Management Information System
Course Guide and Certification Program of RIBAMS.
By Muhammad Khurram Baig (MIS)
Government and Semi Government approved MIS and HR Training Provider
MIS Consultant of OraluxTM Technology Management House
Member of CIC and IPMA UK
A Management Information System
Organization and Management System
• People
• Data
• Procedures
• Manager
• System
• Decision Making
• Boundary
B Information Technology
• Hardware
• Software
• Networks
• Communications
• Database
• Programming
Management
• Planning
• Organization
• Directing
• Controlling
• Coordinating
• Staffing
• Motivating
C ERP Technologies
ERP (Enterprises Resource Planning)
Software or Specialized Modules in Any organization as per requirement of
Management and fulfill principals of MIS
• Software
• Hardware
• People
D Essentials (Functions) of MIS
• Accounting Information System *
• Transaction Processing System
• Management Reporting System
• Decision Support System
• Knowledge Based System
• Office Information System
• Executive Information System
• Expert System
• Automation System
E MIS Implementation
• Analysis
• Design
• Implementation
• Maintenance
F Transformation Engineering Management
• Transformation
• Engineering Systems
Case Studies and Examples.
For more information please contact
Muhammad Khurram Baig (MIS)
03138854562
03154139016
drkoi99@gmail.com
ribams99@gmail.com
Federal Government Approved Certification and Practical Training Program
Departments and Organizations
Any organization has some departments according to its business nature and system
requirement.
Here we are listing some MIS Implemented Departments as per your career scope
and organizational activities.
01 Accounting System
02 Actuaries System
03 Admin and Task Management
04 Admin Management System
05 Advertising Management
06 Aeronautical Science
07 Agriculture Sciences
08 Air and Marine Information System
09 Animal Sciences
10 Appointment System
11 Army and Force Management
12 Auditing System
13 Banking System
14 Bio Medical Sciences
15 Buildings and Lands
16 Business Intelligence System
17 Centralized Management System
18 Communication System
19 Cost Management System
20 Cultures and Civilizations
21 Customer Services
22 Education System
23 Finance System
24 Food Technology
25 Forest and Parks
26 Geographical Information System
27 Health and Sports Management
28 Hospital System
29 Hospitality System
30 Hostel Management System
31 Hotel System
32 Human Resource Management System
33 Insurance System
34 Inventory Management
35 Investments System
36 Library Information System
37 Logistics System
38 Marketing Management
39 Multimedia and Broadcasting
40 Nursing System
41 Operations Management
42 Performance Management
43 Processing Management
44 Production System
45 Project Management
46 Publish Relations
47 Quality Management
48 Real Estates
49 Religious System
50 Resource Management
51 Sales Management
52 Schools System
53 Space Science
54 Sports and Physical Education
55 Supply Chain Management
56 Taxation System
57 Tourism Management System
58 Tracking System
59 Trade System
60 Transaction System
61 Transformation System
62 Transitions Technology
63 Travel Management System
64 University Systems
65 Visa Information System
66 Plan and Control Management
67 Area and Interfaces
68 Strategic Management and Configuration (apr)
69 Material Management
70 Assets Management
and Organizational Activities and Management Systems.
Select any department or Organization according to your career scope
and prepare case study or assignment
Consider you have installed ERP Systems or Application Modules as per
organizational requirement than you have to prepare assignment
Reading Course Work
Course Guide and Certification Program of RIBAMS.
Research Institute of Business Application and Management Sciences
By Muhammad Khurram Baig (MIS)
Case Study: Prepare Presentation as Manager (List of Items/Suppliers/Customers)
Case Study: Prepare Reports and Statements as Supervisor
Case Study: Unskilled and Non Professional Manager has to face
troubles on Daily Basis, How and Why. Also who can change Manager or Management
Case Study: Why our Boss always angry with Management. Install MIS Based System to
make him Happy and Satisfied
Case Study: How do you satisfy your
Boss, if you have MIS System Implemented.
Case Study: What is Right Management in MIS Based
Organization
People (Human Resource or Skilled Personals)
Team or Group of HR or People who are skilled and educated as per requirement of the
organizations (System) and perform same or different duties for the same objectives in their mind
that is goal to (Serve or Get Profit)
Accountants can understand the Reports provided by MIS or MIT or Manager while
Doctors cant understand it easily in the Organization
Prepare a Story of Organization, deals in Trading. The Staff information is
here and prepare their Standard Jobs and Qualification
Executive (Mr Deer)
Manager (Mr Ahrim)
Supervisor (Mr Domin)
Assistant (Ms Sarah)
Customer Services (Ms Shilla)
Another Most Important Job is Administrator (Ms Shabana)
Data (Simple Transactions)
• Raw Facts and Figures to make information after compilation or processing.
• are values of qualitative or quantitative variables, belonging to a set of items.
To prepare report, DO or Assistant has to enter data into software or ERP
Application System.
Procedures
• Instructions or recipes, a set of commands that show how to prepare or make something
• something to proceed input into output
• In computer science, procedure, also known as function, routine, or subprogram
Programing designed or configure by Programmer who developed ERP or
Software. The Programming is set of commands who convert data into information
(report)
Manager
• the person who get work done with others by using management functions
Responsible person who gets reports and manages all procedure of AIS.
Information
• Information, in its most restricted technical sense, is a sequence of symbols that can be
interpreted as a message. Information can be recorded as signs, or transmitted as signals.
Information is any kind of event that affects the state of a dynamic system that can
interpret the information.
• The understandable data or symbols or figures is known as information (message)
Report Lists or Reports of Suppliers are known as Information. That is message
what Executive of the Organization demands from People who are using MIS
System.
System
• A group of interdependent items that interact regularly to perform
a task.
• An established or organized procedure; a method.
• A computer system refers to the hardware and software
components that run a computer or computers.
• An information system is a system that collects and stores data.
People use procedures to prepare reports (message/information) for Executives
from Input (Data) by using software, hardware and networks.
Decision Making
can be regarded as the cognitive process resulting in the selection of a course of action among
several alternative scenarios. Every decision making process produces a final choice. The output
can be an action or an opinion of choice.
Human performance in decision terms has been the subject of active research from several perspectives.
From a psychological perspective, it is necessary to
examine individual decisions in the context of a set of
needs, preferences an individual has and values they seek.
From a cognitive perspective, the decision making process
must be regarded as a continuous process integrated in
the interaction with the environment.
From a normative perspective, the analysis of individual
decisions is concerned with the logic of decision making
and rationality and the invariant choice it leads to.
Boundary
Every Organization has some closed limits/Points. where people use resources in a limit as per
rules and regulations or terms set by the organization.
Management
Management in all business and organizational activities is the act of coordinating the efforts of
people to accomplish desired goals and objectives using available resources efficiently and
effectively.
