SlideShare a Scribd company logo
1 of 27
Download to read offline
Revamped Distribution
Sector Scheme
1
Announcement by Hon’ble Finance Minister
“The viability of Distribution Companies is a serious concern. A
revamped reforms-based result-linked power distribution sector
scheme will be launched with an outlay of INR 3,05,984 crores over 5
years. The scheme will provide assistance to DISCOMS for
Infrastructure creation including pre-paid smart metering and feeder
separation, upgradation of systems, etc., tied to financial
improvements.”
Budget Speech (FY2021-22):
2
Introduction
Objectives
• Improved Quality and Reliability of power supply to consumers
• Financially and operationally efficient distribution sector
o Reduce AT&C losses to 12-15% by 2024-25*
o Reduce ACS-ARR gaps to zero by 2024-25*
o Developing Institutional Capabilities
4
*AT&C loss reduction and ACS-ARR gap reduction targets mentioned above are national targets and state-wise targets would depend on their current levels
of AT&C losses and ACS-ARR gap
Distinguishing features
• Focus on Reforms
• Funding linked to Results/Performance
• Thrust on Smart Metering
• Funds for works leading to
o loss reduction and
o improvement in quality and reliability of power supply
• Reform measures and works customised to the specific needs of the state
5
Scope of the Revamped Distribution Sector Scheme
• Scheme outlay of INR 3,03,758 Cr.; estimated grant from Central Govt of INR 97,631 Cr.
• Revamped Scheme to have 2 key parts:
o Part A - Metering & Distribution Infrastructure works
o Part B - Training & Capacity Building and Other Enabling & Supporting Activities
• All State owned Discoms and State/UT Power Departments (excluding private sector power
utilities) eligible for financial assistance under the revamped scheme.
• Ongoing projects under IPDS, DDUGJY and PMDP-2015 (for the erstwhile State of J&K) to be
subsumed under the new scheme
o No new projects to be sanctioned under IPDS and DDUGJY
o Sanctioned projects will be eligible to receive funds upto 31
st
March2022 in this scheme
6
Project
Formulation and
Approval
Action Plan- salient features
8
• Discom applications to be approved based on Action Plans and DPRs
• The Action Plan will be structured as below:
o Part I - Metering & Distribution Infrastructure Works
o Part II - Reform measures for financial viability
o Part III - Results, Outcomes and Evaluation
• DPRs (only for Part A of Scheme)will be structured as below:
o DPR for Component I –Metering
o DPR for Component II, Part I –infrastructure works for loss reduction (50% share)
o DPR for Component II, Part II –infrastructure works for network strengthening (50% share)
o Action plan to be formulated by Discoms in consultation with Nodal Agency/ MoP; Plan to be
approved by DRC and State Cabinet before submission
o Plan to include the state cabinet decision that If Discom is found ineligible as per the Results
Evaluation Framework, the funding gap will be met by the Discom/State Govt.
Action Plan guidelines
 Metering Plan to be spelled out, to target
100% metering as per targets below:
• Feeder and DT metering (by June’ 2023)
• Agriculture DT metering (by Mar’ 2025)
• Prepaid consumer metering (by Mar’ 2025)
 Plans for other infrastructure works
including:
• works targeted at loss reduction
• works targeted at system strengthening
 Priority will be given to works focused on
loss reduction
 Action plan to broadly include challenges,
targeted infrastructureworks and annual
capital outlay
 Indicative list of works
Action Plan Part I
(for loss reduction and network strengthening
through metering and other works)
 Root cause analysis of reasons for
losses, ACS-ARR gap and other
challenges, targeted reformmeasures,
expected results and timelines
 This part will lay the road map for
bringing down AT&C losses and
reducing ACS-ARR gap to zero by
2024-25
 Plan to also include the financial
support needed from state govt.
(subsidy, govt. dues etc.)
 Clear mapping of problems and
solutions
 Activities and reform to be finalized
based on operational and financial
data (accounts)
 Indicative list of reforms
 Action plan to include baseline data
and annual targets (based on Part I and
II plan) across following outcomes :
• Financial Stability (AT&C, ACS-ARR,
regulatory assets etc.)
• Supply Reliability (hours of supply,
SAIFI, DT failure etc.)
• Infra. works progress (%metering,
feeder segregation, AB cabling etc.)
• Structural reforms progress ( training,
DBT, energy audit, tariffs etc.)
 Base year – FY2019-20
 Targets/ parameters to be proposed for
FY2021-22 to FY2025-26
 Plan to form basis for Result Evaluation
Framework
 Indicative framework
Action Plan Part III
(results, outcomesand evaluation)
Action Plan Part II
(reforms for reduction of losses and ACS-
ARR gap and improvingDiscomviability)
DPR guidelines
• DPR for Component I – Metering
o A single DPR may be prepared for all Consumer metering works.
o DT and Feeder metering works may be included in the same or submitted separately
o Discoms may decide the phasing of implementation based on the cost benefit analysis.
• DPR for Component II, Part I – Infrastructure works for loss reduction
o To include works for Armoured Cabling, AB Cables, Feeder Segregation etc
• DPR for Component II, Part II – Infrastructure works for network strengthening
o To include works for Augmentation and Renovation & Modernisation of Substations &
lines, new substations and lines etc
• DPR to be submitted to Nodal Agency post approval of DRC and in accordance with Action
Plan approved by State Cabinet
• The share of project cost for Part I (infra. works for loss reduction) and Part II (infra. works
for network strengthening) shall be 50% each. Loss reduction works will get first priority.
• In case the distribution losses are low (less than 12% in the base year), then the DISCOM
may allocate more funds to System Strengthening works, with suitable justification
Scheme Components
11
Part A Component 1
• 100% Consumer metering (including
agri) through prepaid or smart prepaid
mode
• Prepaid smart meter tenders initiated
after 1st January 2020 in TOTEX mode
eligible for funding
• 100% communicable DT & Feeder
Metering with AMI to enable energy
accounting
• Metering of unmetered feeders and
making all feeder meters (new and old)
online
• Replace existing non communicable
DT meters with communicable AMI
integrated meters
• Replacement or fresh DT meter
installation in TOTEXmode
Part A Component 2
Targetedat loss reduction (DPR Part I )
• Armored / Aerial bunched Cables in high loss
areas
• New feeders, capacitors, etc. for loss reduction
• Segregation / Bifurcation of feeders and allied
