http://f02documentary09.blogspot.com/201
 0/03/evaluation-matt-de-sousa_02.html




Hannah Precelton 6154
In what ways does your media product use develop or
challenge forms and conventions of real media
products?

Our documentary follows many codes and conventions of real media products for
example, We used Vox pops from students within Solihull Sixth Form College, Solihull we
saw an exam of this when watching Super Size Me.

Another convention we used which we noted from The Morgan Spurlock documentary
was the fact that the voice over gives statistics
The
Occupying just
                                                                    over half the frame
  We made sure for our interviews that
   there was relevant mise-en-scene
  because it shows authenticity and it
  makes the audience believe in what
       they say because of their
             surroundings

                                         To add to the
                                         interview set up.
                                         We had a Skeleton
                                         which adds to the              Oona Stone is
Stop smoking                             connotation of a               wearing a lab coat
website open       Small space           biology teacher
behind.            above head

                                                           For both of our professional
                                                          interviews we made sure we
                                                           focused on shot composure
                                    Mrs Breeze
                                     is in NHS           insuring the experts who were
                                        Nurses          being interviewed looked across
                                       uniform         the dead space and not directly at
                                                                   the camera.
During our interviews, we included a selection of cutaways
in the form mainly of over the shoulder shots.
It made our interviews more visually stimulating than they
would have been had we only shown the subject talking
on the documentary topic.
conventional

               Before our interviews, we included an establishing
               shot. This is common practice as it strengthens the
               spoken narrative. It’s something Grierson defined
               under the expostional mode as “evidentiary editing” as
               it gives support in visual format to the voiceover.
This is our final version of our double page spread.
                                                                                                                                 A Caption with
                                                                                                                               connotations from
                            The title with emphasis on adjective                                                                  words used
                                                                            Stand first in larger print




  Important detail about
     Documentary
        schedule




Drop Caps to emphasis the
    start of the article




                                                                              A Pull-Quote




   Text in columns                                                                                                                     Picture Credit



                                                                                    Article Credit




     Consistent
     House style
                                  Smaller Images
                                 depicting parts of                Footer with magazine name and issue date and page numbers
                                   the interview
How effective is the combination of your main product and ancillary texts?


                    We tried to follow a house style when making the combination of tasks in
                    order for the audience to be able to associate all three as being about one
                    product. We were aiming for a clear brand identity.

                    Therefore as planned to air our documentary on BBC 3, we felt it appropriate
                    to have our double page spread, TV listings in Radio Times because of the
                    association between the two. Although it is questionable that our desired
                    target audience would not themselves read this magazine, we said that they
                    would read their parents copy.
Pull Quote taken direct
                                from interviewee in
                                documentary


 However with reflection on our magazine
  article promoting our product the image
  which we used in the final double page
spread does not actually feature within the
documentary however it is still relevant to
  the topic of the documentary. This was
unfortunate for us, thus being that our first
 choice of image would not place properly
              in portrait format
To further this and to keep a house style we made the decision to use the same
music sound bed from within Garage band for both our documentary and our radio
trailer with the aim that it would contribute to the brand identity




   Music from
   Radio Trailer


                                                                 Music from
                                                                documentary

Within our radio trailer there were sound bites from the documentary itself to continue
to establish a brand identity. This hopefully will also enable the audience to associate
the two products.
On reflection I feel this was a good decision because it appeared to work effectively
Issues may occur with how well the tasks appeal to their intended audiences.
The documentary is probably our best piece, as it has a range of editing techniques which have been
applied and interviews that present hard hitting information. Therefore, the documentary virtually has
something to cater for any type of viewer. The radio trailer is similar in many aspects. In the brief 30
seconds that it plays, it contains a montage of voiceover and documentary sound bites, this is example
of fast editing which we have used in order for the radio trailer to be attention grabbing. With regards to
the double page spread problems may arise when looking at the chosen magazine for our article to be
published in although it follows suit with us airing our documentary on BBC3, the Radio Times is not a
magazine frequently read by our target audience (teenagers). Therefore on reflection if we were to
repeat it’d be suggested we look for a more suitable magazine to aim directly at our target audience

 Overall, I think our ancillary tasks combine with our documentary quite successfully. They look and
sound as if they have a brand identity, and are clear and effective when promoting the program this
can also be seen by the audience feed back results
What have you learnt from audience feedback?
                            To gather our audience feedback, we produced a simple questionnaire, asking fellow
                                   students to rate our products overall, and also on how appropriate they were.
                                                                      These are the results for our final product.

