REC Mechanism
       ----
Execution Details
REC Mechanism
Renewable Energy Certificate (REC) mechanism is a market based instrument to promote
renewable energy and facilitate compliance of renewable purchase obligations (RPO). It is aimed
at addressing the mismatch between availability of RE resources in state and the requirement of
the obligated entities to meet the renewable purchase obligation (RPO).




                                                            Sale of Electricity
                       Revenue
                                                          Sale of REC Certificate
Revenue for a RE generator under REC scheme includes revenue from the sale of electricity
component of RE generation and the revenue from the sale of environmental attributes in the
form of RECs.
Financials REC
      Per MW                 Optimistic       Conservative      Radically Pessimistic
          Cost of Project    Rs 9.5 crores     Rs 10 crores          Rs 10.5 crores

    Expected Generation      17.5 lac units    16.5 Lac units         16 Lac units
       Power Tariff Sale     Rs 4 per unit    Rs 2.7 per unit       Rs 2.7 per unit

        Tariff Escallation        5%                3%                    3%

      Max possible tariff        Rs 8              Rs 7                  Rs 6

  Price of REC for 5 years   Rs 11.5/unit       Rs 9.3 /unit         Rs 9.3 / unit

Price of REC after 5 years     RS 6/unit        Rs 4.0/unit              Zero
           Exim financing    50% of Cost            No                    No

     Interest rate (Exim)        10%                NA                    NA

 Interest rate (domestic)       12.50%             13%                   14%
           Tenor for Exim      15 years             NA                    NA
      Tenor for domestic       12 years          12 years              12 years

Accelerated depreciation          Yes               YES                   Yes


               Equity IRR        90%               40%                   16%
Execution Plan




                0             1         2          3          4           5         6

   MOU

   Reg for
   project          30 days

Accreditation                     42 days

Registration                                       42 days

  Issuance

Open Access                       Documentation with Electricity Dept

Comissioning                                      Setting up of the project
Process of Accreditation
                                               Verification prior
                                      2        to accreditation



ELIGIBLE          1                                             3b
 Entity     Application to
            accreditation             STATE AGENCY         Intimation to
                                                           accreditation
                                                                           SLDC - RVPN
                  Confirmation to
           3a      accreditation


                      Intimation to
                      accreditation       3c




                       NLDC – Central agency
Accreditation




                 0            7            14   21   28        35   42

  Submission

     Check           5 days

   Re Submit                      7 days

  Processiong                                        30 Days

   Certificate
Accreditation

                                    Format 1.1

                Sec A   Owner Details

                Sec B   Operator Details

                Sec C   RE Generating Station Details

                Sec D   Connectivity Details with Concerned Licensee (STU/Discom)
                Sec E   Metering Details

                Sec F   Statutory Clearance Details

                Sec G   General Details

                Sec H   Details of Fee & Charges

                               Section I : Declaration

                Format 1.2      CERTIFICATE OF ACCREDIATION
Accreditation

   Sec A

   Sec B
   Sec C

   Sec D
   Sec E

   Sec F

   Sec G

   Sec H

  Section I : Declaration

   Format 1.2
Accreditation

   Sec A

   Sec B
   Sec C

   Sec D
   Sec E

   Sec F

   Sec G

   Sec H

  Section I : Declaration

   Format 1.2
Accreditation

   Sec A

   Sec B
   Sec C

   Sec D
   Sec E

   Sec F

   Sec G

   Sec H

  Section I : Declaration

   Format 1.2
Accreditation

   Sec A

   Sec B
   Sec C

   Sec D
   Sec E

   Sec F

   Sec G

   Sec H

  Section I : Declaration

   Format 1.2
Accreditation

   Sec A

   Sec B
   Sec C

   Sec D
   Sec E

   Sec F

   Sec G

   Sec H

  Section I : Declaration

   Format 1.2
Accreditation

   Sec A

   Sec B
   Sec C

   Sec D
   Sec E

   Sec F

   Sec G

   Sec H

  Section I : Declaration

   Format 1.2
Accreditation

   Sec A

   Sec B
   Sec C

   Sec D
   Sec E

   Sec F

   Sec G

   Sec H

  Section I : Declaration

   Format 1.2
Accreditation

   Sec A

   Sec B

   Sec C

   Sec D

   Sec E
   Sec F

   Sec G

   Sec H

  Section I : Declaration

   Format 1.2
Process of Registration


          ELIGIBLE
           Entity                                                                         SLDC - RVPN
                                                 STATE AGENCY




