Scienceand Engineering Innovation and Research Building (SEIR)
Description:Thisprojectwillconstructanapproximately222,000 gross square foot(GSF) Science and
EngineeringInnovationandResearch(SEIR) Buildingwithlarge multiuse collaborative spaces,large
classroomsor lecture halls,andinnovationalresearchandteachinglabs.The buildingwill servethe
College of Engineering,the College of Science,andthe College of NursingandHealthInnovation.
ProjectSize:GSF:222,000 ASF:140,890
ProjectCost:$125 million
Role:ConstructionInspector(CivilInspector,Structural Inspector)
EERC – Engineer Education and Research Center
Description - The EngineeringEducation&ResearchCenterwill provide approximately432,794 gross
square feetof newconstructionof criticallyneedededucationandresearchspace and36,243 gross
square feetof renovation/remodel space withinErnestCockrellJr.(ECJ) School of Engineering.The
EERC’s newconstructionfootprintwill replace the EngineeringScience Building(ENS),whichis
functionallyobsolete andhassignificantdeferredmaintenance,aswell astemporarybuildingsCSA and
ACA.The EERC iscentral to achievingthe Cockrell School of Engineering'svisiontobecome aglobal
centerfor technologyinnovation,engineeringeducation,andentrepreneurship.Throughmodular
laboratoriesandintegrationof undergraduate education,interdisciplinarygraduate research,andthe
Electrical andComputerEngineering(ECE) department,the EERCwill bringanew paradigmfor
engineeringeducationandresearchtoUT.
ProjectSize:GSF:476,827 ASF:266,880
ProjectCost:$313,700,000
Role:ConstructionInspectorII/ODR –InspectedUndergroundutilities,rebar,interiorframing,in-wall
roughin’s& close up inspections,MEPsystemstesting,SWPPPInspections,architectural punchlist
Dell Medical Center: Parking Garage/Research Building
Description:Thisfirstphase of developmentwill involve the constructionof approximately515,000
gross square feet(GSF) of newUniversitybuildings,includinganEducationandAdministrationBuilding,
ResearchBuilding,andMedical Office Building1.Additionally,ParkingGarage 1 withapproximately
300,000 to 350,000 GSF is targetedtohouse 1,000 cars. A 480,000 GSF teachinghospital willbe
concurrentlyconstructedbySetonHealthcare incoordinationwithCentral Health.The teachinghospital
isnot includedaspart of thisprojectsince itwill notbe constructedor financedbyU. T. Austin.To
optimize the placementandorganizationof the variousfacilitiesthatwill ultimatelycomprise the
district,some existinginfrastructure andfacilitieswill require removal,relocation,orreplacement.
Transportationandutilityinfrastructureandsite preparationstages,includingpotentialroadway
realignment,willprecedethe buildingconstructionandwill be closelycoordinatedwiththe Cityof
Austin.The scope andphasingof the infrastructure workwill be coordinatedwithCentral Health/Seton
as theyconstruct the newteachinghospital.
ProjectSize:840,000 GSF
Total ProjectCost:$436,397,000
Role:ConstructionInspectorII/ODR –InspectedUndergroundutilities,rebar,interiorframing,in-wall
roughin’s& close upinspections
TACC – Advanced Computing Building
Description- ThisTACCOffice Buildingwillconsistof anapproximately39,000 gross square feet(GSF)
three-story,free-standingbuildingconnectedtothe existingofficeswithinthe ResearchOffice Complex
buildingbywayof an enclosed,pedestrianwalkway.The buildingwillconsistof apublicfirstlevel
housinganopenlobby/gatheringspace,receptionarea,1,500 GSF visualizationlab(anenvironmentof
large flatpanel monitorsofferinganextremelyhighlevel of detail andqualityforscientisttovisualize
and analyze data),auditoriumfor260, flexibletrainingroomfor50 and breakroom/cateringkitchento
be sharedby TACC staff andpublicusers.Inadditiontothese publicaccessspaces,the firstlevel will
alsohouse a large storage room forTACC and requiredmechanical andelectrical spaces.The twoupper
levelswill consistof private officespacesforTACC.The secondlevel will provide 28officeswithalarge
conference room,includinganopenstudentworkarea,andthe thirdlevel willprovide30 officeswith
twoconference roomsfor16 each,and necessarysupportspaces.
ProjectSize:39,891 GSF, 25,072 ASF
ProjectCost:$20,000,000
Role:ConstructionInspectorII/ODR –InspectedUndergroundutilities,rebar,interiorframing,in-wall
roughin’s & close upinspections,MEPsystemstesting,SWPPPInspections,architectural punchlist
Star Medical Center
Cost:$20 million
Description:Thisfacilityconsistsof fouroperatingrooms,one procedure roomand14 Pre-Op/PACU
beds.There are eightprivate 24-hourpatientroomsalongwiththe supportanddietaryspaces. The
remainderof the buildinghousesthe administrativestaff,general examrooms,imagingandED. The
facilityisasingle-storytiltwall structure withamasonryandmetal panel façade. Thisprojecthasbeen
fasttracked and isscheduledforcompletioninonly6monthsfromconstructionstart.
Role:AssistantProjectManager
West Texas Multi-Modal Center (Ft. Stockton)
Cost:$5 million
Role:ProjectManager/Estimator
Southlake Presbyterian Church (Education Addition)
Cost:$5 million
Role:ProjectManager/Estimator
Fort Stockton Elementary (Addition)
Role:AssistantProjectManager
Christ United Methodist Church
Cost:$25 million
Role:AssistantProjectManager
Belk Department Store (North Fort Worth)
Cost:$13 Million
Role ProjectCoordinator
CarMax (San Antonio)
Cost:$15 million
Role:ProjectCoordinator
CarMax (Tulsa, OK)
Cost:$15 million
Role:ProjectCoordinator

Project List

  • 1.