works
• HVDS in high loss areas
• Replacement of conductors, which are old/frayed
Targetedat networkstrengthening(DPR Part II)
• Augmentation of Substations
• IT/OT enablement works, SCADA in all urban
areas
• DMS in 100 urban centres with population over
2.75 lakhs
• Additional HT lines to improve quality of supply
• Other distribution works for system strengthening
Part A Component 3
• Project Management Agency (PMA) shall
be appointed by each DISCOM
• Scope for PMAto include:
o DPR preparation
o Tender documents
o Project awarding
o Monitoring
o Quality assurance
o Material inspection
o Results evaluation
o Other aspect as decided by Discoms
• PMA costs to be restricted to 1% of
project cost
• PMA charges above the permitted
amount to be borne by respective Discom
/ State government
Metering Distribution Infra Work Project Management
Results Evaluation
Framework
Contours of Results Evaluation Framework
• Results evaluation framework would be formulated based on the agreed
upon Action Plan, incorporating result parameters and trajectories
• Base year for setting baseline will be FY2019-20 and trajectories to be set
for FY2021-22 to FY2025-26 across various parameters
• Results evaluation framework will be composed of two components:
o Pre-qualifying criteria
o Result evaluation matrix
• DISCOMs to meet Pre-Qualifying Conditions and score minimum 60 marks
on Evaluation Matrix to be eligible for fund release
• Annual evaluation and verification by independent third parties, against
targets for individual parameters
13
Pre-Qualification Criteria
• Publication of Quarterly un-audited accounts within 60 days of the end of each quarter (45
days from 3
rd
year onwards)
• Publication of audited annual accounts by end of December (end of September from 3
rd
year
onwards)
• Creation of no new regulatory assets in latest tariff determination cycle
• 100% payment of subsidy for previous year and advance payment of subsidy up to current
period by state govt.
• Payment of current dues by all Govt Depts/ Attached Offices/ Local Bodies
• No. of days payable to creditors equal to or less than projected trajectory
• Tariff order for the current year and true up of penultimate year issued and implemented w.e.f.
1st April of current FY
14
Results Evaluation Matrix (1/2)
S.No Result Parameter
Weighta
ge
Base
year
(2019-20)
values
Evaluation of cumulative improvement
from base year upto year under evaluation
Max.
marks
Target Achievement Score
A.Financial
Stability
ACS-ARR Gap (Rs/unit)
60
30
AT&C loss % 20
Liquidation of opening arrears of
subsidy (Rs. Cr)
15
Liquidation of Govt dept dues(Rs.cr) 10
No. of creditor days and debtor days 20
Unliquidated regulatory assets (%
reduction from base value)
Total 100 ∑ Score
B. Outcome of
infra works
Hours of supply (Rural)
20
35
Hours of supply (Urban) 35
SAIFI 20
DT Failure rate 10
Total 100 ∑ Score
• Assessment of prequalified Discoms on results evaluation matrix,
• Targets and trajectories agreed as part of Action Plan
• Results Evaluation Matrix comprised of four basic categories with KPIs in each:
Results Evaluation Matrix (2/2)
S.No Result Parameter
Weightag
e
Base year
(2019-20)
values
Evaluation of cumulative improvement from
base year upto year under evaluation
Max.
marks
Target Achievement Score
C.
Progress
of works
under
Part A
% DT meters
10
50
Feeder Separation 10
AB cable replacement 10
% consumers with prepaid smart
meters
10
% govt depts with prepaid smart meters 10
SCADA- 5
ERP 5
Total 100 ∑ Score
D. Policy
and
Structural
Reforms
Training
10
10
Corp Governance 10
Tariff reforms 15
DBT 15
Energy audit 20
Consumer rights 10
Adoption of PPP mode 10
Operational Rating 10
Total 100 ∑ Score
Funding and
Disbursement
Funding pattern
S.No Item Description Quantity Outlay (Rs. Crore) Grant % (Max) Grant (Rs. Crore)
1
Prepaid Smart metering (Consumer,
DT, and feeder level)- January 2020
onwards
25 crore 1,50,000
15% (max. Rs.900 per
meter for consumer
metersonly)
22,500
2
Other costs including (billing modules,
data management, data analytics, and
support to implementation etc.)
Lumpsum 800 100% 800
Sub-Total: Part A – Funding for Smart metering 1,50,800 23,300
3
Other Infrastructure works (e.g.,
SCADA, DMS, AB cables, feeder
segregation etc.)
1,51,528
60% or 90%* as the
case may be
73301
Sub-Total: Part B – Capacity building etc. 1430 100% 1030*
Total 3,03,758 97631
*90% for special category states- NE and hill states, J&K, Ladakh, A&Nislands, Lakshadweep
• Metering (consumer, feeder and DT) to be carried out in TOTEX mode. Grant for metering is 15%. Remaining 85%
costs are expected to be financed through improvement in billing and collections.
• State Government/DISCOM may also provide Budgetary support in TOTEX mode, including in hybrid mode. PPP
partner to provide metering services in DBFOOT (Design Build Fund Own Operate & Transfer) or similar modes
• For other works under Part A, counterpart funding is to be provided by the DISCOM/ State Government. DISCOM
can raise funds from PFC, REC, Banks and other Financial Institutions including bilateral/ multilaterals
• For PMA appointment, upto 1% of the project cost for both components of Part-A is eligible for 60%/ 90% Grant.
Fund disbursement
 Consumer Meter- 15% of the cost per meter
(subject to max. Rs.900/ meter)
 DT/ Feeder Meter- 15% cost per meter
 Condition for fund release-
• Consumer meter- Demonstration of one
successful bill recharge
• DT/ Feeder meter- Successful
communication with server
 DISCOM can claim the grant funds in
phased manner for every 5% of meters
commissioned against total number of
meters awarded
Metering
 Phase I: 10% advance (10% of 50% of the Distribution Infrastructure)upon DPR Part
I approval (5% advance on sanction and 5% on award of works)
 Phase II: Based on evaluation in FY2022-23, Discomto be eligible for:
• 30%* funding against DPR Part I
• 30%* funding against DPR Part II (10% advance on sanction and 20% on
award)
 Phase III: Based on evaluation in FY2023-24, Discomto be eligible for:
• 60%* of project cost against DPR Part I and II
 Phase IV: Based on Discom evaluation in FY2024-25, Discomto be eligible for
• 100%* of project cost against DPR Part I and II
Distribution Infrastructure works
*cumulative figure
• For Distribution infra works, disbursement is subject to Discom qualification based on Action Plan submitted and the
Result Evaluation Matrix
• If a Discom is unable to get any fund released by FY26, the initial advance of 10% will have to be refunded
• If a Discom achieves the targets as per Action Plan of any previous FY in a subsequent year, then it shall be eligible
for release pertaining to that FY.
