This document contains a project plan consisting of 29 tasks related to the completion of a thesis. The tasks include researching and writing various chapters such as the introduction, literature review, methodology, and conclusions. Other tasks involve collecting data, analyzing results, and finalizing the thesis with a defense. The project began in October 2013 and is scheduled to be completed in April 2014, with most tasks currently in progress or yet to begin.
El documento presenta un cuestionario sobre la Web 2.0 y la Web 3.0. Pregunta sobre el origen y características de la Web 2.0, incluyendo herramientas como blogs, wikis y redes sociales. También pregunta sobre la diferencia entre la Web 1.0 y la Web 2.0, características de la Web 3.0 e incluye preguntas sobre blogs, wikis y otros temas relacionados con la Web.
Formatos para líneas de tiempo - útiles para ilustrar de una forma mas agradable presentaciones gerenciales -en cuanto a fases de desarrollo de proyectos
This document contains a schedule for an academic year broken into units from August 2015 to May 2016. Each line provides the date, day of the week, unit number, lesson number and sometimes notes on assessments or field trips (TGAs). The schedule shows 15 units covered throughout the year with lessons within each unit and periodic assessments noted. Key dates like holidays, breaks and conferences are also included.
This Gantt chart outlines the schedule for a 49 day design studio project from January 23rd to March 30th. It includes tasks such as establishing project requirements, ideation contributions, solidworks modeling and analysis, drawing preparations, purchasing materials, assembling parts, and weekly meetings. The key deliverables are the actual project model targeted to be completed by March 29th.
This document outlines the tasks, durations, start and finish dates for the electrical installation project of the Antalya cable ski facility. The project has a total duration of 90.38 days from January 18th to April 23rd 2008. Key tasks include project design, material approvals, procurement, mobilization, installation which has sub-tasks for medium voltage, transformers, generators and more. Installation is the critical longest task spanning 40 days. Milestones are tracked throughout the project.
This Gantt chart outlines a 12 task, 23 day project simulation that runs from August 6th to September 7th 2021. The project includes tasks A through K, with tasks C, D, E, F, H, I, J and K dependent on the completion of prior tasks and milestones.
Ramadan in 2013 will begin on July 9th in North America and last 30 days, ending on August 7th. However, in some Muslim-majority countries, Ramadan may start a day later on July 10th depending on sightings of the new crescent moon. The dates provided are based on astronomical calculations by the Fiqh Council of North America rather than actual sightings. The timing of Ramadan shifts around 11 days each year on the Gregorian calendar due to differences between the lunar Islamic calendar and the solar Gregorian calendar.
The document contains tide tables for Guernsey for January and February 2023. It lists the times and heights of high tides and low tides each day, measured in meters. The time zone is listed as GMT.
El documento presenta un cuestionario sobre la Web 2.0 y la Web 3.0. Pregunta sobre el origen y características de la Web 2.0, incluyendo herramientas como blogs, wikis y redes sociales. También pregunta sobre la diferencia entre la Web 1.0 y la Web 2.0, características de la Web 3.0 e incluye preguntas sobre blogs, wikis y otros temas relacionados con la Web.
Formatos para líneas de tiempo - útiles para ilustrar de una forma mas agradable presentaciones gerenciales -en cuanto a fases de desarrollo de proyectos
This document contains a schedule for an academic year broken into units from August 2015 to May 2016. Each line provides the date, day of the week, unit number, lesson number and sometimes notes on assessments or field trips (TGAs). The schedule shows 15 units covered throughout the year with lessons within each unit and periodic assessments noted. Key dates like holidays, breaks and conferences are also included.
This Gantt chart outlines the schedule for a 49 day design studio project from January 23rd to March 30th. It includes tasks such as establishing project requirements, ideation contributions, solidworks modeling and analysis, drawing preparations, purchasing materials, assembling parts, and weekly meetings. The key deliverables are the actual project model targeted to be completed by March 29th.
This document outlines the tasks, durations, start and finish dates for the electrical installation project of the Antalya cable ski facility. The project has a total duration of 90.38 days from January 18th to April 23rd 2008. Key tasks include project design, material approvals, procurement, mobilization, installation which has sub-tasks for medium voltage, transformers, generators and more. Installation is the critical longest task spanning 40 days. Milestones are tracked throughout the project.
This Gantt chart outlines a 12 task, 23 day project simulation that runs from August 6th to September 7th 2021. The project includes tasks A through K, with tasks C, D, E, F, H, I, J and K dependent on the completion of prior tasks and milestones.
Ramadan in 2013 will begin on July 9th in North America and last 30 days, ending on August 7th. However, in some Muslim-majority countries, Ramadan may start a day later on July 10th depending on sightings of the new crescent moon. The dates provided are based on astronomical calculations by the Fiqh Council of North America rather than actual sightings. The timing of Ramadan shifts around 11 days each year on the Gregorian calendar due to differences between the lunar Islamic calendar and the solar Gregorian calendar.
The document contains tide tables for Guernsey for January and February 2023. It lists the times and heights of high tides and low tides each day, measured in meters. The time zone is listed as GMT.
