SlideShare a Scribd company logo
February / March Flood event
across Moira Shire
Rainfall figures



Town                    May 14th –              October 2nd              February 27th Comments
                        15th 1974               – 4th 1993               – March 4th
                                                                         2012
Yarrawonga              115 mm                  25 mm                    277 mm                  Major contributor to
                                                                                                 Muckatah depression
                                                                                                 flow

Tungamah                76 mm                   78 mm                    292 mm                  Contributor to Broken
                                                                                                 and Boosey Creeks.

Numurkah                72 mm                   57 mm                    191 mm                  Recorded across
                                                                                                 various locations

Nathalia                71 mm                   65 mm                    151 mm
Benalla*                95 mm                   202 mm                   215 mm                  * Rainfall recorded in
                                                                                                 the week prior to
                                                                                                 other towns.

The cumulative effect of rainfall events along the Eastern border of Moira Shire and beyond resulted in the Sandy
creek, Boosey creek, Broken creek and Muckatah depression carrying the equivalent of the water volume of Sydney
Harbour. Compounding this was the above average rainfall which fell across the entire municipality during that time.
That’s a lot of rain!
An emergency that spanned 18 days
The Emergency Response




• Municipal Emergency Management Plan activated.


• An Incident Control Centre (ICC) established at Shepparton


• Municipal Emergency Control Centre (MECC) – Cobram


• Coordination across 17 affected localities.
The challenges of an emergency




• Planning
• Advanced warning and mobilisation
• Volume of water
• Variability of water movement
   •   Planned development eg residential and farm planning
   •   Informal / illegal development
• Coordination of services and the community in an emergency
• Resourcing
• Chinese whispers
Our people and friends
The impact across the municipality




• An emergency event that was endured for 18 days, a recovery that
  will be measured in years.
• Approx 230 homes inundated.
• Over 700 properties isolated.
• Over 1800 properties indirectly affected
   across 17 of Moira’s 23 communities.
• Between 3,500 and 4,000 residents
   directly impacted.
• Approx 500,000 sandbags were used.
• An infrastructure damage bill expected to exceed $30M.
Cobram MECC, March 8
Cobram MECC, March 8




By Scott Davey
Cobram MECC, March 8 6:43 a.m.
Cobram MECC, March 8
Virtual Agencies




                   MECC Central   Virtual MECC
                                  Central Agencies
Requests
Requests
Incident Report
• 460 pages
• All requests,
  information,
  offers.
• A complete
  record of the
  event.
The Recovery
• The impact of flooding
Impact Tracking
Impact Tracking
Assessment & Service Tracking
Recovery is still ongoing
Infrastructure restoration
Moira Shires approach




• Damages expected to exceed $30M
• Dedicated Flood Recovery team to coordinate restoration
• In excess of 1500 “jobs” where restoration to community
  infrastructure eg. Roads, drains, bridges, sporting surfaces,
  buildings, parks and gardens, walking tracks etc have been
  damaged by flooding
• Programmed inspections aim to identify all damage
• Approval from VicRoads
• Programming of restoration works
• Approved value of works to this time - $10.5M and counting
• Timeframe. 30 June 2014
From MECC Book to MECC Central




1. Provide a Common Operating Picture – Enter existing
   records & “catch up” to real-time, then use MECC Central for
   COP.
2. Training - Train Registry Officers, then promote champions.
3. Go Hybrid - Run a hybrid book/electronic system to avoid
   getting in the way of busy EM officers.
4. Build skills - Progressively train key users in core
   functionality, and set up shift handover training.
5. Go Electronic - When ready, hide the MECC Books.
6. Tune - Watch and course-correct to prevent learning bad
   habits.
Virtual Agencies




• SES & VicRoads not in the MECC.
• Communication to those agencies
  was via the ICC Liaison Officer.
• Being Agile - To assist in
  workflow, create an agency to
  track requests into the ICC.
• SES & VicRoads become “sub-
  agencies” of the ICC Liaison
  agency.
Outcomes




• Moira was bootstrapped from MECC Book to MECC Central
  in 24 hours
• Almost 300 requests recorded in response phase
• Over 1200 impact cases recorded and managed
• Improved situational awareness & peripheral vision in MECC
• Clearer messages, nothing lost or forgotten
• Comprehensive reporting
1. Keep it simple




Don’t overcomplicate things – the core of the system is
request tracking, and it requires very little training.
2. MECC Central Champion




Appoint one or more MECC Central Champions and train them
fully.


