Projecta manufactures projection screens from start to finish at their facility in the Netherlands. They form raw metal into casings and apply a special powder coating to prevent unwanted reflection. Projection surfaces are cut to size and assembled with borders and black drops. Every product undergoes quality checks and testing before being packaged for shipment. New products for 2014 include dry erase projection screens and the Elpro Concept screen with a leaf-shaped case for design-sensitive installations.