This document outlines a project plan consisting of 3 phases with various tasks and durations. Phase 1 involves selecting, purchasing, reading and summarizing a book, with a total duration of 180 days. Phase 2 entails writing, revising and presenting the summary over 130 days. Phase 3 includes a final exam with a duration of 65 days. The project in total is planned from February 12, 2012 to December 21, 2012.
Printable desktop calendar 2020 created by @rajathdm :)
This was an experiment I did earlier this year. I printed 100 copies and sent them to friends and family.
Do share an image with us if you print this.
The document lists the dates for Cambridge English exams in 2017. It provides the dates for the Key English Test (KET), Preliminary English Test (PET), First Certificate in English (FCE), Certificate in Advanced English (CAE), and Certificate of Proficiency in English (CPE) exams. The dates are broken down by paper-based and computer-based exam formats for each qualification.
This document contains a project schedule with multiple tasks for constructing modular containers and barges. It includes tasks for materials procurement, module construction, outfitting, and transportation. The largest module, Module 3, contains 36 containers and has over 160 tasks scheduled from August 2013 through March 2014. Other projects on the schedule include constructing a captain's bridge and power barge.
The document appears to be a log of time and date information spanning from October 28th, 2007 to June 2029. It includes the time in half hour increments for Fiji, Tonga, and Samoa over this period. It also includes the Islamic year and its starting and ending Gregorian dates for years 1420-1449.
Ump semester dates 2015 16 (23 may 2014 v2)Seif Ziwar
This document contains the academic calendar for the 2015-2016 academic year at an unnamed university. It lists the weeks of the year and any notable events occurring each week, such as holidays, exam periods, and graduation dates. Key events include enrollment and induction during the first week of September, Easter break from March 25th to April 8th, Christmas closure from December 24th to January 3rd, and exam periods for terms 1 and 2 (S1 and S2). The calendar notes that graduation may occur on any date marked with a # symbol, as needed.
This document outlines a project schedule consisting of 84 tasks related to construction work. The tasks include activities like installing scaffolding, removing structures, floating concrete, tiling, painting, and bricklaying. Each task is assigned a duration and scheduled start and finish dates, with some tasks listing predecessor tasks that must be completed first. The schedule spans from January 25th to February 15th and involves multiple contractors completing their portions of the work in parallel.
This document provides the Malaysia holiday calendar for 2022. It lists the months of the year and includes the dates for each day of the week. It also lists the 19 national holidays in Malaysia for 2022, including Chinese New Year, Labour Day, Hari Raya Puasa, Wesak Day, the King's birthday, Hari Raya Haji, National Day, Malaysia Day, Diwali, Christmas, and other important religious holidays. The dates for some of the Muslim holidays are noted as tentative since they are dependent on sightings of the moon.
This document outlines a project plan consisting of 3 phases with various tasks and durations. Phase 1 involves selecting, purchasing, reading and summarizing a book, with a total duration of 180 days. Phase 2 entails writing, revising and presenting the summary over 130 days. Phase 3 includes a final exam with a duration of 65 days. The project in total is planned from February 12, 2012 to December 21, 2012.
Printable desktop calendar 2020 created by @rajathdm :)
This was an experiment I did earlier this year. I printed 100 copies and sent them to friends and family.
Do share an image with us if you print this.
The document lists the dates for Cambridge English exams in 2017. It provides the dates for the Key English Test (KET), Preliminary English Test (PET), First Certificate in English (FCE), Certificate in Advanced English (CAE), and Certificate of Proficiency in English (CPE) exams. The dates are broken down by paper-based and computer-based exam formats for each qualification.
This document contains a project schedule with multiple tasks for constructing modular containers and barges. It includes tasks for materials procurement, module construction, outfitting, and transportation. The largest module, Module 3, contains 36 containers and has over 160 tasks scheduled from August 2013 through March 2014. Other projects on the schedule include constructing a captain's bridge and power barge.
The document appears to be a log of time and date information spanning from October 28th, 2007 to June 2029. It includes the time in half hour increments for Fiji, Tonga, and Samoa over this period. It also includes the Islamic year and its starting and ending Gregorian dates for years 1420-1449.
Ump semester dates 2015 16 (23 may 2014 v2)Seif Ziwar
This document contains the academic calendar for the 2015-2016 academic year at an unnamed university. It lists the weeks of the year and any notable events occurring each week, such as holidays, exam periods, and graduation dates. Key events include enrollment and induction during the first week of September, Easter break from March 25th to April 8th, Christmas closure from December 24th to January 3rd, and exam periods for terms 1 and 2 (S1 and S2). The calendar notes that graduation may occur on any date marked with a # symbol, as needed.
This document outlines a project schedule consisting of 84 tasks related to construction work. The tasks include activities like installing scaffolding, removing structures, floating concrete, tiling, painting, and bricklaying. Each task is assigned a duration and scheduled start and finish dates, with some tasks listing predecessor tasks that must be completed first. The schedule spans from January 25th to February 15th and involves multiple contractors completing their portions of the work in parallel.
