This document contains a list of 123 projects from 2012 across various domains including cloud computing, knowledge and data engineering, mobile computing, network security, network routing, network attack and induction detection, and more. Each project is given a unique code and covers technical topics such as secure cloud storage, mobile cloud architectures, network intrusion detection, traffic analysis, and topology management. Contact details are provided at the top for more information.
This document provides a list of 61 projects related to cloud computing, knowledge and data engineering, mobile computing, network security, network routing, and network attack and induction detection. Each project is given a project title, code, and year. Additional details on the projects can be found by visiting the provided website or by sending a request to the given email address.
This document lists 28 projects from 2012 across various domains including cloud computing, networking, parallel and distributed systems, secure computing, wireless communication, multimedia, data mining, image processing, and internet computing. It provides the project title, domain, and year for each project. Contact information is also provided for Temasolution, the organization associated with these projects.
This document lists 28 projects from 2012 across various domains including cloud computing, networking, parallel and distributed systems, secure computing, wireless communication, multimedia, data mining, image processing, and internet computing. It provides the project title, domain, and year for each project. Contact information is also provided for Temasolution, the organization associated with these projects.
This document lists 28 projects from 2012 across various domains including cloud computing, networking, parallel and distributed systems, secure computing, wireless communication, multimedia, data mining, image processing, and internet computing. It provides the project title, domain, and year for each project. Contact information is also provided for Temasolution, the organization associated with these projects.
This document lists 28 projects from 2012 across various domains including cloud computing, networking, parallel and distributed systems, secure computing, wireless communication, multimedia, data mining, image processing, and internet computing. It provides the project title, domain, and year for each project. Contact information is also provided for Temasolution, the organization associated with these projects.
This document lists 28 projects from 2012 across various domains including cloud computing, networking, parallel and distributed systems, secure computing, wireless communication, multimedia, data mining, image processing, and internet computing. It provides the project title, domain, and year for each project. Contact information is also provided for Temasolution, the organization associated with these projects.
This document lists 16 aeronautical projects including the design and analysis of various multicopter drones, micro air vehicles, and unmanned aerial vehicles. Projects involve computational stress analysis, design and fabrication, system integration, control stabilization techniques, and incorporating sensors and mechanisms for applications such as surveillance, delivery, and disaster response. The contact information provided is for Tema Solution, an engineering company located in Chennai, India.
NON IEEE PROJECT TITLES FOR JAVA & DOTNETtema_solution
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
This document provides a list of 61 projects related to cloud computing, knowledge and data engineering, mobile computing, network security, network routing, and network attack and induction detection. Each project is given a project title, code, and year. Additional details on the projects can be found by visiting the provided website or by sending a request to the given email address.
This document lists 28 projects from 2012 across various domains including cloud computing, networking, parallel and distributed systems, secure computing, wireless communication, multimedia, data mining, image processing, and internet computing. It provides the project title, domain, and year for each project. Contact information is also provided for Temasolution, the organization associated with these projects.
This document lists 28 projects from 2012 across various domains including cloud computing, networking, parallel and distributed systems, secure computing, wireless communication, multimedia, data mining, image processing, and internet computing. It provides the project title, domain, and year for each project. Contact information is also provided for Temasolution, the organization associated with these projects.
This document lists 28 projects from 2012 across various domains including cloud computing, networking, parallel and distributed systems, secure computing, wireless communication, multimedia, data mining, image processing, and internet computing. It provides the project title, domain, and year for each project. Contact information is also provided for Temasolution, the organization associated with these projects.
This document lists 28 projects from 2012 across various domains including cloud computing, networking, parallel and distributed systems, secure computing, wireless communication, multimedia, data mining, image processing, and internet computing. It provides the project title, domain, and year for each project. Contact information is also provided for Temasolution, the organization associated with these projects.
This document lists 28 projects from 2012 across various domains including cloud computing, networking, parallel and distributed systems, secure computing, wireless communication, multimedia, data mining, image processing, and internet computing. It provides the project title, domain, and year for each project. Contact information is also provided for Temasolution, the organization associated with these projects.
This document lists 16 aeronautical projects including the design and analysis of various multicopter drones, micro air vehicles, and unmanned aerial vehicles. Projects involve computational stress analysis, design and fabrication, system integration, control stabilization techniques, and incorporating sensors and mechanisms for applications such as surveillance, delivery, and disaster response. The contact information provided is for Tema Solution, an engineering company located in Chennai, India.
