
and organizational arrangements for designing,
implementing, monitoring, reviewing and
continually improving risk management
throughout the organization.
Statement of the overall
intentions and direction of an
organization related to risk
management.
Overall process of
risk identification,
risk analysis and risk
evaluation
The principles and practices of risk management
can be applied across an entire organization, to
its many areas and levels, as well as to specific
issues, functions, projects & activities.
Jamshaid Ali (2k15-MeT-38)
WHAT IS THE RISK
MANAGEMENT PROCESS?
The Risk Management Process consists of a series
of steps that, when undertaken in sequence,
enable continual improvement in decision-making.
Establish the context.
Identify the Risk.
Analyze the Risk.
Evaluate the risks.
Treat the risks.
Respond to the Risk.
Monitor the Risk.
 ESTABLISH THE
CONTEXT:
 Provides a five-step process to assist
with establishing the context within
which risk will be identified.
1-Establish the internal context
2-Establish the external context
3-Establish the risk management
context
4- Develop risk criteria
5- Define the structure for risk
analysis
 As previously discussed, risk is the chance of something happening
that will impact on objectives.
 As such, the objectives and goals of a business, project or activity
must first be identified to ensure that all significant risks are
understood.
 This ensures that risk decisions always support the broader goals
and objectives of the business. This approach encourages long-term
and strategic thinking.
 Is there an internal culture that needs to be
considered? For example, are staff Resistant to
change? Is there a professional culture that might
create unnecessary risks for the business?
 What staff groups are present?
What capabilities does the business have in terms
of people, systems, processes, equipment and other
resources?
2. ESTABLISH THE
EXTERNAL CONTEXT:
This step defines the overall environment in which a
business operates and includes an understanding of the
clients’ or customers’ perceptions of the business. An
analysis of these factors will identify the strengths,
weaknesses, opportunities and threats to the business in
the external environment.
A BUSINESS OWNER MAY ASK THE
FOLLOWING QUESTIONS WHEN
DETERMINING THE EXTERNAL
CONTEXT:
 A business owner may ask the following questions when
determining the external context:
• What regulations and legislation must the business comply with?
• Are there any other requirements the business needs to comply
with?
• What is the market within which the business operates? Who are
the competitors?
• Are there any social, cultural or political issues that need to be
considered?
3- ESTABLISH THE RISK
MANAGEMENT CONTEXT:
 Before beginning a risk identification exercise, it is
important to define the limits, objectives and scope of the
activity or issue under examination.
 For example, in conducting a risk analysis for a new
project, such as the introduction of a new piece of
equipment or a new product line, it is important to clearly
identify the parameters for this activity to ensure that all
significant risks are identified.
Risk criteria allow a business to clearly define
unacceptable levels of risk. Conversely, risk criteria may
include the acceptable level of risk for a specific activity or
event. In this step the risk criteria may be broadly defined
and then further refined later in the risk management
process.
5. DEFINE THE
STRUCTURE FOR RISK
ANALYSIS
Isolate the categories of risk that you want to
manage. This will provide greater depth and
accuracy in identifying significant risks.
The chosen structure for risk analysis will depend
upon the type of activity or issue, its complexity
and the context of the risks.
Muhammad Faisal (2k15-MeT-29)
 You can’t resolve a risk if you don’t know what
it is. There are many ways to identify risk. As
you do go through this step, you’ll want to
collect the data in a risk register.
 Once the context of the business has been
defined, the next step is to utilize the
information to identify as many risks as
possible.
 One way is brainstorming or even brainwriting,
which is a more structured way to get a group
to look at a problem.
Risk identification:
Involves identifying sources
of risk, areas of impact,
events and their causes and
consequences.
 As noted earlier, you can tap your resources. That can be
your team, colleagues or stakeholders. Find those
individuals with relevant experience and set up
interviews so you can gather the information you’ll need
to both identify and resolve.
 It doesn’t hurt to speak with that person in your
organization who is the glass is always half-empty type.