• Responsible for setting up MECC Central.
• Must be non-operational in the emergency, to be free to float
  around the room and support users.
3. Develop a Quickstart Guide
4. Keep Current




Small scale, short duration table-top simulations deliver better
training outcomes.

• Can be as short as 30 minutes every two months.
• Try it today – spend 5 minutes with us at our MECC Central
  Lab to see how we do it.


Datalink have online training, on-site workshops and consulting
services to help you to get prepared and stay current.
What to expect in 2012-2013




• Over 100 feature improvements under development.
• Mapping improvements – Vicmap, Icons, Layers, Polygons.
• Track Relief Centres
• Track and manage recovery of the four pillars
• Vulnerable Persons Register
• Integration
...and…
• Mobile Reporting – Impacts and Hazards.
• Community Apps – Resident Communication & Self-Service
Mobile Reporting – Impacts & Hazards
MECC Central =
Questions

More Related Content

Viewers also liked

Duplicidade sunaccont ics sun
Duplicidade  sunaccont ics sun Duplicidade  sunaccont ics sun
Duplicidade sunaccont ics sun
Thelma Mariano
 
Tom Lilja
Tom LiljaTom Lilja
Tom Lilja
thestateof
 
Keynote Presentation : Senator John Hoeven - North Dakota's Energy Resources
Keynote Presentation : Senator John Hoeven - North Dakota's Energy ResourcesKeynote Presentation : Senator John Hoeven - North Dakota's Energy Resources
Keynote Presentation : Senator John Hoeven - North Dakota's Energy Resources
thestateof
 
Chuck MacFarlane
Chuck MacFarlaneChuck MacFarlane
Chuck MacFarlane
thestateof
 
Lynn Helms
Lynn HelmsLynn Helms
Lynn Helms
thestateof
 
Sandi Tabor
Sandi TaborSandi Tabor
Sandi Tabor
thestateof
 
James Brown
James BrownJames Brown
James Brown
thestateof
 
Year 2070
Year 2070Year 2070
Year 2070
moreatwork
 
Prospective of islamic banking in germany (1)
Prospective of islamic banking in germany (1)Prospective of islamic banking in germany (1)
Prospective of islamic banking in germany (1)
Bilal Iqbal
 
Planificacion fisica 1er parcial 2016. ing. ariel marcillo
Planificacion fisica 1er parcial 2016.  ing. ariel marcilloPlanificacion fisica 1er parcial 2016.  ing. ariel marcillo
Planificacion fisica 1er parcial 2016. ing. ariel marcillo
Ariel Marcillo
 
Planificaciones matemáticas 2016 1er período. ing ariel marcillo
Planificaciones matemáticas 2016 1er período. ing ariel marcilloPlanificaciones matemáticas 2016 1er período. ing ariel marcillo
Planificaciones matemáticas 2016 1er período. ing ariel marcillo
Ariel Marcillo
 

Viewers also liked (11)

Duplicidade sunaccont ics sun
Duplicidade  sunaccont ics sun Duplicidade  sunaccont ics sun
Duplicidade sunaccont ics sun
 
Tom Lilja
Tom LiljaTom Lilja
Tom Lilja
 
Keynote Presentation : Senator John Hoeven - North Dakota's Energy Resources
Keynote Presentation : Senator John Hoeven - North Dakota's Energy ResourcesKeynote Presentation : Senator John Hoeven - North Dakota's Energy Resources
Keynote Presentation : Senator John Hoeven - North Dakota's Energy Resources
 
Chuck MacFarlane
Chuck MacFarlaneChuck MacFarlane
Chuck MacFarlane
 
Lynn Helms
Lynn HelmsLynn Helms
Lynn Helms
 
Sandi Tabor
Sandi TaborSandi Tabor
Sandi Tabor
 
James Brown
James BrownJames Brown
James Brown
 
Year 2070
Year 2070Year 2070
Year 2070
 
Prospective of islamic banking in germany (1)
Prospective of islamic banking in germany (1)Prospective of islamic banking in germany (1)
Prospective of islamic banking in germany (1)
 
Planificacion fisica 1er parcial 2016. ing. ariel marcillo
Planificacion fisica 1er parcial 2016.  ing. ariel marcilloPlanificacion fisica 1er parcial 2016.  ing. ariel marcillo
Planificacion fisica 1er parcial 2016. ing. ariel marcillo
 