NON IEEE PROJECT TITLES FOR JAVA & DOTNETtema_solution
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
This document contains a list of 20 Android titles related to topics in data clustering, XML tree patterns, web performance forecasting, data reliability, data manifolds, process discovery, personal health records, single sign-on security, target tracking, driving directions, location management, social network anonymization, Wikipedia relationships, mobile presence services, approximate membership localization, RF location fingerprinting, location proof updating, neighbor position verification, rare class active learning, and exploiting data collection in wireless sensor networks. The document provides contact information for Tema Solution including their address, phone number, mobile number, website, and email.
2013 NEW PROJECT TITLES LIST FOR POWER SYSTEMtema_solution
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
2013 NEW PROJECT TITLES LIST FOR POWER ELECTRONICS TITLEStema_solution
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
2013 NEW PROJECT TITLES LIST FOR MECHANICAL TITLEStema_solution
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
2013 NEW PROJECT TITLES LIST FOR MECHANICALtema_solution
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
2013 NEW PROJECT TITLES LIST FOR MATLAP IMAGE PROCESSINGtema_solution
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
2013 NEW PROJECT TITLES LIST FOR JAVA AND DOTNETtema_solution
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
2013 NEW PROJECT TITLES LIST FOR EMBADDED SYSTEMtema_solution
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
2013 NEW PROJECT TITLES LIST FOR COMMUNICATIONtema_solution
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
2013 NEW PROJECT TITLES LIST FOR ANDROIDtema_solution
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
This document contains contact information for Temasolution, an organization that provides VLSI design services. It lists 72 VLSI design projects and codes them VL1 through VL72. More details on Temasolution's services can be found on their website at www.temasolution.com. Potential clients can send requests to info@temasolution.com.
IEEE REAL TIME PROJECT FOR POWER SYSTEMtema_solution
This document contains details about power systems consulting and solutions provided by Tema Solution, including their address, contact information, and a list of 39 power systems titles they provide solutions for. The titles cover topics related to fault detection, transmission lines, wind and solar power integration, electric vehicles, economic dispatch, and stability and security of power systems. More details can be found on their website at www.temasolution.com.
IEEE REAL TIME PROJECTS FOR POWER ELECTRONICtema_solution
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
IEEE REAL TIME PROJECTS FOR ALL BRANCHES Mechanical titlestema_solution
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
IEEE REAL TIME MATLAP COMMUNICATION PROJECTStema_solution
This document contains contact information for Tema Solution, an organization located in Chennai, India. It lists 33 titles related to communication topics, each with a unique code. More details on Tema Solution's services can be found on their website at www.temasolution.com by sending a request to info@temasolution.com.
IEEE PROJECT FOR MATLAP IMAGE PROCESSINGtema_solution
The document lists 68 MATLAB image processing codes available from Tema Solution, an image processing company located in Chennai, India. The codes cover a wide range of image processing topics including segmentation, classification, enhancement, and more. Contact information is provided to request more details on specific codes.
NON IEEE REAL TIME PROJECT FOR JAVA,DOTNET,ANDROIDtema_solution
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
IEEE REAL TIME PROJECT FOR ALL BRANCHEStema_solution
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
IEEE REAL TIME PROJECT AND NON IEEE PROJECT FOR ALL BRANCHEStema_solution
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
This document contains a list of 20 Android titles related to topics in data clustering, XML tree patterns, web performance forecasting, data reliability, data manifolds, process discovery, personal health records, single sign-on security, target tracking, driving directions, location management, social network anonymization, Wikipedia relationships, mobile presence services, approximate membership localization, RF location fingerprinting, location proof updating, neighbor position verification, rare class active learning, and exploiting data collection in wireless sensor networks. The document provides contact information for Tema Solution including their address, phone number, mobile number, website, and email.
