SlideShare a Scribd company logo
1 of 21
Download to read offline
APRIL 2022
DISCLAIMER
The information provided in this presentation is not intended to be a
comprehensive review of all matters and developments concerning the
Company and should be read in conjunction with all other disclosure documents
of the Company. The information contained herein is not a substitute for detailed
investigation or analysis. No securities commission or regulatory authority has
reviewed the accuracy or adequacy of the information presented.
FORWARD-LOOKING STATEMENTS
This presentation contains statements and information that constitute forward-
looking information within the meaning of Canadian securities legislation,
referred to herein as "forward‐looking statements", include statements
regarding proposed exploration and development activities and their timing,
resource estimates, exploration potential and the PEA, including estimates of
capital and sustaining costs, anticipated internal rates of return, mine production,
estimated recoveries, mine life, estimated payback period and net present
values, opportunities to enhance the value of the Tuvatu Gold Project and other
plans and objectives of the Company. In making the forward-looking statements
herein, the Company has applied several material assumptions, including that
(1) required approvals, permits and financing will be obtained; (2) the proposed
exploration and development of the Company's properties will proceed as
planned and that actual results will be consistent management’s expectations;
(3) with respect to mineral resource estimates, the key assumptions and
parameters on which such estimates are based; (4) market fundamentals will
result in sustained metals and minerals prices; and (5) with respect to the PEA,
the assumptions underlying the PEA, that the proposed mine plan and
recoveries will be achieved, that capital costs and sustaining costs will be as
estimated and that no unforeseen accident, fire, ground instability, flooding, labor
disruption, equipment failure, metallurgical, environmental or other events that
could delay or increase the cost of development will occur.
Forward-looking statements are subject to a variety of known and unknown
risks, uncertainties and other factors which could cause actual events or results
to differ from those expressed or implied by the forward-looking statements,
including: delays or inability to obtain required government or other regulatory
approvals, permits or financing, the risk of unexpected variations in mineral
resources, grade or recovery rates, of failure of plant, equipment or processes to
operate as anticipated, of accidents, labor disputes, and unanticipated delays in
completing exploration and development activities, the risk that estimated costs
will be higher than anticipated and the risk that the proposed mine plan and
recoveries will not be achieved, bad weather, exploration and development risks,
actual results of exploration and/or development activities being materially
different from those expected by management; uncertainties related to
interpretation of drill results and geological tests, failure to meet expenditure and
financing requirements, title matters, third party consents, operating hazards,
metal prices, political and economic factors, competitive factors and general
economic conditions. Actual results may vary from those implied or projected by
forward-looking statements and therefore investors should not place undue
reliance on such statements. The forward-looking statements herein are made
as at the date of this presentation and the Company expressly disclaims any
intention or obligation to update or revise any forward-looking statements except
as required by applicable securities legislation.
TECHNICAL DISCLOSURE
The technical information in this presentation has been approved by Sergio
Cattalani, P,Geo., Senior Vice President, Exploration of the Company and a
Qualified Person as defined by National Instrument “NI” 43-101 Standards of
Disclosure for Mineral Projects .
www.liononemetals.com
TSX-V: LIO OTCQX: LOMLF 2
MAJOR INVESTORS
FRANKLIN PRECIOUS METALS (9.58%)
DONALD SMITH VALUE FUND (7.51%)
INVESCO GOLD FUND (4.82%)
RBC GLOBAL PRECIOUS METALS
CI PRECIOUS METALS
AEGIS VALUE FUND
GABELLI GOLD FUND
MACKENZIE PRECIOUS METALS
CEO WALTER BERUKOFF (13%)
CANADA USA AUSTRALIA
TSX-V: LIO OTCQX: LOMLF ASX: LLO
LIO: $1.18 52wk: $1.44 $0.97 Avg. vol: 74k
TSX-V: LIO
www.liononemetals.com
TSX-V: LIO OTCQX: LOMLF 3
Shares Outstanding 156,371,893
Options 8,580,000
Broker Warrants 1,303,010
Warrants 0
Shares Fully Diluted 166,254,903
Working Capital CAD$45M
Market Capitalization $196M*
* As of Apr 6, 2022 @ $1.18 per share
COMPANY BUILDER TRACK RECORD
Northern Orion sold to Yamana in 2007 for $1.1B
Miramar Mining sold to Newmont in 2008 for $1.5B
La Mancha sold in 2012 for $600M
Emperor Gold Mines Fiji Gold Assets
(Vatukoula & Tuvatu) purchased in 2008.
Lion One Metals Limited created in 2011
Walter Berukoff
Chairman & CEO
DIRECTORS
RICHARD MELI CA., EX-RIO TINTO, LA MANCHA
KEVIN PUIL CFA RIVI ADVISORS
DAVID TRETBAR PGEO SUMMIT USA (SUMITOMO)
MANAGEMENT
PATRICK HICKEY, COO EX-NEWMONT, KINROSS
SERGIO CATTALANI, SVP EXPLORATION EX
OSISKO
TONY YOUNG, CA CFO
HAMISH GREIG, VP, CORP. SECRETARY
www.liononemetals.com
TSX-V: LIO OTCQX: LOMLF www.liononemetals.com
TSX-V: LIO OTCQX: LOMLF 4
Lion One Fiji Team
Over 200 years combined