                                                                                      3c          Intimation of
         3a                            Intimation of          3b                                   Registration
                                        Registration
Confirmation to
 Registration



                            1
                     Application for                NLDC –
                      Registration               Central agency
                                                                                    3d              POWER
                                                 2
                                                            Verification for   Intimation of       EXCHANGE
                                                             registration       Registration
Registration


                 0          7         14      21     28   35        42

  Submission

     Check           2

  incomplete             7 work day

   Processing                              15 days

   Certificate

  Fees Submit                                             15 days
Registration


   Format 2.1        Application for Registration of RE Generating as Eligible Entity

   Sec A       Owner Details

   Sec B       RE Generating Station Details
   Sec C       Copy of Certificate of Accreditation from State Agency

   Sec D       Commissioning Schedule

   Sec E       Details of Fee & Charges

   Sec F       Declaration


  Section I : Declaration

   Format 2.2           CERTIFICATE OF REGISTRATION
Registration


   Format 2.1

   Sec A

   Sec B

   Sec C

   Sec D
   Sec E

   Sec F


  Section I : Declaration

   Format 2.2
Registration


   Format 2.1

   Sec A

   Sec B

   Sec C

   Sec D
   Sec E

   Sec F


  Section I : Declaration

   Format 2.2
Registration

   Format 2.1

   Sec A

   Sec B

   Sec C

   Sec D
   Sec E

   Sec F


  Section I : Declaration

   Format 2.2
Registration

   Format 2.1

   Sec A

   Sec B

   Sec C

   Sec D
   Sec E

   Sec F


  Section I : Declaration

   Format 2.2
Registration


   Format 2.1

   Sec A

   Sec B

   Sec C

   Sec D
   Sec E

   Sec F


  Section I : Declaration

   Format 2.2
Registration

   Format 2.1

   Sec A

   Sec B

   Sec C

   Sec D
   Sec E

   Sec F


  Section I : Declaration

   Format 2.2
Registration


   Format 2.1

   Sec A

   Sec B

   Sec C

   Sec D
   Sec E

   Sec F


  Section I : Declaration

   Format 2.2
Process of Open Access




NLDC                      RREC




Power Ex             Urja Bhawan
Open Access


                 0            10    20       30   40         50    60

     MOU

  Submission

  incomplete         10 day

   Processing                      30 days

 System Study                                      30 days


  System stren                                                    ???
Open Access


               Form I     APPLICATION FOR SCHEDULING

               Form II    CONCURENCE FROM SLDC

              Form III    REQUEST/CONCURRENCE FROM RLDC
              Form IV     CONGESTION INFORMATION (ADVANCE SCHEDULING)

              Form V      REQUEST FOR REVISION OF SCHEDULE DUE TO CONGESTION

              Form VI     ACCEPTANCE FOR SCHEDULING

              Form VII    DETAILS OF PAYMENT

              Form VIII   REGISTRATION FORM
Commissioning
Process of Issuance
                       Intimation to
                         Issuance

STATE AGENCY               5b                       2        Verification prior
                                                               to Issuance


                   3
               Regular Injection

                       Report                    NLDC – Central agency
SLDC - RVPN
                   Intimation of Meter Reading                                    Issuance of
                                                                                      REC


                                                                1                 5a
     4c                                    4b               Application for
                                                              Issuance

    Distribution
     Licensee

                            4a
                                                 ELIGIBLE Entity
Issuance

                0         7      14         21   28   35   42

   Submit

    Check           2

 Incomplete             5 days

 Processiong                          15 days

  Certificate
Issuance


             Format 3.1

           Sec A    Energy Injection Report

           Sec B    Registration Certificate (To ascertain validity)

           Sec C    Details of Fee & Charges
           Sec D    Compliance Auditor Report (if applicable)

