Guided Tour
Current: Basement column with water 
accumulation on east side 
Current: Basement column with water 
accumulation on north side 
#1 Columns 
Current: Basement columns with water 
accumulation near north entrance surrounded by drywall enclosure 
1
Current: Corroded basement columns on north side 
#2 Columns & Corroded Shelving 
2 
Exposed corroded rebar (reinforcement bars) in sloping ceiling basment 
#3 Corrosion
Current: Sloping ceiling in file room on north side. Rusted rebar (reinforcement bars) & cracked 
cement on beams 
#4 Exposed Rusted Rebar 
3
#5 Compromised Workspaces 
Current: Pumping water out of workspaces- walking hazards on west side 
4 
Current: Corroded shelving supports in east side basement file room due to water intrusion
Current: Rust on 24th floor sign in stairwell 2 
#6 Rust 
Current: Corrosion on conduit pipes emerging from interior wall 
#7 The 25th Floor 
Current: Cracked façade over interior column 
#8 The 25th Floor 
5
Current: Algae growing on interior walls due to water intrusion 
#9 The 25th Floor 
Curent: Exposed corroded rebar (reinforcement bars) on interior floor 
#10 The 25th Floor -Algae 
6
Water Intrusion
Current: Waste water leaking into office on 9th floor 
Working conditions: Water intrusion in 22nd floor staff attorneys’ offices 
Damage to wall in 19th floor bathroom 
Humidity damage in 16th floor stairwell 
Water Intrusion 
7
Current: Water accumulation near hallway on west side 
Water Intrusion 
Current: Flooding and corrosion on bottom shelves in basement file room on north side 
Working conditions: 23rd floor office shows flooding prior to remediation 
8 
Fan drying water damaged files in the basement
Corrosion
Current: Corrosion inside west basement entryway prior to remediation 
Corrosion 
Working Conditions: Exposed corroded pipes and leaks above active office spaces 
9
Cracked façade over columns in basement mail room before remediation 
Crumbled façade over columns in basement before remediation 
Corrosion 
Removal of rusted beams during 
façade restoration project 
10
Termites
Termite Activity on 22nd floor 
Termite activity in courtroom 5-2 
Termites 
Termite Activity on 6th Floor 
11
Mold and Air Quality
Mold before remediation 
8th floor offices containing mold 
beneath wallpaper before remediation 
Mold/ Air Quality 
14th floor mold on walls before remediation 
12
Inadequate Space
Working conditions: limited visibilty in courtroom 10-1 
Inadequate Space 
Working Conditions: 5th floor judge’s 
chambers has limited area to access files 
13
Structural Damage
Exterior structural damage prior to façade restoration project 
Structural Damage 
14

Photo journal v8. 9 16-14

  • 1.
    DADE COUNTY COURTHOUSE Photo Journal Office of Government Liaison & Public Relations September 16th, 2014
  • 2.
  • 3.
    Current: Basement columnwith water accumulation on east side Current: Basement column with water accumulation on north side #1 Columns Current: Basement columns with water accumulation near north entrance surrounded by drywall enclosure 1
  • 4.
    Current: Corroded basementcolumns on north side #2 Columns & Corroded Shelving 2 Exposed corroded rebar (reinforcement bars) in sloping ceiling basment #3 Corrosion
  • 5.
    Current: Sloping ceilingin file room on north side. Rusted rebar (reinforcement bars) & cracked cement on beams #4 Exposed Rusted Rebar 3
  • 6.
    #5 Compromised Workspaces Current: Pumping water out of workspaces- walking hazards on west side 4 Current: Corroded shelving supports in east side basement file room due to water intrusion
  • 7.
    Current: Rust on24th floor sign in stairwell 2 #6 Rust Current: Corrosion on conduit pipes emerging from interior wall #7 The 25th Floor Current: Cracked façade over interior column #8 The 25th Floor 5
  • 8.
    Current: Algae growingon interior walls due to water intrusion #9 The 25th Floor Curent: Exposed corroded rebar (reinforcement bars) on interior floor #10 The 25th Floor -Algae 6
  • 9.
  • 10.
    Current: Waste waterleaking into office on 9th floor Working conditions: Water intrusion in 22nd floor staff attorneys’ offices Damage to wall in 19th floor bathroom Humidity damage in 16th floor stairwell Water Intrusion 7
  • 11.
    Current: Water accumulationnear hallway on west side Water Intrusion Current: Flooding and corrosion on bottom shelves in basement file room on north side Working conditions: 23rd floor office shows flooding prior to remediation 8 Fan drying water damaged files in the basement
  • 12.
  • 13.
    Current: Corrosion insidewest basement entryway prior to remediation Corrosion Working Conditions: Exposed corroded pipes and leaks above active office spaces 9
  • 14.
    Cracked façade overcolumns in basement mail room before remediation Crumbled façade over columns in basement before remediation Corrosion Removal of rusted beams during façade restoration project 10
  • 15.
  • 16.
    Termite Activity on22nd floor Termite activity in courtroom 5-2 Termites Termite Activity on 6th Floor 11
  • 17.
    Mold and AirQuality
  • 18.
    Mold before remediation 8th floor offices containing mold beneath wallpaper before remediation Mold/ Air Quality 14th floor mold on walls before remediation 12
  • 19.
  • 20.
    Working conditions: limitedvisibilty in courtroom 10-1 Inadequate Space Working Conditions: 5th floor judge’s chambers has limited area to access files 13
  • 21.
  • 22.
    Exterior structural damageprior to façade restoration project Structural Damage 14