experience in underground mining,
geology, drilling, and mineral
exploration
Patrick Hickey
Chief Operating Officer
Engineer, mine builder, Ex
Newmont/Kinross
Kevin Li
Project Manager
Engineer – Formerly Fluor, SNC
Lavalin, Saskpower, Pretium
TSX-V: LIO OTCQX: LOMLF www.liononemetals.com
TSX-V: LIO OTCQX: LOMLF 5
Sergio Cattalani
Senior VP, Exploration
Economic geologist,
Ex-Osisko Mining, Inco-CVRD,
Equinox Gold
Will Ostrenga, P.Geo
Economic geologist,
Ex-Sumitomo, Novo Resources
Quinton Hennigh, P.Geo
Economic geologist,
Ex-Newmont, Novo Resources
6 DRILL RIGS
ASSAY LAB
www.liononemetals.com
TSX-V: LIO OTCQX: LOMLF 6
Project located 40km SW of Vatukoula Gold Mine
Fiji Islands situated along the Pacific Ring of Fire
NADI AIRPORT
VATUKOULA
TUVATU
PORT OF
LAUTOKA
VITI LEVU, FIJI
PORGERA, PNG
LIHIR, PNG
VATUKOULA, FIJI
WORLD CLASS
ALKALINE GOLD SYSTEMS
75 MILLION OZ.
GOLD PRODUCTION
www.liononemetals.com
TSX-V: LIO OTCQX: LOMLF 7
ALKALINE GOLD SYSTEMS
In the South Pacific
Small in Number but Economically Significant Unusually Large, Unusually High Grade
www.liononemetals.com
TSX-V: LIO OTCQX: LOMLF 8
modified from Jensen, E.P. and Barton, M.D. 2000 Gold Deposits Related to Alkaline Magmatism, SEG Reviews, v. 13, Chapter 8, pp. 279-314
Tuvatu
Tuvatu
TUVATU
Current Resource (3.0 g/t cutoff)
274,600 oz. indicated @ 8.48 g/t Au
384,000 oz. inferred @ 9.00 g/t Au
46 g/t Au
BANANA CREEK
FROM ROCK CHIPS
100 g/t Au
KINGSTON
FROM ROCK CHIPS
502 g/t Au
JOMAKI
FROM ROCK CHIPS
293 g/t Au
NUBUNIDIKE
FROM ROCK CHIPS
54 g/t Au
MATANAVATU
FROM ROCK CHIPS
101 g/t Au
URA CREEK
FROM ROCK CHIPS
www.liononemetals.com
TSX-V: LIO OTCQX: LOMLF 9
EXPLORATION STRATEGY
1. RESOURCE EXPANSION
2. DEPTH EXTENSIONS
3. REGIONAL TARGETS
LOCATED 40KM SW OF
VATUKOULA WITH
11M OZ MINERAL INVENTORY
www.liononemetals.com
TSX-V: LIO OTCQX: LOMLF 10
Navilawa
caldera
EXPLORATION LICENSE
MINING LEASE
TSX-V: LIO OTCQX: LOMLF 11 www.liononemetals.com
decline
Zone 2
Zone 5
500
zone
Zone 5 infill drilling and
resampling program,
7500m planned
Zone 2 infill drilling and
resampling program,
~8400m, completed
TSX-V: LIO OTCQX: LOMLF 12
decline
Murau and
Snake lodes
1616 g/t Au
TUDDH565
Zone 2 infill drilling showing
all intercepts =>10 g/t Au
www.liononemetals.com
TSX-V: LIO OTCQX: LOMLF 13
decline
All intercepts =>10 g/t Au
Alkaline Au deposits are known
to exhibit remarkable vertical
continuity of mineralization, up
to >1200m vertically e.g. Cripple
Creek, CO; Vatukoula, Fiji.
Vertical extent of mineralization
at Tuvatu is currently 1140 m
350m of largely untested
high-grade feeder
www.liononemetals.com
TSX-V: LIO OTCQX: LOMLF 14
14.1 gpt
12.3 gpt
15.4 gpt
5.32/5.4
20.7/3.5
33.4/3.9
17.4/1.5,
46.8/0.6;
33.1/0.6
24.9/3.7
55.4/2.3
17.2/2.15
80.9/3.3
55.0/12.7
114.1/0.3
38.0/1.10
52.1 gpt
35.3/2.0
10.5/0.3
5.8/5.2
19.8/2.0
4.4/5.2,
7.9/3.9,
87.8/1.5
?
• mineralization is known to occur at least
another ~350m lower
• remains largely untested
500 Zone drilling to date
• 150m x 250m over a ~90m thickness
• using a 3 g/t cutoff, average grade of
all composited intervals in this zone is
~25 g/t Au
www.liononemetals.com
25.8/2.7
VG
10.5 gpt
VG-bn
550m
750m
950m
12.2 gpt
23.1/3.0
2.3/1.2
12.5 gpt
DDH 500 DDH 533
DDH 500 55.43 g/t Au over 12.7m
from 571.0m
TSX-V: LIO OTCQX: LOMLF 15
DDH 533 55.44 g/t Au over 2.30m
from 575.7m
DDH 544W2 33.40 g/t Au
over 3.90m from 629.3m
DDH 544W2
www.liononemetals.com
DDH 494 re-
entry 1106m
TSX-V: LIO OTCQX: LOMLF 16
decline
All intercepts =>10 g/t Au
500
zone
other possible feeders?
DRILL TARGETS
www.liononemetals.com
HI
46 g/t Au
BANANA CREEK
FROM ROCK CHIPS
20 g/t Au
CENTRAL RIDGE
FROM ROCK CHIPS
100 g/t Au
KINGSTON
FROM ROCK CHIPS
293 g/t Au
NUBUNIDIKE
FROM ROCK CHIPS
101 g/t Au
URA CREEK
FROM ROCK CHIPS
502 g/t Au
JOMAKI
FROM ROCK CHIPS
TUVATU Current Resource (3.0 g/t cutoff)
274,600 oz. indicated @ 8.48 g/t Au
384,000 oz. inferred @ 9.00 g/t Au
NAVILAWA
CALDERA
HIGH GRADE GOLD
ACROSS 7KM WIDE
NAVILAWA CALDERA
DRILLED RESOURCE AREA
COVERS LESS THAN 5% OF
LICENSE AREA
TARGET RICH DRILLING
PIPELINE
www.liononemetals.com
TSX-V: LIO OTCQX: LOMLF
54 g/t Au
MATANAVATU
FROM ROCK CHIPS
17
PERMITS ARE IN PLACE FOR
UNDERGROUND MINING OPERATIONS
DEVELOPMENT OF NO. 2 UNDERGROUND
ACCESS PORTAL UNDERWAY
MOBILE MINING EQUIPMENT FLEET HAS
BEEN PURCHASED OR DELIVERED
EXPECTED UG DEV RATE OF 2M/DAY
www.liononemetals.com
TSX-V: LIO OTCQX: LOMLF 18
DETAILED ENGINEERING &
PROCUREMENT UNDERWAY
DESIGN PROCESS COMPLETED FOR
SCALABLE MILL FACILITY
INSTALLATION & INITIAL PRODUCTION
PLANNED FOR Q3 & Q4 2023
www.liononemetals.com
TSX-V: LIO OTCQX: LOMLF 19
www.liononemetals.com
TSX-V: LIO OTCQX: LOMLF
MINESITE INFRASTRUCTURE
Contracts are complete or in final negotiation for all
infrastructure including:
1. Offices
2. Water supply and waste-water treatment.
3. Power
4. Tailings
5. Mine Explosives Magazine
6. Communications including fiber-optic access
ERP SYSTEMS IMPLEMENTATION
Lion One is Implementing fully integrated HRIS and
Enterprise Resource Platforms (ERP) for Accounting,
Supply Chain, Maintenance, Inventory, cost control and
Personnel tracking.
Base Camp (obscured)
And core sheds
Exploration
Bays 1 & 2
Plant SIte
20
LION ONE METALS LIMITED
306-267 WEST ESPLANADE
NORTH VANCOUVER BC V7M 1A5
CANADA
Investor Relations
Tel: 604-998-1250 Fax: 604-998-1253
Toll Free: 1-855-805-1250
email: info @ liononemetals.com
www.liononemetals.com
TSX-V: LIO OTCQX: LOMLF www.liononemetals.com
21