Functions of Management
• Planning
• Directing
• Organizing
• Controlling
• Coordinating
• Staffing
• Motivating
Planning
• Planning is the process of thinking about and organizing the activities required to achieve a
desired goal. or
• A set of activities to achieve organizational goals
As MIS consultant if you are going to implement AIS or FIS system, first you have to plan
• The business system and procedures adopted by Business
• Number of Staff in specific departments
• Knowledge and Expertise of the Staff
• Plan, how to face barriers in implementing system
• company interest on investments
• company interest on adopting new system
• basic or trend needs (Desktop or Server or Cloud System)
• Who 'll manage and maintain the system
• training, learning and acknowledgments of personals
if you plan in right way and prepare your work as per company's requirement than
you ll be able to implement system successfully
Directing
• To manage something in a right way or in straight line
• Directing is telling people how to get something done. It is how something should be done.
Directing can be done by telling someone something verbally, written or by actions.
Organizing
• Organizing is the act of rearranging elements following one or more rules.
• Anything is commonly considered organized when it looks like everything has a correct
order or placement.
Controlling
• The act or use power to direct and organize
• Controlling refers to the state of maintain authority or influence over something or
someone. It may also refer to the act of determining the behavior or supervising the
running of something.
Coordinating
• Bring the different elements of (a complex activity or organization) into a relationship that
will ensure efficiency or harmony.
• Negotiate with others in order to work together effectively.
In the sens how we are communicating with each other
Staffing
Staffing is the act of employing people in an organization. People with right qualifications for
various posts are usually hired by employers in the job market.
Motivating
Motivation is a psychological feature that arouses an organism to act towards a desired goal and
elicits, controls, and sustains certain goal-directed behaviors.
Definition of motivation: Internal and external factors that stimulate desire and energy in people to
be continually interested and committed to a job,
For Example you want to implement successful MIS System in your organization. Is this
possible with unskilled Professionals. Simply No. for this you have to hire Educated and Skilled
Professionals to work with Your Organization and Implement Right MIS Systems. To get results you
have to Proper Motivate and Train them and Acknowledge their activities.
When evaluating an organization's workforce, there are several areas that must be addressed.
First, the staff must have the tools and resources that they need to do their jobs effectively.
Employees cannot be blamed for an organization's inefficiency if they are not provided with the
equipment necessary to perform adequately. Next, get to know each employee as an individual
and make sure that they are aware of their specific role within the organization. Clarify their
responsibilities and goals. Also, involve each employee in making decisions which affect their area
of expertise. This will result in the employee feeling that they "have a say" in what goes on in the
organization and he or she will feel a sense of ownership. Finally, make sure that employees have
an opportunity to have fun with their coworkers at appropriate times.
People Empowerment can be a very effective tool within the field of people management. This
technique can be used to involve employees in any improvement program within an organization.
Authority, accountability, and responsibility are delegated to the employees for improving the
processes which are under their control without first having to obtain permission from
management before making changes. This can be successful only when employees are
recognized, congratulated, and rewarded for their commitment to problem solving.
B Information Technology
• Hardware
• Software
• Networks / Communications
• Database
• Firmware
Computer hardware is the collection of physical elements that constitute a computer
system. Computer hardware refers to the physical parts or components of a computer such
as monitor, keyboard, Computer data storage, hard drive disk, mouse, CPU (graphic cards,
sound cards, memory, motherboard and chips), etc. all of which are physical objects that you can
actually touch. In contrast, software is untouchable. Software exists as ideas, application,
concepts, and symbols, but it has no substance. A combination of hardware and software forms a
usable computing system.
Input Devices Keyboard · Image scanner · Microphone · Pointing device (Graphics
tablet · Joystick · Light pen · Mouse · Pointing stick · Touchpad · Touchscreen · Trackball) ·
Webcam (Softcam)
Output devices Monitor · Printer · Speakers · Plotter
Removable data storage Optical disc drive (CD-RW · DVD+RW) · Disk pack ·
Floppy disk · Memory card · USB flash drive
Computer case Central processing unit (CPU) · Hard disk / Solid-state drive ·
Motherboard · Network interface controller · Power supply · Random-access memory (RAM) ·
Sound card · Video card
Data ports Ethernet · FireWire (IEEE 1394) · Parallel port · Serial port · USB
A database is an organized collection of data. The data are typically organized to model
relevant aspects of reality (for example, the availability of rooms in hotels), in a way that supports
processes requiring this information (for example, finding a hotel with vacancies).
A computer network or data network is a telecommunications network that allows
computers to exchange data. The physical connection between networked computing
devices is established using either cable media or wireless media. The best-known
computer network is the Internet.
Network devices that originate, route and terminate the data are called network nodes.[1]
Nodes can include hosts such as servers and personal computers, as well as networking
hardware. Two devices are said to be networked when a process in one device is able to
exchange information with a process in another device.
Computer networks support applications such as access to the World Wide Web, shared use of
application and storage servers, printers, and fax machines, and use of email and instant
messaging applications. The remainder of this article discusses local area network technologies
and classifies them according to the following characteristics: the physical media used to transmit
signals, the communications protocols used to organize network traffic, along with the network's
size, its topology and its organizational intent.
Database management systems (DBMSs) are specially designed applications that
interact with the user, other applications, and the database itself to capture and analyze
data. A general-purpose database management system (DBMS) is a software system
designed to allow the definition, creation, querying, update, and administration of databases. Well-
known DBMSs include MySQL, PostgreSQL, SQLite, Microsoft SQL Server, Microsoft Access, Oracle,
SAP, dBASE, FoxPro, IBM DB2, LibreOffice Base and FileMaker Pro. A database is not generally
portable across different DBMS, but different DBMSs can inter-operate by using standards such as
SQL and ODBC or JDBC to allow a single application to work with more than one database.
Firmware
In electronic systems and computing, firmware is the combination of persistent memory and
program code and data stored in it.[1] Typical examples of devices containing firmware are
embedded systems (such as traffic lights, consumer appliances, and digital watches), computers,
computer peripherals, mobile phones, and digital cameras.
Programming Language
A programming language is a formal language designed to communicate instructions to a
machine, particularly a computer. Programming languages can be used to create programs that
control the behavior of a machine and/or to express algorithms precisely.
The description of a programming language is usually split into the two components of syntax
(form) and semantics (meaning). Some languages are defined by a specification document (for
example, the C programming language is specified by an ISO Standard), while other languages,
such as Perl 5 and earlier, have a dominant implementation that is used as a reference.