    Project List Scienceand EngineeringInnovation and Research Building (SEIR) Description:Thisprojectwillconstructanapproximately222,000 gross square foot(GSF) Science and EngineeringInnovationandResearch(SEIR) Buildingwithlarge multiuse collaborative spaces,large classroomsor lecture halls,andinnovationalresearchandteachinglabs.The buildingwill servethe College of Engineering,the College of Science,andthe College of NursingandHealthInnovation. ProjectSize:GSF:222,000 ASF:140,890 ProjectCost:$125 million Role:ConstructionInspector(CivilInspector,Structural Inspector) EERC – Engineer Education and Research Center Description - The EngineeringEducation&ResearchCenterwill provide approximately432,794 gross square feetof newconstructionof criticallyneedededucationandresearchspace and36,243 gross square feetof renovation/remodel space withinErnestCockrellJr.(ECJ) School of Engineering.The EERC’s newconstructionfootprintwill replace the EngineeringScience Building(ENS),whichis functionallyobsolete andhassignificantdeferredmaintenance,aswell astemporarybuildingsCSA and ACA.The EERC iscentral to achievingthe Cockrell School of Engineering'svisiontobecome aglobal centerfor technologyinnovation,engineeringeducation,andentrepreneurship.Throughmodular laboratoriesandintegrationof undergraduate education,interdisciplinarygraduate research,andthe Electrical andComputerEngineering(ECE) department,the EERCwill bringanew paradigmfor engineeringeducationandresearchtoUT. ProjectSize:GSF:476,827 ASF:266,880 ProjectCost:$313,700,000 Role:ConstructionInspectorII/ODR –InspectedUndergroundutilities,rebar,interiorframing,in-wall roughin’s& close up inspections,MEPsystemstesting,SWPPPInspections,architectural punchlist Dell Medical Center: Parking Garage/Research Building Description:Thisfirstphase of developmentwill involve the constructionof approximately515,000 gross square feet(GSF) of newUniversitybuildings,includinganEducationandAdministrationBuilding, ResearchBuilding,andMedical Office Building1.Additionally,ParkingGarage 1 withapproximately 300,000 to 350,000 GSF is targetedtohouse 1,000 cars. A 480,000 GSF teachinghospital willbe concurrentlyconstructedbySetonHealthcare incoordinationwithCentral Health.The teachinghospital isnot includedaspart of thisprojectsince itwill notbe constructedor financedbyU. T. Austin.To optimize the placementandorganizationof the variousfacilitiesthatwill ultimatelycomprise the district,some existinginfrastructure andfacilitieswill require removal,relocation,orreplacement.
  • 2.
    Transportationandutilityinfrastructureandsite preparationstages,includingpotentialroadway realignment,willprecedethe buildingconstructionandwillbe closelycoordinatedwiththe Cityof Austin.The scope andphasingof the infrastructure workwill be coordinatedwithCentral Health/Seton as theyconstruct the newteachinghospital. ProjectSize:840,000 GSF Total ProjectCost:$436,397,000 Role:ConstructionInspectorII/ODR –InspectedUndergroundutilities,rebar,interiorframing,in-wall roughin’s& close upinspections TACC – Advanced Computing Building Description- ThisTACCOffice Buildingwillconsistof anapproximately39,000 gross square feet(GSF) three-story,free-standingbuildingconnectedtothe existingofficeswithinthe ResearchOffice Complex buildingbywayof an enclosed,pedestrianwalkway.The buildingwillconsistof apublicfirstlevel housinganopenlobby/gatheringspace,receptionarea,1,500 GSF visualizationlab(anenvironmentof large flatpanel monitorsofferinganextremelyhighlevel of detail andqualityforscientisttovisualize and analyze data),auditoriumfor260, flexibletrainingroomfor50 and breakroom/cateringkitchento be sharedby TACC staff andpublicusers.Inadditiontothese publicaccessspaces,the firstlevel will alsohouse a large storage room forTACC and requiredmechanical andelectrical spaces.The twoupper levelswill consistof private officespacesforTACC.The secondlevel will provide 28officeswithalarge conference room,includinganopenstudentworkarea,andthe thirdlevel willprovide30 officeswith twoconference roomsfor16 each,and necessarysupportspaces. ProjectSize:39,891 GSF, 25,072 ASF ProjectCost:$20,000,000 Role:ConstructionInspectorII/ODR –InspectedUndergroundutilities,rebar,interiorframing,in-wall roughin’s & close upinspections,MEPsystemstesting,SWPPPInspections,architectural punchlist Star Medical Center Cost:$20 million Description:Thisfacilityconsistsof fouroperatingrooms,one procedure roomand14 Pre-Op/PACU beds.There are eightprivate 24-hourpatientroomsalongwiththe supportanddietaryspaces. The remainderof the buildinghousesthe administrativestaff,general examrooms,imagingandED. The facilityisasingle-storytiltwall structure withamasonryandmetal panel façade. Thisprojecthasbeen fasttracked and isscheduledforcompletioninonly6monthsfromconstructionstart. Role:AssistantProjectManager
  • 3.
    West Texas Multi-ModalCenter (Ft. Stockton) Cost:$5 million Role:ProjectManager/Estimator Southlake Presbyterian Church (Education Addition) Cost:$5 million Role:ProjectManager/Estimator Fort Stockton Elementary (Addition) Role:AssistantProjectManager Christ United Methodist Church Cost:$25 million Role:AssistantProjectManager Belk Department Store (North Fort Worth) Cost:$13 Million Role ProjectCoordinator CarMax (San Antonio) Cost:$15 million Role:ProjectCoordinator CarMax (Tulsa, OK) Cost:$15 million Role:ProjectCoordinator