More Related Content

Similar to Lion One Presentation April 2022

Lion One Metals Presentation Nov 2021
Lion One Metals Presentation Nov 2021Lion One Metals Presentation Nov 2021
Lion One Metals Presentation Nov 2021Lion One Metals
 
Lion One Metals Presentation Jan 2022
Lion One Metals Presentation Jan 2022Lion One Metals Presentation Jan 2022
Lion One Metals Presentation Jan 2022Joe Gray
 
Lion One Metals Presentation July 2022
Lion One Metals Presentation July 2022Lion One Metals Presentation July 2022
Lion One Metals Presentation July 2022Joe Gray
 
LIO PPT JULY 2022.pdf
LIO PPT JULY 2022.pdfLIO PPT JULY 2022.pdf
LIO PPT JULY 2022.pdfJoe Gray
 
Lion One Metals Presentation Dec 2021
Lion One Metals Presentation Dec 2021Lion One Metals Presentation Dec 2021
Lion One Metals Presentation Dec 2021Joe Gray
 
Lion One Metals January 2020 Presentation
Lion One Metals January 2020 PresentationLion One Metals January 2020 Presentation
Lion One Metals January 2020 PresentationJoe Gray
 
Lion One Metals Presentation June 2020
Lion One Metals Presentation June 2020Lion One Metals Presentation June 2020
Lion One Metals Presentation June 2020Joe Gray
 
Lion One Metals Presentation Jan 2018
Lion One Metals Presentation Jan 2018Lion One Metals Presentation Jan 2018
Lion One Metals Presentation Jan 2018Joe Gray
 
Lion One Presentation August 2020
Lion One Presentation August 2020Lion One Presentation August 2020
Lion One Presentation August 2020Joe Gray
 
Lion One Metals Presentation Dec 2017
Lion One Metals Presentation Dec 2017Lion One Metals Presentation Dec 2017
Lion One Metals Presentation Dec 2017Joe Gray
 