Planificaciones matemáticas 2016 1er período. ing ariel marcillo
Planificaciones matemáticas 2016 1er período. ing ariel marcilloPlanificaciones matemáticas 2016 1er período. ing ariel marcillo
Planificaciones matemáticas 2016 1er período. ing ariel marcillo
 

Recently uploaded

Digital Marketing with a Focus on Sustainability
Digital Marketing with a Focus on SustainabilityDigital Marketing with a Focus on Sustainability
Digital Marketing with a Focus on Sustainability
sssourabhsharma
 
Best practices for project execution and delivery
Best practices for project execution and deliveryBest practices for project execution and delivery
Best practices for project execution and delivery
CLIVE MINCHIN
 
Innovative Uses of Revit in Urban Planning and Design
Innovative Uses of Revit in Urban Planning and DesignInnovative Uses of Revit in Urban Planning and Design
Innovative Uses of Revit in Urban Planning and Design
Chandresh Chudasama
 
How to Buy an Engagement Ring.pcffbhfbfghfhptx
How to Buy an Engagement Ring.pcffbhfbfghfhptxHow to Buy an Engagement Ring.pcffbhfbfghfhptx
How to Buy an Engagement Ring.pcffbhfbfghfhptx
Charleston Alexander
 
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Stone Art Hub
 
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
Garments ERP Software in Bangladesh _ Pridesys IT Ltd.pdf
Garments ERP Software in Bangladesh _ Pridesys IT Ltd.pdfGarments ERP Software in Bangladesh _ Pridesys IT Ltd.pdf
Garments ERP Software in Bangladesh _ Pridesys IT Ltd.pdf
Pridesys IT Ltd.
 
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Kalyan Satta Matka Guessing Matka Result Main Bazar chart
 
The Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac SignThe Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac Sign
my Pandit
 
Profiles of Iconic Fashion Personalities.pdf
Profiles of Iconic Fashion Personalities.pdfProfiles of Iconic Fashion Personalities.pdf
Profiles of Iconic Fashion Personalities.pdf
TTop Threads
 
Income Tax exemption for Start up : Section 80 IAC
Income Tax  exemption for Start up : Section 80 IACIncome Tax  exemption for Start up : Section 80 IAC
Income Tax exemption for Start up : Section 80 IAC
CA Dr. Prithvi Ranjan Parhi
 
The Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb PlatformThe Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb Platform
SabaaSudozai
 
The latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from NewentideThe latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from Newentide
JoeYangGreatMachiner
 
DearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUniDearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUni
katiejasper96
 
Part 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 SlowdownPart 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 Slowdown
jeffkluth1
 
Negotiation & Presentation Skills regarding steps in business communication, ...
Negotiation & Presentation Skills regarding steps in business communication, ...Negotiation & Presentation Skills regarding steps in business communication, ...
Negotiation & Presentation Skills regarding steps in business communication, ...
UdayaShankarS1
 
2022 Vintage Roman Numerals Men Rings
2022 Vintage Roman  Numerals  Men  Rings2022 Vintage Roman  Numerals  Men  Rings
2022 Vintage Roman Numerals Men Rings
aragme
 
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
Lacey Max
 
list of states and organizations .pdf
list of  states  and  organizations .pdflist of  states  and  organizations .pdf
list of states and organizations .pdf
Rbc Rbcua
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
Adnet Communications
 

Recently uploaded (20)

Digital Marketing with a Focus on Sustainability
Digital Marketing with a Focus on SustainabilityDigital Marketing with a Focus on Sustainability
Digital Marketing with a Focus on Sustainability
 
Best practices for project execution and delivery
Best practices for project execution and deliveryBest practices for project execution and delivery
Best practices for project execution and delivery
 
Innovative Uses of Revit in Urban Planning and Design
Innovative Uses of Revit in Urban Planning and DesignInnovative Uses of Revit in Urban Planning and Design
Innovative Uses of Revit in Urban Planning and Design
 
How to Buy an Engagement Ring.pcffbhfbfghfhptx
How to Buy an Engagement Ring.pcffbhfbfghfhptxHow to Buy an Engagement Ring.pcffbhfbfghfhptx
How to Buy an Engagement Ring.pcffbhfbfghfhptx
 
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
 
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
 
Garments ERP Software in Bangladesh _ Pridesys IT Ltd.pdf
Garments ERP Software in Bangladesh _ Pridesys IT Ltd.pdfGarments ERP Software in Bangladesh _ Pridesys IT Ltd.pdf
Garments ERP Software in Bangladesh _ Pridesys IT Ltd.pdf
 
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
❼❷⓿❺❻❷❽❷❼❽ Dpboss Matka Result Satta Matka Guessing Satta Fix jodi Kalyan Fin...
 
The Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac SignThe Steadfast and Reliable Bull: Taurus Zodiac Sign
The Steadfast and Reliable Bull: Taurus Zodiac Sign
 
Profiles of Iconic Fashion Personalities.pdf
Profiles of Iconic Fashion Personalities.pdfProfiles of Iconic Fashion Personalities.pdf
Profiles of Iconic Fashion Personalities.pdf
 
Income Tax exemption for Start up : Section 80 IAC
Income Tax  exemption for Start up : Section 80 IACIncome Tax  exemption for Start up : Section 80 IAC
Income Tax exemption for Start up : Section 80 IAC
 
The Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb PlatformThe Genesis of BriansClub.cm Famous Dark WEb Platform
The Genesis of BriansClub.cm Famous Dark WEb Platform
 
The latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from NewentideThe latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from Newentide
 
DearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUniDearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUni
 
Part 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 SlowdownPart 2 Deep Dive: Navigating the 2024 Slowdown
Part 2 Deep Dive: Navigating the 2024 Slowdown
 
Negotiation & Presentation Skills regarding steps in business communication, ...
Negotiation & Presentation Skills regarding steps in business communication, ...Negotiation & Presentation Skills regarding steps in business communication, ...
Negotiation & Presentation Skills regarding steps in business communication, ...
 
2022 Vintage Roman Numerals Men Rings
2022 Vintage Roman  Numerals  Men  Rings2022 Vintage Roman  Numerals  Men  Rings
2022 Vintage Roman Numerals Men Rings
 
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....
 
list of states and organizations .pdf
list of  states  and  organizations .pdflist of  states  and  organizations .pdf
list of states and organizations .pdf
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
 