                            Overall Documentary Score
                   12
Amount of people




                   10
                    8
                    6
                    4
                    2
                    0
                        1     2   3 4 5 6 7            8    9 10
                                   Score out of ten



  From the bar chart we can tell that our documentary was believed to be average
              because 11 out of 23 people rated our documentary 7/10.
These results tell us that our documentary was not thought of as poor this is shown
 by us not receiving anything below 4. On the other hand students believed if given
the chance there was still elements which we could improve upon as 10/10 was not
                                       scored.
The following pie chart represents whether or not students thought
 the ancillary tasks which we produced effectively promoted the
 documentary. Overall unfortunately 39% of people we asked
 believe that the radio trailer and double page spread failed to
 effectively promote our documentary. However 61% believe that our
 ancillary tasks did work successfully in promoting our documentary.



           No

                                When asked if they thought our 3 tasks had a clear defined brand identity.
                                The pie chart on the left shows that 78% believe that our 3 products did but
                                22% of the 23 people we questioned disagreed.



 From the verbal feedback we received it was noted that the documentary had good sound quality and
that the choice of music was appropriate as it was insistent which create tension. Furthermore we were
  informed that our interviews were very informative and that the mise- en- scene and shot composure
                                           were of high standard.
     A point raised in the verbal feed back about our documentary was that there seemed to be an
inconsistence, with questions appearing on screen and the voice over asking the questions. In addition
   with regards to the double page spread it was advised that if we had the chance to edit/ tweak our
 tasks that the photograph of the cigarettes shouldn’t be the feature image. These are both points we
would take on board as improvements if we were to repeat this project. Unfortunately our questionnaire
   lets us down because it didn’t clearly enable us to gain enough qualitative data with the audience’s
 opinions. A question was asked about target audience however the exacts of target audience was not
                                                 specified.
How did you use media technologies in the construction and
                    research planning and evaluation stage?




   During all stages of the production we used an assortment of technologies and
software, ones which we were both familiar and unfamiliar with. However in our initial
 research into the project we also used a wide range of technology; this involved the
analysis of existing documentaries our primary internet research. Also throughout we
             uploaded materials and proof of our work onto Blogger.com
Blogger.com allowed us to organise and share our research and planning with the rest
                    of the group, I feel that this medium was effective way in storing our work as it
                    didn’t involve needing a large quantity of paper evidence. Other than text and
                         images, there is little else Blogger offers in the way of features. However,
                  one technology that was ample and convenient for our research was a scanner,
                 this enabled us to generate digital versions of our the few pieces of paper-based
                                          work which we had to produce in order to update our blog.
     This internet site was incredibly useful as it enable us to access the work we had done from
            any computer and I found it easy to deal with but it was a shame it didn’t enable us to
                                     upload videos without embedding links from site like YouTube.
In our production phase, the video cameras which we used to create the documentary involved
fairly new unfamiliar technology. This was convenient as the uploading process was incredibly
simple. The convenience of the video cams was they were easy mountable on a tripod meaning
we were able ensure that our shots were still and level.
As the camera had ports for headphones and a microphone,
we were able to monitor the audio, this feature was
particularly important to us when conducting interviews as
we could monitor and attempt to reduce the background
noise.
                         The majority of our post-production took place on an Apple iMac Computer.
                          In order to edit and produce our documentary, we used Final Cut Express.
                     The software was new to the whole group, this means it took a little time for us
                                       to familiarise ourselves with the program and how it functions.
                             Myself , I found it a little complicated at first because of the fact that the
                            programme was quite complex with it’s smaller feature on the other hand
                                                     the initial main idea of Final Cut was rather simple.
Log and Transfer was first step
                              for our clips, during which we
                              wanted to use. Once footage had
                              been selected and organised it
                              appeared in the Browser on the
                              left-hand side and we were able
                              to place the footage anywhere on
                              our time line.




We then added video transitions to the clips, by dragging them
from the viewer to the rough position on the timeline. We watched
 the edit through a couple of times, and tweaked where needed.
They then appeared on the time line as grey rectangles
For our over the shoulder shots it
                                                      can be seen that we used a feature
                                                      which enabled us to alter the speed.
                                                      The reason we applied this feature
                                                      to our documentary was to use the
                                                      footage as a cutaway thus meaning
                                                      it didn’t need to be on screen very
                                                      long and we wanted to make sure
                                                      our audience got the information we
                                                      wanted to convey.




In our final editing stage we went to modify and
normalization and applied Normalization Gain
to all our clips. This feature of Final Cut allowed
us to ensure that we had a consistent sound
level across our documentary.


