The document contains 35 interview questions for a manual tester position. The questions cover a wide range of software testing topics including: SDLC vs STLC, different types of testing (unit, integration, system, acceptance), defect management process, test case vs test scenario, functional vs non-functional testing, validation vs verification, when to start testing, exploratory testing, cost of defects, change-related testing, test techniques like black box vs white box vs grey box testing, use case testing, equivalence partitioning and boundary value analysis, requirements traceability matrix, static vs dynamic testing, test planning, reporting, risks in testing, defect reports, risk-based testing, alpha and beta testing, test independence, random/monkey testing,