           Format 3.2           CERTIFICATE OF ISSUANCE
Issuance

    Format 3.1

  Sec A

  Sec B
  Sec C

  Sec D

  Format 3.2
Issuance

    Format 3.1

  Sec A

  Sec B
  Sec C

  Sec D

  Format 3.2
Issuance

    Format 3.1

  Sec A

  Sec B
  Sec C

  Sec D

  Format 3.2
Issuance
    Format 3.1

  Sec A

  Sec B

  Sec C

  Sec D

  Format 3.2
Issuance

    Format 3.1

  Sec A

  Sec B
  Sec C

  Sec D

  Format 3.2
Application

              Execution time

                  Forms
Application

                                                      Execution time
 I     Company Details
                                                          Forms
 II    Proposed Power Project
III    Details of Proposed Power Project

IV     Electrical Details
 V     Financial Details

VI     Any Other relevant information

VII    Declaration

VIII   Documents enclosed – As applicable
Application

                                                      Execution time
 I     Company Details
                                                          Forms
 II    Proposed Power Project
III    Details of Proposed Power Project

IV     Electrical Details
 V     Financial Details

VI     Any Other relevant information

VII    Declaration

VIII   Documents enclosed – As applicable
Services Offered




Conceptualization                   Execution           Project Monitoring

   Feasibility Study          Land Identification          Monitoring

Rebates and Incentives               Design               Maintenance

       Quality                      Procure

       Funding                       Install

                            Testing and Certification


              Providing Engineering Excellence in every Step
Scope of Work



                 Incorporating Renewable Incentives and Policy changes to get maximum out
Business Model
                 of the Business Model
                 Forming JV for FI’s and facilitating tie ups with Indian Companies.
Investor
                 Overcoming legal hurdles to ease Investments in India
                 Consulting about best technology for Solar projects, based on the location
Technical
                 and the cost.
                  Pre Bid and Post Bid Consultancy for lucrative but competitive for Solar
Proposals
                 tenders in India

Finance          Arranging Funds and Optimizing it to get maximum returns on Equity

                 Making strategic tie-ups for Foreign companies looking for Solar Business
Tie ups
                 Opportunity in India
Thank You
       Contact us:-
       410, Alankar Plaza
       Jaipur, Rajasthan
       Ph no :- +91 141 2231469
       Fax :- +91 141 3916464
       Mob no :- +91 – 9829031658
       Email :- agm@greenergytechnologies.in




Our Business Associations
NLDC            RREC




Power Ex   Urja Bhawan
S.No   Type                           Charges
1      Registration for the project   Rs 10,000 / MW
       Registration Charges           Rs 50,000/ MW
       Processing Charges             Rs 10,000 / MW
2      Accreditation Charges