2013 NEW PROJECT TITLES LIST FOR POWER SYSTEMtema_solution
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
2013 NEW PROJECT TITLES LIST FOR POWER ELECTRONICS TITLEStema_solution
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
2013 NEW PROJECT TITLES LIST FOR MECHANICAL TITLEStema_solution
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
2013 NEW PROJECT TITLES LIST FOR MECHANICALtema_solution
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
2013 NEW PROJECT TITLES LIST FOR MATLAP IMAGE PROCESSINGtema_solution
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
2013 NEW PROJECT TITLES LIST FOR JAVA AND DOTNETtema_solution
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
2013 NEW PROJECT TITLES LIST FOR EMBADDED SYSTEMtema_solution
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
2013 NEW PROJECT TITLES LIST FOR COMMUNICATIONtema_solution
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
2013 NEW PROJECT TITLES LIST FOR ANDROIDtema_solution
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
This document contains contact information for Temasolution, an organization that provides VLSI design services. It lists 72 VLSI design projects and codes them VL1 through VL72. More details on Temasolution's services can be found on their website at www.temasolution.com. Potential clients can send requests to info@temasolution.com.
IEEE REAL TIME PROJECT FOR POWER SYSTEMtema_solution
This document contains details about power systems consulting and solutions provided by Tema Solution, including their address, contact information, and a list of 39 power systems titles they provide solutions for. The titles cover topics related to fault detection, transmission lines, wind and solar power integration, electric vehicles, economic dispatch, and stability and security of power systems. More details can be found on their website at www.temasolution.com.
IEEE REAL TIME PROJECTS FOR POWER ELECTRONICtema_solution
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
IEEE REAL TIME PROJECTS FOR ALL BRANCHES Mechanical titlestema_solution
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
IEEE REAL TIME MATLAP COMMUNICATION PROJECTStema_solution
This document contains contact information for Tema Solution, an organization located in Chennai, India. It lists 33 titles related to communication topics, each with a unique code. More details on Tema Solution's services can be found on their website at www.temasolution.com by sending a request to info@temasolution.com.
IEEE PROJECT FOR MATLAP IMAGE PROCESSINGtema_solution
The document lists 68 MATLAB image processing codes available from Tema Solution, an image processing company located in Chennai, India. The codes cover a wide range of image processing topics including segmentation, classification, enhancement, and more. Contact information is provided to request more details on specific codes.
NON IEEE REAL TIME PROJECT FOR JAVA,DOTNET,ANDROIDtema_solution
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
IEEE REAL TIME PROJECT FOR ALL BRANCHEStema_solution
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
IEEE REAL TIME PROJECT AND NON IEEE PROJECT FOR ALL BRANCHEStema_solution
We are Offering the projects in quality and low price with free projects class and demonstration classes. Further Details visit our website TEMASOLUTION.COM
IEEE REAL TIME PROJECT AND NON IEEE PROJECT FOR ALL BRANCHES
Ieee 2012 titles for java & .net
1. 28,South Usman Road,, TNagar,
Chennai-17. Ph : 044-43855940
Mobile : +91-9042085008
Web : www.temasolution.com
email : temasolution@gmail.com
S.NO PROJECT TITLE CODE YEAR
CLOUD COMPUTING
1. HASBE: A Hierarchical Attribute-Based Solution for Flexible and Scalable JD001 2012
Access Control in Cloud Computing
2. A Secure Erasure Code-Based Cloud Storage System with Secure Data JD002 2012
Forwarding
3. Enabling Secure and Efficient Ranked Keyword Search over Outsourced JD003 2012
Cloud Data
4. A service oriented livestock management system using occasionally JD004 2012
connected mobile-cloud architecture
5. Privacy Preserving Access Control with Authentication for Securing Data in JD005 2012
Clouds
6. Data Outsourcing Simplified: Generating Data Connectors from JD006 2012
Confidentiality and Access Policies
7. Towards bringing real-time online applications on Clouds JD007 2012
8. An analysis of requirements to supporting mobility in Body Area Networks JD008 2012
KNOWLEDGE AND DATA ENGINEERING
9. Answering General Time-Sensitive Queries JD009 2012
10. Creating Evolving User Behaviour Profiles Automatically JD010 2012
11. Effective Pattern Discovery for Text Mining JD011 2012
12. Extending Attribute Information for Small Data Set Classification JD012 2012