MEMEG 2012 - Moira, Victorian Floods & MECC Central

  • 1. February / March Flood event across Moira Shire
  • 2.
  • 3. Rainfall figures Town May 14th – October 2nd February 27th Comments 15th 1974 – 4th 1993 – March 4th 2012 Yarrawonga 115 mm 25 mm 277 mm Major contributor to Muckatah depression flow Tungamah 76 mm 78 mm 292 mm Contributor to Broken and Boosey Creeks. Numurkah 72 mm 57 mm 191 mm Recorded across various locations Nathalia 71 mm 65 mm 151 mm Benalla* 95 mm 202 mm 215 mm * Rainfall recorded in the week prior to other towns. The cumulative effect of rainfall events along the Eastern border of Moira Shire and beyond resulted in the Sandy creek, Boosey creek, Broken creek and Muckatah depression carrying the equivalent of the water volume of Sydney Harbour. Compounding this was the above average rainfall which fell across the entire municipality during that time.
  • 4. That’s a lot of rain!
  • 5. An emergency that spanned 18 days
  • 6. The Emergency Response • Municipal Emergency Management Plan activated. • An Incident Control Centre (ICC) established at Shepparton • Municipal Emergency Control Centre (MECC) – Cobram • Coordination across 17 affected localities.
  • 7. The challenges of an emergency • Planning • Advanced warning and mobilisation • Volume of water • Variability of water movement • Planned development eg residential and farm planning • Informal / illegal development • Coordination of services and the community in an emergency • Resourcing • Chinese whispers
  • 8. Our people and friends
  • 9. The impact across the municipality • An emergency event that was endured for 18 days, a recovery that will be measured in years. • Approx 230 homes inundated. • Over 700 properties isolated. • Over 1800 properties indirectly affected across 17 of Moira’s 23 communities. • Between 3,500 and 4,000 residents directly impacted. • Approx 500,000 sandbags were used. • An infrastructure damage bill expected to exceed $30M.
  • 10.
  • 12. Cobram MECC, March 8 By Scott Davey
  • 13. Cobram MECC, March 8 6:43 a.m.
  • 15. Virtual Agencies MECC Central Virtual MECC Central Agencies
  • 18. Incident Report • 460 pages • All requests, information, offers. • A complete record of the event.
  • 20. • The impact of flooding
  • 21.
  • 25. Recovery is still ongoing
  • 26. Infrastructure restoration Moira Shires approach • Damages expected to exceed $30M • Dedicated Flood Recovery team to coordinate restoration • In excess of 1500 “jobs” where restoration to community infrastructure eg. Roads, drains, bridges, sporting surfaces, buildings, parks and gardens, walking tracks etc have been damaged by flooding • Programmed inspections aim to identify all damage • Approval from VicRoads • Programming of restoration works • Approved value of works to this time - $10.5M and counting • Timeframe. 30 June 2014
  • 27. From MECC Book to MECC Central 1. Provide a Common Operating Picture – Enter existing records & “catch up” to real-time, then use MECC Central for COP. 2. Training - Train Registry Officers, then promote champions. 3. Go Hybrid - Run a hybrid book/electronic system to avoid getting in the way of busy EM officers. 4. Build skills - Progressively train key users in core functionality, and set up shift handover training. 5. Go Electronic - When ready, hide the MECC Books. 6. Tune - Watch and course-correct to prevent learning bad habits.
  • 28. Virtual Agencies • SES & VicRoads not in the MECC. • Communication to those agencies was via the ICC Liaison Officer. • Being Agile - To assist in workflow, create an agency to track requests into the ICC. • SES & VicRoads become “sub- agencies” of the ICC Liaison agency.
  • 29. Outcomes • Moira was bootstrapped from MECC Book to MECC Central in 24 hours • Almost 300 requests recorded in response phase • Over 1200 impact cases recorded and managed • Improved situational awareness & peripheral vision in MECC • Clearer messages, nothing lost or forgotten • Comprehensive reporting
  • 30. 1. Keep it simple Don’t overcomplicate things – the core of the system is request tracking, and it requires very little training.
  • 31. 2. MECC Central Champion Appoint one or more MECC Central Champions and train them fully. • Responsible for setting up MECC Central. • Must be non-operational in the emergency, to be free to float around the room and support users.
  • 32. 3. Develop a Quickstart Guide
  • 33. 4. Keep Current Small scale, short duration table-top simulations deliver better training outcomes. • Can be as short as 30 minutes every two months. • Try it today – spend 5 minutes with us at our MECC Central Lab to see how we do it. Datalink have online training, on-site workshops and consulting services to help you to get prepared and stay current.
  • 34. What to expect in 2012-2013 • Over 100 feature improvements under development. • Mapping improvements – Vicmap, Icons, Layers, Polygons. • Track Relief Centres • Track and manage recovery of the four pillars • Vulnerable Persons Register • Integration ...and… • Mobile Reporting – Impacts and Hazards. • Community Apps – Resident Communication & Self-Service
  • 35. Mobile Reporting – Impacts & Hazards

