This document provides an overview of multiple regression analysis techniques. It begins with an introduction to multiple regression, explaining how it allows modeling of a dependent variable (Y) based on multiple independent variables (X1, X2, X3, etc). The document then outlines the basic steps for developing a multiple regression model, including visualizing relationships in the data, assessing correlation, generating a prediction equation, and validating the model. An example involving silver consumption in a production plant is presented to demonstrate these steps. The goal is to help readers understand how to identify correlation between variables, create mathematical models relating multiple inputs to an output, and evaluate models.