• PMA grant shall be based on sanction or award cost (whichever is lower) in March every year – 10% as advance in
sanction year, 30% annually for each subsequent year subject to utilization certificates for previous year.
Other key conditions for funding
 Key conditions for release of funds:
 Execution of Tripartite / Bipartite agreement (required before release of advance)
 Submission of PMA Report
 Satisfying all pre-qualification Criteria for the year under evaluation
 Scoring the eligibility marks in the evaluation against results evaluation matrix for the year under evaluation.
 Certificate from Discom regarding utilization of grant already released
 Certificate regarding receipts and expenditure on the project certified by a Chartered Accountant.
 Physical and financial (grant and counterpart funding) progress report
 Arrangement for counter-part funding shall be demonstrated (loan/Discom’s resources/State Govt. funding)
 Discom can avail loan from any Bank/FI or multilateral financial institutions, at any stage of the project.
 The performance of the DISCOMs in the scheme would be considered for any financing out of the scope of this
scheme by PFC, REC, Banks/FI’s and Multilateral Development Banks.
 Loan sanction term shall also contain a clause that loans prepaid out of GoI grant shall not attract prepayment penalty
 Discoms shall submit utilization certificates (UC) for any FY in prescribed format latest by 30
th
April of succeeding year.
 Discoms furnish audited accounts of scheme funding and expenditure for the FY by 30
th
June of succeeding year
 As funding will be through PFMS, utilities shall mandatorily enter details like receipts, expenditures, etc in PFMS portal
Monitoring and
Governance mechanisms
Monitoring and evaluation
 Third Party evaluation of Result Evaluation Framework
 Appropriate third party/parties will be appointed by MOP / Nodal Agency to verify Discom
achievements
 Niti Aayog will be involved in the process of selection of Independent third parties
 Performance Evaluation of the scheme to be carriedout by a separate third-party agency
 Mid-term evaluation of the scheme will be done for FY 2021-22 & FY 2022-23.
 Post completion evaluation of the scheme will be done at the conclusion of scheme
 QualityAssurance
 The Discomshall be solely responsible & accountable for assuring quality in the scheme works
 Discomshall formulate a comprehensive Quality Assurance (QA) and Inspection Plan, which will be
integral part of contract with the turnkey contractor or the equipment supplier/ vendor
 District Vigilanceand Monitoring Committee (DVMC):The implementation of the scheme at district
level shall be reviewed periodically during meetings of DVMC.
Governance mechanisms
 Nodal agencies:PFC and REC shall be the nodal agencies.
 Eligible costs:Project cost approved by the Monitoring Committee or actual cost incurred, whichever is
less, shall be the eligible cost shall be considered. Cost overrun to be borne by Discoms/ State govt.
Project cost shall include all costs except cost of land.
 Distribution Reforms Committee (DRC):The DRC shall be chaired by Secretary (Energy). Members of
DRC shall be Secretary (Finance), Secretary (Land Revenue) and Secretary (Forest and Environment) or
their representatives.
 Tripartite agreement:will be signed among the State Government, DISCOM and GoI (or Nodal agency
on behalf of GoI) for undertaking and agreeing to their stipulated roles and responsibilities.
 The tripartite agreement may also include a provision for securing loan (from NBFCs under GoI) through
TPA (Tri-partiteAgreement) arrangement among GoI, the State Government and RBI.
 Standard Bidding Document:ForAMI, SBDs issued by NSGM shall be adopted. For other works, nodal
agencies shall issue the SBDs. Discoms can customize SBDs with approval from nodal agencies.
 MIS: A web portal shall be developed by the Nodal Agency for submission of Action Plan & DPRs,
Results evaluation framework, physical & financial progress, quality reports etc.
 Completion of the project:A Project completion certificate, recommended and forwarded by State
Energy Department shall be submitted after completion of scheme.
Thank You
Annexures
Indicative reforms – Part II of Action Plan
26
1. Mechanism for prompt payments by Govt. departments
2. Mechanism for ensuring consumptionby the subsidized categories is accounted for properly and released to the DISCOMin
advance, credited to the consumer account via DBT
3. Tariff reforms,incl. annual tariff fixation, rationalization of consumercategories,no Regulatory Assets to be created
4. Progressiontowards cost reflective tariffs, including timely filing of tariff petitions, MYT and timely issuance of tariff orders
5. Preparation of and adherence to a roadmap for funding accumulated and current financial losses and clearance of part or
whole of regulatory assets through tariff or state funding.
6. Corporate Governance reforms,private participation or through CPSUs/JVs of CPSUs
7. Distribution Franchisee arrangements in some areas of DISCOM
8. Setting up electricity police stations in line with the provisions of the Electricity Act, 2003
9. Training and Capacity Building of existing manpower, Creation of IT wing within DISCOM for management of IT/OT services or
engaging knowledge partners / consultants for the same.
10. Laying down, publishing, and reporting of a monthly system of energy audits
11. Compliance of RPO trajectories
12. Publication of quarterly audited/unaudited reports in a standardized format circulated by PFC. Quarterly and Annual Accounts of
DISCOMs need to explicitly include details of subsidy and Govt. Dept. dues. The annual accounts of the previous year would be
published by DISCOMs latest by September30th of the current year.
13. Initiation of performance linked transfer policy for DISCOMstaff
14. Any other activity which serves to achieve the objective of the scheme.
Indicative works – Part I of Action Plan
27
Other Infrastructure works focussed on loss reduction and network strengthening
1. Augmentation of Substations
2. Provision of Armoured / Aerial bunched Cables (ABC) in high loss areas
3. Segregation / Bifurcation of feeders and other allied works
4. Replacement of conductors, which are old/frayed
5. Additional HT lines to improve quality of supply
6. IT/OT enablement works, Supervisory Control and Data Acquisition (SCADA) in all urban areas; and DMS in 100
urban centres above the population of 2.75 lakhs as per urban census 2011
7. Works like new feeders, capacitors, etc for loss reduction
8. High Voltage Distribution System (HVDS) in high loss areas
9. Distribution Works for system strengthening