Their doom-and-gloom perspective can be surprisingly
helpful to see risks that might not be evident to everyone
else.
 Look both forward and backwards. That is, imagine the
project in progress. Think of the many things that can go
wrong. Note them. Do the same with historical data on
past projects. Now your list of potential risk has grown
 Once the context of the business has been defined, the
next step is to utilize the information to identify as
many risks as possible.
M.Abdullah (2k15-MeT-35)
1- Identifying retrospective risks
Retrospective risks are those that have previously
occurred, such as incidents or accidents. Retrospective risk
identification is often the most common way to identify
risk, and the easiest. It’s easier to believe something if it
has happened before. It is also easier to quantify its
impact and to see the damage it has caused.
 As you’re identifying risk, you’ll want to make sure
you that your risk register isn’t filling up with risks
that are really outliers and not risks at all. Make
sure the risks are rooted in the cause of a problem.
Basically, drill down to the root cause to see if the
risk is one that will have the kind of impact on your
project that needs identifying.
 When trying to minimize risk it’s good to trust your
intuition. This can point you to unlikely scenarios
that you just assume couldn’t happen. Remember,
don’t be overconfident. Use process to weed out risks
from non-risks.
 There are many sources of information
about retrospective risk. These include:
• Hazard or incident logs or registers.
• Audit reports.
• Customer complaints.
• Accreditation documents and reports.
• Past staff or client surveys.
• Newspapers or professional media, such as journals or websites.
 Prospective risks are often harder to identify. These are things that
have not yet happened, but might happen some time in the future.
 Identification should include all risks, whether or not they are
currently being managed. The rationale here is to record all
significant risks and monitor or review the effectiveness of their
control.
• Brainstorming with staff or external stakeholders
• Researching the economic, political, legislative and operating
environment
• Conducting interviews with relevant people and/or organizations
• Undertaking surveys of staff or clients to identify anticipated
issues or problems
• Flow charting a process
• Reviewing system design or preparing system analysis techniques.
TIPS FOR EFFECTIVE RISK
IDENTIFICATION:
Select a risk identification methodology appropriate to the
type of risk and the nature of the activity
 Involve the right people in risk identification activities
 Take a life cycle approach to risk identification and
determine how risks change and evolve throughout this
cycle.
Muhammad Shahbaz (2k15-MeT-30)
During the risk identification
step, a business owner may have
identified many risks and it is
often not possible to try to
address all those identified.
The risk analysis step will assist
in determining which risks have
a greater consequence or impact
than others.
What is risk analysis?
Risk analysis involves combining the possible
consequences, or impact, of an event,
with the likelihood of that event occurring. The
result is a ‘level of risk’. That is:
Risk = consequence x likelihood
The elements of risk analysis are as follows:
1. Identify existing strategies and controls that act to minimize
negative risk and enhance opportunities.
2. Determine the consequences of a negative
impact or an opportunity (these may be positive or negative).
3. Determine the likelihood of a negative consequence or an
opportunity.
4. Estimate the level of risk by combining consequence and likelihood.
5. Consider and identify any uncertainties in the estimates.
 Three categories or types of analysis can be used to determine level
of risk:
• Qualitative
• Semi-quantitative
• Quantitative.
 The most common type of risk analysis is the qualitative method.
The type of analysis chosen will be based upon the area of risk being
analyzed.
• Risk analysis is usually done in the context of existing controls –
take the time to identify them
• The risk analysis methodology selected should, where possible, be
comparable to the significance and complexity of the risk being
analyzed, i.e. the higher the potential consequence the more rigorous
the methodology
• Risk analysis tools are designed to help rank or priorities risks. To
do this they must be designed for the specific context and the risk
dimension under analysis.
Okay, you’ve got a lot of potential risks listed in your risk
register, but what are you going to do with them? The next
step is to determine how likely each of those risks are to
happen. This information should also go into your risk
register.
When you assess project risk you can ultimately and
proactively address many impacts, such as avoiding
potential litigation, addressing regulatory issues,
complying with new legislation, reducing your exposure
and minimizing impact.