Editor's Notes

  1. Moira Shire experienced an event that spanned almost 3 weeks. From the East of Bundalong and South from Yabba across the municipality to the West and finally outflowing into the Murray River at Barmah.
  2. Moira shire work closely with key agencies as the development, updating and training in its MEMP. This document is designed to enable response, relief and recovery activities to a number of emergencies including flood emergency.State SES control all agencies through the emergency phase. They receive information, make decisions and direct a responses on the ground using the resources available to them.The Shepparton ICC coordinated the flood emergency response for CoGS and Moira. Representative agencies included SES, VicPol, CFA, LGA, GMW, GVW, GBCMA, BoM, DPI, DSE, Parks Victoria, Red Cross. ICC ran 24 hours a day through the emergency period and was supported by locally based command centres.Also in support of the Shepparton ICC, Moira Shire maintained its MECC which provided local information in and received direction from ICC on which it acted.
  3. Moira maintains a Municipal Emergency Management Plan. Scenario exercises are held to simulate emergency response.Such a large scale and sudden event presents challenges for everyone involved.The volume of water involved creates its own set of challenges.Over many years and certainly since the last flood development changes the dynamics of water flow. Whilst some of these changes are known, many are unknown for their impact until the flood occurs by which time it is too late.Bringing together emergency services including those unfamiliar to the area is necessary. Without them the task would be more difficult. At a minimum it is reassuring. Coordinating with communities is always a challenge in the emergency.Resourcing is bought in from across the state by all agencies. Community spirit is the greatest resource but can be difficult to manage. The process is not perfect but is effective. SES, CFA and Council’s role in the emergency is limited by its own resources. There is indeed a lot of factual information available during the emergency. Intermixed with this is rumor which is often taken on face value by some and can lead to confusion and indeed incorrect conclusion.
  4. There are too many individuals, groups, organisations and others to name but to say that without the collective efforts of all involved the impact could have been far greater.Sandbagging, catering, welfare checks and evacuations are but a few of the tasks. Family, friends and neighbors helping each other, communities uniting and support from many organisations all combined. This energy continues through recovery.
  5. With the support of DHS, Red Cross, VCC EM, St Vincent De Paul and local service clubs
  6. Datalink offered to come and bootstrap Moira with MECC Central, and we converted from paper to MECC Central in 1 day.
  7. Here’s another view of our MECC. Notice:Maps on the wallsWhiteboardsActive discussionMECC Central via notebooks and projector.The MECC is designed to foster “eyecalling” and verbal communication.
  8. Some interesting points in this photo8 computers on shared tabletop – a focus on team “eyeball“ communication rather than electronic. Gary Barton has PEEC on screen – he was switching between PEEC and MECC Central and transferring data between the two systems.Hydrologist (agency user) left of screen, was not a userWall maps, printouts, whiteboards compliment electronic.This was a few minutes after I arrived for the second day, and I quickly realised Moira was self sufficient.
  9. Notice the use of whiteboards and non-electronic devices.Where are the agency users?
  10. Reduced phone calls between MECC and ICCMany questions and status updates from ICC to MECC LO were answered by Bobby using the system rather than the phone.Phone calls were reserved for urgent issues A “touch-base” call every hour or so was made to discuss multiple requests in aggregate.MECC Central kept a list of current status of requests from MECC to agencies, and Bobby could track her own delegations to those agencies.
  11. All counters are 0 now, as the MECC is no longer active.299 requests total
  12. A sample case Road block – transferred from PEEC to MECC Central by MERC via copy/paste.Map shows location of road block signsThis was added in this way without training.
  13. Once the emergency has passed, relief turns into recoveryMoira Shire is the lead agency throughout the recovery Recovery aims to support those affected by the flood event to get back on their feet.The challenges of recovery are many and varied.Damage to assets, house vs property, business and farms.Insurance and or access to
  14. The impact of flooding on individuals is varied.While no one lost their life in this event, some people lost their homes and this is perhaps the greatest tragedy and our highest priority.Isolation can be as difficult as inundation. Unable to get to work.Assistance both financial as well as a helping hand4WD clubs, CFA groups, Corrections teams
  15. For an extended period of time following the emergency, life remains unsettled.Planned events are lost, schools disruptedCommunity infrastructure is damagedThe cost to community is varied. The disruption to normal activities can be long lasting
  16. Over 1200 impacted properties reported via MECC Central. As of yesterday, 811 remain open.
  17. An impact record tracks the affected address, along with the applicant and the case status.Here you can read the applicant is at a temporary address.
  18. MECC Central tracks all affected people, and can give you reports on, say, the number of girls under 18 in currently-impacted properties.The damage assessment and the services required can be customised, which we did.The services required tracks not just the services needed for this case, but whether or not it has been done – in this case, they are outstanding.
  19. Councils annual Capital works program is approx $10M. Flood Recovery will double this over the coming 2 years.A rigorous inspection regime is being undertaken to ensure that infrastructure damaged by flood water is identified and referred for approval from VicRoads.At this time, $10.5M has been approved for repair or replacement. Approx $1M worth of works is being identified each week.In many cases, damaged infrastructure restored to the current standard will be in better condition following the floods than before.Council seeks to combine programmed inspections with customer requests to ensure that all damage is identified.CAUTION. This funding is only made available because of the declaration of natural disaster.
  20. ICC Liaison agency set up to improve workflow. ItProvided a single counter for all requests that were routed through the ICCAllowed the MECC LO to assign to sub-agencies when she had passed the request to the agency, and thus keep track of each request she had to follow up on.It’s not the only way to do this, but it worked for us on the day. It’s all about being agile and making it work for the given situation, rather than being prescriptive.
  21. Get them to network with other champions
  22. * Community Apps - self-service - profile editing by affected residents - bulk & one-on-one communication to affected residents via email, web, app and sms - public information pre/post disaster
  23. * Community Apps - self-service - profile editing by affected residents - bulk & one-on-one communication to affected residents via email, web, app and sms - public information pre/post disasterImpact Reporting - via web - from the field (RIA, PIA) - from the community (SMS, Social)