More Related Content

Similar to PPT_for_states_reforms scheme which is very important aspect.pdf

Edison International Business Update - July 2017
Edison International Business Update - July 2017Edison International Business Update - July 2017
Edison International Business Update - July 2017EdisonInternational
 
tew (12.10.18) - Facilitating network investments through rab
tew (12.10.18) - Facilitating network investments through rab tew (12.10.18) - Facilitating network investments through rab
tew (12.10.18) - Facilitating network investments through rab Денис Киркач
 
UK Energy Utilities: Preparing for the Smart Metering Implementation Programm...
UK Energy Utilities: Preparing for the Smart Metering Implementation Programm...UK Energy Utilities: Preparing for the Smart Metering Implementation Programm...
UK Energy Utilities: Preparing for the Smart Metering Implementation Programm...Cognizant
 
Edison International October 2017 Business Update
Edison International October 2017 Business UpdateEdison International October 2017 Business Update
Edison International October 2017 Business UpdateEdisonInternational
 
Repowering Indian Discoms - Academic Research
Repowering Indian Discoms - Academic ResearchRepowering Indian Discoms - Academic Research
Repowering Indian Discoms - Academic ResearchAditya Parchure
 
Edison International Business Update - May 2017
Edison International Business Update - May 2017Edison International Business Update - May 2017
Edison International Business Update - May 2017EdisonInternational
 
Edison International Business Update June 2017
Edison International Business Update June 2017Edison International Business Update June 2017
Edison International Business Update June 2017EdisonInternational
 
1. Medium-Term Fiscal Framework, Expenditure Management Framework, and Guidel...
1. Medium-Term Fiscal Framework, Expenditure Management Framework, and Guidel...1. Medium-Term Fiscal Framework, Expenditure Management Framework, and Guidel...
1. Medium-Term Fiscal Framework, Expenditure Management Framework, and Guidel...ssuser486a8b
 
Multi year tariffs and regulations
Multi year tariffs and regulationsMulti year tariffs and regulations
Multi year tariffs and regulationsNavajyoti Martha
 
Bulletin #53 - Plan Now For Upcoming Changes to SR&ED
Bulletin #53 - Plan Now For Upcoming Changes to SR&EDBulletin #53 - Plan Now For Upcoming Changes to SR&ED
Bulletin #53 - Plan Now For Upcoming Changes to SR&EDScitax Advisory Partners LP
 
Transfer Pricing - Indian Budget 2022 and Global TP Updates.pdf
Transfer Pricing - Indian Budget 2022 and Global TP Updates.pdfTransfer Pricing - Indian Budget 2022 and Global TP Updates.pdf
Transfer Pricing - Indian Budget 2022 and Global TP Updates.pdfSteadfast Business Consulting
 
Edison International Business Update - May 2018
Edison International Business Update - May 2018Edison International Business Update - May 2018
Edison International Business Update - May 2018EdisonInternational
 
SLAs the heart of Outsourcing
SLAs the heart of OutsourcingSLAs the heart of Outsourcing
SLAs the heart of OutsourcingDr Bharat Vagadia
 
PPTTR2024 for public release presentation.pdf
PPTTR2024 for public release presentation.pdfPPTTR2024 for public release presentation.pdf
PPTTR2024 for public release presentation.pdfMukeshKr19
 
Performance budgeting: United Kingdom experience, Julian Kelly, United Kingdom
Performance budgeting: United Kingdom experience, Julian Kelly, United KingdomPerformance budgeting: United Kingdom experience, Julian Kelly, United Kingdom
Performance budgeting: United Kingdom experience, Julian Kelly, United KingdomOECD Governance
 
Edison International Business Update
Edison International Business UpdateEdison International Business Update
Edison International Business UpdateEdisonInternational
 

Similar to PPT_for_states_reforms scheme which is very important aspect.pdf (20)

Edison International Business Update - July 2017
Edison International Business Update - July 2017Edison International Business Update - July 2017
Edison International Business Update - July 2017
 
tew (12.10.18) - Facilitating network investments through rab
tew (12.10.18) - Facilitating network investments through rab tew (12.10.18) - Facilitating network investments through rab
tew (12.10.18) - Facilitating network investments through rab
 
UK Energy Utilities: Preparing for the Smart Metering Implementation Programm...
UK Energy Utilities: Preparing for the Smart Metering Implementation Programm...UK Energy Utilities: Preparing for the Smart Metering Implementation Programm...
UK Energy Utilities: Preparing for the Smart Metering Implementation Programm...
 
Edison International October 2017 Business Update
Edison International October 2017 Business UpdateEdison International October 2017 Business Update
Edison International October 2017 Business Update
 
Repowering Indian Discoms - Academic Research
Repowering Indian Discoms - Academic ResearchRepowering Indian Discoms - Academic Research
Repowering Indian Discoms - Academic Research
 
Edison International Business Update - May 2017
Edison International Business Update - May 2017Edison International Business Update - May 2017
Edison International Business Update - May 2017
 
Edison International Business Update June 2017
Edison International Business Update June 2017Edison International Business Update June 2017
Edison International Business Update June 2017
 
1. Medium-Term Fiscal Framework, Expenditure Management Framework, and Guidel...
1. Medium-Term Fiscal Framework, Expenditure Management Framework, and Guidel...1. Medium-Term Fiscal Framework, Expenditure Management Framework, and Guidel...
1. Medium-Term Fiscal Framework, Expenditure Management Framework, and Guidel...
 