EVALUATE THE
RISKS.
Muhammad Usman (2k15-MeT-37)
EVALUATE THE RISKS:
 Risk evaluation involves
comparing the level of risk found
during the analysis process with
previously established risk
criteria, and deciding whether
these risks require treatment.
 The result of a risk evaluation is a
prioritized list of risks that require
further action.
 This step is about deciding
whether risks are acceptable or
need treatment.
 Not all risks are created equally. You need to evaluate the risk to know
what resources you’re going to assemble towards resolving it when and
if it occurs. Some risks are going to be acceptable. You would grind the
project to a halt and possibly not even be able to finish it without first
prioritizing the risks.
 Having a large list of risks can be daunting. But you can manage this
by simply categorizing risks as high, medium or low. Now there’s a
horizon line and you can see the risk in context. With this perspective,
you can begin to plan for how and when you’ll address these risks.
 Some risks are going to require immediate attention. These are the
risks that can derail your project. Failure isn’t an option. Other risks
are important, but perhaps not threatening the success of your project.
You can act accordingly.
Risk acceptance
A risk may be accepted for the following reasons:
• The cost of treatment far exceeds the benefit, so that
acceptance is the only option (applies particularly to lower
ranked risks)
• The level of the risk is so low that specific treatment is not
appropriate with available resources
• The opportunities presented outweigh the threats to such
a degree that the risks justified
• The risk is such that there is no treatment available, for
example the risk that the business may suffer storm
damage.
TREAT THE RISKS.
MONITOR AND
REVIEW.
Ibtisam (2k15-MeT-32)
TREAT THE RISKS:
 Risk treatment is about
considering options for treating
risks that were not considered
acceptable or tolerable at Step 5.
 Risk treatment involves
identifying options for treating
or controlling risk, in order to
either reduce or eliminate
negative consequences, or to
reduce the likelihood of an
adverse occurrence. Risk
treatment should also aim to
enhance positive outcomes.
Options for risk treatment:
Identifies the following options that may assist in the
minimization of negative risk or an increase in the impact of
positive risk.
1- Avoid the risk
2- Change the likelihood of the occurrence
3- Change the consequences
4- Share the risk
5- Retain the risk
MONITOR AND REVIEW:
 Monitor and review is an
essential and integral step in the
risk management process.
 A business owner must monitor
risks and review the effectiveness
of the treatment plan, strategies
and management system that
have been set up to effectively
manage risk.
Risks need to be monitored periodically to ensure changing
circumstances do not alter the risk priorities. Very few risks
will remain static, therefore the risk management process
needs to be regularly repeated, so that new risks are
captured in the process and effectively managed.
A risk management plan at a business level should be
reviewed at least on an annual basis. An effective way to
ensure that this occurs is to combine risk planning or risk
review with annual business planning.
SUMMARY OF RISK
MANAGEMENT STEPS:
 All your hard work identifying and evaluating risk is for naught if you don’t
assign someone to oversee the risk. In fact, this is something that you should do
when listing the risks. Who is the person who is responsible for that risk,
identifying it when and if it should occur and then leading the work towards
resolving it?
 That determination is up to you. There might be a team member who is more
skilled or experienced in the risk. Then that person should lead the charge to
resolve it. Or it might just be an arbitrary choice. Of course, it’s better to assign
the task to the right person, but equally important in making sure that every risk
has a person responsible for it.
 Think about it. If you don’t give each risk a person tasked with watching out for it,
and then dealing with resolving it when and if it should arise, you’re opening
yourself up to more risk. It’s one thing to identify risk, but if you don’t manage it
then you’re not protecting the project.
Zia Masood Joiya (2k15-MeT-39)
 The International Risk Management Standard AS/NZS ISO
31000:2009 (the Standard) provides the principles and guidelines for
risk management.
 According to the Standard, “the success of risk management will
depend on the effectiveness of the management framework
providing the foundations and arrangements that will embed it
throughout the organization at all levels.”