Lio ppt mar 2018
Lio ppt mar 2018Lio ppt mar 2018
Lio ppt mar 2018Joe Gray
 
Lion One Presentation March 2018
Lion One Presentation March 2018Lion One Presentation March 2018
Lion One Presentation March 2018Joe Gray
 
Lion One Corporate Presentation May 2018
Lion One Corporate Presentation May 2018Lion One Corporate Presentation May 2018
Lion One Corporate Presentation May 2018Joe Gray
 
Lion One Metals Presentation Sept 2019
Lion One Metals Presentation Sept 2019Lion One Metals Presentation Sept 2019
Lion One Metals Presentation Sept 2019Joe Gray
 
Lion One Presenation April 2016
Lion One Presenation April 2016Lion One Presenation April 2016
Lion One Presenation April 2016Lion One Metals
 
Lion One Metals Presentation May 2020
Lion One Metals Presentation May 2020Lion One Metals Presentation May 2020
Lion One Metals Presentation May 2020Joe Gray
 
Lion One Metals March Presentation
Lion One Metals March PresentationLion One Metals March Presentation
Lion One Metals March PresentationJoe Gray
 
Lion One Metals Presentation Oct 2018
Lion One Metals Presentation Oct 2018Lion One Metals Presentation Oct 2018
Lion One Metals Presentation Oct 2018Joe Gray
 
Lion One Metals Dec 2018 Presentation
Lion One Metals Dec 2018 PresentationLion One Metals Dec 2018 Presentation
Lion One Metals Dec 2018 PresentationJoe Gray
 
Lion One Metals Presenation Oct 2018
Lion One Metals Presenation Oct 2018 Lion One Metals Presenation Oct 2018
Lion One Metals Presenation Oct 2018 Joe Gray
 

Similar to Lion One Presentation April 2022 (20)

Lion One Metals Presentation Nov 2021
Lion One Metals Presentation Nov 2021Lion One Metals Presentation Nov 2021
Lion One Metals Presentation Nov 2021
 
Lion One Metals Presentation Jan 2022
Lion One Metals Presentation Jan 2022Lion One Metals Presentation Jan 2022
Lion One Metals Presentation Jan 2022
 
Lion One Metals Presentation July 2022
Lion One Metals Presentation July 2022Lion One Metals Presentation July 2022
Lion One Metals Presentation July 2022
 
LIO PPT JULY 2022.pdf
LIO PPT JULY 2022.pdfLIO PPT JULY 2022.pdf
LIO PPT JULY 2022.pdf
 
Lion One Metals Presentation Dec 2021
Lion One Metals Presentation Dec 2021Lion One Metals Presentation Dec 2021
Lion One Metals Presentation Dec 2021
 
Lion One Metals January 2020 Presentation
Lion One Metals January 2020 PresentationLion One Metals January 2020 Presentation
Lion One Metals January 2020 Presentation
 
Lion One Metals Presentation June 2020
Lion One Metals Presentation June 2020Lion One Metals Presentation June 2020
Lion One Metals Presentation June 2020
 
Lion One Metals Presentation Jan 2018
Lion One Metals Presentation Jan 2018Lion One Metals Presentation Jan 2018
Lion One Metals Presentation Jan 2018
 
Lion One Presentation August 2020
Lion One Presentation August 2020Lion One Presentation August 2020
Lion One Presentation August 2020
 
Lion One Metals Presentation Dec 2017
Lion One Metals Presentation Dec 2017Lion One Metals Presentation Dec 2017
Lion One Metals Presentation Dec 2017
 
Lio ppt mar 2018
Lio ppt mar 2018Lio ppt mar 2018
Lio ppt mar 2018
 
Lion One Presentation March 2018
Lion One Presentation March 2018Lion One Presentation March 2018
Lion One Presentation March 2018
 
Lion One Corporate Presentation May 2018
Lion One Corporate Presentation May 2018Lion One Corporate Presentation May 2018
Lion One Corporate Presentation May 2018
 
Lion One Metals Presentation Sept 2019
Lion One Metals Presentation Sept 2019Lion One Metals Presentation Sept 2019
Lion One Metals Presentation Sept 2019
 
Lion One Presenation April 2016
Lion One Presenation April 2016Lion One Presenation April 2016
Lion One Presenation April 2016
 
Lion One Metals Presentation May 2020
Lion One Metals Presentation May 2020Lion One Metals Presentation May 2020
Lion One Metals Presentation May 2020
 
Lion One Metals March Presentation
Lion One Metals March PresentationLion One Metals March Presentation
Lion One Metals March Presentation
 
Lion One Metals Presentation Oct 2018
Lion One Metals Presentation Oct 2018Lion One Metals Presentation Oct 2018
Lion One Metals Presentation Oct 2018
 
Lion One Metals Dec 2018 Presentation
Lion One Metals Dec 2018 PresentationLion One Metals Dec 2018 Presentation
Lion One Metals Dec 2018 Presentation
 
Lion One Metals Presenation Oct 2018
Lion One Metals Presenation Oct 2018 Lion One Metals Presenation Oct 2018
Lion One Metals Presenation Oct 2018
 

More from Joe Gray

LIO Corporate IR Deck September 2022 1.pdf
LIO Corporate IR Deck September 2022 1.pdfLIO Corporate IR Deck September 2022 1.pdf
LIO Corporate IR Deck September 2022 1.pdfJoe Gray
 
