Law360, New York (January 12, 2012, 5:12 PM ET) -- We have urged contractors generally to manage
affirmatively the Federal Awardee Performance and Integrity Information System[1] and, specifically, to:
(1) place a high priority on entry and updating of data into FAPIIS; (2) take advantage of every
opportunity to comment on, explain or rebut information posted in FAPIIS; and (3) be alert for
government posting of harmful information, in particular information potentially protected from
disclosure by a Freedom of Information Act disclosure exemption, Exemption 4.

It is now apparent that, in light of a recent action of the Civilian Agency Acquisition Council and the
Defense Acquisition Regulation Council, contractors who successfully manage FAPIIS will be those
contractors that not only implement the above steps but do so very quickly and are, as well, hyperalert
for and prepared to react immediately to government posting of potentially harmful information.

On Jan. 3, 2012, the councils finalized the rule initially proposed on Jan. 24, 2011 amending Federal
Acquisition Regulation Sections 9.104-7, 9.105-2, 9.406-3, 42.1503 and the clause at FAR 52.209-9 to
implement the requirement of Section 3010 of the Supplemental Appropriations Act, 2010. That act
requires that the information in FAPIIS, “excluding past performance reviews, ... be made publicly
available.” Public Access to the Federal Awardee Performance and Integrity Information System, 77 Fed.
Reg. 197 (Jan. 3, 2012).

As to the final rule, the councils note that FAPIIS consists of two segments, a "nonpublic segment," also
known as the Past Performance Information System (PPIRS), and a publicly available segment, also
known as the “public site.” The councils also noted that “the structure of FAPIIS ensures that 'past
performance reviews' will not be inadvertently released” because such information is stored in the
PPIRS module, which is “completely separate ... from the other *publicly available+ information in
FAPIIS.” 77 Fed. Reg. 199.

The councils’ assurance of “complete” separation, while probably not literally inaccurate, is nevertheless
confusing because, as it turns out, government-generated information intended for ultimate posting on
the public site is first entered into FAPIIS via the nonpublic segment — and it is at this point that the
importance of a very high level of contractor alertness becomes apparent. Here's why.
Government-generated information destined to be posted on the public site includes contracting officer
final determinations of:

       contractor default,
       submission of defective cost or pricing data,
       nonresponsibility, and
       suspension and debarment official listing of a contractor in the Excluded Parties Listing System
        (“EPLS”) and related matters, (e.g., contractor execution of an administrative agreement). FAR
        9.105-2(b)(2); 77 Fed. Reg. 199, 20


These determinations regarding contractor integrity, any of which can contain potentially harmful
contractor proprietary information or other commercial sensitive information protected from disclosure
exemption under FOIA, are to be posted to FAPIIS' nonpublic segment within three working days of
finalization of the determination by the responsible government official.

The official must also give immediate notice of the posting to the contractor who then has a mere seven
calendar — not working — days to: (1) review the posted information and (2) assert in writing to the
official that information has been posted that is covered by a disclosure exemption under FOIA, and,
citing FAR 52.209-9, explicitly request its removal from the site.

The government official must then within seven calendar days remove the posting from the nonpublic
FAPIIS segment and “resolve the issue in accordance with agency” FOIA procedures prior to reposting
any of the information determined to be releasable. FAR 9.105-2 (b)(2). Ominously, “*i+f the
Government official does not remove the item, it will be automatically released to the public site within
14 calendar days after the review period began.” 77 Fed. Reg. 196; FAR 52.209-9(b)(2).

Seven days is, on its face, a very brief period of time for a federal contractor to review, analyze and
respond in writing to a final determination posting that discloses proprietary or other commercial
sensitive information covered by a FOIA exemption. Recognizing this fact, several individuals who
submitted comments on the regulation as initially proposed urged that the councils adopt response
periods ranging from 30 to 60 days for contractors to review such information and prepare a response.

But the councils, nevertheless, have specified seven days, and contractors must accept and deal with the
brevity of the period available to respond to posting of final determinations and EPLS listings. But the
brevity of this particular review period perhaps holds a larger lesson, which is that the government is
announcing its intention that FAPIIS operate efficiently and at high speed.

Thus, while the regulations provide a somewhat longer — albeit still very brief — period of 30 days to
respond to past performance information in PPIRS. The regulations place no time limit on the contractor
opportunity to post comments rebutting government-generated information posted to the FAPIIS public
site, probably because it is viewed as unnecessary.

