Cary Bush   Sales Director 205.565.2280 [email_address] http://www.logistasolutions.com/ps-voip.html Voice and IP Communications Overview
Logista provides three fundamental solution groups to support all communications needs Logista Voice  and IP Communications LogistaLink LogistaTotal LogistaCare
LogistaLink-  Flexible   Connectivity Solutions Managed IP Services IP Telephone Lines With nationwide telephone number availability Enables legacy systems/platforms to take advantage of lower cost UC options Facilities based services with IP Telephone Lines “ Site Built” solutions Fully hosted managed LAN/WAN services MPLS network Hosted voice Full business continuity/disaster recovery proposition
LogistaLink-  Flexible   Connectivity Solutions IP Telephone Lines Reduces monthly expenses by up to 60% Facilities based (“Site Built”) managed service solution with IP telephone lines Ideal SMB or branch office solution Lease based, low cost deployments Fully hosted services Guaranteed QoS and bandwidth management on a Cisco powered MPLS network Complete WAN and voice/data traffic visibility Unlimited MAC and service
LogistaTotal-  Next Generation Engineering Services Consulting for premise based (“Site Built”) deployments and solutions “Bundled” engineering options for easy outsourcing Corporate LAN/WAN design and configuration services Small office/branch office tiered service offerings
LogistaTotal-  Next Generation Engineering Services Communications Services Consulting Network assessment Network readiness discovery for unified communications capability Services assessment Outlines typical cost of ownership based on manufacturer specific and support criteria Line and circuit audit  Complete documented inventory of all telco lines and data circuits
LogistaTotal-  Next Generation Engineering Services Communications Services Consulting- Deliverables Asset report Voice and data infrastructure Services (telco line/circuit ID) Network Assessment report Network readiness for UC Graphic and outline of current LAN/WAN bandwidth utilization Comprehensive report outlining existing monthly communications costs Exposes unnecessary monthly expenses Reveals ROI for upgrading technologies
LogistaCare-  Absolute Support Telephony and network support plans priced per seat Remote and onsite repair capabilities nationwide Extends warranty on all telephony and network components Systems monitoring and optimization Time and materials options available
LogistaCare-  Absolute Support LogistaCare Telephony Maintenance Priced per seat/per month Cisco, Nortel, Mitel, Siemens, Avaya (and a variety of other SMB phone systems) Unlimited monitoring and remote MAC included (where available; minimum site/seat counts may apply) Quarterly review reports Service frequencies and escalations MAC frequencies and associated costs Percentages met on SLA’s System uptime and alarm frequencies (where availabale) Preventative Maintenance and Minor Software Release Management
LogistaCare-  Absolute Support LogistaCare Telephony and Network Maintenance Priced per seat/per month Includes network switches in addition to complete telecom infrastructure maintenance/support Unlimited monitoring and remote MAC included (minimum site/seat counts may apply) Quarterly Review Reports Preventative Maintenance and Minor Software Release Management
“ With Logista, time  is  on your side” For Logista customers, the outsourcing of some (or all) of these services has streamlined their vendor support programs and freed their IT staff to continue managing and supporting internal applications and processes, resulting in IT budget effectiveness and time saving productivity resource planning.

Logista Voice And IPC Overview

  • 1.
    Cary Bush Sales Director 205.565.2280 [email_address] http://www.logistasolutions.com/ps-voip.html Voice and IP Communications Overview
  • 2.
    Logista provides threefundamental solution groups to support all communications needs Logista Voice and IP Communications LogistaLink LogistaTotal LogistaCare
  • 3.
    LogistaLink- Flexible Connectivity Solutions Managed IP Services IP Telephone Lines With nationwide telephone number availability Enables legacy systems/platforms to take advantage of lower cost UC options Facilities based services with IP Telephone Lines “ Site Built” solutions Fully hosted managed LAN/WAN services MPLS network Hosted voice Full business continuity/disaster recovery proposition
  • 4.
    LogistaLink- Flexible Connectivity Solutions IP Telephone Lines Reduces monthly expenses by up to 60% Facilities based (“Site Built”) managed service solution with IP telephone lines Ideal SMB or branch office solution Lease based, low cost deployments Fully hosted services Guaranteed QoS and bandwidth management on a Cisco powered MPLS network Complete WAN and voice/data traffic visibility Unlimited MAC and service
  • 5.
    LogistaTotal- NextGeneration Engineering Services Consulting for premise based (“Site Built”) deployments and solutions “Bundled” engineering options for easy outsourcing Corporate LAN/WAN design and configuration services Small office/branch office tiered service offerings
  • 6.
    LogistaTotal- NextGeneration Engineering Services Communications Services Consulting Network assessment Network readiness discovery for unified communications capability Services assessment Outlines typical cost of ownership based on manufacturer specific and support criteria Line and circuit audit Complete documented inventory of all telco lines and data circuits
  • 7.
    LogistaTotal- NextGeneration Engineering Services Communications Services Consulting- Deliverables Asset report Voice and data infrastructure Services (telco line/circuit ID) Network Assessment report Network readiness for UC Graphic and outline of current LAN/WAN bandwidth utilization Comprehensive report outlining existing monthly communications costs Exposes unnecessary monthly expenses Reveals ROI for upgrading technologies
  • 8.
    LogistaCare- AbsoluteSupport Telephony and network support plans priced per seat Remote and onsite repair capabilities nationwide Extends warranty on all telephony and network components Systems monitoring and optimization Time and materials options available
  • 9.
    LogistaCare- AbsoluteSupport LogistaCare Telephony Maintenance Priced per seat/per month Cisco, Nortel, Mitel, Siemens, Avaya (and a variety of other SMB phone systems) Unlimited monitoring and remote MAC included (where available; minimum site/seat counts may apply) Quarterly review reports Service frequencies and escalations MAC frequencies and associated costs Percentages met on SLA’s System uptime and alarm frequencies (where availabale) Preventative Maintenance and Minor Software Release Management
  • 10.
    LogistaCare- AbsoluteSupport LogistaCare Telephony and Network Maintenance Priced per seat/per month Includes network switches in addition to complete telecom infrastructure maintenance/support Unlimited monitoring and remote MAC included (minimum site/seat counts may apply) Quarterly Review Reports Preventative Maintenance and Minor Software Release Management
  • 11.
    “ With Logista,time is on your side” For Logista customers, the outsourcing of some (or all) of these services has streamlined their vendor support programs and freed their IT staff to continue managing and supporting internal applications and processes, resulting in IT budget effectiveness and time saving productivity resource planning.