Lion One Metals Presenation August 2021
Lion One Metals Presenation August 2021Lion One Metals Presenation August 2021
Lion One Metals Presenation August 2021Joe Gray
 
Lion One Metals Presentation July 2021
Lion One Metals Presentation July 2021Lion One Metals Presentation July 2021
Lion One Metals Presentation July 2021Joe Gray
 
Lion One Metals Presentation June 2021
Lion One Metals Presentation June 2021Lion One Metals Presentation June 2021
Lion One Metals Presentation June 2021Joe Gray
 
Lion One Metals Presentation April 2021
Lion One Metals Presentation April 2021Lion One Metals Presentation April 2021
Lion One Metals Presentation April 2021Joe Gray
 
Lion One Metals Presentation April 2021
Lion One Metals Presentation April 2021Lion One Metals Presentation April 2021
Lion One Metals Presentation April 2021Joe Gray
 
Lion One Metals Presentation March 2021
Lion One Metals Presentation March 2021Lion One Metals Presentation March 2021
Lion One Metals Presentation March 2021Joe Gray
 
Lion One Metals Presentation Feb 2021
Lion One Metals Presentation Feb 2021Lion One Metals Presentation Feb 2021
Lion One Metals Presentation Feb 2021Joe Gray
 
Lion One Roundup Presentation Jan 2021
Lion One Roundup Presentation Jan 2021Lion One Roundup Presentation Jan 2021
Lion One Roundup Presentation Jan 2021Joe Gray
 
Lion One Metals Presentation January 2021
Lion One Metals Presentation January 2021Lion One Metals Presentation January 2021
Lion One Metals Presentation January 2021Joe Gray
 
Lion One Metals Presenation Dec 2020
Lion One Metals Presenation Dec 2020Lion One Metals Presenation Dec 2020
Lion One Metals Presenation Dec 2020Joe Gray
 
Lion One Metals Presentation Nov 2020
Lion One Metals Presentation Nov 2020Lion One Metals Presentation Nov 2020
Lion One Metals Presentation Nov 2020Joe Gray
 
Lion One Metals Presentation Nov 2020
Lion One Metals Presentation Nov 2020Lion One Metals Presentation Nov 2020
Lion One Metals Presentation Nov 2020Joe Gray
 
Lion One Metals Presentation Oct 2020
Lion One Metals Presentation Oct 2020Lion One Metals Presentation Oct 2020
Lion One Metals Presentation Oct 2020Joe Gray
 
Lion One Metals Presentation Sept 2020
Lion One Metals Presentation Sept 2020Lion One Metals Presentation Sept 2020
Lion One Metals Presentation Sept 2020Joe Gray
 

More from Joe Gray (15)

LIO Corporate IR Deck September 2022 1.pdf
LIO Corporate IR Deck September 2022 1.pdfLIO Corporate IR Deck September 2022 1.pdf
LIO Corporate IR Deck September 2022 1.pdf
 
Lion One Metals Presenation August 2021
Lion One Metals Presenation August 2021Lion One Metals Presenation August 2021
Lion One Metals Presenation August 2021
 
Lion One Metals Presentation July 2021
Lion One Metals Presentation July 2021Lion One Metals Presentation July 2021
Lion One Metals Presentation July 2021
 
Lion One Metals Presentation June 2021
Lion One Metals Presentation June 2021Lion One Metals Presentation June 2021
Lion One Metals Presentation June 2021
 
Lion One Metals Presentation April 2021
Lion One Metals Presentation April 2021Lion One Metals Presentation April 2021
Lion One Metals Presentation April 2021
 
Lion One Metals Presentation April 2021
Lion One Metals Presentation April 2021Lion One Metals Presentation April 2021
Lion One Metals Presentation April 2021
 
Lion One Metals Presentation March 2021
Lion One Metals Presentation March 2021Lion One Metals Presentation March 2021
Lion One Metals Presentation March 2021
 
Lion One Metals Presentation Feb 2021
Lion One Metals Presentation Feb 2021Lion One Metals Presentation Feb 2021
Lion One Metals Presentation Feb 2021
 
Lion One Roundup Presentation Jan 2021
Lion One Roundup Presentation Jan 2021Lion One Roundup Presentation Jan 2021
Lion One Roundup Presentation Jan 2021
 
Lion One Metals Presentation January 2021
Lion One Metals Presentation January 2021Lion One Metals Presentation January 2021
Lion One Metals Presentation January 2021
 
Lion One Metals Presenation Dec 2020
Lion One Metals Presenation Dec 2020Lion One Metals Presenation Dec 2020
Lion One Metals Presenation Dec 2020
 
Lion One Metals Presentation Nov 2020
Lion One Metals Presentation Nov 2020Lion One Metals Presentation Nov 2020
Lion One Metals Presentation Nov 2020
 
Lion One Metals Presentation Nov 2020
Lion One Metals Presentation Nov 2020Lion One Metals Presentation Nov 2020
Lion One Metals Presentation Nov 2020
 
Lion One Metals Presentation Oct 2020
Lion One Metals Presentation Oct 2020Lion One Metals Presentation Oct 2020
Lion One Metals Presentation Oct 2020
 