After all, contractors have a clear incentive to react quickly to such postings because the longer
damaging information is available on the public site without contractor explanation, the more harm it is
likely to cause. In any event, this recently issued final rule highlights the reality that potentially damaging
government-generated information can now appear on short notice in FAPIIS, whether in PPIRS or the
public site. Contractors ignore this reality at their own risk.

--By W. Bruce Shirk, Sheppard Mullin Richter & Hampton LLP
Bruce Shirk is special counsel in Sheppard Mullin's government contracts and regulated industries
practice group in the firm's Washington, D.C., office.

The opinions expressed are those of the author and do not necessarily reflect the views of the firm, its
clients, or Portfolio Media, publisher of Law360. This article is for general information purposes and is
not intended to be and should not be taken as legal advice.

[1] http://www.governmentcontractslawblog.com/2010/06/articles/far/fapiis-the-new-integrity-
database-for-government-contractors/
http://www.governmentcontractslawblog.com/2011/03/articles/fapiis/fapiis-an-update-on-the-
integrity-database-for-government-contractors/


All Content © 2003-2011, Portfolio Media, Inc.

More Related Content

Similar to Responding To Govt FAPIIS Postings

NEW WHISTLEBLOWER INCENTIVES AND PROTECTION IN THE DODD-FRANK ACT
NEW WHISTLEBLOWER INCENTIVES AND PROTECTION IN THE DODD-FRANK ACTNEW WHISTLEBLOWER INCENTIVES AND PROTECTION IN THE DODD-FRANK ACT
NEW WHISTLEBLOWER INCENTIVES AND PROTECTION IN THE DODD-FRANK ACTptcollins
 
A PRACTICAL GUIDE TO THE FAR MANDATORY DISCLOSURE RULE FAR 52.203-13
A PRACTICAL GUIDE TO THE FAR MANDATORY DISCLOSURE RULE FAR 52.203-13A PRACTICAL GUIDE TO THE FAR MANDATORY DISCLOSURE RULE FAR 52.203-13
A PRACTICAL GUIDE TO THE FAR MANDATORY DISCLOSURE RULE FAR 52.203-13dbolton007
 
JOBS Act Rulemaking Comments on SEC File Number S7-11-13 Dated March 26, 2014...
JOBS Act Rulemaking Comments on SEC File Number S7-11-13 Dated March 26, 2014...JOBS Act Rulemaking Comments on SEC File Number S7-11-13 Dated March 26, 2014...
JOBS Act Rulemaking Comments on SEC File Number S7-11-13 Dated March 26, 2014...Jason Coombs
 
A simple note on prospectus
A simple note on prospectusA simple note on prospectus
A simple note on prospectusvideoaakash15
 
Discussion Paper on review of clause 36 and related clauses of Equity Listing...
Discussion Paper on review of clause 36 and related clauses of Equity Listing...Discussion Paper on review of clause 36 and related clauses of Equity Listing...
Discussion Paper on review of clause 36 and related clauses of Equity Listing...Rajiv Bajaj
 
Civil Authority Coverage and the PPP
Civil Authority Coverage and the PPPCivil Authority Coverage and the PPP
Civil Authority Coverage and the PPPJasonSchupp1
 
4 q16 external presentation_2017-02-08_final_lvlt
4 q16 external presentation_2017-02-08_final_lvlt4 q16 external presentation_2017-02-08_final_lvlt
4 q16 external presentation_2017-02-08_final_lvltLevel3_Communications
 
CrowdCheck's Regulation Crowdfunding Memo, 4(a)(6)
CrowdCheck's Regulation Crowdfunding Memo, 4(a)(6)CrowdCheck's Regulation Crowdfunding Memo, 4(a)(6)
CrowdCheck's Regulation Crowdfunding Memo, 4(a)(6)ar1815
 
U.S. Bureau of Land Management New Rules for Fracking on Federally-Owned Lands
U.S. Bureau of Land Management New Rules for Fracking on Federally-Owned LandsU.S. Bureau of Land Management New Rules for Fracking on Federally-Owned Lands
U.S. Bureau of Land Management New Rules for Fracking on Federally-Owned LandsMarcellus Drilling News
 