This document provides the Malaysia holiday calendar for 2022. It lists the months of the year and includes the dates for each day of the week. It also lists the 19 national holidays in Malaysia for 2022, including Chinese New Year, Labour Day, Hari Raya Puasa, Wesak Day, the King's birthday, Hari Raya Haji, National Day, Malaysia Day, Diwali, Christmas, and other important religious holidays. The dates for some of the Muslim holidays are noted as tentative since they are dependent on sightings of the moon.
1. ID
Nombre de tarea
Duration
Start
01 August
Finish
% Complete
01/09
1
2
3
4
5
6
7
8
9
10
11
12
13
24 days?
1 day
2 days?
15 days
6 days
27 days
4 days
6 days
7 days
6 days
4 days
23 days
10 days
Sat 19/10/13
Sat 19/10/13
Sun 20/10/13
Tue 22/10/13
Wed 06/11/13
Thu 14/11/13
Thu 14/11/13
Wed 20/11/13
Thu 28/11/13
Mon 09/12/13
Tue 17/12/13
Mon 23/12/13
Mon 23/12/13
Wed 13/11/13
Sat 19/10/13
Mon 21/10/13
Tue 05/11/13
Wed 13/11/13
Fri 20/12/13
Tue 19/11/13
Wed 27/11/13
Fri 06/12/13
Mon 16/12/13
Fri 20/12/13
Wed 22/01/14
Fri 03/01/14
3 days
4 days
6 days
17 days
Mon 06/01/14
Thu 09/01/14
Wed 15/01/14
Thu 23/01/14
Wed 08/01/14
Tue 14/01/14
Wed 22/01/14
Fri 14/02/14
0%
0%
0%
3%
18
19
20
21
22
23
24
25
26
27
28
29
POBLACIÓN Y MUESTRA
CUADRO DE POBLACIÓN INVESTIGADA
CUADRO ESTADÍSTICO DEL MALTRATO
ANÁLISIS CUANTITATIVO
CAPITULO V
CONCLUCIONES
RECOMENDACIONES
ALTERNATIVAS DE SOLUCION
ANEXOS
BIBLIOGRAFÍA
APROVACION DE LA TESIS
DEFENSA DE LA TESIS
6 days
3 days
3 days
6 days
37 days?
4 days
2 days
7 days
23 days
2 days?
1 day?
1 day?
Thu 23/01/14
Thu 30/01/14
Tue 04/02/14
Fri 07/02/14
Mon 17/02/14
Mon 17/02/14
Fri 21/02/14
Mon 24/02/14
Tue 04/03/14
Fri 04/04/14
Mon 07/04/14
Tue 08/10/13
Thu 30/01/14
Mon 03/02/14
Thu 06/02/14
Fri 14/02/14
Mon 07/04/14
Thu 20/02/14
Sat 22/02/14
Tue 04/03/14
Thu 03/04/14
Mon 07/04/14
Mon 07/04/14
Tue 08/10/13
8%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
13/10
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
0%
14
15
16
17
CAPITULO I TESIS
BUSQUEDA DEL TEMA
OBJETIVOS
JUSTIFICACIÓN
METODOLOGÍA
CAPITULO II MARCO TEORICO
FUNDAMENTOS SOCIOPOLÍTICOS
FUNDAMENTOS PSICOPEDAGÓGICOS
FUNDAMENTOS ONTOLÓGICOS
FUNDAMENTOS EPISTEMOLÓGICOS
FUNDAMENTOS METODOLÓGICOS
CAPITULO III INVESTIGACIONES
CARACTERÍSTICAS DE LOS NIÑOS ENTRE
5 Y 6 AÑOS DE EDAD
CARACTERÍSTICAS FÍSICAS
CARACTERÍSTICAS PSICOLÓGICAS
CARACTERÍSTICAS SOCIALES
CAPITULO IV INVESTIGACIÓN DE CAMPO
21 September
22/09
internet
internet
internet
internet
int
laptop
Tarea
Hito externo
Manual Summary Rollup
División
Proyecto: Proyect1
Fecha: Wed 13/11/13
Inactive Task
Manual Summary
Hito
Inactive Milestone
Start-only
Resumen
Inactive Summary
Finish-only
Resumen del proyecto
Manual Task
Progreso
Tareas externas
Duration-only
Fecha límite
Página 1
11 November
03/11
2. 11 November
03/11
01 January
24/11
15/12
05/01
21 February
16/02
26/01
09/03
11 April
30/03
net
ernet
internet
internet
internet
internet
internet
internet
internet
internet
internet
laptop
laptop
laptop
laptop
laptop
laptop
laptop
laptop
laptop
laptop
laptop
laptop
Tarea
Proyecto: Proyect1
Fecha: Wed 13/11/13
Hito externo
Manual Summary Rollup
División
Inactive Task
Manual Summary
Hito
Inactive Milestone
Start-only
Resumen
Inactive Summary
Finish-only
Resumen del proyecto
Manual Task
Progreso
Tareas externas
Duration-only
Fecha límite
Página 2
01 Jun
20/04
11/05