Lion One Metals Presentation Sept 2020
Lion One Metals Presentation Sept 2020Lion One Metals Presentation Sept 2020
Lion One Metals Presentation Sept 2020
 

Recently uploaded

High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls KolkataHigh Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With RoomVIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Roomrran7532
 
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServiceMalad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServicePooja Nehwal
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...wyqazy
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCRSapana Sha
 
OKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T ShirtsOKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T Shirtsrahman018755
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...
VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...
VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...aditipandeya
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024TeckResourcesLtd
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd
 
如何办理圣何塞州立大学毕业证(文凭)SJSU学位证书
如何办理圣何塞州立大学毕业证(文凭)SJSU学位证书如何办理圣何塞州立大学毕业证(文凭)SJSU学位证书
如何办理圣何塞州立大学毕业证(文凭)SJSU学位证书Fir La
 

Recently uploaded (20)

@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
 
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
 
young call girls in Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
young  call girls in   Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Serviceyoung  call girls in   Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
 
High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls KolkataHigh Profile Call Girls Kolkata Gayatri 🤌  8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Gayatri 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
Preet Vihar (Delhi) 9953330565 Escorts, Call Girls Services
Preet Vihar (Delhi) 9953330565 Escorts, Call Girls ServicesPreet Vihar (Delhi) 9953330565 Escorts, Call Girls Services
Preet Vihar (Delhi) 9953330565 Escorts, Call Girls Services
 
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With RoomVIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
 
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServiceMalad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCRCall Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
 
Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ...
Call Girls 🫤 Mukherjee Nagar ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ...
 
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
《加州大学圣克鲁兹分校学位证书复制》Q微信741003700美国学历疑难问题指南|挂科被加州大学圣克鲁兹分校劝退没有毕业证怎么办?《UCSC毕业证购买|加...
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
 
OKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T ShirtsOKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T Shirts
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...
VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...
VIP 7001035870 Find & Meet Hyderabad Call Girls Banjara Hills high-profile Ca...
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024
 
Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
 
如何办理圣何塞州立大学毕业证(文凭)SJSU学位证书
如何办理圣何塞州立大学毕业证(文凭)SJSU学位证书如何办理圣何塞州立大学毕业证(文凭)SJSU学位证书
如何办理圣何塞州立大学毕业证(文凭)SJSU学位证书
 
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Serviceyoung Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
 
Falcon Invoice Discounting - Best Platform
Falcon Invoice Discounting - Best PlatformFalcon Invoice Discounting - Best Platform
Falcon Invoice Discounting - Best Platform
 