C ERP Technologies
ERP (Enterprises Resource Planning)
Software or Specialized Modules in Any organization as per requirement of Management and fulfill
principals of MIS
Software
Applications
Operating System
Firmware
Integrated System
Technologies & Charts
Server / Client Technologies
(To access and share information and data in a single room or in a building I.e LAN,
WAN,MAN)
Cloud Servers Technologies
(To access and share information and data from anywhere / anytime by using Internet
Technologies)
e Server System
(to access and share information and data from anywhere / anytime by multiple users
through Internet and Intranet Technologies)
Desktops System
(to access data on own / single computer by the Users I.e Laptop/ Tablet/PC)
Assessments Cloud E Server Server/Client Desktop
Direct Work from
Online Servers
Do work on Desktop
and Connect Online
Server
Do work on different
PCs / Workstations
and Share through
Server
Personal Computer
or Laptops Systems
Ranking Very High
(US/CND/AU/UK)
High(US/CN/AU/UK/E
U/UAE)
Medium
(Everywhere)
Low (Everywhere)
Cost as per
Standards
1 Million for 1/ 5
Users
500,000 = 1 / 5
Users
100,000 = 4 Users 15,000
Organizations Multinationals /
Large Groups for
Efficient Systems
Multinationals or
Large Groups
Medium Small / Personal
MIS (Accounts) E-Account Pro U.S Accounting
Manager
Professional
Accounting
Peach tree / Quick
Book
Users (AIS) MIS ERP
Consultant – Post
Graduate or Prof
+ 8 Yrs Exp.
MIS Prof –
Manager /
Supervisors of
Technologies
MIS Trainee –
ACCA / CA / BBA /
MBA / BCOM. & IT
Background
MIS Student /
Trainee Graduate
with Accounts & IT
Background
Hardware: System Specifications
• RAM (Random Access Memory)
• ROM (Read Only Memory)
• Mother Board (CPU)
• CD/DVD Read and Writer
• Intel or other Chips
• Hard Disks
• VGA or Video Graphic Accelerators Cards
• 3D Cards
• USB Ports or Cards
• Sound Cards
• Networks Cards
• Wireless Chip or Cards
• Blue tooth
• Infrared
• Cables
• Networking Cables
• Networking JACKS
• Networking Hubs
• Networking Switches
• Networking Routers
• LCD
• LED
• Monitor
• External Hard Drive
• Sky Drives
• Server Drives
• Workstation
• Terminals
People
IT Professional
◦ MIT Manager
◦ MIT Assistant
◦ Programmers
◦ Configuration Professionals
◦ Database Experts
◦ Hardware Engineers
◦ Software Engineers
◦ Networking Engineers
◦ Database Engineers
◦ System Engineering
◦ System Consultants
◦ System Designers
◦ Multimedia Developers
◦ Media Professionals
◦ Graphic Designers
MIS Experts
• MIS Professionals
• MIS Consultants
• ERP Consultants
• ERP Experts
• System Analyst
• Accounting Information System Professionals
• Financial ISP
• Inventory ISP
• Production ISP
• Operations ISP
• ----- SPs (Departments)
• Project Manager
D Essentials (Functions) of MIS
• Accounting Information System *
Prepare accounting reports after summarizing and analysis through expert software as per firms'
requirements.
Prepare case study of AIS and its effective use in an MIS Based Organization
There are some sub modules of MIS information system, now prepare
activity of these information system.
Financial Information System
Audit Information System
Tax Information System
Production Information System
Operations Information System
Banking Information System
Insurance Information System
Project Management Information System
Quality Management System
Visa Information System
Hotel Information System
Hospital Information System
Inventory Management Information System
Stocks Information System
Bio Medical Information System
Geographical Information System
Wastage Management and Information System
Travel and Tours Management and Information System
Human Resource Management System
Education Management System
Corporate Training and Learning System
Trade Management Information System
Transaction Processing System
the set of instructions or programs to compile data into information by using
software or application modules.
A transaction processing system (TPS) or transaction server is a software system, or
software/hardware combination, that supports transaction processing.
Management Reporting System
To get reports from MIS implemented System (Program or Software or Application
Modules). The reports should be from data already input. It should be reliable as
understandable to CEO or Directors or Manager (Or Relevancy Message)
For Example
When Manager ask Supervisor please stop current data entry and compile all data from
networks to get reports.
All data from Masters or Dependents Tables will shift in One Manageable Table from where
executives or managers have to get Reports. It depends on
• Time (Real Time). All took at once or step by step for specific time
• Batch Processing (The Commands set by Programmers)
Q: is TPS is possible in Software
Q: What is TPS actually
Q: The Program already written by Programmers is known as
Q: TPS is perform by a series of instructions in Real Time
Perform an activity regarding TPS in an Organization
The activity must show, that without TPS it is hard to operate software.
Manager ask Junior Assistant to stop data entry, why.
TPS is essential Function of MIS, How do you explain.
One Day Mr X CEO calls Mr Y Manager. He demands give me reports of Product 001 and Product
002 as
• Summarized
• in Details
Now Mr Y, who has only one subordinate calls and draft the narration as per CEO Demands.
Subordinate rush towards his cabin and check the data for reports. In this case he don’t need to
ask somebody to stop work or held all activities or stop data entry. He simply run the TPS button
as prepared by the Software Consultant or MIS Professionals and Print different reports. Afterward
he set in the files (appropriate files) and give to Mr Y, Manager.
• Do you think so, Manager Mr Y should print and prepare reports by himself
• Why he demands these reports from Supervisor.
Should he has not MIS or IT based Certified or Appropriate qualified
One day Mr Y, Manager was on leave and Mr J the Assistant was available, Mr X The CEO visited
the Cabin and Ask about Mr Y, Mr J said he was on leave for two days and HR know about the
situation and his absence. Mr X was in trouble and ask please give me report of suppliers and
relevant items purchased from them so that I could able to give them Order for the new session.
• Mr J should give reports
• Mr J should be prepare for this
• Mr J should ask anything, if complex for him
• Mr J should call Mr Y
• Mr J should not reply
if Mr J Print the reports to Mr X than it will be more effective for him and it raise points towards the
Management Level
if Mr J remains untouched and ask sir I don’t know how to print, than it ll be negative effect to him
directly
if Mr J tells that he is not allowed than it effects the Manager's credibility
Similarly One Day Mr J on Leave due to illness and Mr X demands some critical detailed reports of
customer, Mr Y was thinking how to produce reports. He should know that all data was in table by
Mr J and He only use TPS system to make reports.
Recommendation
• MR J should be able to satisfy Mr X the CEO and if possible provide them maximum
information so that there should not be negative effect on Mr Y and His team
• Mr J if more qualified than Mr Y, Manager than there may be only Gap of Experience to
takeover the position of Mr Y,
• if Mr Y is totally depends on Mr J and don’t start learning or update his knowledge then
ultimately his career be in danger.