 Within the Standard the expressions, ‘risk management’ and
‘managing risks’, are both used.
 In general terms:
• risk management refers collectively to the principles, framework
and process for managing risks effectively, and
• managing risks refers to the application of these principles,
framework and process to particular risks.
ISO 31000 is applicable to all organizations, regardless of
type, size, activities and location, and covers all types of
risk. It was developed by a range of stakeholders and is
intended for use by anyone who manages risks, not just
professional risk managers.
 ISO 31000 helps organizations develop a risk management strategy
to effectively identify and mitigate risks, thereby enhancing the
likelihood of achieving their objectives and increasing the protection
of their assets.
 Its overarching goal is to develop a risk management culture where
employees and stakeholders are aware of the importance of
monitoring and managing risk. Its overarching goal is to develop a
risk management culture where employees and stakeholders are
aware of the importance of monitoring and managing risk.
 ISO 31000:2018 provides more strategic guidance than ISO
31000:2009 and places more emphasis on both the involvement of
senior management and the integration of risk management into the
organization.
 This includes the recommendation to develop a statement or policy
that confirms a commitment to risk management, assigning
authority, responsibility and accountability at the appropriate levels
within the organization and ensuring that the necessary resources
are allocated to managing risk.
 The revised standard now also recommends that risk management
be part of the organization’s structure, processes, objectives, strategy
and activities.
 Risk management can be applied to an entire organization, at its
many areas and levels, at any time, as well as to specific functions,
projects and activities.
 When implemented and maintained in accordance with this
International Standard, the management of risk enables an
organization to, for example:
 ⎯ increase the likelihood of achieving objectives;
 ⎯ encourage proactive management;
 ⎯ be aware of the need to identify and treat risk throughout the
organization;
 ⎯ improve the identification of opportunities and threats;
 ⎯ comply with relevant legal and regulatory requirements and
international norms;
 ⎯ improve mandatory and voluntary reporting;
 ⎯ improve governance;
 ⎯ improve stakeholder confidence and trust;
 ⎯ establish a reliable basis for decision making and planning;
 ⎯ improve controls;
 ⎯ effectively allocate and use resources for risk treatment;
 ⎯ improve operational effectiveness and efficiency;
 ⎯ enhance health and safety performance, as well as environmental
protection;
 ⎯ improve loss prevention and incident management;
 ⎯ minimize losses;
 ⎯ improve organizational learning; and
 ⎯ improve organizational resilience. ⎯ establish a reliable basis for
decision making and planning;
 ⎯ improve controls;
 ⎯ effectively allocate and use resources for risk treatment;
 ⎯ improve operational effectiveness and efficiency;
 ⎯ enhance health and safety performance, as well as environmental
protection;
 ⎯ improve loss prevention and incident management;
 ⎯ minimize losses;
 ⎯ improve organizational learning; and
 ⎯ improve organizational resilience.
Risk management
Risk management

Risk management

  • 1.
    HEALTH SAFETY AND ENVIRONMENT. SubjectTeacher: Mam Isra Saleem Department of Mechanical Engineering & Technology NFC-IET, Multan.
  • 3.
     Muhammad Faisal(2k15-MeT-29)  Muhammad Shahbaz (2k15-MeT-30)  Ibtisam (2k15-MeT-32)  M.Abdullah (2k15-MeT-35)  Azhar Aslam (2k15-MeT-36)  Muhammad Usman (2k15-MeT-37)  Jamshaid Ali (2k15-MeT-38)  Zia Masood Joiya (2k15-MeT-39)
  • 4.
    TOPIC OUTLINE: Risk. Risk Management. Riskmanagement policy. Risk assessment. Risk Management Process. Risk Management Standard. Case Study
  • 5.
  • 7.
    Possibility of lossor injury. The chance of loss; the degree of probability of such loss. The possibility of financial loss. A possibility of harm or damage against which something is insured. Risks can come from various sources including uncertainty in financial markets, threats from project failures (at any phase in design, development, production, and life-cycles), credit risk, accidents, natural causes etc.