Lion One Presentation April 2022

  • 2. DISCLAIMER The information provided in this presentation is not intended to be a comprehensive review of all matters and developments concerning the Company and should be read in conjunction with all other disclosure documents of the Company. The information contained herein is not a substitute for detailed investigation or analysis. No securities commission or regulatory authority has reviewed the accuracy or adequacy of the information presented. FORWARD-LOOKING STATEMENTS This presentation contains statements and information that constitute forward- looking information within the meaning of Canadian securities legislation, referred to herein as "forward‐looking statements", include statements regarding proposed exploration and development activities and their timing, resource estimates, exploration potential and the PEA, including estimates of capital and sustaining costs, anticipated internal rates of return, mine production, estimated recoveries, mine life, estimated payback period and net present values, opportunities to enhance the value of the Tuvatu Gold Project and other plans and objectives of the Company. In making the forward-looking statements herein, the Company has applied several material assumptions, including that (1) required approvals, permits and financing will be obtained; (2) the proposed exploration and development of the Company's properties will proceed as planned and that actual results will be consistent management’s expectations; (3) with respect to mineral resource estimates, the key assumptions and parameters on which such estimates are based; (4) market fundamentals will result in sustained metals and minerals prices; and (5) with respect to the PEA, the assumptions underlying the PEA, that the proposed mine plan and recoveries will be achieved, that capital costs and sustaining costs will be as estimated and that no unforeseen accident, fire, ground instability, flooding, labor disruption, equipment failure, metallurgical, environmental or other events that could delay or increase the cost of development will occur. Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors which could cause actual events or results to differ from those expressed or implied by the forward-looking statements, including: delays or inability to obtain required government or other regulatory approvals, permits or financing, the risk of unexpected variations in mineral resources, grade or recovery rates, of failure of plant, equipment or processes to operate as anticipated, of accidents, labor disputes, and unanticipated delays in completing exploration and development activities, the risk that estimated costs will be higher than anticipated and the risk that the proposed mine plan and recoveries will not be achieved, bad weather, exploration and development risks, actual results of exploration and/or development activities being materially different from those expected by management; uncertainties related to interpretation of drill results and geological tests, failure to meet expenditure and financing requirements, title matters, third party consents, operating hazards, metal prices, political and economic factors, competitive factors and general economic conditions. Actual results may vary from those implied or projected by forward-looking statements and therefore investors should not place undue reliance on such statements. The forward-looking statements herein are made as at the date of this presentation and the Company expressly disclaims any intention or obligation to update or revise any forward-looking statements except as required by applicable securities legislation. TECHNICAL DISCLOSURE The technical information in this presentation has been approved by Sergio Cattalani, P,Geo., Senior Vice President, Exploration of the Company and a Qualified Person as defined by National Instrument “NI” 43-101 Standards of Disclosure for Mineral Projects . www.liononemetals.com TSX-V: LIO OTCQX: LOMLF 2
  • 3. MAJOR INVESTORS FRANKLIN PRECIOUS METALS (9.58%) DONALD SMITH VALUE FUND (7.51%) INVESCO GOLD FUND (4.82%) RBC GLOBAL PRECIOUS METALS CI PRECIOUS METALS AEGIS VALUE FUND GABELLI GOLD FUND MACKENZIE PRECIOUS METALS CEO WALTER BERUKOFF (13%) CANADA USA AUSTRALIA TSX-V: LIO OTCQX: LOMLF ASX: LLO LIO: $1.18 52wk: $1.44 $0.97 Avg. vol: 74k TSX-V: LIO www.liononemetals.com TSX-V: LIO OTCQX: LOMLF 3 Shares Outstanding 156,371,893 Options 8,580,000 Broker Warrants 1,303,010 Warrants 0 Shares Fully Diluted 166,254,903 Working Capital CAD$45M Market Capitalization $196M* * As of Apr 6, 2022 @ $1.18 per share
  • 4. COMPANY BUILDER TRACK RECORD Northern Orion sold to Yamana in 2007 for $1.1B Miramar Mining sold to Newmont in 2008 for $1.5B La Mancha sold in 2012 for $600M Emperor Gold Mines Fiji Gold Assets (Vatukoula & Tuvatu) purchased in 2008. Lion One Metals Limited created in 2011 Walter Berukoff Chairman & CEO DIRECTORS RICHARD MELI CA., EX-RIO TINTO, LA MANCHA KEVIN PUIL CFA RIVI ADVISORS DAVID TRETBAR PGEO SUMMIT USA (SUMITOMO) MANAGEMENT PATRICK HICKEY, COO EX-NEWMONT, KINROSS SERGIO CATTALANI, SVP EXPLORATION EX OSISKO TONY YOUNG, CA CFO HAMISH GREIG, VP, CORP. SECRETARY www.liononemetals.com TSX-V: LIO OTCQX: LOMLF www.liononemetals.com TSX-V: LIO OTCQX: LOMLF 4