MIS Wizard Trick
Mr Y should have command over TPS and Mr J should perform DO and manage
filling.
Decision Support System
The system assist in decision making
A decision support system (DSS) is a computer-based information system that supports
business or organizational decision-making activities. DSSs serve the management, operations,
and planning levels of an organization and help to make decisions, which may be rapidly changing
and not easily specified in advance. Decision support systems can be either fully computerized,
human or a combination of both.
• How do you implement DSS
• Prepare a relevant Case study
• Prepare an Activity Sheet of the DSS Function
• is Decision-making system use in Accounting Information System
Knowledge Based System
System to implement with complete or Standard Requirement to get results
A Knowledge-based system is a computer program that reasons and uses knowledge to solve
complex problems. Knowledge is acquired and represented using various knowledge
representation techniques rules, frames and scripts. The basic advantages offered by such system
are documentation of knowledge, intelligent decision support, self learning, reasoning and
explanation. Knowledge-based systems[are systems based on the methods and techniques of
Artificial Intelligence. Their core components are:
• knowledge base
• acquisition mechanisms
• inference mechanisms
Knowledge Base Systems (KBS) goes beyond the decision support philosophy to indicate the
expert system technology into the decision making framework. Expert Systems (ES) have been the
tools and techniques perfected by artificial intelligence (AI) researchers to deduce decision
influences based on codification of knowledge. The codification of knowledge use the principles of
knowledge representation (part of the large theoretical ideas of knowledge engineering). Typically
such codification uses rules like IF-THEN rules to represent logical implications.
While for some authors[who?] expert systems, case-based reasoning systems and neural networks
are all particular types of knowledge-based systems, there are others who consider that neural
networks are different, and exclude it from this category.[citation needed]
KBS is a frequently used abbreviation for knowledge-based system.
• What is KBS
• How do you familiar an MIS system as KBS
• Show KBS in your Activity
• Prepare a Complete Case Study of KBS in MIS Implemented Organization
where AIS and Inventory Management System is Implemented
Office Information System
The system of Basic Office Requirement that is
Spread Sheet, Drafting and Editing. Presentations, Database and Mail / Contacts Management
These software or Applications support the Office Day basis activities
• Which software or application, you can use for Presentations
• Word Use for Drafting and Editing
• In which software we use Graphs for the Tables
• How do we manage daily routine work in Calendar
• Is there any software to make quick notes
• Where should we save the record of Customer or Clients or Contact person which emails
• As an accountant we can use any software for Calculations
• What is Pdf and why do we use it
• Front Page use for Make simple website (asp and html) based
• do you know simple office software. Make the list of software you know and their purpose in
Office (Basic Desktop Applications)
Executive Information System
The System that is useful or understandable to Seniors or Executives or those persons who will use
in decision-making
An executive information system (EIS) is a type of management information system that
facilitates and supports senior executive information and decision-making needs. It provides easy
access to internal and external information relevant to organizational goals. It is commonly
considered a specialized form of decision support system (DSS)
EIS emphasizes graphical displays and easy-to-use user interfaces. They offer strong reporting and
drill-down capabilities. In general, EIS are enterprise-wide DSS that help top-level executives
analyze, compare, and highlight trends in important variables so that they can monitor
performance and identify opportunities and problems. EIS and data warehousing technologies are
converging in the marketplace.
Executives information system is for executives
EIS depends on System
EIS depends on Modules
EIS is Costly system
EIS is for Skilled and Educated Professionals
EIS is easy to implement
Prepare an activity, that shows the Successful Implementation of EIS in
an organization's
Prepare a Case study regarding EIS Modules and its functionally
When director Asks to get Report of Suppliers and Customers in Summarized and
Detailed form, if there is MIS system implemented than how do he produce result
or if there is no MIS System than how do he ll produce report
Expert System
The system or software applications, having easy and valuable modules
In artificial intelligence, an expert system is a computer system that emulates the
decision-making ability of a human expert, Expert systems are designed to solve
complex problems by reasoning about knowledge, like an expert, and not by following
the procedure of a developer as is the case in conventional programming.
When manager ask to prepare reports of all suppliers along with their supplies to our
organization than MIS Expert should has to prepare such a system that will produce the
information easily
• MS Office is combination of Application that is good example of Executives
Information System
• Accounting Software that prepare financial statement and analysis reports, known
as expert system
Q: What is Implementation in MIS System /Brief
Q: How do you Implement AIS System in Trading Organization / Draft
Q: Get results continually from installed modules is Implementation System /Y
Q: Plan and Putting into Action, this action is known as Implementation /Y
Maintenance
The process of maintaining or preserving someone or something, or the state of being maintained:
"the maintenance of democratic government".
The process of keeping something in good condition: "car maintenance"; "essential maintenance
work".
All actions which have the objective of retaining or restoring an item in or to a state in which it can
perform its required function. The actions include the combination of all technical and
corresponding administrative, managerial, and supervision actions
Case: (Design and Implementation)
As MIS Consultant you are going to a company. You have to check the departments. To implement
Accounting Information system you come to know there are four rooms.
Now if you have to install Server/Client Networks System for Accounting Information System and
Modules you have to design it to implement MIS Successfully
Implementation of Accounting Information System
Client /Server
Environment
ROOMS Operating Systems System Available for
AIS (Accounts Dept)
Server Manager Room R2 Windows Server 2003 C to Duo-1000MB/500GB
Workstation 001 Director Room R1 Windows XP P4 Laptop 1000/100 GB
Workstation 002 Senior Assistant R3 Windows XP P4 PC 500/80 GB
Workstation 003 Junior Assistant -1 R4 Windows XP P4 PC 256/40 GB
Workstation 004 Junior Assistant -2 R4 Windows XP P4 PC 256/40 GB
Now the design draft or report is supplied to Business Director or MR Person (Management
Responsible Person). If the context of system is suitable and sufficient in the organizational project
than the proposal will be putting into action by the responsible team within specific time.
F Transformation Engineering Management
• Transformation
• Engineering Systems
Change the state of current data into information, the process
is known as transformation
Some time you visit any organization, you find different software in different
organizations or departments.
It is due to customization or instructions provided to Engineers (software) to
prepare system according to their requirement
Case study
As an MIS Professional. You visit an organization and find that all of their management
work is done by management system or you can say Manual system is implemented
now it is yours task to transform Manual system into computerized MIS based System.
• If you are accounting professional than you install Accounting software there and
implement accounting standard as per IT requirements
• if you are business graduate and you have Inventory system expertise that you
will implement the system there
• if you are HR expert than you will prefer to implement HR information system
first.
Departments and Organizations
Any organization has some departments according to its business nature
and system requirement.
Here we are listing some MIS Implemented Departments as per your career scope
and organizational activities.