Multi year tariffs and regulations
Multi year tariffs and regulationsMulti year tariffs and regulations
Multi year tariffs and regulations
 
Presentation steel
 Presentation steel  Presentation steel
Presentation steel
 
Bulletin #53 - Plan Now For Upcoming Changes to SR&ED
Bulletin #53 - Plan Now For Upcoming Changes to SR&EDBulletin #53 - Plan Now For Upcoming Changes to SR&ED
Bulletin #53 - Plan Now For Upcoming Changes to SR&ED
 
Transfer Pricing - Indian Budget 2022 and Global TP Updates.pdf
Transfer Pricing - Indian Budget 2022 and Global TP Updates.pdfTransfer Pricing - Indian Budget 2022 and Global TP Updates.pdf
Transfer Pricing - Indian Budget 2022 and Global TP Updates.pdf
 
Belt - Electricity Reform
Belt - Electricity ReformBelt - Electricity Reform
Belt - Electricity Reform
 
Edison International Business Update - May 2018
Edison International Business Update - May 2018Edison International Business Update - May 2018
Edison International Business Update - May 2018
 
PSP & Guidelines MOP.pptx
PSP & Guidelines MOP.pptxPSP & Guidelines MOP.pptx
PSP & Guidelines MOP.pptx
 
SLAs the heart of Outsourcing
SLAs the heart of OutsourcingSLAs the heart of Outsourcing
SLAs the heart of Outsourcing
 
PPTTR2024 for public release presentation.pdf
PPTTR2024 for public release presentation.pdfPPTTR2024 for public release presentation.pdf
PPTTR2024 for public release presentation.pdf
 
Performance budgeting: United Kingdom experience, Julian Kelly, United Kingdom
Performance budgeting: United Kingdom experience, Julian Kelly, United KingdomPerformance budgeting: United Kingdom experience, Julian Kelly, United Kingdom
Performance budgeting: United Kingdom experience, Julian Kelly, United Kingdom
 
What can we do? against inefficient budget execution
What can we do?  against inefficient budget executionWhat can we do?  against inefficient budget execution
What can we do? against inefficient budget execution
 
Edison International Business Update
Edison International Business UpdateEdison International Business Update
Edison International Business Update
 

Recently uploaded

High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikHigh Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure serviceCall US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure servicePooja Nehwal
 
The Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfThe Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfGale Pooley
 
Instant Issue Debit Cards - High School Spirit
Instant Issue Debit Cards - High School SpiritInstant Issue Debit Cards - High School Spirit
Instant Issue Debit Cards - High School Spiritegoetzinger
 
Dividend Policy and Dividend Decision Theories.pptx
Dividend Policy and Dividend Decision Theories.pptxDividend Policy and Dividend Decision Theories.pptx
Dividend Policy and Dividend Decision Theories.pptxanshikagoel52
 
Q3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast SlidesQ3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast SlidesMarketing847413
 
Lundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfLundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfAdnet Communications
 
VIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
VIP Call Girls Thane Sia 8617697112 Independent Escort Service ThaneVIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
VIP Call Girls Thane Sia 8617697112 Independent Escort Service ThaneCall girls in Ahmedabad High profile
 
Shrambal_Distributors_Newsletter_Apr-2024 (1).pdf
Shrambal_Distributors_Newsletter_Apr-2024 (1).pdfShrambal_Distributors_Newsletter_Apr-2024 (1).pdf
Shrambal_Distributors_Newsletter_Apr-2024 (1).pdfvikashdidwania1
 
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...shivangimorya083
 
Instant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School DesignsInstant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School Designsegoetzinger
 
Chapter 2.ppt of macroeconomics by mankiw 9th edition
Chapter 2.ppt of macroeconomics by mankiw 9th editionChapter 2.ppt of macroeconomics by mankiw 9th edition
Chapter 2.ppt of macroeconomics by mankiw 9th editionMuhammadHusnain82237
 
20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdfAdnet Communications
 
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130  Available With RoomVIP Kolkata Call Girl Serampore 👉 8250192130  Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Roomdivyansh0kumar0
 
20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdfAdnet Communications
 
Andheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot ModelsAndheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot Modelshematsharma006
 
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service NashikHigh Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
High Class Call Girls Nashik Maya 7001305949 Independent Escort Service Nashik
 
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure serviceCall US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
Call US 📞 9892124323 ✅ Kurla Call Girls In Kurla ( Mumbai ) secure service
 
The Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfThe Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdf
 
Instant Issue Debit Cards - High School Spirit
Instant Issue Debit Cards - High School SpiritInstant Issue Debit Cards - High School Spirit
Instant Issue Debit Cards - High School Spirit
 
Dividend Policy and Dividend Decision Theories.pptx
Dividend Policy and Dividend Decision Theories.pptxDividend Policy and Dividend Decision Theories.pptx
Dividend Policy and Dividend Decision Theories.pptx
 
Q3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast SlidesQ3 2024 Earnings Conference Call and Webcast Slides
Q3 2024 Earnings Conference Call and Webcast Slides
 
Lundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdfLundin Gold April 2024 Corporate Presentation v4.pdf
Lundin Gold April 2024 Corporate Presentation v4.pdf
 
VIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
VIP Call Girls Thane Sia 8617697112 Independent Escort Service ThaneVIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
VIP Call Girls Thane Sia 8617697112 Independent Escort Service Thane
 
Shrambal_Distributors_Newsletter_Apr-2024 (1).pdf
Shrambal_Distributors_Newsletter_Apr-2024 (1).pdfShrambal_Distributors_Newsletter_Apr-2024 (1).pdf
Shrambal_Distributors_Newsletter_Apr-2024 (1).pdf
 
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...
Russian Call Girls In Gtb Nagar (Delhi) 9711199012 💋✔💕😘 Naughty Call Girls Se...
 
Veritas Interim Report 1 January–31 March 2024
Veritas Interim Report 1 January–31 March 2024Veritas Interim Report 1 January–31 March 2024
Veritas Interim Report 1 January–31 March 2024
 
🔝+919953056974 🔝young Delhi Escort service Pusa Road
🔝+919953056974 🔝young Delhi Escort service Pusa Road🔝+919953056974 🔝young Delhi Escort service Pusa Road
🔝+919953056974 🔝young Delhi Escort service Pusa Road
 
Instant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School DesignsInstant Issue Debit Cards - School Designs
Instant Issue Debit Cards - School Designs
 
Chapter 2.ppt of macroeconomics by mankiw 9th edition
Chapter 2.ppt of macroeconomics by mankiw 9th editionChapter 2.ppt of macroeconomics by mankiw 9th edition
Chapter 2.ppt of macroeconomics by mankiw 9th edition
 
20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf20240417-Calibre-April-2024-Investor-Presentation.pdf
20240417-Calibre-April-2024-Investor-Presentation.pdf
 
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130  Available With RoomVIP Kolkata Call Girl Serampore 👉 8250192130  Available With Room
VIP Kolkata Call Girl Serampore 👉 8250192130 Available With Room
 