The smaller features within Final Cut were a tad complex to find however they
                  enabled us to fine tune our documentary
Track contains chunks of audio from different sources
                                  ( Sound bites from documentary and Voice over)



                    Dragging in sound clips and generally using Garage Band itself was an uncomplicated
                    process in my opinion and a good piece of simple software which aided our radio trailer
                    production

                                                    When designing our magazine article we used Adobe InDesign

                     Colour picker was used
                     from this software to insure
                     a consistency of colour with
                     box a pull-quote




InDesign works on the of Placing images
into frames in the document, so that they
are still linked to the original file. Although
we used this technology at AS I
myself, found it challenging as the software
isn’t self explanatory. Although the text is in
columns like you would see in a normal
double page spread it isn’t level and drastic
tweaking is needed. However the software
allows our double page spread to look
relatively like a everyday newspaper
spread

Media Evaluation

  • 1.
  • 2.
    In what waysdoes your media product use develop or challenge forms and conventions of real media products? Our documentary follows many codes and conventions of real media products for example, We used Vox pops from students within Solihull Sixth Form College, Solihull we saw an exam of this when watching Super Size Me. Another convention we used which we noted from The Morgan Spurlock documentary was the fact that the voice over gives statistics
  • 3.
  • 4.
    Occupying just over half the frame We made sure for our interviews that there was relevant mise-en-scene because it shows authenticity and it makes the audience believe in what they say because of their surroundings To add to the interview set up. We had a Skeleton which adds to the Oona Stone is Stop smoking connotation of a wearing a lab coat website open Small space biology teacher behind. above head For both of our professional interviews we made sure we focused on shot composure Mrs Breeze is in NHS insuring the experts who were Nurses being interviewed looked across uniform the dead space and not directly at the camera.
  • 5.
    During our interviews,we included a selection of cutaways in the form mainly of over the shoulder shots. It made our interviews more visually stimulating than they would have been had we only shown the subject talking on the documentary topic.
  • 6.
    conventional Before our interviews, we included an establishing shot. This is common practice as it strengthens the spoken narrative. It’s something Grierson defined under the expostional mode as “evidentiary editing” as it gives support in visual format to the voiceover.
  • 8.
    This is ourfinal version of our double page spread. A Caption with connotations from The title with emphasis on adjective words used Stand first in larger print Important detail about Documentary schedule Drop Caps to emphasis the start of the article A Pull-Quote Text in columns Picture Credit Article Credit Consistent House style Smaller Images depicting parts of Footer with magazine name and issue date and page numbers the interview
  • 9.
    How effective isthe combination of your main product and ancillary texts? We tried to follow a house style when making the combination of tasks in order for the audience to be able to associate all three as being about one product. We were aiming for a clear brand identity. Therefore as planned to air our documentary on BBC 3, we felt it appropriate to have our double page spread, TV listings in Radio Times because of the association between the two. Although it is questionable that our desired target audience would not themselves read this magazine, we said that they would read their parents copy.
  • 10.
    Pull Quote takendirect from interviewee in documentary However with reflection on our magazine article promoting our product the image which we used in the final double page spread does not actually feature within the documentary however it is still relevant to the topic of the documentary. This was unfortunate for us, thus being that our first choice of image would not place properly in portrait format
  • 11.
    To further thisand to keep a house style we made the decision to use the same music sound bed from within Garage band for both our documentary and our radio trailer with the aim that it would contribute to the brand identity Music from Radio Trailer Music from documentary Within our radio trailer there were sound bites from the documentary itself to continue to establish a brand identity. This hopefully will also enable the audience to associate the two products. On reflection I feel this was a good decision because it appeared to work effectively
  • 12.
    Issues may occurwith how well the tasks appeal to their intended audiences. The documentary is probably our best piece, as it has a range of editing techniques which have been applied and interviews that present hard hitting information. Therefore, the documentary virtually has something to cater for any type of viewer. The radio trailer is similar in many aspects. In the brief 30 seconds that it plays, it contains a montage of voiceover and documentary sound bites, this is example of fast editing which we have used in order for the radio trailer to be attention grabbing. With regards to the double page spread problems may arise when looking at the chosen magazine for our article to be published in although it follows suit with us airing our documentary on BBC3, the Radio Times is not a magazine frequently read by our target audience (teenagers). Therefore on reflection if we were to repeat it’d be suggested we look for a more suitable magazine to aim directly at our target audience Overall, I think our ancillary tasks combine with our documentary quite successfully. They look and sound as if they have a brand identity, and are clear and effective when promoting the program this can also be seen by the audience feed back results
  • 13.