NCLT- Will it live up to its promise
NCLT- Will it live up to its promiseNCLT- Will it live up to its promise
NCLT- Will it live up to its promisePrachi Narang
 
nispom_major_changes.pdf
nispom_major_changes.pdfnispom_major_changes.pdf
nispom_major_changes.pdfTeabeAmet
 
Regulations And Standards For DR
Regulations And Standards For DRRegulations And Standards For DR
Regulations And Standards For DRTPComps LLC
 
Payroll Webinar: Payroll Tax Compliance 2020 & 2021 Legislative Update
Payroll Webinar: Payroll Tax Compliance 2020 & 2021 Legislative UpdatePayroll Webinar: Payroll Tax Compliance 2020 & 2021 Legislative Update
Payroll Webinar: Payroll Tax Compliance 2020 & 2021 Legislative UpdateAscentis
 
The government contractor
The government contractorThe government contractor
The government contractorRachel Hamilton
 
Gabriel Hernandez_Assignment 2b_BUL 6890
Gabriel Hernandez_Assignment 2b_BUL 6890Gabriel Hernandez_Assignment 2b_BUL 6890
Gabriel Hernandez_Assignment 2b_BUL 6890Gabriel Hernandez Fonte
 
SCOPE OF AUDIT – CHANGING DIMENSIONS
SCOPE OF AUDIT – CHANGING DIMENSIONSSCOPE OF AUDIT – CHANGING DIMENSIONS
SCOPE OF AUDIT – CHANGING DIMENSIONSNeha Sharma
 
Understanding and preparing for an 'industry sweep' under the fcpa
Understanding and preparing for an 'industry sweep' under the fcpaUnderstanding and preparing for an 'industry sweep' under the fcpa
Understanding and preparing for an 'industry sweep' under the fcpaRachel Hamilton
 

Similar to Responding To Govt FAPIIS Postings (20)

NEW WHISTLEBLOWER INCENTIVES AND PROTECTION IN THE DODD-FRANK ACT
NEW WHISTLEBLOWER INCENTIVES AND PROTECTION IN THE DODD-FRANK ACTNEW WHISTLEBLOWER INCENTIVES AND PROTECTION IN THE DODD-FRANK ACT
NEW WHISTLEBLOWER INCENTIVES AND PROTECTION IN THE DODD-FRANK ACT
 
A PRACTICAL GUIDE TO THE FAR MANDATORY DISCLOSURE RULE FAR 52.203-13
A PRACTICAL GUIDE TO THE FAR MANDATORY DISCLOSURE RULE FAR 52.203-13A PRACTICAL GUIDE TO THE FAR MANDATORY DISCLOSURE RULE FAR 52.203-13
A PRACTICAL GUIDE TO THE FAR MANDATORY DISCLOSURE RULE FAR 52.203-13
 
JOBS Act Rulemaking Comments on SEC File Number S7-11-13 Dated March 26, 2014...
JOBS Act Rulemaking Comments on SEC File Number S7-11-13 Dated March 26, 2014...JOBS Act Rulemaking Comments on SEC File Number S7-11-13 Dated March 26, 2014...
JOBS Act Rulemaking Comments on SEC File Number S7-11-13 Dated March 26, 2014...
 
A simple note on prospectus
A simple note on prospectusA simple note on prospectus
A simple note on prospectus
 
Discussion Paper on review of clause 36 and related clauses of Equity Listing...
Discussion Paper on review of clause 36 and related clauses of Equity Listing...Discussion Paper on review of clause 36 and related clauses of Equity Listing...
Discussion Paper on review of clause 36 and related clauses of Equity Listing...
 
Civil Authority Coverage and the PPP
Civil Authority Coverage and the PPPCivil Authority Coverage and the PPP
Civil Authority Coverage and the PPP
 
4 q16 external presentation_2017-02-08_final_lvlt
4 q16 external presentation_2017-02-08_final_lvlt4 q16 external presentation_2017-02-08_final_lvlt
4 q16 external presentation_2017-02-08_final_lvlt
 
2Q'17 Level 3 Earnings Presentation
2Q'17 Level 3 Earnings Presentation2Q'17 Level 3 Earnings Presentation
2Q'17 Level 3 Earnings Presentation
 