  • 5. Lion One Fiji Team Over 200 years combined experience in underground mining, geology, drilling, and mineral exploration Patrick Hickey Chief Operating Officer Engineer, mine builder, Ex Newmont/Kinross Kevin Li Project Manager Engineer – Formerly Fluor, SNC Lavalin, Saskpower, Pretium TSX-V: LIO OTCQX: LOMLF www.liononemetals.com TSX-V: LIO OTCQX: LOMLF 5
  • 6. Sergio Cattalani Senior VP, Exploration Economic geologist, Ex-Osisko Mining, Inco-CVRD, Equinox Gold Will Ostrenga, P.Geo Economic geologist, Ex-Sumitomo, Novo Resources Quinton Hennigh, P.Geo Economic geologist, Ex-Newmont, Novo Resources 6 DRILL RIGS ASSAY LAB www.liononemetals.com TSX-V: LIO OTCQX: LOMLF 6
  • 7. Project located 40km SW of Vatukoula Gold Mine Fiji Islands situated along the Pacific Ring of Fire NADI AIRPORT VATUKOULA TUVATU PORT OF LAUTOKA VITI LEVU, FIJI PORGERA, PNG LIHIR, PNG VATUKOULA, FIJI WORLD CLASS ALKALINE GOLD SYSTEMS 75 MILLION OZ. GOLD PRODUCTION www.liononemetals.com TSX-V: LIO OTCQX: LOMLF 7
  • 8. ALKALINE GOLD SYSTEMS In the South Pacific Small in Number but Economically Significant Unusually Large, Unusually High Grade www.liononemetals.com TSX-V: LIO OTCQX: LOMLF 8 modified from Jensen, E.P. and Barton, M.D. 2000 Gold Deposits Related to Alkaline Magmatism, SEG Reviews, v. 13, Chapter 8, pp. 279-314 Tuvatu Tuvatu
  • 9. TUVATU Current Resource (3.0 g/t cutoff) 274,600 oz. indicated @ 8.48 g/t Au 384,000 oz. inferred @ 9.00 g/t Au 46 g/t Au BANANA CREEK FROM ROCK CHIPS 100 g/t Au KINGSTON FROM ROCK CHIPS 502 g/t Au JOMAKI FROM ROCK CHIPS 293 g/t Au NUBUNIDIKE FROM ROCK CHIPS 54 g/t Au MATANAVATU FROM ROCK CHIPS 101 g/t Au URA CREEK FROM ROCK CHIPS www.liononemetals.com TSX-V: LIO OTCQX: LOMLF 9
  • 10. EXPLORATION STRATEGY 1. RESOURCE EXPANSION 2. DEPTH EXTENSIONS 3. REGIONAL TARGETS LOCATED 40KM SW OF VATUKOULA WITH 11M OZ MINERAL INVENTORY www.liononemetals.com TSX-V: LIO OTCQX: LOMLF 10 Navilawa caldera EXPLORATION LICENSE MINING LEASE
  • 11. TSX-V: LIO OTCQX: LOMLF 11 www.liononemetals.com decline Zone 2 Zone 5 500 zone Zone 5 infill drilling and resampling program, 7500m planned Zone 2 infill drilling and resampling program, ~8400m, completed
  • 12. TSX-V: LIO OTCQX: LOMLF 12 decline Murau and Snake lodes 1616 g/t Au TUDDH565 Zone 2 infill drilling showing all intercepts =>10 g/t Au www.liononemetals.com
  • 13. TSX-V: LIO OTCQX: LOMLF 13 decline All intercepts =>10 g/t Au Alkaline Au deposits are known to exhibit remarkable vertical continuity of mineralization, up to >1200m vertically e.g. Cripple Creek, CO; Vatukoula, Fiji. Vertical extent of mineralization at Tuvatu is currently 1140 m 350m of largely untested high-grade feeder www.liononemetals.com
  • 14. TSX-V: LIO OTCQX: LOMLF 14 14.1 gpt 12.3 gpt 15.4 gpt 5.32/5.4 20.7/3.5 33.4/3.9 17.4/1.5, 46.8/0.6; 33.1/0.6 24.9/3.7 55.4/2.3 17.2/2.15 80.9/3.3 55.0/12.7 114.1/0.3 38.0/1.10 52.1 gpt 35.3/2.0 10.5/0.3 5.8/5.2 19.8/2.0 4.4/5.2, 7.9/3.9, 87.8/1.5 ? • mineralization is known to occur at least another ~350m lower • remains largely untested 500 Zone drilling to date • 150m x 250m over a ~90m thickness • using a 3 g/t cutoff, average grade of all composited intervals in this zone is ~25 g/t Au www.liononemetals.com 25.8/2.7 VG 10.5 gpt VG-bn 550m 750m 950m 12.2 gpt 23.1/3.0 2.3/1.2 12.5 gpt
  • 15. DDH 500 DDH 533 DDH 500 55.43 g/t Au over 12.7m from 571.0m TSX-V: LIO OTCQX: LOMLF 15 DDH 533 55.44 g/t Au over 2.30m from 575.7m DDH 544W2 33.40 g/t Au over 3.90m from 629.3m DDH 544W2 www.liononemetals.com DDH 494 re- entry 1106m
  • 16. TSX-V: LIO OTCQX: LOMLF 16 decline All intercepts =>10 g/t Au 500 zone other possible feeders? DRILL TARGETS www.liononemetals.com
  • 17. HI 46 g/t Au BANANA CREEK FROM ROCK CHIPS 20 g/t Au CENTRAL RIDGE FROM ROCK CHIPS 100 g/t Au KINGSTON FROM ROCK CHIPS 293 g/t Au NUBUNIDIKE FROM ROCK CHIPS 101 g/t Au URA CREEK FROM ROCK CHIPS 502 g/t Au JOMAKI FROM ROCK CHIPS TUVATU Current Resource (3.0 g/t cutoff) 274,600 oz. indicated @ 8.48 g/t Au 384,000 oz. inferred @ 9.00 g/t Au NAVILAWA CALDERA HIGH GRADE GOLD ACROSS 7KM WIDE NAVILAWA CALDERA DRILLED RESOURCE AREA COVERS LESS THAN 5% OF LICENSE AREA TARGET RICH DRILLING PIPELINE www.liononemetals.com TSX-V: LIO OTCQX: LOMLF 54 g/t Au MATANAVATU FROM ROCK CHIPS 17
  • 18. PERMITS ARE IN PLACE FOR UNDERGROUND MINING OPERATIONS DEVELOPMENT OF NO. 2 UNDERGROUND ACCESS PORTAL UNDERWAY MOBILE MINING EQUIPMENT FLEET HAS BEEN PURCHASED OR DELIVERED EXPECTED UG DEV RATE OF 2M/DAY www.liononemetals.com TSX-V: LIO OTCQX: LOMLF 18
  • 19. DETAILED ENGINEERING & PROCUREMENT UNDERWAY DESIGN PROCESS COMPLETED FOR SCALABLE MILL FACILITY INSTALLATION & INITIAL PRODUCTION PLANNED FOR Q3 & Q4 2023 www.liononemetals.com TSX-V: LIO OTCQX: LOMLF 19
  • 20. www.liononemetals.com TSX-V: LIO OTCQX: LOMLF MINESITE INFRASTRUCTURE Contracts are complete or in final negotiation for all infrastructure including: 1. Offices 2. Water supply and waste-water treatment. 3. Power 4. Tailings 5. Mine Explosives Magazine 6. Communications including fiber-optic access ERP SYSTEMS IMPLEMENTATION Lion One is Implementing fully integrated HRIS and Enterprise Resource Platforms (ERP) for Accounting, Supply Chain, Maintenance, Inventory, cost control and Personnel tracking. Base Camp (obscured) And core sheds Exploration Bays 1 & 2 Plant SIte 20
  • 21. LION ONE METALS LIMITED 306-267 WEST ESPLANADE NORTH VANCOUVER BC V7M 1A5 CANADA Investor Relations Tel: 604-998-1250 Fax: 604-998-1253 Toll Free: 1-855-805-1250 email: info @ liononemetals.com www.liononemetals.com TSX-V: LIO OTCQX: LOMLF www.liononemetals.com 21