01 Accounting System
02 Actuaries System
03 Admin and Task Management
04 Admin Management System
05 Advertising Management
06 Aeronautical Science
07 Agriculture Sciences
08 Air and Marine Information System
09 Animal Sciences
10 Appointment System
11 Army and Force Management
12 Auditing System
13 Banking System
14 Bio Medical Sciences
15
Management Information System Complete Guide and Notes by muhammad Khurram baig RIBAMS
Management Information System Complete Guide and Notes by muhammad Khurram baig RIBAMS
Management Information System Complete Guide and Notes by muhammad Khurram baig RIBAMS

Management Information System Complete Guide and Notes by muhammad Khurram baig RIBAMS

  • 1.
    Management Information System CourseGuide and Certification Program of RIBAMS. By Muhammad Khurram Baig (MIS) Government and Semi Government approved MIS and HR Training Provider MIS Consultant of OraluxTM Technology Management House Member of CIC and IPMA UK
  • 2.
    A Management InformationSystem Organization and Management System • People • Data • Procedures • Manager • System • Decision Making • Boundary B Information Technology • Hardware • Software • Networks • Communications • Database • Programming Management • Planning • Organization • Directing • Controlling • Coordinating • Staffing • Motivating C ERP Technologies ERP (Enterprises Resource Planning) Software or Specialized Modules in Any organization as per requirement of Management and fulfill principals of MIS • Software • Hardware • People
  • 3.
    D Essentials (Functions)of MIS • Accounting Information System * • Transaction Processing System • Management Reporting System • Decision Support System • Knowledge Based System • Office Information System • Executive Information System • Expert System • Automation System E MIS Implementation • Analysis • Design • Implementation • Maintenance F Transformation Engineering Management • Transformation • Engineering Systems Case Studies and Examples. For more information please contact Muhammad Khurram Baig (MIS) 03138854562 03154139016 drkoi99@gmail.com ribams99@gmail.com Federal Government Approved Certification and Practical Training Program
  • 4.
    Departments and Organizations Anyorganization has some departments according to its business nature and system requirement. Here we are listing some MIS Implemented Departments as per your career scope and organizational activities. 01 Accounting System 02 Actuaries System 03 Admin and Task Management 04 Admin Management System 05 Advertising Management 06 Aeronautical Science 07 Agriculture Sciences 08 Air and Marine Information System 09 Animal Sciences 10 Appointment System 11 Army and Force Management 12 Auditing System 13 Banking System 14 Bio Medical Sciences 15 Buildings and Lands 16 Business Intelligence System 17 Centralized Management System 18 Communication System 19 Cost Management System 20 Cultures and Civilizations 21 Customer Services 22 Education System 23 Finance System 24 Food Technology 25 Forest and Parks 26 Geographical Information System 27 Health and Sports Management 28 Hospital System 29 Hospitality System 30 Hostel Management System 31 Hotel System 32 Human Resource Management System 33 Insurance System 34 Inventory Management 35 Investments System 36 Library Information System 37 Logistics System 38 Marketing Management 39 Multimedia and Broadcasting 40 Nursing System 41 Operations Management 42 Performance Management
  • 5.
    43 Processing Management 44Production System 45 Project Management 46 Publish Relations 47 Quality Management 48 Real Estates 49 Religious System 50 Resource Management 51 Sales Management 52 Schools System 53 Space Science 54 Sports and Physical Education 55 Supply Chain Management 56 Taxation System 57 Tourism Management System 58 Tracking System 59 Trade System 60 Transaction System 61 Transformation System 62 Transitions Technology 63 Travel Management System 64 University Systems 65 Visa Information System 66 Plan and Control Management 67 Area and Interfaces 68 Strategic Management and Configuration (apr) 69 Material Management 70 Assets Management and Organizational Activities and Management Systems. Select any department or Organization according to your career scope and prepare case study or assignment Consider you have installed ERP Systems or Application Modules as per organizational requirement than you have to prepare assignment
  • 6.
    Reading Course Work CourseGuide and Certification Program of RIBAMS. Research Institute of Business Application and Management Sciences By Muhammad Khurram Baig (MIS)
  • 7.
    Case Study: PreparePresentation as Manager (List of Items/Suppliers/Customers) Case Study: Prepare Reports and Statements as Supervisor Case Study: Unskilled and Non Professional Manager has to face troubles on Daily Basis, How and Why. Also who can change Manager or Management Case Study: Why our Boss always angry with Management. Install MIS Based System to make him Happy and Satisfied Case Study: How do you satisfy your Boss, if you have MIS System Implemented. Case Study: What is Right Management in MIS Based Organization
  • 9.
    People (Human Resourceor Skilled Personals) Team or Group of HR or People who are skilled and educated as per requirement of the organizations (System) and perform same or different duties for the same objectives in their mind that is goal to (Serve or Get Profit) Accountants can understand the Reports provided by MIS or MIT or Manager while Doctors cant understand it easily in the Organization Prepare a Story of Organization, deals in Trading. The Staff information is here and prepare their Standard Jobs and Qualification Executive (Mr Deer) Manager (Mr Ahrim) Supervisor (Mr Domin) Assistant (Ms Sarah) Customer Services (Ms Shilla) Another Most Important Job is Administrator (Ms Shabana)
  • 10.
    Data (Simple Transactions) •Raw Facts and Figures to make information after compilation or processing. • are values of qualitative or quantitative variables, belonging to a set of items. To prepare report, DO or Assistant has to enter data into software or ERP Application System. Procedures • Instructions or recipes, a set of commands that show how to prepare or make something • something to proceed input into output • In computer science, procedure, also known as function, routine, or subprogram Programing designed or configure by Programmer who developed ERP or Software. The Programming is set of commands who convert data into information (report) Manager • the person who get work done with others by using management functions Responsible person who gets reports and manages all procedure of AIS. Information • Information, in its most restricted technical sense, is a sequence of symbols that can be interpreted as a message. Information can be recorded as signs, or transmitted as signals. Information is any kind of event that affects the state of a dynamic system that can interpret the information. • The understandable data or symbols or figures is known as information (message) Report Lists or Reports of Suppliers are known as Information. That is message what Executive of the Organization demands from People who are using MIS System.
  • 11.
    System • A groupof interdependent items that interact regularly to perform a task. • An established or organized procedure; a method. • A computer system refers to the hardware and software components that run a computer or computers. • An information system is a system that collects and stores data. People use procedures to prepare reports (message/information) for Executives from Input (Data) by using software, hardware and networks. Decision Making can be regarded as the cognitive process resulting in the selection of a course of action among several alternative scenarios. Every decision making process produces a final choice. The output can be an action or an opinion of choice. Human performance in decision terms has been the subject of active research from several perspectives. From a psychological perspective, it is necessary to examine individual decisions in the context of a set of needs, preferences an individual has and values they seek. From a cognitive perspective, the decision making process must be regarded as a continuous process integrated in the interaction with the environment. From a normative perspective, the analysis of individual decisions is concerned with the logic of decision making and rationality and the invariant choice it leads to. Boundary Every Organization has some closed limits/Points. where people use resources in a limit as per rules and regulations or terms set by the organization.