    What have youlearnt from audience feedback? To gather our audience feedback, we produced a simple questionnaire, asking fellow students to rate our products overall, and also on how appropriate they were. These are the results for our final product. Overall Documentary Score 12 Amount of people 10 8 6 4 2 0 1 2 3 4 5 6 7 8 9 10 Score out of ten From the bar chart we can tell that our documentary was believed to be average because 11 out of 23 people rated our documentary 7/10. These results tell us that our documentary was not thought of as poor this is shown by us not receiving anything below 4. On the other hand students believed if given the chance there was still elements which we could improve upon as 10/10 was not scored.
  • 14.
    The following piechart represents whether or not students thought the ancillary tasks which we produced effectively promoted the documentary. Overall unfortunately 39% of people we asked believe that the radio trailer and double page spread failed to effectively promote our documentary. However 61% believe that our ancillary tasks did work successfully in promoting our documentary. No When asked if they thought our 3 tasks had a clear defined brand identity. The pie chart on the left shows that 78% believe that our 3 products did but 22% of the 23 people we questioned disagreed. From the verbal feedback we received it was noted that the documentary had good sound quality and that the choice of music was appropriate as it was insistent which create tension. Furthermore we were informed that our interviews were very informative and that the mise- en- scene and shot composure were of high standard. A point raised in the verbal feed back about our documentary was that there seemed to be an inconsistence, with questions appearing on screen and the voice over asking the questions. In addition with regards to the double page spread it was advised that if we had the chance to edit/ tweak our tasks that the photograph of the cigarettes shouldn’t be the feature image. These are both points we would take on board as improvements if we were to repeat this project. Unfortunately our questionnaire lets us down because it didn’t clearly enable us to gain enough qualitative data with the audience’s opinions. A question was asked about target audience however the exacts of target audience was not specified.
  • 15.
    How did youuse media technologies in the construction and research planning and evaluation stage? During all stages of the production we used an assortment of technologies and software, ones which we were both familiar and unfamiliar with. However in our initial research into the project we also used a wide range of technology; this involved the analysis of existing documentaries our primary internet research. Also throughout we uploaded materials and proof of our work onto Blogger.com
  • 16.
    Blogger.com allowed usto organise and share our research and planning with the rest of the group, I feel that this medium was effective way in storing our work as it didn’t involve needing a large quantity of paper evidence. Other than text and images, there is little else Blogger offers in the way of features. However, one technology that was ample and convenient for our research was a scanner, this enabled us to generate digital versions of our the few pieces of paper-based work which we had to produce in order to update our blog. This internet site was incredibly useful as it enable us to access the work we had done from any computer and I found it easy to deal with but it was a shame it didn’t enable us to upload videos without embedding links from site like YouTube. In our production phase, the video cameras which we used to create the documentary involved fairly new unfamiliar technology. This was convenient as the uploading process was incredibly simple. The convenience of the video cams was they were easy mountable on a tripod meaning we were able ensure that our shots were still and level. As the camera had ports for headphones and a microphone, we were able to monitor the audio, this feature was particularly important to us when conducting interviews as we could monitor and attempt to reduce the background noise. The majority of our post-production took place on an Apple iMac Computer. In order to edit and produce our documentary, we used Final Cut Express. The software was new to the whole group, this means it took a little time for us to familiarise ourselves with the program and how it functions. Myself , I found it a little complicated at first because of the fact that the programme was quite complex with it’s smaller feature on the other hand the initial main idea of Final Cut was rather simple.
  • 17.
    Log and Transferwas first step for our clips, during which we wanted to use. Once footage had been selected and organised it appeared in the Browser on the left-hand side and we were able to place the footage anywhere on our time line. We then added video transitions to the clips, by dragging them from the viewer to the rough position on the timeline. We watched the edit through a couple of times, and tweaked where needed. They then appeared on the time line as grey rectangles
  • 18.
    For our overthe shoulder shots it can be seen that we used a feature which enabled us to alter the speed. The reason we applied this feature to our documentary was to use the footage as a cutaway thus meaning it didn’t need to be on screen very long and we wanted to make sure our audience got the information we wanted to convey. In our final editing stage we went to modify and normalization and applied Normalization Gain to all our clips. This feature of Final Cut allowed us to ensure that we had a consistent sound level across our documentary. The smaller features within Final Cut were a tad complex to find however they enabled us to fine tune our documentary
  • 19.
    Track contains chunksof audio from different sources ( Sound bites from documentary and Voice over) Dragging in sound clips and generally using Garage Band itself was an uncomplicated process in my opinion and a good piece of simple software which aided our radio trailer production When designing our magazine article we used Adobe InDesign Colour picker was used from this software to insure a consistency of colour with box a pull-quote InDesign works on the of Placing images into frames in the document, so that they are still linked to the original file. Although we used this technology at AS I myself, found it challenging as the software isn’t self explanatory. Although the text is in columns like you would see in a normal double page spread it isn’t level and drastic tweaking is needed. However the software allows our double page spread to look relatively like a everyday newspaper spread