CrowdCheck's Regulation Crowdfunding Memo, 4(a)(6)
CrowdCheck's Regulation Crowdfunding Memo, 4(a)(6)CrowdCheck's Regulation Crowdfunding Memo, 4(a)(6)
CrowdCheck's Regulation Crowdfunding Memo, 4(a)(6)
 
U.S. Bureau of Land Management New Rules for Fracking on Federally-Owned Lands
U.S. Bureau of Land Management New Rules for Fracking on Federally-Owned LandsU.S. Bureau of Land Management New Rules for Fracking on Federally-Owned Lands
U.S. Bureau of Land Management New Rules for Fracking on Federally-Owned Lands
 
NCLT- Will it live up to its promise
NCLT- Will it live up to its promiseNCLT- Will it live up to its promise
NCLT- Will it live up to its promise
 
nispom_major_changes.pdf
nispom_major_changes.pdfnispom_major_changes.pdf
nispom_major_changes.pdf
 
Regulations And Standards For DR
Regulations And Standards For DRRegulations And Standards For DR
Regulations And Standards For DR
 
Payroll Webinar: Payroll Tax Compliance 2020 & 2021 Legislative Update
Payroll Webinar: Payroll Tax Compliance 2020 & 2021 Legislative UpdatePayroll Webinar: Payroll Tax Compliance 2020 & 2021 Legislative Update
Payroll Webinar: Payroll Tax Compliance 2020 & 2021 Legislative Update
 
The government contractor
The government contractorThe government contractor
The government contractor
 
Gabriel Hernandez_Assignment 2b_BUL 6890
Gabriel Hernandez_Assignment 2b_BUL 6890Gabriel Hernandez_Assignment 2b_BUL 6890
Gabriel Hernandez_Assignment 2b_BUL 6890
 
H-1B AMENDMENTS POST-SIMEIO SOLUTIONS: WHY CIS SHOULD CONSIDER TAKING OFF THE...
H-1B AMENDMENTS POST-SIMEIO SOLUTIONS: WHY CIS SHOULD CONSIDER TAKING OFF THE...H-1B AMENDMENTS POST-SIMEIO SOLUTIONS: WHY CIS SHOULD CONSIDER TAKING OFF THE...
H-1B AMENDMENTS POST-SIMEIO SOLUTIONS: WHY CIS SHOULD CONSIDER TAKING OFF THE...
 
SCOPE OF AUDIT – CHANGING DIMENSIONS
SCOPE OF AUDIT – CHANGING DIMENSIONSSCOPE OF AUDIT – CHANGING DIMENSIONS
SCOPE OF AUDIT – CHANGING DIMENSIONS
 
Understanding and preparing for an 'industry sweep' under the fcpa
Understanding and preparing for an 'industry sweep' under the fcpaUnderstanding and preparing for an 'industry sweep' under the fcpa
Understanding and preparing for an 'industry sweep' under the fcpa
 
Open Government Directive
Open Government DirectiveOpen Government Directive
Open Government Directive
 