  • 12.
    Management Management in allbusiness and organizational activities is the act of coordinating the efforts of people to accomplish desired goals and objectives using available resources efficiently and effectively. Functions of Management • Planning • Directing • Organizing • Controlling • Coordinating • Staffing • Motivating Planning • Planning is the process of thinking about and organizing the activities required to achieve a desired goal. or • A set of activities to achieve organizational goals As MIS consultant if you are going to implement AIS or FIS system, first you have to plan • The business system and procedures adopted by Business • Number of Staff in specific departments • Knowledge and Expertise of the Staff • Plan, how to face barriers in implementing system • company interest on investments • company interest on adopting new system • basic or trend needs (Desktop or Server or Cloud System) • Who 'll manage and maintain the system • training, learning and acknowledgments of personals if you plan in right way and prepare your work as per company's requirement than you ll be able to implement system successfully Directing
  • 13.
    • To managesomething in a right way or in straight line • Directing is telling people how to get something done. It is how something should be done. Directing can be done by telling someone something verbally, written or by actions. Organizing • Organizing is the act of rearranging elements following one or more rules. • Anything is commonly considered organized when it looks like everything has a correct order or placement. Controlling • The act or use power to direct and organize • Controlling refers to the state of maintain authority or influence over something or someone. It may also refer to the act of determining the behavior or supervising the running of something. Coordinating • Bring the different elements of (a complex activity or organization) into a relationship that will ensure efficiency or harmony. • Negotiate with others in order to work together effectively. In the sens how we are communicating with each other Staffing Staffing is the act of employing people in an organization. People with right qualifications for various posts are usually hired by employers in the job market. Motivating Motivation is a psychological feature that arouses an organism to act towards a desired goal and elicits, controls, and sustains certain goal-directed behaviors. Definition of motivation: Internal and external factors that stimulate desire and energy in people to be continually interested and committed to a job, For Example you want to implement successful MIS System in your organization. Is this possible with unskilled Professionals. Simply No. for this you have to hire Educated and Skilled Professionals to work with Your Organization and Implement Right MIS Systems. To get results you have to Proper Motivate and Train them and Acknowledge their activities.
  • 15.
    When evaluating anorganization's workforce, there are several areas that must be addressed. First, the staff must have the tools and resources that they need to do their jobs effectively. Employees cannot be blamed for an organization's inefficiency if they are not provided with the equipment necessary to perform adequately. Next, get to know each employee as an individual and make sure that they are aware of their specific role within the organization. Clarify their responsibilities and goals. Also, involve each employee in making decisions which affect their area of expertise. This will result in the employee feeling that they "have a say" in what goes on in the organization and he or she will feel a sense of ownership. Finally, make sure that employees have an opportunity to have fun with their coworkers at appropriate times. People Empowerment can be a very effective tool within the field of people management. This technique can be used to involve employees in any improvement program within an organization. Authority, accountability, and responsibility are delegated to the employees for improving the processes which are under their control without first having to obtain permission from management before making changes. This can be successful only when employees are recognized, congratulated, and rewarded for their commitment to problem solving.
  • 16.
    B Information Technology •Hardware • Software • Networks / Communications • Database • Firmware Computer hardware is the collection of physical elements that constitute a computer system. Computer hardware refers to the physical parts or components of a computer such as monitor, keyboard, Computer data storage, hard drive disk, mouse, CPU (graphic cards, sound cards, memory, motherboard and chips), etc. all of which are physical objects that you can actually touch. In contrast, software is untouchable. Software exists as ideas, application, concepts, and symbols, but it has no substance. A combination of hardware and software forms a usable computing system. Input Devices Keyboard · Image scanner · Microphone · Pointing device (Graphics tablet · Joystick · Light pen · Mouse · Pointing stick · Touchpad · Touchscreen · Trackball) · Webcam (Softcam) Output devices Monitor · Printer · Speakers · Plotter Removable data storage Optical disc drive (CD-RW · DVD+RW) · Disk pack · Floppy disk · Memory card · USB flash drive Computer case Central processing unit (CPU) · Hard disk / Solid-state drive · Motherboard · Network interface controller · Power supply · Random-access memory (RAM) · Sound card · Video card Data ports Ethernet · FireWire (IEEE 1394) · Parallel port · Serial port · USB A database is an organized collection of data. The data are typically organized to model relevant aspects of reality (for example, the availability of rooms in hotels), in a way that supports processes requiring this information (for example, finding a hotel with vacancies). A computer network or data network is a telecommunications network that allows computers to exchange data. The physical connection between networked computing devices is established using either cable media or wireless media. The best-known computer network is the Internet. Network devices that originate, route and terminate the data are called network nodes.[1] Nodes can include hosts such as servers and personal computers, as well as networking hardware. Two devices are said to be networked when a process in one device is able to exchange information with a process in another device.
  • 17.
    Computer networks supportapplications such as access to the World Wide Web, shared use of application and storage servers, printers, and fax machines, and use of email and instant messaging applications. The remainder of this article discusses local area network technologies and classifies them according to the following characteristics: the physical media used to transmit signals, the communications protocols used to organize network traffic, along with the network's size, its topology and its organizational intent. Database management systems (DBMSs) are specially designed applications that interact with the user, other applications, and the database itself to capture and analyze data. A general-purpose database management system (DBMS) is a software system designed to allow the definition, creation, querying, update, and administration of databases. Well- known DBMSs include MySQL, PostgreSQL, SQLite, Microsoft SQL Server, Microsoft Access, Oracle, SAP, dBASE, FoxPro, IBM DB2, LibreOffice Base and FileMaker Pro. A database is not generally portable across different DBMS, but different DBMSs can inter-operate by using standards such as SQL and ODBC or JDBC to allow a single application to work with more than one database. Firmware In electronic systems and computing, firmware is the combination of persistent memory and program code and data stored in it.[1] Typical examples of devices containing firmware are embedded systems (such as traffic lights, consumer appliances, and digital watches), computers, computer peripherals, mobile phones, and digital cameras. Programming Language A programming language is a formal language designed to communicate instructions to a machine, particularly a computer. Programming languages can be used to create programs that control the behavior of a machine and/or to express algorithms precisely. The description of a programming language is usually split into the two components of syntax (form) and semantics (meaning). Some languages are defined by a specification document (for example, the C programming language is specified by an ISO Standard), while other languages, such as Perl 5 and earlier, have a dominant implementation that is used as a reference.