20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf20240429 Calibre April 2024 Investor Presentation.pdf
20240429 Calibre April 2024 Investor Presentation.pdf
 
Andheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot ModelsAndheri Call Girls In 9825968104 Mumbai Hot Models
Andheri Call Girls In 9825968104 Mumbai Hot Models
 
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Commercial Bank Economic Capsule - April 2024
Commercial Bank Economic Capsule - April 2024Commercial Bank Economic Capsule - April 2024
Commercial Bank Economic Capsule - April 2024
 

PPT_for_states_reforms scheme which is very important aspect.pdf

  • 2. Announcement by Hon’ble Finance Minister “The viability of Distribution Companies is a serious concern. A revamped reforms-based result-linked power distribution sector scheme will be launched with an outlay of INR 3,05,984 crores over 5 years. The scheme will provide assistance to DISCOMS for Infrastructure creation including pre-paid smart metering and feeder separation, upgradation of systems, etc., tied to financial improvements.” Budget Speech (FY2021-22): 2
  • 4. Objectives • Improved Quality and Reliability of power supply to consumers • Financially and operationally efficient distribution sector o Reduce AT&C losses to 12-15% by 2024-25* o Reduce ACS-ARR gaps to zero by 2024-25* o Developing Institutional Capabilities 4 *AT&C loss reduction and ACS-ARR gap reduction targets mentioned above are national targets and state-wise targets would depend on their current levels of AT&C losses and ACS-ARR gap
  • 5. Distinguishing features • Focus on Reforms • Funding linked to Results/Performance • Thrust on Smart Metering • Funds for works leading to o loss reduction and o improvement in quality and reliability of power supply • Reform measures and works customised to the specific needs of the state 5
  • 6. Scope of the Revamped Distribution Sector Scheme • Scheme outlay of INR 3,03,758 Cr.; estimated grant from Central Govt of INR 97,631 Cr. • Revamped Scheme to have 2 key parts: o Part A - Metering & Distribution Infrastructure works o Part B - Training & Capacity Building and Other Enabling & Supporting Activities • All State owned Discoms and State/UT Power Departments (excluding private sector power utilities) eligible for financial assistance under the revamped scheme. • Ongoing projects under IPDS, DDUGJY and PMDP-2015 (for the erstwhile State of J&K) to be subsumed under the new scheme o No new projects to be sanctioned under IPDS and DDUGJY o Sanctioned projects will be eligible to receive funds upto 31 st March2022 in this scheme 6
  • 8. Action Plan- salient features 8 • Discom applications to be approved based on Action Plans and DPRs • The Action Plan will be structured as below: o Part I - Metering & Distribution Infrastructure Works o Part II - Reform measures for financial viability o Part III - Results, Outcomes and Evaluation • DPRs (only for Part A of Scheme)will be structured as below: o DPR for Component I –Metering o DPR for Component II, Part I –infrastructure works for loss reduction (50% share) o DPR for Component II, Part II –infrastructure works for network strengthening (50% share) o Action plan to be formulated by Discoms in consultation with Nodal Agency/ MoP; Plan to be approved by DRC and State Cabinet before submission o Plan to include the state cabinet decision that If Discom is found ineligible as per the Results Evaluation Framework, the funding gap will be met by the Discom/State Govt.
  • 9. Action Plan guidelines  Metering Plan to be spelled out, to target 100% metering as per targets below: • Feeder and DT metering (by June’ 2023) • Agriculture DT metering (by Mar’ 2025) • Prepaid consumer metering (by Mar’ 2025)  Plans for other infrastructure works including: • works targeted at loss reduction • works targeted at system strengthening  Priority will be given to works focused on loss reduction  Action plan to broadly include challenges, targeted infrastructureworks and annual capital outlay  Indicative list of works Action Plan Part I (for loss reduction and network strengthening through metering and other works)  Root cause analysis of reasons for losses, ACS-ARR gap and other challenges, targeted reformmeasures, expected results and timelines  This part will lay the road map for bringing down AT&C losses and reducing ACS-ARR gap to zero by 2024-25  Plan to also include the financial support needed from state govt. (subsidy, govt. dues etc.)  Clear mapping of problems and solutions  Activities and reform to be finalized based on operational and financial data (accounts)  Indicative list of reforms  Action plan to include baseline data and annual targets (based on Part I and II plan) across following outcomes : • Financial Stability (AT&C, ACS-ARR, regulatory assets etc.) • Supply Reliability (hours of supply, SAIFI, DT failure etc.) • Infra. works progress (%metering, feeder segregation, AB cabling etc.) • Structural reforms progress ( training, DBT, energy audit, tariffs etc.)  Base year – FY2019-20  Targets/ parameters to be proposed for FY2021-22 to FY2025-26  Plan to form basis for Result Evaluation Framework  Indicative framework Action Plan Part III (results, outcomesand evaluation) Action Plan Part II (reforms for reduction of losses and ACS- ARR gap and improvingDiscomviability)
  • 10. DPR guidelines • DPR for Component I – Metering o A single DPR may be prepared for all Consumer metering works. o DT and Feeder metering works may be included in the same or submitted separately o Discoms may decide the phasing of implementation based on the cost benefit analysis. • DPR for Component II, Part I – Infrastructure works for loss reduction o To include works for Armoured Cabling, AB Cables, Feeder Segregation etc • DPR for Component II, Part II – Infrastructure works for network strengthening o To include works for Augmentation and Renovation & Modernisation of Substations & lines, new substations and lines etc • DPR to be submitted to Nodal Agency post approval of DRC and in accordance with Action Plan approved by State Cabinet • The share of project cost for Part I (infra. works for loss reduction) and Part II (infra. works for network strengthening) shall be 50% each. Loss reduction works will get first priority. • In case the distribution losses are low (less than 12% in the base year), then the DISCOM may allocate more funds to System Strengthening works, with suitable justification