  • 12.
     Risk managementis the identification, evaluation, and prioritization of risks followed by coordinated and economical application of resources to minimize, monitor, and control the probability or impact of unfortunate events or to maximize the realization of opportunities.  Risks can come from various sources including uncertainty in financial markets, threats from project failures (at any phase in design, development, production, and life-cycles), credit risk, accidents, natural causes etc. Risk management: Coordinated activities to direct and control an organisation with regard to risk
  • 13.
     There aretwo types of events i.e. negative events can be classified as risks while positive events are classified as opportunities.  Several risk management standards have been developed including the Project Management Institute, the National Institute of Standards and Technology, societies, and ISO standards. A demonstrable risk management system incorporates • Risk profiles • Risk assessments • Treatment plans • Results of monitoring & risk reviews • Evidence of consultation & communication • Good documentation / formal records
  • 14.
     Definitions andgoals vary widely according to whether the risk management method is in the context of project management, security, engineering, industrial processes, financial portfolios, actuarial assessments, or public health and safety.  Adopting good risk management ensures that an organization can undertake activities in the knowledge that a) appropriate and adequate measures are in place to maximize the benefits, and b) appropriate and adequate measures are in place to minimizing the negative or unanticipated effects of any of the risks or opportunities that are presented in the course of achieving organizational objectives.
  • 15.
    Set of componentsthat provide the foundations and organizational arrangements for designing, implementing, monitoring, reviewing and continually improving risk management throughout the organization.
  • 16.
    Statement of theoverall intentions and direction of an organization related to risk management.
  • 17.
    Overall process of riskidentification, risk analysis and risk evaluation
  • 19.
    The principles andpractices of risk management can be applied across an entire organization, to its many areas and levels, as well as to specific issues, functions, projects & activities.
  • 20.
  • 21.
    WHAT IS THERISK MANAGEMENT PROCESS? The Risk Management Process consists of a series of steps that, when undertaken in sequence, enable continual improvement in decision-making.
  • 22.
    Establish the context. Identifythe Risk. Analyze the Risk. Evaluate the risks. Treat the risks. Respond to the Risk. Monitor the Risk.
  • 23.
     ESTABLISH THE CONTEXT: Provides a five-step process to assist with establishing the context within which risk will be identified. 1-Establish the internal context 2-Establish the external context 3-Establish the risk management context 4- Develop risk criteria 5- Define the structure for risk analysis
  • 24.
     As previouslydiscussed, risk is the chance of something happening that will impact on objectives.  As such, the objectives and goals of a business, project or activity must first be identified to ensure that all significant risks are understood.  This ensures that risk decisions always support the broader goals and objectives of the business. This approach encourages long-term and strategic thinking.
  • 25.
     Is therean internal culture that needs to be considered? For example, are staff Resistant to change? Is there a professional culture that might create unnecessary risks for the business?  What staff groups are present? What capabilities does the business have in terms of people, systems, processes, equipment and other resources?
  • 26.
    2. ESTABLISH THE EXTERNALCONTEXT: This step defines the overall environment in which a business operates and includes an understanding of the clients’ or customers’ perceptions of the business. An analysis of these factors will identify the strengths, weaknesses, opportunities and threats to the business in the external environment.
  • 27.
    A BUSINESS OWNERMAY ASK THE FOLLOWING QUESTIONS WHEN DETERMINING THE EXTERNAL CONTEXT:  A business owner may ask the following questions when determining the external context: • What regulations and legislation must the business comply with? • Are there any other requirements the business needs to comply with? • What is the market within which the business operates? Who are the competitors? • Are there any social, cultural or political issues that need to be considered?
  • 28.
    3- ESTABLISH THERISK MANAGEMENT CONTEXT:  Before beginning a risk identification exercise, it is important to define the limits, objectives and scope of the activity or issue under examination.  For example, in conducting a risk analysis for a new project, such as the introduction of a new piece of equipment or a new product line, it is important to clearly identify the parameters for this activity to ensure that all significant risks are identified.