  • 18.
    C ERP Technologies ERP(Enterprises Resource Planning) Software or Specialized Modules in Any organization as per requirement of Management and fulfill principals of MIS Software Applications Operating System Firmware Integrated System Technologies & Charts Server / Client Technologies (To access and share information and data in a single room or in a building I.e LAN, WAN,MAN) Cloud Servers Technologies (To access and share information and data from anywhere / anytime by using Internet Technologies) e Server System (to access and share information and data from anywhere / anytime by multiple users through Internet and Intranet Technologies) Desktops System (to access data on own / single computer by the Users I.e Laptop/ Tablet/PC) Assessments Cloud E Server Server/Client Desktop Direct Work from Online Servers Do work on Desktop and Connect Online Server Do work on different PCs / Workstations and Share through Server Personal Computer or Laptops Systems Ranking Very High (US/CND/AU/UK) High(US/CN/AU/UK/E U/UAE) Medium (Everywhere) Low (Everywhere) Cost as per Standards 1 Million for 1/ 5 Users 500,000 = 1 / 5 Users 100,000 = 4 Users 15,000 Organizations Multinationals / Large Groups for Efficient Systems Multinationals or Large Groups Medium Small / Personal MIS (Accounts) E-Account Pro U.S Accounting Manager Professional Accounting Peach tree / Quick Book Users (AIS) MIS ERP Consultant – Post Graduate or Prof + 8 Yrs Exp. MIS Prof – Manager / Supervisors of Technologies MIS Trainee – ACCA / CA / BBA / MBA / BCOM. & IT Background MIS Student / Trainee Graduate with Accounts & IT Background
  • 19.
    Hardware: System Specifications •RAM (Random Access Memory) • ROM (Read Only Memory) • Mother Board (CPU) • CD/DVD Read and Writer • Intel or other Chips • Hard Disks • VGA or Video Graphic Accelerators Cards • 3D Cards • USB Ports or Cards • Sound Cards • Networks Cards • Wireless Chip or Cards • Blue tooth • Infrared • Cables • Networking Cables • Networking JACKS • Networking Hubs • Networking Switches • Networking Routers • LCD • LED • Monitor • External Hard Drive • Sky Drives • Server Drives • Workstation • Terminals
  • 20.
    People IT Professional ◦ MITManager ◦ MIT Assistant ◦ Programmers ◦ Configuration Professionals ◦ Database Experts ◦ Hardware Engineers ◦ Software Engineers ◦ Networking Engineers ◦ Database Engineers ◦ System Engineering ◦ System Consultants ◦ System Designers ◦ Multimedia Developers ◦ Media Professionals ◦ Graphic Designers MIS Experts • MIS Professionals • MIS Consultants • ERP Consultants • ERP Experts • System Analyst • Accounting Information System Professionals • Financial ISP • Inventory ISP • Production ISP • Operations ISP • ----- SPs (Departments) • Project Manager
  • 21.
    D Essentials (Functions)of MIS • Accounting Information System * Prepare accounting reports after summarizing and analysis through expert software as per firms' requirements. Prepare case study of AIS and its effective use in an MIS Based Organization There are some sub modules of MIS information system, now prepare activity of these information system. Financial Information System Audit Information System Tax Information System Production Information System Operations Information System Banking Information System Insurance Information System Project Management Information System Quality Management System Visa Information System Hotel Information System Hospital Information System Inventory Management Information System Stocks Information System Bio Medical Information System Geographical Information System Wastage Management and Information System Travel and Tours Management and Information System Human Resource Management System Education Management System Corporate Training and Learning System Trade Management Information System
  • 22.
    Transaction Processing System theset of instructions or programs to compile data into information by using software or application modules. A transaction processing system (TPS) or transaction server is a software system, or software/hardware combination, that supports transaction processing. Management Reporting System To get reports from MIS implemented System (Program or Software or Application Modules). The reports should be from data already input. It should be reliable as understandable to CEO or Directors or Manager (Or Relevancy Message) For Example When Manager ask Supervisor please stop current data entry and compile all data from networks to get reports. All data from Masters or Dependents Tables will shift in One Manageable Table from where executives or managers have to get Reports. It depends on • Time (Real Time). All took at once or step by step for specific time • Batch Processing (The Commands set by Programmers) Q: is TPS is possible in Software Q: What is TPS actually Q: The Program already written by Programmers is known as Q: TPS is perform by a series of instructions in Real Time Perform an activity regarding TPS in an Organization The activity must show, that without TPS it is hard to operate software. Manager ask Junior Assistant to stop data entry, why. TPS is essential Function of MIS, How do you explain. One Day Mr X CEO calls Mr Y Manager. He demands give me reports of Product 001 and Product 002 as • Summarized • in Details Now Mr Y, who has only one subordinate calls and draft the narration as per CEO Demands. Subordinate rush towards his cabin and check the data for reports. In this case he don’t need to ask somebody to stop work or held all activities or stop data entry. He simply run the TPS button as prepared by the Software Consultant or MIS Professionals and Print different reports. Afterward he set in the files (appropriate files) and give to Mr Y, Manager. • Do you think so, Manager Mr Y should print and prepare reports by himself
  • 23.
    • Why hedemands these reports from Supervisor. Should he has not MIS or IT based Certified or Appropriate qualified One day Mr Y, Manager was on leave and Mr J the Assistant was available, Mr X The CEO visited the Cabin and Ask about Mr Y, Mr J said he was on leave for two days and HR know about the situation and his absence. Mr X was in trouble and ask please give me report of suppliers and relevant items purchased from them so that I could able to give them Order for the new session. • Mr J should give reports • Mr J should be prepare for this • Mr J should ask anything, if complex for him • Mr J should call Mr Y • Mr J should not reply if Mr J Print the reports to Mr X than it will be more effective for him and it raise points towards the Management Level if Mr J remains untouched and ask sir I don’t know how to print, than it ll be negative effect to him directly if Mr J tells that he is not allowed than it effects the Manager's credibility Similarly One Day Mr J on Leave due to illness and Mr X demands some critical detailed reports of customer, Mr Y was thinking how to produce reports. He should know that all data was in table by Mr J and He only use TPS system to make reports. Recommendation • MR J should be able to satisfy Mr X the CEO and if possible provide them maximum information so that there should not be negative effect on Mr Y and His team • Mr J if more qualified than Mr Y, Manager than there may be only Gap of Experience to takeover the position of Mr Y, • if Mr Y is totally depends on Mr J and don’t start learning or update his knowledge then ultimately his career be in danger. MIS Wizard Trick Mr Y should have command over TPS and Mr J should perform DO and manage filling.
  • 24.