Responding To Govt FAPIIS Postings

  • 1. Portfolio Media. Inc. | 860 Broadway, 6th Floor | New York, NY 10003 | www.law360.com Phone: +1 646 783 7100 | Fax: +1 646 783 7161 | customerservice@law360.com Responding To Gov’t FAPIIS Postings Law360, New York (January 12, 2012, 5:12 PM ET) -- We have urged contractors generally to manage affirmatively the Federal Awardee Performance and Integrity Information System[1] and, specifically, to: (1) place a high priority on entry and updating of data into FAPIIS; (2) take advantage of every opportunity to comment on, explain or rebut information posted in FAPIIS; and (3) be alert for government posting of harmful information, in particular information potentially protected from disclosure by a Freedom of Information Act disclosure exemption, Exemption 4. It is now apparent that, in light of a recent action of the Civilian Agency Acquisition Council and the Defense Acquisition Regulation Council, contractors who successfully manage FAPIIS will be those contractors that not only implement the above steps but do so very quickly and are, as well, hyperalert for and prepared to react immediately to government posting of potentially harmful information. On Jan. 3, 2012, the councils finalized the rule initially proposed on Jan. 24, 2011 amending Federal Acquisition Regulation Sections 9.104-7, 9.105-2, 9.406-3, 42.1503 and the clause at FAR 52.209-9 to implement the requirement of Section 3010 of the Supplemental Appropriations Act, 2010. That act requires that the information in FAPIIS, “excluding past performance reviews, ... be made publicly available.” Public Access to the Federal Awardee Performance and Integrity Information System, 77 Fed. Reg. 197 (Jan. 3, 2012). As to the final rule, the councils note that FAPIIS consists of two segments, a "nonpublic segment," also known as the Past Performance Information System (PPIRS), and a publicly available segment, also known as the “public site.” The councils also noted that “the structure of FAPIIS ensures that 'past performance reviews' will not be inadvertently released” because such information is stored in the PPIRS module, which is “completely separate ... from the other *publicly available+ information in FAPIIS.” 77 Fed. Reg. 199. The councils’ assurance of “complete” separation, while probably not literally inaccurate, is nevertheless confusing because, as it turns out, government-generated information intended for ultimate posting on the public site is first entered into FAPIIS via the nonpublic segment — and it is at this point that the importance of a very high level of contractor alertness becomes apparent. Here's why.
  • 2. Government-generated information destined to be posted on the public site includes contracting officer final determinations of:  contractor default,  submission of defective cost or pricing data,  nonresponsibility, and  suspension and debarment official listing of a contractor in the Excluded Parties Listing System (“EPLS”) and related matters, (e.g., contractor execution of an administrative agreement). FAR 9.105-2(b)(2); 77 Fed. Reg. 199, 20 These determinations regarding contractor integrity, any of which can contain potentially harmful contractor proprietary information or other commercial sensitive information protected from disclosure exemption under FOIA, are to be posted to FAPIIS' nonpublic segment within three working days of finalization of the determination by the responsible government official. The official must also give immediate notice of the posting to the contractor who then has a mere seven calendar — not working — days to: (1) review the posted information and (2) assert in writing to the official that information has been posted that is covered by a disclosure exemption under FOIA, and, citing FAR 52.209-9, explicitly request its removal from the site. The government official must then within seven calendar days remove the posting from the nonpublic FAPIIS segment and “resolve the issue in accordance with agency” FOIA procedures prior to reposting any of the information determined to be releasable. FAR 9.105-2 (b)(2). Ominously, “*i+f the Government official does not remove the item, it will be automatically released to the public site within 14 calendar days after the review period began.” 77 Fed. Reg. 196; FAR 52.209-9(b)(2). Seven days is, on its face, a very brief period of time for a federal contractor to review, analyze and respond in writing to a final determination posting that discloses proprietary or other commercial sensitive information covered by a FOIA exemption. Recognizing this fact, several individuals who submitted comments on the regulation as initially proposed urged that the councils adopt response periods ranging from 30 to 60 days for contractors to review such information and prepare a response. But the councils, nevertheless, have specified seven days, and contractors must accept and deal with the brevity of the period available to respond to posting of final determinations and EPLS listings. But the brevity of this particular review period perhaps holds a larger lesson, which is that the government is announcing its intention that FAPIIS operate efficiently and at high speed. Thus, while the regulations provide a somewhat longer — albeit still very brief — period of 30 days to respond to past performance information in PPIRS. The regulations place no time limit on the contractor opportunity to post comments rebutting government-generated information posted to the FAPIIS public site, probably because it is viewed as unnecessary. After all, contractors have a clear incentive to react quickly to such postings because the longer damaging information is available on the public site without contractor explanation, the more harm it is likely to cause. In any event, this recently issued final rule highlights the reality that potentially damaging government-generated information can now appear on short notice in FAPIIS, whether in PPIRS or the public site. Contractors ignore this reality at their own risk. --By W. Bruce Shirk, Sheppard Mullin Richter & Hampton LLP
  • 3. Bruce Shirk is special counsel in Sheppard Mullin's government contracts and regulated industries practice group in the firm's Washington, D.C., office. The opinions expressed are those of the author and do not necessarily reflect the views of the firm, its clients, or Portfolio Media, publisher of Law360. This article is for general information purposes and is not intended to be and should not be taken as legal advice. [1] http://www.governmentcontractslawblog.com/2010/06/articles/far/fapiis-the-new-integrity- database-for-government-contractors/ http://www.governmentcontractslawblog.com/2011/03/articles/fapiis/fapiis-an-update-on-the- integrity-database-for-government-contractors/ All Content © 2003-2011, Portfolio Media, Inc.