Project Cost 
$ x 1000 Diameter Product Length (LF) Equipment Crossing Name Location
Date 
Completed Owner Contact Name Contact Number
60 6" Steel Gas Line 430 Vermeer 36/50 Stream / Road Crossing Perry County, PA July‐2016 O&M Construction for OTIS Ron Mote (513) 535‐8252
250 16" Steel Gas Line 710 American Auger DD110 Stream Wetland Crossing Erie, PA May‐2016 John Anderson Construction John Anderson (570) 795‐9601
150 12" Poly Water Line 800 American Auger DD110 Railroad / Wetland Crossing Carrollton, Ohio April‐2016 Keystone Clearwater Solutions Bryan Wehler (717) 514‐5493
120 12" Poly Gas Line 680 Vermeer 36/50 Roadway Crossing Bethlehem, PA April‐2016 UGI Utilities Jess Macker (610) 807‐3725
150 8" Poly Gas Line 2100 Vermeer 36/50 Easement / Roadway Crossing Bethlehem, PA March‐2016 UGI Utilities Tim Stewart  (484) 226‐8132
400 12" Steel Gas Line 1400 American Auger DD110 River Crossing Gastonia, NC January‐2016 Primoris Pipeline Jamey Lambert (910) 471‐5917
200 12" Steel Gas Line 500 Vermeer 36/50 Railroad / Roadway Crossing Waynsburg, PA January‐2016 West Penn  Brian Ludwig (412) 559‐6259
180 12" Steel Gas Line 710 Vermeer 36/50 Roadway Crossing Lancaster, PA January‐2016 Conti Corporation David Cygan (732) 484‐2343
200 16" Poly Gas Line 350 Vermeer 36/50 Roadway Crossing Waynsburg, PA December‐2015 Keystone Clearwayer Solutions Bryan Wehler (717) 514‐5493
80 6"  HDPE Gas Line 300 Vermeer 36/50 Railroad Crossing Scranton, PA October‐2015 UGI Utilities Chris Morris (570) 417‐6014
400 12" Steel Gas Line 1200 American Auger DD110 Lehigh River Crossing Allentown, PA October‐2015 John Anderson Construction for UGI John Anderson (570) 795‐9601
790 2" ‐ 6" HDPE Force Main 6000 Vermeer 24/40 Various Locations Borough of Millville, PA October‐2015 Larson Design Group Paul Krizan (570) 651‐1565
120 6" Steel Gas Line 500 Vermeer 36/50 Shermans Creek Crossing Perry County, PA September‐2015 O&M Construction for OTIS Ron Mote (513) 535‐8252
90 6"  HDPE Gas Line 350 Vermeer 36/50 Creek Crossing Factoryville, PA September‐2015 UGI Utilities Donald Thiede (570) 876‐7030
80 4" HDPE Drain Line 500 Vermeer 36/50 Embankment Borings at Wellpad Washington, PA September‐2015 Range Resources Andy Egut (724) 743‐6764
400 14" Steel Casing Pipe 950 American Auger DD110 CXS Railroad Crossing St Marys, WV August‐2015 Keystone Clearwater Solutions Bryan Wehler (717) 514‐5493
850 6" ‐ 16" Steel Gas Line 300 ‐ 800 American Auger DD110
8 Bores ‐ CXS Railroad / 
Road Bores / Creek Bores
Mercer, PA April‐2015 Circle K of Arkansas Greg Horton (724) 901‐7073
550 6" HDPE Force Main 5000 Vermeer 24/40 Surface Streets Anne Arundle, MD January‐2015 Anne Arundle County Rick Talbot (410) 371‐1393
400 4" HDPE Gas Line 15000 Vermeer 24/40 Surface Streets Montrose, PA January‐2015 GEC Services Inc John Gilarde (570) 906‐0404
450 18" HDPE Water Line 1300 Vermeer 220 River Crossing Audobaun, PA December‐2014 Brubacher Construction for PA Amerian Water Allan Day (717) 445‐4571
400 16" Steel Casing Pipe 800 American Auger DD110 Railroad Crossing Carrolton, OH October‐2014 Keystone Clearwater Solutions Bryan Wehler (717) 514‐5493
180 12" Steel Gas Line 700 Vermeer 36/50 Railroad Crossing Indiana, PA October‐2014 John Anderson Construction John Anderson (570) 795‐9601
100 8" Steel Gas Line 500 Vermeer 36/50 Roadway Crossing Tripp Hill, PA June‐2014 18 Karat Inc. for Consol Energy Dylan Kevech (724) 229‐5006
400 16" Steel Gas Line 750 Vermeer 220 Creek and Railroad Crossing Mercer, PA May‐2014 Circle K of Arkansas Greg Horton (724) 901‐7073
400 24" HDPE Water Line 800 American Auger DD110 River Crossing Bridgeport, WV May‐2014 CA Murren Mark Mey (678) 218‐8255
150 8" Steel Gas Pipeline 650 American Auger DD110 Roadway Crossing Evansville, IN March‐2014 Troy Construction Jim Jacob (706) 336‐0063
2200 8" & 24" Steel Gas Line 1200 American Auger DD110 Creek and Railroad Crossing Waterville, ME February‐2014 Summit Utilities (855) 910‐4433
2000 8" & 24" Steel Gas Line 1800 American Auger DD110 Creek and Railroad Crossing Waterville, ME January‐2014 Daniel O' Connell's Sons, Inc (603) 594‐3082
Recient Project References
175 3" HDPE Water Line 1800 American Auger DD110 Lake Crossing (Single Bore) Ricketts Glen State Park, PA January‐2014 PA DCNR Victor Li (215) 453‐5030
150 16" Steel Gas Pipeline 300 American Auger DD110 Roadway Crossing Wyoming County, PA October‐2013 Strike LLC Jeff Gillam (832) 701‐8656
150 8" Steel Gas Pipeline 500 American Auger DD110 Roadway Crossing Pittsburgh, PA September‐2013 Oil Fields Construction for EQT Barron Allen (606) 791‐5174
600 4" ‐ 24" Steel Gas Pipeline 50 ‐ 500 Vermeer 24/40 Creek / Roadway Montrose, PA January‐2013 JP Riley Construction Bill Reilly (570) 553‐2223
240 4"  CPVC Conduit 2500 Vermeer 24/40 Surface Streets Hamburg, PA October‐2012 Systems Design Engineers Tom Duffy (610) 916‐8500
12000 Pennsylvania April 2009 ‐ Present PPL Electric Utilities Matt Helm (717) 507‐5996
2500 Pennsylvania January 2008 ‐ Present Fiber Technology  (Quanta) Donny Speck (570) 560‐7102
1500 Pennsylvania November 2009 ‐ Present First Energy (Met‐ED) Bruce Balthaser (610) 587‐6042
700 Pennsylvania November 2010 ‐ Present Sunesys Tom Reitz (412) 925‐7021
250 Pennsylvania November 2011 ‐ Present Diamondback Signal Kemp Buettner (410) 795‐9606
Directional Bores, Multi Duct Road Crossings
Railroad Crossings at 40 Location ‐ 4" HDPE Pipe
Utility / Contract Work
Power Installation via Directional Boring, Turn Key Products, 
Terminations through Energizing, Manhole Placements, Ductwork. Various bores from 20 ‐ 750'
Directional Boring, Fiber Optic Cable Installation, Manhole Placement
Power Installation, Turn Key Products, Directional Bores