  • 29.
    Risk criteria allowa business to clearly define unacceptable levels of risk. Conversely, risk criteria may include the acceptable level of risk for a specific activity or event. In this step the risk criteria may be broadly defined and then further refined later in the risk management process.
  • 30.
    5. DEFINE THE STRUCTUREFOR RISK ANALYSIS Isolate the categories of risk that you want to manage. This will provide greater depth and accuracy in identifying significant risks. The chosen structure for risk analysis will depend upon the type of activity or issue, its complexity and the context of the risks.
  • 31.
  • 32.
     You can’tresolve a risk if you don’t know what it is. There are many ways to identify risk. As you do go through this step, you’ll want to collect the data in a risk register.  Once the context of the business has been defined, the next step is to utilize the information to identify as many risks as possible.  One way is brainstorming or even brainwriting, which is a more structured way to get a group to look at a problem. Risk identification: Involves identifying sources of risk, areas of impact, events and their causes and consequences.
  • 33.
     As notedearlier, you can tap your resources. That can be your team, colleagues or stakeholders. Find those individuals with relevant experience and set up interviews so you can gather the information you’ll need to both identify and resolve.  It doesn’t hurt to speak with that person in your organization who is the glass is always half-empty type. Their doom-and-gloom perspective can be surprisingly helpful to see risks that might not be evident to everyone else.  Look both forward and backwards. That is, imagine the project in progress. Think of the many things that can go wrong. Note them. Do the same with historical data on past projects. Now your list of potential risk has grown
  • 34.
     Once thecontext of the business has been defined, the next step is to utilize the information to identify as many risks as possible.
  • 36.
  • 37.
    1- Identifying retrospectiverisks Retrospective risks are those that have previously occurred, such as incidents or accidents. Retrospective risk identification is often the most common way to identify risk, and the easiest. It’s easier to believe something if it has happened before. It is also easier to quantify its impact and to see the damage it has caused.
  • 38.
     As you’reidentifying risk, you’ll want to make sure you that your risk register isn’t filling up with risks that are really outliers and not risks at all. Make sure the risks are rooted in the cause of a problem. Basically, drill down to the root cause to see if the risk is one that will have the kind of impact on your project that needs identifying.  When trying to minimize risk it’s good to trust your intuition. This can point you to unlikely scenarios that you just assume couldn’t happen. Remember, don’t be overconfident. Use process to weed out risks from non-risks.
  • 39.
     There aremany sources of information about retrospective risk. These include: • Hazard or incident logs or registers. • Audit reports. • Customer complaints. • Accreditation documents and reports. • Past staff or client surveys. • Newspapers or professional media, such as journals or websites.
  • 40.
     Prospective risksare often harder to identify. These are things that have not yet happened, but might happen some time in the future.  Identification should include all risks, whether or not they are currently being managed. The rationale here is to record all significant risks and monitor or review the effectiveness of their control.
  • 41.
    • Brainstorming withstaff or external stakeholders • Researching the economic, political, legislative and operating environment • Conducting interviews with relevant people and/or organizations • Undertaking surveys of staff or clients to identify anticipated issues or problems • Flow charting a process • Reviewing system design or preparing system analysis techniques.
  • 42.
    TIPS FOR EFFECTIVERISK IDENTIFICATION: Select a risk identification methodology appropriate to the type of risk and the nature of the activity  Involve the right people in risk identification activities  Take a life cycle approach to risk identification and determine how risks change and evolve throughout this cycle.
  • 43.
  • 44.
    During the riskidentification step, a business owner may have identified many risks and it is often not possible to try to address all those identified. The risk analysis step will assist in determining which risks have a greater consequence or impact than others.
  • 45.
    What is riskanalysis? Risk analysis involves combining the possible consequences, or impact, of an event, with the likelihood of that event occurring. The result is a ‘level of risk’. That is: Risk = consequence x likelihood
  • 46.
