SlideShare a Scribd company logo
Work
Sample
RYAN THOMAS MOSS
2 0 1 6
Contents
i Virginia Winery..................................................2
ii Subterannean Cabins.....................................22
iii Residential Complex & Retail..........................28
iv Graduate School Addition...............................34
v Internship........................................................40
vi Contracted Work.............................................44
vii CMU City.........................................................52
viii Warehouse......................................................56
ix Competitions...................................................60
x First Year.........................................................62
Below: Model Building
This is a picture of myself assembling a
model for my thesis. Intersecting strips of
Douglas-Fir will represent a waffle slab.
Opposite: The Woven Winery
A sketch of the winery, showing the tram.
3CONTENTS
5VIRGINIA WINERY
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
Scale: 1/4” = 1’ - 0”
Isometric
Winery Wall-Section
1. Foundation
2. Cast-in-place Concrete Retaining Wall
3. Precast Concrete Panels
4. Precast Concrete Columns
5. Stainless Steel Bolted Connection
6. Cast-in-place Waffle Slab (Holedeck)
7. Embedded Steel T-Column
8. Glass Curtain Wall
9. Window Mullions
10. Cast-in-place S.O.G.
11. IsoKorb Thermal Break
12. Compression Resistant Water Proofing
13. Roof Insulation
14. Permanent Filtration Geotextile
15. Chip Bed
16. Pavement
Scale: 1/4” = 1’ - 0”
Exploded isometric
Winery Wall-Section
VIRGINIA WINERY 6
VIRGINIA WINERY8
Below: Winery Section
This image highlights the view into
the cellar from the atrium above. The
openings in between the concrete
ribs are covered by a thin layer of
glass for thermal control.
VIRGINIA WINERY10
Below: Winery Render
An exterior render of the Winery
looking North East along the facade.
Hardwood Flooring
Marble Tile
Mortar
Plywood Sub-Flooring (4’ x 8’ x 3/4”)
Furring Strips (1” x 4”)
Radiant Tubing
Rebar
Plumbing
Electrical Channel
Wiring
Mortar Bed
Radiant Tubing
Opposite: Atrium
This image illustrates the interior
circulation at the building’s core.
Right: Winery Facade Study
A brise soleil fixed between exterior
columns shades the building interior,
while openings in the waffle slab allow
rain and light to pass through.
13VIRGINIA WINERY
Opposite: Winery Section Model
This image is a sectional model of the
building facade.
Right: The Cellar
The large ceiling height of this area will
accommodate tall winery tanks that are
necessary for fermentation.
VIRGINIA WINERY 15
Opposite: Model Perspective
Pre-cast panels are bolted to the
outermost columns. A cast-in-place
retaining wall rests below them.
Right: Slab Opening Overlay
This is an image taken looking up in
between the ribs of each floor. Imagine
feeling the rain, listening to the drops
splatter at various heights.
17VIRGINIA WINERY
Winery 1st & 2nd Floor Plans
VIRGINIA WINERY18
Winery Ground & Roof Plans
VIRGINIA WINERY 19
Cabins
Winery
Tram A
Tram B
Forest
Vineyard
SUBTERANNEAN CABINS22
SUBTERANNEAN CABINS24
Scale: 1/8” = 1’ - 0”
Floor Plan: Cabin Units
SUBTERANNEAN CABINS26
Below: Residential Complex
An exterior render of the Residential
complex along the SW facade. On
the right, the market shelter peaks out
from behind the dwellings.
864
RESIDENTIAL COMPLEX30
1st 2nd/3rd 5th 4th/6th
DOCUMENTATION 31
4
RESIDENTIAL COMPLEX 31
Floor Plans
Upper Level Plan
First Floor Plan
Scale: 1/48” = 1’ - 0”
RESIDENTIAL COMPLEX32
4
RESIDENTIAL COMPLEX 33
GRADUATE SCHOOL34
GRADUATE SCHOOL36
Scale: 1/80”= 1’
PERRYST.
2060
2040
2050
GRADUATE SCHOOL 37
Scale: 1/64”= 1’ Scale: 1/64”= 1’
GRADUATE SCHOOL38 GRADUATE SCHOOL 39
INTERNSHIP40
AICUZ
INTERNSHIP42 INTERNSHIP 43
CONTRACTED WORK 45
1'6-1/4"
2'5-3/4"
3'1-3/4"
3'0"
2'10"
1'4-3/4"
1'5-1/2"
8"
8"
2'11-1/4"
7'0"
2'5"
8'0"
12'0"
16'0"
2'0"
3'0-3/4"
8"8"
3'4" 3'1-3/4"
2'6-1/2"
Ground Plan
Scale: 3/8”=1’-0”
6"
2'7"2'0"15'10-3/4"
CONTRACTED WORK46 CONTRACTED WORK 47
2'0"2'0"2'0"
8'0"
8'4-1/2"
1'6-1/2"8"6'10-1/4"1'0-3/4"8'0"4'0"
CONTRACTED WORK48 CONTRACTED WORK 49
3'6-1/2"
3'6-1/2"
7'6"
11'1"
7'6-1/2"
16'0"
12'0"
11'3"
2'11-3/4"
1'4"
CONTRACTED WORK50
A. KITCHEN + DINING B. STUDENT DORMS C. MEETING + FACULTY DORM
A.
B. B.
C.
1’ - 0” = 1/16”
CMU CITY 53
CLERK OF WORKS OFFICE
CMU CITY 55CMU CITY54
20 40
WAREHOUSE 57WAREHOUSE56
SOUTH SECTION: 1/4”=1’0”
SOUTH ELEVATION: 1/4”=1’0”
EAST SECTION: 1/4”=1’0”
EAST ELEVATION: 1/4”=1’0”
WAREHOUSE 59WAREHOUSE58
20 40
Rattle Snake
Fire Station
The tower represents the
element of fire, while the
reflecting pool expresses
the serenity of water.
COMPETITIONS 61COMPETITIONS60
FIRST YEAR 63FIRST YEAR62