More Related Content

Similar to References_8_16

Abtrex custom tank and vessel fabrication
Abtrex custom tank and vessel fabricationAbtrex custom tank and vessel fabrication
Abtrex custom tank and vessel fabrication
Abtrex Inc
 
Abtrex rubber tank lining process
Abtrex rubber tank lining processAbtrex rubber tank lining process
Abtrex rubber tank lining process
Abtrex Inc
 
Abtrex field installations and repairs on site
Abtrex field installations and repairs on siteAbtrex field installations and repairs on site
Abtrex field installations and repairs on site
Abtrex Inc
 
Who's Abtrex Inc- Custom Tank Fabricators and Rubber Liners
Who's Abtrex Inc- Custom Tank Fabricators and Rubber LinersWho's Abtrex Inc- Custom Tank Fabricators and Rubber Liners
Who's Abtrex Inc- Custom Tank Fabricators and Rubber Liners
Abtrex Inc
 
Lead Generation11 - Sheet1
Lead Generation11 - Sheet1Lead Generation11 - Sheet1
Lead Generation11 - Sheet1
Tripti Sharma
 
Brian resume 2015
Brian resume 2015Brian resume 2015
Brian resume 2015
Brian Peterson
 

Similar to References_8_16 (6)

Abtrex custom tank and vessel fabrication
Abtrex custom tank and vessel fabricationAbtrex custom tank and vessel fabrication
Abtrex custom tank and vessel fabrication
 
Abtrex rubber tank lining process
Abtrex rubber tank lining processAbtrex rubber tank lining process
Abtrex rubber tank lining process
 
Abtrex field installations and repairs on site
Abtrex field installations and repairs on siteAbtrex field installations and repairs on site
Abtrex field installations and repairs on site
 
Who's Abtrex Inc- Custom Tank Fabricators and Rubber Liners
Who's Abtrex Inc- Custom Tank Fabricators and Rubber LinersWho's Abtrex Inc- Custom Tank Fabricators and Rubber Liners
Who's Abtrex Inc- Custom Tank Fabricators and Rubber Liners
 
Lead Generation11 - Sheet1
Lead Generation11 - Sheet1Lead Generation11 - Sheet1
Lead Generation11 - Sheet1
 