    The elements ofrisk analysis are as follows: 1. Identify existing strategies and controls that act to minimize negative risk and enhance opportunities. 2. Determine the consequences of a negative impact or an opportunity (these may be positive or negative). 3. Determine the likelihood of a negative consequence or an opportunity. 4. Estimate the level of risk by combining consequence and likelihood. 5. Consider and identify any uncertainties in the estimates.
  • 47.
     Three categoriesor types of analysis can be used to determine level of risk: • Qualitative • Semi-quantitative • Quantitative.  The most common type of risk analysis is the qualitative method. The type of analysis chosen will be based upon the area of risk being analyzed.
  • 52.
    • Risk analysisis usually done in the context of existing controls – take the time to identify them • The risk analysis methodology selected should, where possible, be comparable to the significance and complexity of the risk being analyzed, i.e. the higher the potential consequence the more rigorous the methodology • Risk analysis tools are designed to help rank or priorities risks. To do this they must be designed for the specific context and the risk dimension under analysis.
  • 53.
    Okay, you’ve gota lot of potential risks listed in your risk register, but what are you going to do with them? The next step is to determine how likely each of those risks are to happen. This information should also go into your risk register. When you assess project risk you can ultimately and proactively address many impacts, such as avoiding potential litigation, addressing regulatory issues, complying with new legislation, reducing your exposure and minimizing impact.
  • 54.
  • 55.
    EVALUATE THE RISKS: Risk evaluation involves comparing the level of risk found during the analysis process with previously established risk criteria, and deciding whether these risks require treatment.  The result of a risk evaluation is a prioritized list of risks that require further action.  This step is about deciding whether risks are acceptable or need treatment.
  • 56.
     Not allrisks are created equally. You need to evaluate the risk to know what resources you’re going to assemble towards resolving it when and if it occurs. Some risks are going to be acceptable. You would grind the project to a halt and possibly not even be able to finish it without first prioritizing the risks.  Having a large list of risks can be daunting. But you can manage this by simply categorizing risks as high, medium or low. Now there’s a horizon line and you can see the risk in context. With this perspective, you can begin to plan for how and when you’ll address these risks.  Some risks are going to require immediate attention. These are the risks that can derail your project. Failure isn’t an option. Other risks are important, but perhaps not threatening the success of your project. You can act accordingly.
  • 58.
    Risk acceptance A riskmay be accepted for the following reasons: • The cost of treatment far exceeds the benefit, so that acceptance is the only option (applies particularly to lower ranked risks) • The level of the risk is so low that specific treatment is not appropriate with available resources • The opportunities presented outweigh the threats to such a degree that the risks justified • The risk is such that there is no treatment available, for example the risk that the business may suffer storm damage.
  • 59.
    TREAT THE RISKS. MONITORAND REVIEW. Ibtisam (2k15-MeT-32)
  • 60.
    TREAT THE RISKS: Risk treatment is about considering options for treating risks that were not considered acceptable or tolerable at Step 5.  Risk treatment involves identifying options for treating or controlling risk, in order to either reduce or eliminate negative consequences, or to reduce the likelihood of an adverse occurrence. Risk treatment should also aim to enhance positive outcomes.
  • 61.
    Options for risktreatment: Identifies the following options that may assist in the minimization of negative risk or an increase in the impact of positive risk. 1- Avoid the risk 2- Change the likelihood of the occurrence 3- Change the consequences 4- Share the risk 5- Retain the risk
  • 62.
    MONITOR AND REVIEW: Monitor and review is an essential and integral step in the risk management process.  A business owner must monitor risks and review the effectiveness of the treatment plan, strategies and management system that have been set up to effectively manage risk.
  • 63.
    Risks need tobe monitored periodically to ensure changing circumstances do not alter the risk priorities. Very few risks will remain static, therefore the risk management process needs to be regularly repeated, so that new risks are captured in the process and effectively managed. A risk management plan at a business level should be reviewed at least on an annual basis. An effective way to ensure that this occurs is to combine risk planning or risk review with annual business planning.