3      Registration for certificate



4      Issuance for Certificates
Compliance Auditor

REC Mechanism

  • 1.
    REC Mechanism ---- Execution Details
  • 2.
    REC Mechanism Renewable EnergyCertificate (REC) mechanism is a market based instrument to promote renewable energy and facilitate compliance of renewable purchase obligations (RPO). It is aimed at addressing the mismatch between availability of RE resources in state and the requirement of the obligated entities to meet the renewable purchase obligation (RPO). Sale of Electricity Revenue Sale of REC Certificate Revenue for a RE generator under REC scheme includes revenue from the sale of electricity component of RE generation and the revenue from the sale of environmental attributes in the form of RECs.
  • 3.
    Financials REC Per MW Optimistic Conservative Radically Pessimistic Cost of Project Rs 9.5 crores Rs 10 crores Rs 10.5 crores Expected Generation 17.5 lac units 16.5 Lac units 16 Lac units Power Tariff Sale Rs 4 per unit Rs 2.7 per unit Rs 2.7 per unit Tariff Escallation 5% 3% 3% Max possible tariff Rs 8 Rs 7 Rs 6 Price of REC for 5 years Rs 11.5/unit Rs 9.3 /unit Rs 9.3 / unit Price of REC after 5 years RS 6/unit Rs 4.0/unit Zero Exim financing 50% of Cost No No Interest rate (Exim) 10% NA NA Interest rate (domestic) 12.50% 13% 14% Tenor for Exim 15 years NA NA Tenor for domestic 12 years 12 years 12 years Accelerated depreciation Yes YES Yes Equity IRR 90% 40% 16%
  • 4.
    Execution Plan 0 1 2 3 4 5 6 MOU Reg for project 30 days Accreditation 42 days Registration 42 days Issuance Open Access Documentation with Electricity Dept Comissioning Setting up of the project
  • 5.
    Process of Accreditation Verification prior 2 to accreditation ELIGIBLE 1 3b Entity Application to accreditation STATE AGENCY Intimation to accreditation SLDC - RVPN Confirmation to 3a accreditation Intimation to accreditation 3c NLDC – Central agency
  • 6.
    Accreditation 0 7 14 21 28 35 42 Submission Check 5 days Re Submit 7 days Processiong 30 Days Certificate
  • 7.
    Accreditation Format 1.1 Sec A Owner Details Sec B Operator Details Sec C RE Generating Station Details Sec D Connectivity Details with Concerned Licensee (STU/Discom) Sec E Metering Details Sec F Statutory Clearance Details Sec G General Details Sec H Details of Fee & Charges Section I : Declaration Format 1.2 CERTIFICATE OF ACCREDIATION
  • 8.
    Accreditation Sec A Sec B Sec C Sec D Sec E Sec F Sec G Sec H Section I : Declaration Format 1.2
  • 9.
    Accreditation Sec A Sec B Sec C Sec D Sec E Sec F Sec G Sec H Section I : Declaration Format 1.2
  • 10.
    Accreditation Sec A Sec B Sec C Sec D Sec E Sec F Sec G Sec H Section I : Declaration Format 1.2
  • 11.
    Accreditation Sec A Sec B Sec C Sec D Sec E Sec F Sec G Sec H Section I : Declaration Format 1.2
  • 12.
    Accreditation Sec A Sec B Sec C Sec D Sec E Sec F Sec G Sec H Section I : Declaration Format 1.2
  • 13.
    Accreditation Sec A Sec B Sec C Sec D Sec E Sec F Sec G Sec H Section I : Declaration Format 1.2
  • 14.
    Accreditation Sec A Sec B Sec C Sec D Sec E Sec F Sec G Sec H Section I : Declaration Format 1.2
  • 15.
    Accreditation Sec A Sec B Sec C Sec D Sec E Sec F Sec G Sec H Section I : Declaration Format 1.2
  • 16.
    Process of Registration ELIGIBLE Entity SLDC - RVPN STATE AGENCY 3c Intimation of 3a Intimation of 3b Registration Registration Confirmation to Registration 1 Application for NLDC – Registration Central agency 3d POWER 2 Verification for Intimation of EXCHANGE registration Registration
  • 17.
    Registration 0 7 14 21 28 35 42 Submission Check 2 incomplete 7 work day Processing 15 days Certificate Fees Submit 15 days
  • 18.
    Registration Format 2.1 Application for Registration of RE Generating as Eligible Entity Sec A Owner Details Sec B RE Generating Station Details Sec C Copy of Certificate of Accreditation from State Agency Sec D Commissioning Schedule Sec E Details of Fee & Charges Sec F Declaration Section I : Declaration Format 2.2 CERTIFICATE OF REGISTRATION
  • 19.
    Registration Format 2.1 Sec A Sec B Sec C Sec D Sec E Sec F Section I : Declaration Format 2.2