    Decision Support System Thesystem assist in decision making A decision support system (DSS) is a computer-based information system that supports business or organizational decision-making activities. DSSs serve the management, operations, and planning levels of an organization and help to make decisions, which may be rapidly changing and not easily specified in advance. Decision support systems can be either fully computerized, human or a combination of both. • How do you implement DSS • Prepare a relevant Case study • Prepare an Activity Sheet of the DSS Function • is Decision-making system use in Accounting Information System Knowledge Based System System to implement with complete or Standard Requirement to get results A Knowledge-based system is a computer program that reasons and uses knowledge to solve complex problems. Knowledge is acquired and represented using various knowledge representation techniques rules, frames and scripts. The basic advantages offered by such system are documentation of knowledge, intelligent decision support, self learning, reasoning and explanation. Knowledge-based systems[are systems based on the methods and techniques of Artificial Intelligence. Their core components are: • knowledge base • acquisition mechanisms • inference mechanisms Knowledge Base Systems (KBS) goes beyond the decision support philosophy to indicate the expert system technology into the decision making framework. Expert Systems (ES) have been the tools and techniques perfected by artificial intelligence (AI) researchers to deduce decision influences based on codification of knowledge. The codification of knowledge use the principles of knowledge representation (part of the large theoretical ideas of knowledge engineering). Typically such codification uses rules like IF-THEN rules to represent logical implications. While for some authors[who?] expert systems, case-based reasoning systems and neural networks are all particular types of knowledge-based systems, there are others who consider that neural networks are different, and exclude it from this category.[citation needed] KBS is a frequently used abbreviation for knowledge-based system. • What is KBS • How do you familiar an MIS system as KBS • Show KBS in your Activity • Prepare a Complete Case Study of KBS in MIS Implemented Organization where AIS and Inventory Management System is Implemented
  • 25.
    Office Information System Thesystem of Basic Office Requirement that is Spread Sheet, Drafting and Editing. Presentations, Database and Mail / Contacts Management These software or Applications support the Office Day basis activities • Which software or application, you can use for Presentations • Word Use for Drafting and Editing • In which software we use Graphs for the Tables • How do we manage daily routine work in Calendar • Is there any software to make quick notes • Where should we save the record of Customer or Clients or Contact person which emails • As an accountant we can use any software for Calculations • What is Pdf and why do we use it • Front Page use for Make simple website (asp and html) based • do you know simple office software. Make the list of software you know and their purpose in Office (Basic Desktop Applications)
  • 26.
    Executive Information System TheSystem that is useful or understandable to Seniors or Executives or those persons who will use in decision-making An executive information system (EIS) is a type of management information system that facilitates and supports senior executive information and decision-making needs. It provides easy access to internal and external information relevant to organizational goals. It is commonly considered a specialized form of decision support system (DSS) EIS emphasizes graphical displays and easy-to-use user interfaces. They offer strong reporting and drill-down capabilities. In general, EIS are enterprise-wide DSS that help top-level executives analyze, compare, and highlight trends in important variables so that they can monitor performance and identify opportunities and problems. EIS and data warehousing technologies are converging in the marketplace. Executives information system is for executives EIS depends on System EIS depends on Modules EIS is Costly system EIS is for Skilled and Educated Professionals EIS is easy to implement Prepare an activity, that shows the Successful Implementation of EIS in an organization's Prepare a Case study regarding EIS Modules and its functionally When director Asks to get Report of Suppliers and Customers in Summarized and Detailed form, if there is MIS system implemented than how do he produce result or if there is no MIS System than how do he ll produce report Expert System The system or software applications, having easy and valuable modules In artificial intelligence, an expert system is a computer system that emulates the decision-making ability of a human expert, Expert systems are designed to solve complex problems by reasoning about knowledge, like an expert, and not by following the procedure of a developer as is the case in conventional programming. When manager ask to prepare reports of all suppliers along with their supplies to our organization than MIS Expert should has to prepare such a system that will produce the information easily • MS Office is combination of Application that is good example of Executives Information System • Accounting Software that prepare financial statement and analysis reports, known as expert system
  • 29.
    Q: What isImplementation in MIS System /Brief Q: How do you Implement AIS System in Trading Organization / Draft Q: Get results continually from installed modules is Implementation System /Y Q: Plan and Putting into Action, this action is known as Implementation /Y Maintenance The process of maintaining or preserving someone or something, or the state of being maintained: "the maintenance of democratic government". The process of keeping something in good condition: "car maintenance"; "essential maintenance work". All actions which have the objective of retaining or restoring an item in or to a state in which it can perform its required function. The actions include the combination of all technical and corresponding administrative, managerial, and supervision actions Case: (Design and Implementation) As MIS Consultant you are going to a company. You have to check the departments. To implement Accounting Information system you come to know there are four rooms. Now if you have to install Server/Client Networks System for Accounting Information System and Modules you have to design it to implement MIS Successfully Implementation of Accounting Information System Client /Server Environment ROOMS Operating Systems System Available for AIS (Accounts Dept) Server Manager Room R2 Windows Server 2003 C to Duo-1000MB/500GB Workstation 001 Director Room R1 Windows XP P4 Laptop 1000/100 GB Workstation 002 Senior Assistant R3 Windows XP P4 PC 500/80 GB Workstation 003 Junior Assistant -1 R4 Windows XP P4 PC 256/40 GB Workstation 004 Junior Assistant -2 R4 Windows XP P4 PC 256/40 GB Now the design draft or report is supplied to Business Director or MR Person (Management Responsible Person). If the context of system is suitable and sufficient in the organizational project than the proposal will be putting into action by the responsible team within specific time. F Transformation Engineering Management • Transformation • Engineering Systems Change the state of current data into information, the process is known as transformation Some time you visit any organization, you find different software in different organizations or departments. It is due to customization or instructions provided to Engineers (software) to
  • 30.
    prepare system accordingto their requirement Case study As an MIS Professional. You visit an organization and find that all of their management work is done by management system or you can say Manual system is implemented now it is yours task to transform Manual system into computerized MIS based System. • If you are accounting professional than you install Accounting software there and implement accounting standard as per IT requirements • if you are business graduate and you have Inventory system expertise that you will implement the system there • if you are HR expert than you will prefer to implement HR information system first.
  • 31.
    Departments and Organizations Anyorganization has some departments according to its business nature and system requirement. Here we are listing some MIS Implemented Departments as per your career scope and organizational activities. 01 Accounting System 02 Actuaries System 03 Admin and Task Management 04 Admin Management System 05 Advertising Management 06 Aeronautical Science 07 Agriculture Sciences 08 Air and Marine Information System 09 Animal Sciences 10 Appointment System 11 Army and Force Management 12 Auditing System 13 Banking System 14 Bio Medical Sciences 15