  • 11. Scheme Components 11 Part A Component 1 • 100% Consumer metering (including agri) through prepaid or smart prepaid mode • Prepaid smart meter tenders initiated after 1st January 2020 in TOTEX mode eligible for funding • 100% communicable DT & Feeder Metering with AMI to enable energy accounting • Metering of unmetered feeders and making all feeder meters (new and old) online • Replace existing non communicable DT meters with communicable AMI integrated meters • Replacement or fresh DT meter installation in TOTEXmode Part A Component 2 Targetedat loss reduction (DPR Part I ) • Armored / Aerial bunched Cables in high loss areas • New feeders, capacitors, etc. for loss reduction • Segregation / Bifurcation of feeders and allied works • HVDS in high loss areas • Replacement of conductors, which are old/frayed Targetedat networkstrengthening(DPR Part II) • Augmentation of Substations • IT/OT enablement works, SCADA in all urban areas • DMS in 100 urban centres with population over 2.75 lakhs • Additional HT lines to improve quality of supply • Other distribution works for system strengthening Part A Component 3 • Project Management Agency (PMA) shall be appointed by each DISCOM • Scope for PMAto include: o DPR preparation o Tender documents o Project awarding o Monitoring o Quality assurance o Material inspection o Results evaluation o Other aspect as decided by Discoms • PMA costs to be restricted to 1% of project cost • PMA charges above the permitted amount to be borne by respective Discom / State government Metering Distribution Infra Work Project Management
  • 13. Contours of Results Evaluation Framework • Results evaluation framework would be formulated based on the agreed upon Action Plan, incorporating result parameters and trajectories • Base year for setting baseline will be FY2019-20 and trajectories to be set for FY2021-22 to FY2025-26 across various parameters • Results evaluation framework will be composed of two components: o Pre-qualifying criteria o Result evaluation matrix • DISCOMs to meet Pre-Qualifying Conditions and score minimum 60 marks on Evaluation Matrix to be eligible for fund release • Annual evaluation and verification by independent third parties, against targets for individual parameters 13
  • 14. Pre-Qualification Criteria • Publication of Quarterly un-audited accounts within 60 days of the end of each quarter (45 days from 3 rd year onwards) • Publication of audited annual accounts by end of December (end of September from 3 rd year onwards) • Creation of no new regulatory assets in latest tariff determination cycle • 100% payment of subsidy for previous year and advance payment of subsidy up to current period by state govt. • Payment of current dues by all Govt Depts/ Attached Offices/ Local Bodies • No. of days payable to creditors equal to or less than projected trajectory • Tariff order for the current year and true up of penultimate year issued and implemented w.e.f. 1st April of current FY 14
  • 15. Results Evaluation Matrix (1/2) S.No Result Parameter Weighta ge Base year (2019-20) values Evaluation of cumulative improvement from base year upto year under evaluation Max. marks Target Achievement Score A.Financial Stability ACS-ARR Gap (Rs/unit) 60 30 AT&C loss % 20 Liquidation of opening arrears of subsidy (Rs. Cr) 15 Liquidation of Govt dept dues(Rs.cr) 10 No. of creditor days and debtor days 20 Unliquidated regulatory assets (% reduction from base value) Total 100 ∑ Score B. Outcome of infra works Hours of supply (Rural) 20 35 Hours of supply (Urban) 35 SAIFI 20 DT Failure rate 10 Total 100 ∑ Score • Assessment of prequalified Discoms on results evaluation matrix, • Targets and trajectories agreed as part of Action Plan • Results Evaluation Matrix comprised of four basic categories with KPIs in each:
  • 16. Results Evaluation Matrix (2/2) S.No Result Parameter Weightag e Base year (2019-20) values Evaluation of cumulative improvement from base year upto year under evaluation Max. marks Target Achievement Score C. Progress of works under Part A % DT meters 10 50 Feeder Separation 10 AB cable replacement 10 % consumers with prepaid smart meters 10 % govt depts with prepaid smart meters 10 SCADA- 5 ERP 5 Total 100 ∑ Score D. Policy and Structural Reforms Training 10 10 Corp Governance 10 Tariff reforms 15 DBT 15 Energy audit 20 Consumer rights 10 Adoption of PPP mode 10 Operational Rating 10 Total 100 ∑ Score
  • 18. Funding pattern S.No Item Description Quantity Outlay (Rs. Crore) Grant % (Max) Grant (Rs. Crore) 1 Prepaid Smart metering (Consumer, DT, and feeder level)- January 2020 onwards 25 crore 1,50,000 15% (max. Rs.900 per meter for consumer metersonly) 22,500 2 Other costs including (billing modules, data management, data analytics, and support to implementation etc.) Lumpsum 800 100% 800 Sub-Total: Part A – Funding for Smart metering 1,50,800 23,300 3 Other Infrastructure works (e.g., SCADA, DMS, AB cables, feeder segregation etc.) 1,51,528 60% or 90%* as the case may be 73301 Sub-Total: Part B – Capacity building etc. 1430 100% 1030* Total 3,03,758 97631 *90% for special category states- NE and hill states, J&K, Ladakh, A&Nislands, Lakshadweep • Metering (consumer, feeder and DT) to be carried out in TOTEX mode. Grant for metering is 15%. Remaining 85% costs are expected to be financed through improvement in billing and collections. • State Government/DISCOM may also provide Budgetary support in TOTEX mode, including in hybrid mode. PPP partner to provide metering services in DBFOOT (Design Build Fund Own Operate & Transfer) or similar modes • For other works under Part A, counterpart funding is to be provided by the DISCOM/ State Government. DISCOM can raise funds from PFC, REC, Banks and other Financial Institutions including bilateral/ multilaterals • For PMA appointment, upto 1% of the project cost for both components of Part-A is eligible for 60%/ 90% Grant.
  • 19. Fund disbursement  Consumer Meter- 15% of the cost per meter (subject to max. Rs.900/ meter)  DT/ Feeder Meter- 15% cost per meter  Condition for fund release- • Consumer meter- Demonstration of one successful bill recharge • DT/ Feeder meter- Successful communication with server  DISCOM can claim the grant funds in phased manner for every 5% of meters commissioned against total number of meters awarded Metering  Phase I: 10% advance (10% of 50% of the Distribution Infrastructure)upon DPR Part I approval (5% advance on sanction and 5% on award of works)  Phase II: Based on evaluation in FY2022-23, Discomto be eligible for: • 30%* funding against DPR Part I • 30%* funding against DPR Part II (10% advance on sanction and 20% on award)  Phase III: Based on evaluation in FY2023-24, Discomto be eligible for: • 60%* of project cost against DPR Part I and II  Phase IV: Based on Discom evaluation in FY2024-25, Discomto be eligible for • 100%* of project cost against DPR Part I and II Distribution Infrastructure works *cumulative figure • For Distribution infra works, disbursement is subject to Discom qualification based on Action Plan submitted and the Result Evaluation Matrix • If a Discom is unable to get any fund released by FY26, the initial advance of 10% will have to be refunded • If a Discom achieves the targets as per Action Plan of any previous FY in a subsequent year, then it shall be eligible for release pertaining to that FY. • PMA grant shall be based on sanction or award cost (whichever is lower) in March every year – 10% as advance in sanction year, 30% annually for each subsequent year subject to utilization certificates for previous year.