More Related Content

Viewers also liked

Week 4 assignment 2 (d. thompson)
Week 4   assignment 2 (d. thompson)Week 4   assignment 2 (d. thompson)
Week 4 assignment 2 (d. thompson)
Dthomp11
 
Barcelona, El Born
Barcelona, El BornBarcelona, El Born
Barcelona, El Born
Carlos Colomer
 
The Valley Winery Case Study AUEB MBA
The Valley Winery Case Study AUEB MBAThe Valley Winery Case Study AUEB MBA
The Valley Winery Case Study AUEB MBA
AUEB MBA full-time alumni
 
Agenda fls2 n lomojari dan o2sn
Agenda fls2 n lomojari dan o2snAgenda fls2 n lomojari dan o2sn
Agenda fls2 n lomojari dan o2sn
Hilmi Janggo
 
Бюгельный протез
Бюгельный протезБюгельный протез
Бюгельный протез
Renessans
 
Nota Serah tugas
Nota Serah tugasNota Serah tugas
Nota Serah tugas
Azhani Ahmad
 
Protezirovanie implant
Protezirovanie implantProtezirovanie implant
Protezirovanie implant
stomat12
 
Sk penetapan juara
Sk penetapan juaraSk penetapan juara
Sk penetapan juara
Hilmi Janggo
 
Borang nota serah tugas untuk pertukaran
Borang nota serah tugas untuk pertukaranBorang nota serah tugas untuk pertukaran
Borang nota serah tugas untuk pertukaran
Mohd Jeffreen Mohd Khadzri
 
Introduction to CMMI-DEV v1.3 - Day 3
Introduction to CMMI-DEV v1.3  - Day 3Introduction to CMMI-DEV v1.3  - Day 3
Introduction to CMMI-DEV v1.3 - Day 3
Sherif Salah, MBA, ITIL, CMMI, MCSA, TQM
 
Digital Marketing - A quick workshop
Digital Marketing - A quick workshopDigital Marketing - A quick workshop
Digital Marketing - A quick workshop
Socialab
 
Gaudí 1 english
Gaudí 1 englishGaudí 1 english
Gaudí 1 englishHome
 
使用 wagon + VS Code 輕鬆打造 Windows 平台 PHP/Laravel 開發環境
使用 wagon + VS Code 輕鬆打造 Windows 平台 PHP/Laravel 開發環境使用 wagon + VS Code 輕鬆打造 Windows 平台 PHP/Laravel 開發環境
使用 wagon + VS Code 輕鬆打造 Windows 平台 PHP/Laravel 開發環境
Shengyou Fan
 
淺談 QR Code
淺談 QR Code淺談 QR Code
淺談 QR Code
Kun Chen
 
Anatomy of a PR Research Report
Anatomy of a PR Research ReportAnatomy of a PR Research Report
Anatomy of a PR Research ReportKhiara McMillin
 

Viewers also liked (16)

Week 4 assignment 2 (d. thompson)
Week 4   assignment 2 (d. thompson)Week 4   assignment 2 (d. thompson)
Week 4 assignment 2 (d. thompson)
 
Barcelona, El Born
Barcelona, El BornBarcelona, El Born
Barcelona, El Born
 
The Valley Winery Case Study AUEB MBA
The Valley Winery Case Study AUEB MBAThe Valley Winery Case Study AUEB MBA
The Valley Winery Case Study AUEB MBA
 
Ipa kelas v
Ipa kelas vIpa kelas v
Ipa kelas v
 
Agenda fls2 n lomojari dan o2sn
Agenda fls2 n lomojari dan o2snAgenda fls2 n lomojari dan o2sn
Agenda fls2 n lomojari dan o2sn
 
Бюгельный протез
Бюгельный протезБюгельный протез
Бюгельный протез
 
Nota Serah tugas
Nota Serah tugasNota Serah tugas
Nota Serah tugas
 
Protezirovanie implant
Protezirovanie implantProtezirovanie implant
Protezirovanie implant
 
Sk penetapan juara
Sk penetapan juaraSk penetapan juara
Sk penetapan juara
 
Borang nota serah tugas untuk pertukaran
Borang nota serah tugas untuk pertukaranBorang nota serah tugas untuk pertukaran
Borang nota serah tugas untuk pertukaran
 
Introduction to CMMI-DEV v1.3 - Day 3
Introduction to CMMI-DEV v1.3  - Day 3Introduction to CMMI-DEV v1.3  - Day 3
Introduction to CMMI-DEV v1.3 - Day 3
 
Digital Marketing - A quick workshop
Digital Marketing - A quick workshopDigital Marketing - A quick workshop
Digital Marketing - A quick workshop
 
Gaudí 1 english
Gaudí 1 englishGaudí 1 english
Gaudí 1 english
 
使用 wagon + VS Code 輕鬆打造 Windows 平台 PHP/Laravel 開發環境
使用 wagon + VS Code 輕鬆打造 Windows 平台 PHP/Laravel 開發環境使用 wagon + VS Code 輕鬆打造 Windows 平台 PHP/Laravel 開發環境
使用 wagon + VS Code 輕鬆打造 Windows 平台 PHP/Laravel 開發環境
 
淺談 QR Code
淺談 QR Code淺談 QR Code
淺談 QR Code
 
Anatomy of a PR Research Report
Anatomy of a PR Research ReportAnatomy of a PR Research Report
Anatomy of a PR Research Report
 

Portfolio 2016.compressed