  • 65.
  • 66.
     All yourhard work identifying and evaluating risk is for naught if you don’t assign someone to oversee the risk. In fact, this is something that you should do when listing the risks. Who is the person who is responsible for that risk, identifying it when and if it should occur and then leading the work towards resolving it?  That determination is up to you. There might be a team member who is more skilled or experienced in the risk. Then that person should lead the charge to resolve it. Or it might just be an arbitrary choice. Of course, it’s better to assign the task to the right person, but equally important in making sure that every risk has a person responsible for it.  Think about it. If you don’t give each risk a person tasked with watching out for it, and then dealing with resolving it when and if it should arise, you’re opening yourself up to more risk. It’s one thing to identify risk, but if you don’t manage it then you’re not protecting the project.
  • 67.
    Zia Masood Joiya(2k15-MeT-39)
  • 68.
     The InternationalRisk Management Standard AS/NZS ISO 31000:2009 (the Standard) provides the principles and guidelines for risk management.  According to the Standard, “the success of risk management will depend on the effectiveness of the management framework providing the foundations and arrangements that will embed it throughout the organization at all levels.”
  • 69.
     Within theStandard the expressions, ‘risk management’ and ‘managing risks’, are both used.  In general terms: • risk management refers collectively to the principles, framework and process for managing risks effectively, and • managing risks refers to the application of these principles, framework and process to particular risks.
  • 70.
    ISO 31000 isapplicable to all organizations, regardless of type, size, activities and location, and covers all types of risk. It was developed by a range of stakeholders and is intended for use by anyone who manages risks, not just professional risk managers.
  • 71.
     ISO 31000helps organizations develop a risk management strategy to effectively identify and mitigate risks, thereby enhancing the likelihood of achieving their objectives and increasing the protection of their assets.  Its overarching goal is to develop a risk management culture where employees and stakeholders are aware of the importance of monitoring and managing risk. Its overarching goal is to develop a risk management culture where employees and stakeholders are aware of the importance of monitoring and managing risk.
  • 72.
     ISO 31000:2018provides more strategic guidance than ISO 31000:2009 and places more emphasis on both the involvement of senior management and the integration of risk management into the organization.  This includes the recommendation to develop a statement or policy that confirms a commitment to risk management, assigning authority, responsibility and accountability at the appropriate levels within the organization and ensuring that the necessary resources are allocated to managing risk.  The revised standard now also recommends that risk management be part of the organization’s structure, processes, objectives, strategy and activities.
  • 73.
     Risk managementcan be applied to an entire organization, at its many areas and levels, at any time, as well as to specific functions, projects and activities.  When implemented and maintained in accordance with this International Standard, the management of risk enables an organization to, for example:  ⎯ increase the likelihood of achieving objectives;  ⎯ encourage proactive management;  ⎯ be aware of the need to identify and treat risk throughout the organization;  ⎯ improve the identification of opportunities and threats;  ⎯ comply with relevant legal and regulatory requirements and international norms;  ⎯ improve mandatory and voluntary reporting;
  • 74.
     ⎯ improvegovernance;  ⎯ improve stakeholder confidence and trust;  ⎯ establish a reliable basis for decision making and planning;  ⎯ improve controls;  ⎯ effectively allocate and use resources for risk treatment;  ⎯ improve operational effectiveness and efficiency;  ⎯ enhance health and safety performance, as well as environmental protection;  ⎯ improve loss prevention and incident management;  ⎯ minimize losses;  ⎯ improve organizational learning; and
  • 75.
     ⎯ improveorganizational resilience. ⎯ establish a reliable basis for decision making and planning;  ⎯ improve controls;  ⎯ effectively allocate and use resources for risk treatment;  ⎯ improve operational effectiveness and efficiency;  ⎯ enhance health and safety performance, as well as environmental protection;  ⎯ improve loss prevention and incident management;  ⎯ minimize losses;  ⎯ improve organizational learning; and  ⎯ improve organizational resilience.