Brian resume 2015
Brian resume 2015Brian resume 2015
Brian resume 2015
 

References_8_16

  • 1. 841 W Trindle Road Mechanicsburg, PA 17055 Phone: (717) 697‐4029 Fax: (717)697‐4039 www.JMFunderground.com Project Cost  $ x 1000 Diameter Product Length (LF) Equipment Crossing Name Location Date  Completed Owner Contact Name Contact Number 60 6" Steel Gas Line 430 Vermeer 36/50 Stream / Road Crossing Perry County, PA July‐2016 O&M Construction for OTIS Ron Mote (513) 535‐8252 250 16" Steel Gas Line 710 American Auger DD110 Stream Wetland Crossing Erie, PA May‐2016 John Anderson Construction John Anderson (570) 795‐9601 150 12" Poly Water Line 800 American Auger DD110 Railroad / Wetland Crossing Carrollton, Ohio April‐2016 Keystone Clearwater Solutions Bryan Wehler (717) 514‐5493 120 12" Poly Gas Line 680 Vermeer 36/50 Roadway Crossing Bethlehem, PA April‐2016 UGI Utilities Jess Macker (610) 807‐3725 150 8" Poly Gas Line 2100 Vermeer 36/50 Easement / Roadway Crossing Bethlehem, PA March‐2016 UGI Utilities Tim Stewart  (484) 226‐8132 400 12" Steel Gas Line 1400 American Auger DD110 River Crossing Gastonia, NC January‐2016 Primoris Pipeline Jamey Lambert (910) 471‐5917 200 12" Steel Gas Line 500 Vermeer 36/50 Railroad / Roadway Crossing Waynsburg, PA January‐2016 West Penn  Brian Ludwig (412) 559‐6259 180 12" Steel Gas Line 710 Vermeer 36/50 Roadway Crossing Lancaster, PA January‐2016 Conti Corporation David Cygan (732) 484‐2343 200 16" Poly Gas Line 350 Vermeer 36/50 Roadway Crossing Waynsburg, PA December‐2015 Keystone Clearwayer Solutions Bryan Wehler (717) 514‐5493 80 6"  HDPE Gas Line 300 Vermeer 36/50 Railroad Crossing Scranton, PA October‐2015 UGI Utilities Chris Morris (570) 417‐6014 400 12" Steel Gas Line 1200 American Auger DD110 Lehigh River Crossing Allentown, PA October‐2015 John Anderson Construction for UGI John Anderson (570) 795‐9601 790 2" ‐ 6" HDPE Force Main 6000 Vermeer 24/40 Various Locations Borough of Millville, PA October‐2015 Larson Design Group Paul Krizan (570) 651‐1565 120 6" Steel Gas Line 500 Vermeer 36/50 Shermans Creek Crossing Perry County, PA September‐2015 O&M Construction for OTIS Ron Mote (513) 535‐8252 90 6"  HDPE Gas Line 350 Vermeer 36/50 Creek Crossing Factoryville, PA September‐2015 UGI Utilities Donald Thiede (570) 876‐7030 80 4" HDPE Drain Line 500 Vermeer 36/50 Embankment Borings at Wellpad Washington, PA September‐2015 Range Resources Andy Egut (724) 743‐6764 400 14" Steel Casing Pipe 950 American Auger DD110 CXS Railroad Crossing St Marys, WV August‐2015 Keystone Clearwater Solutions Bryan Wehler (717) 514‐5493 850 6" ‐ 16" Steel Gas Line 300 ‐ 800 American Auger DD110 8 Bores ‐ CXS Railroad /  Road Bores / Creek Bores Mercer, PA April‐2015 Circle K of Arkansas Greg Horton (724) 901‐7073 550 6" HDPE Force Main 5000 Vermeer 24/40 Surface Streets Anne Arundle, MD January‐2015 Anne Arundle County Rick Talbot (410) 371‐1393 400 4" HDPE Gas Line 15000 Vermeer 24/40 Surface