  • 20. Other key conditions for funding  Key conditions for release of funds:  Execution of Tripartite / Bipartite agreement (required before release of advance)  Submission of PMA Report  Satisfying all pre-qualification Criteria for the year under evaluation  Scoring the eligibility marks in the evaluation against results evaluation matrix for the year under evaluation.  Certificate from Discom regarding utilization of grant already released  Certificate regarding receipts and expenditure on the project certified by a Chartered Accountant.  Physical and financial (grant and counterpart funding) progress report  Arrangement for counter-part funding shall be demonstrated (loan/Discom’s resources/State Govt. funding)  Discom can avail loan from any Bank/FI or multilateral financial institutions, at any stage of the project.  The performance of the DISCOMs in the scheme would be considered for any financing out of the scope of this scheme by PFC, REC, Banks/FI’s and Multilateral Development Banks.  Loan sanction term shall also contain a clause that loans prepaid out of GoI grant shall not attract prepayment penalty  Discoms shall submit utilization certificates (UC) for any FY in prescribed format latest by 30 th April of succeeding year.  Discoms furnish audited accounts of scheme funding and expenditure for the FY by 30 th June of succeeding year  As funding will be through PFMS, utilities shall mandatorily enter details like receipts, expenditures, etc in PFMS portal
  • 22. Monitoring and evaluation  Third Party evaluation of Result Evaluation Framework  Appropriate third party/parties will be appointed by MOP / Nodal Agency to verify Discom achievements  Niti Aayog will be involved in the process of selection of Independent third parties  Performance Evaluation of the scheme to be carriedout by a separate third-party agency  Mid-term evaluation of the scheme will be done for FY 2021-22 & FY 2022-23.  Post completion evaluation of the scheme will be done at the conclusion of scheme  QualityAssurance  The Discomshall be solely responsible & accountable for assuring quality in the scheme works  Discomshall formulate a comprehensive Quality Assurance (QA) and Inspection Plan, which will be integral part of contract with the turnkey contractor or the equipment supplier/ vendor  District Vigilanceand Monitoring Committee (DVMC):The implementation of the scheme at district level shall be reviewed periodically during meetings of DVMC.
  • 23. Governance mechanisms  Nodal agencies:PFC and REC shall be the nodal agencies.  Eligible costs:Project cost approved by the Monitoring Committee or actual cost incurred, whichever is less, shall be the eligible cost shall be considered. Cost overrun to be borne by Discoms/ State govt. Project cost shall include all costs except cost of land.  Distribution Reforms Committee (DRC):The DRC shall be chaired by Secretary (Energy). Members of DRC shall be Secretary (Finance), Secretary (Land Revenue) and Secretary (Forest and Environment) or their representatives.  Tripartite agreement:will be signed among the State Government, DISCOM and GoI (or Nodal agency on behalf of GoI) for undertaking and agreeing to their stipulated roles and responsibilities.  The tripartite agreement may also include a provision for securing loan (from NBFCs under GoI) through TPA (Tri-partiteAgreement) arrangement among GoI, the State Government and RBI.  Standard Bidding Document:ForAMI, SBDs issued by NSGM shall be adopted. For other works, nodal agencies shall issue the SBDs. Discoms can customize SBDs with approval from nodal agencies.  MIS: A web portal shall be developed by the Nodal Agency for submission of Action Plan & DPRs, Results evaluation framework, physical & financial progress, quality reports etc.  Completion of the project:A Project completion certificate, recommended and forwarded by State Energy Department shall be submitted after completion of scheme.
  • 26. Indicative reforms – Part II of Action Plan 26 1. Mechanism for prompt payments by Govt. departments 2. Mechanism for ensuring consumptionby the subsidized categories is accounted for properly and released to the DISCOMin advance, credited to the consumer account via DBT 3. Tariff reforms,incl. annual tariff fixation, rationalization of consumercategories,no Regulatory Assets to be created 4. Progressiontowards cost reflective tariffs, including timely filing of tariff petitions, MYT and timely issuance of tariff orders 5. Preparation of and adherence to a roadmap for funding accumulated and current financial losses and clearance of part or whole of regulatory assets through tariff or state funding. 6. Corporate Governance reforms,private participation or through CPSUs/JVs of CPSUs 7. Distribution Franchisee arrangements in some areas of DISCOM 8. Setting up electricity police stations in line with the provisions of the Electricity Act, 2003 9. Training and Capacity Building of existing manpower, Creation of IT wing within DISCOM for management of IT/OT services or engaging knowledge partners / consultants for the same. 10. Laying down, publishing, and reporting of a monthly system of energy audits 11. Compliance of RPO trajectories 12. Publication of quarterly audited/unaudited reports in a standardized format circulated by PFC. Quarterly and Annual Accounts of DISCOMs need to explicitly include details of subsidy and Govt. Dept. dues. The annual accounts of the previous year would be published by DISCOMs latest by September30th of the current year. 13. Initiation of performance linked transfer policy for DISCOMstaff 14. Any other activity which serves to achieve the objective of the scheme.
  • 27. Indicative works – Part I of Action Plan 27 Other Infrastructure works focussed on loss reduction and network strengthening 1. Augmentation of Substations 2. Provision of Armoured / Aerial bunched Cables (ABC) in high loss areas 3. Segregation / Bifurcation of feeders and other allied works 4. Replacement of conductors, which are old/frayed 5. Additional HT lines to improve quality of supply 6. IT/OT enablement works, Supervisory Control and Data Acquisition (SCADA) in all urban areas; and DMS in 100 urban centres above the population of 2.75 lakhs as per urban census 2011 7. Works like new feeders, capacitors, etc for loss reduction 8. High Voltage Distribution System (HVDS) in high loss areas 9. Distribution Works for system strengthening