  • 20.
    Registration Format 2.1 Sec A Sec B Sec C Sec D Sec E Sec F Section I : Declaration Format 2.2
  • 21.
    Registration Format 2.1 Sec A Sec B Sec C Sec D Sec E Sec F Section I : Declaration Format 2.2
  • 22.
    Registration Format 2.1 Sec A Sec B Sec C Sec D Sec E Sec F Section I : Declaration Format 2.2
  • 23.
    Registration Format 2.1 Sec A Sec B Sec C Sec D Sec E Sec F Section I : Declaration Format 2.2
  • 24.
    Registration Format 2.1 Sec A Sec B Sec C Sec D Sec E Sec F Section I : Declaration Format 2.2
  • 25.
    Registration Format 2.1 Sec A Sec B Sec C Sec D Sec E Sec F Section I : Declaration Format 2.2
  • 26.
    Process of OpenAccess NLDC RREC Power Ex Urja Bhawan
  • 27.
    Open Access 0 10 20 30 40 50 60 MOU Submission incomplete 10 day Processing 30 days System Study 30 days System stren ???
  • 28.
    Open Access Form I APPLICATION FOR SCHEDULING Form II CONCURENCE FROM SLDC Form III REQUEST/CONCURRENCE FROM RLDC Form IV CONGESTION INFORMATION (ADVANCE SCHEDULING) Form V REQUEST FOR REVISION OF SCHEDULE DUE TO CONGESTION Form VI ACCEPTANCE FOR SCHEDULING Form VII DETAILS OF PAYMENT Form VIII REGISTRATION FORM
  • 29.
  • 30.
    Process of Issuance Intimation to Issuance STATE AGENCY 5b 2 Verification prior to Issuance 3 Regular Injection Report NLDC – Central agency SLDC - RVPN Intimation of Meter Reading Issuance of REC 1 5a 4c 4b Application for Issuance Distribution Licensee 4a ELIGIBLE Entity
  • 31.
    Issuance 0 7 14 21 28 35 42 Submit Check 2 Incomplete 5 days Processiong 15 days Certificate
  • 32.
    Issuance Format 3.1 Sec A Energy Injection Report Sec B Registration Certificate (To ascertain validity) Sec C Details of Fee & Charges Sec D Compliance Auditor Report (if applicable) Format 3.2 CERTIFICATE OF ISSUANCE
  • 33.
    Issuance Format 3.1 Sec A Sec B Sec C Sec D Format 3.2
  • 34.
    Issuance Format 3.1 Sec A Sec B Sec C Sec D Format 3.2
  • 35.
    Issuance Format 3.1 Sec A Sec B Sec C Sec D Format 3.2
  • 36.
    Issuance Format 3.1 Sec A Sec B Sec C Sec D Format 3.2
  • 37.
    Issuance Format 3.1 Sec A Sec B Sec C Sec D Format 3.2
  • 38.
    Application Execution time Forms
  • 39.
    Application Execution time I Company Details Forms II Proposed Power Project III Details of Proposed Power Project IV Electrical Details V Financial Details VI Any Other relevant information VII Declaration VIII Documents enclosed – As applicable
  • 40.
    Application Execution time I Company Details Forms II Proposed Power Project III Details of Proposed Power Project IV Electrical Details V Financial Details VI Any Other relevant information VII Declaration VIII Documents enclosed – As applicable
  • 41.
    Services Offered Conceptualization Execution Project Monitoring Feasibility Study Land Identification Monitoring Rebates and Incentives Design Maintenance Quality Procure Funding Install Testing and Certification Providing Engineering Excellence in every Step
  • 42.
    Scope of Work Incorporating Renewable Incentives and Policy changes to get maximum out Business Model of the Business Model Forming JV for FI’s and facilitating tie ups with Indian Companies. Investor Overcoming legal hurdles to ease Investments in India Consulting about best technology for Solar projects, based on the location Technical and the cost. Pre Bid and Post Bid Consultancy for lucrative but competitive for Solar Proposals tenders in India Finance Arranging Funds and Optimizing it to get maximum returns on Equity Making strategic tie-ups for Foreign companies looking for Solar Business Tie ups Opportunity in India
  • 43.
    Thank You Contact us:- 410, Alankar Plaza Jaipur, Rajasthan Ph no :- +91 141 2231469 Fax :- +91 141 3916464 Mob no :- +91 – 9829031658 Email :- agm@greenergytechnologies.in Our Business Associations
  • 44.
    NLDC RREC Power Ex Urja Bhawan
  • 45.
    S.No Type Charges 1 Registration for the project Rs 10,000 / MW Registration Charges Rs 50,000/ MW Processing Charges Rs 10,000 / MW 2 Accreditation Charges 3 Registration for certificate 4 Issuance for Certificates
  • 46.