Streets Montrose, PA January‐2015 GEC Services Inc John Gilarde (570) 906‐0404 450 18" HDPE Water Line 1300 Vermeer 220 River Crossing Audobaun, PA December‐2014 Brubacher Construction for PA Amerian Water Allan Day (717) 445‐4571 400 16" Steel Casing Pipe 800 American Auger DD110 Railroad Crossing Carrolton, OH October‐2014 Keystone Clearwater Solutions Bryan Wehler (717) 514‐5493 180 12" Steel Gas Line 700 Vermeer 36/50 Railroad Crossing Indiana, PA October‐2014 John Anderson Construction John Anderson (570) 795‐9601 100 8" Steel Gas Line 500 Vermeer 36/50 Roadway Crossing Tripp Hill, PA June‐2014 18 Karat Inc. for Consol Energy Dylan Kevech (724) 229‐5006 400 16" Steel Gas Line 750 Vermeer 220 Creek and Railroad Crossing Mercer, PA May‐2014 Circle K of Arkansas Greg Horton (724) 901‐7073 400 24" HDPE Water Line 800 American Auger DD110 River Crossing Bridgeport, WV May‐2014 CA Murren Mark Mey (678) 218‐8255 150 8" Steel Gas Pipeline 650 American Auger DD110 Roadway Crossing Evansville, IN March‐2014 Troy Construction Jim Jacob (706) 336‐0063 2200 8" & 24" Steel Gas Line 1200 American Auger DD110 Creek and Railroad Crossing Waterville, ME February‐2014 Summit Utilities (855) 910‐4433 2000 8" & 24" Steel Gas Line 1800 American Auger DD110 Creek and Railroad Crossing Waterville, ME January‐2014 Daniel O' Connell's Sons, Inc (603) 594‐3082 Recient Project References
  • 2. 175 3" HDPE Water Line 1800 American Auger DD110 Lake Crossing (Single Bore) Ricketts Glen State Park, PA January‐2014 PA DCNR Victor Li (215) 453‐5030 150 16" Steel Gas Pipeline 300 American Auger DD110 Roadway Crossing Wyoming County, PA October‐2013 Strike LLC Jeff Gillam (832) 701‐8656 150 8" Steel Gas Pipeline 500 American Auger DD110 Roadway Crossing Pittsburgh, PA September‐2013 Oil Fields Construction for EQT Barron Allen (606) 791‐5174 600 4" ‐ 24" Steel Gas Pipeline 50 ‐ 500 Vermeer 24/40 Creek / Roadway Montrose, PA January‐2013 JP Riley Construction Bill Reilly (570) 553‐2223 240 4"  CPVC Conduit 2500 Vermeer 24/40 Surface Streets Hamburg, PA October‐2012 Systems Design Engineers Tom Duffy (610) 916‐8500 12000 Pennsylvania April 2009 ‐ Present PPL Electric Utilities Matt Helm (717) 507‐5996 2500 Pennsylvania January 2008 ‐ Present Fiber Technology  (Quanta) Donny Speck (570) 560‐7102 1500 Pennsylvania November 2009 ‐ Present First Energy (Met‐ED) Bruce Balthaser (610) 587‐6042 700 Pennsylvania November 2010 ‐ Present Sunesys Tom Reitz (412) 925‐7021 250 Pennsylvania November 2011 ‐ Present Diamondback Signal Kemp Buettner (410) 795‐9606 Directional Bores, Multi Duct Road Crossings Railroad Crossings at 40 Location ‐ 4" HDPE Pipe Utility / Contract Work Power Installation via Directional Boring, Turn Key Products,  Terminations through Energizing, Manhole Placements, Ductwork. Various bores from 20 ‐ 750' Directional Boring, Fiber Optic Cable Installation, Manhole Placement Power Installation, Turn Key Products, Directional Bores