13. Horizontal Aggregations in SQL to Prepare Data Sets for Data Mining JD013 2012
Analysis
14. Organizing User Search Histories JD014 2012
15. Outsourced Similarity Search on Metric Data Assets JD015 2012
16. Practical Efficient String Mining JD016 2012
17. Ranking Model Adaptation for Domain-Specific Search JD017 2012
18. Tree-Based Mining for Discovering Patterns of Human Interaction in JD018 2012
Meetings
19. Slicing: A New Approach for Privacy Preserving Data Publishing JD019 2012
20. SPIRE: Efficient Data Inference and Compression over RFID Streams JD020 2012
21. ROAD: A New Spatial Object Search Framework for Road Networks JD021 2012
Further more details visit : http://www.temasolution.com/downloads.html
send your request to : info@temasolution.com
2. 28,South Usman Road,, TNagar,
Chennai-17. Ph : 044-43855940
Mobile : +91-9042085008
Web : www.temasolution.com
email : temasolution@gmail.com
22. Saturn: Range Queries, Load Balancing and Fault Tolerance in DHT Data JD022 2012
Systems
23. Segmentation and Sampling of Moving Object Trajectories Based on JD023 2012
Representativeness
MOBILE COMPUTING
24. Approximation Algorithms for Data Broadcast in Wireless Networks JD024 2012
25. Enhancing Privacy and Accuracy in Probe Vehicle-Based Traffic Monitoring JD025 2012
via Virtual Trip Lines
26. Energy-Efficient Cooperative Video Distribution with Statistical QoS JD026 2012
Provisions over Wireless Networks
27. Mobile Data Offloading through Opportunistic Communications and Social JD027 2012
Participation
28. A New Mobile Spatial Information Service Grid Computing Model Based on JD028 2012
Mobile Agent
29. Mobile Computing Systems Programming: A Graduate Distributed JD029 2012
Computing Course
30. Mobile cloud computing service based on heterogeneous wireless and JD030 2012
mobile P2P networks
31. Mobile computing scheduling mechanism based on self ranking algorithm JD031 2012
32. Reducing location management costs in hierarchical-based model of mobile JD032 2012
and wireless computing systems
33. A proposal of a memory management architecture for mobile computing JD033 2012
environments
34. Real-time transaction management in mobile computing systems JD034 2012
35. A Distributed Cache Management Architecture for Mobile Computing JD035 2012
Environments
36. Trusted Management for Mobile Computing Entities Enabled by Fuzzy JD036 2012
Logic Approach
37. Monitoring and detecting abnormal behaviour in mobile cloud infrastructure JD037 2012
NETWORK SECURITY
38. Scalable Video Multicast with Adaptive Modulation and Coding in JD038 2012
Broadband Wireless Data Systems
39. Adaptive Opportunistic Routing for Wireless Ad Hoc Networks JD039 2012
40. Exploiting Data Fusion to Improve the Coverage of Wireless Sensor JD040 2012
Networks
41. Distributed Resource Allocation Based on Queue Balancing in Multihop JD041 2012
Cognitive Radio Networks
42. Insights on Media Streaming Progress Using BitTorrent-Like Protocols for JD042 2012
On-Demand Streaming
43. Bit Rate Reduction Video Transcoding with Distributed Computing JD043 2012
44. Distributed S-Net: Cluster and Grid Computing without the Hassle JD044 2012
Further more details visit : http://www.temasolution.com/downloads.html
send your request to : info@temasolution.com
3. 28,South Usman Road,, TNagar,
Chennai-17. Ph : 044-43855940
Mobile : +91-9042085008
Web : www.temasolution.com
email : temasolution@gmail.com
NETWORK ROUTING
45. Multi-rate combination of opportunistic routing and network coding: An JD045 2012
optimization perspective
46. LRNC: Lifetime-aware routing using network coding in wireless sensor JD046 2012
network
47. A Multipath Layered Cluster Based Routing for Ad Hoc Networks JD047 2012
48. Comparison of routing and network coding in undirected network group JD048 2012
communications
49. Measurement-Aware Monitor Placement and Routing: A Joint Optimization JD049 2012
Approach for Network-Wide Measurements
50. On dynamics of field based anycast routing in wireless mesh networks JD050 2012
51. Multipath routing backbones for load balancing in Mobile Ad hoc Networks JD051 2012
NETWORK ATTACK AND INDRUTION DETECION
52. Knowledge-independent traffic monitoring: Unsupervised detection of JD052 2012
network attacks
53. An efficient sequential watermark detection model for tracing network attack JD053 2012
flows
54. FireCol: A Collaborative Protection Network for the Detection of Flooding JD054 2012
DDoS Attacks
55. Detection and prevention of SIP flooding attacks in voice over IP networks JD055 2012
56. The Model — Dynamic and Flexible Intrusion Detection Protocol for high JD056 2012
error rate Wireless Sensor Networks based on data flow
57. Alert over the attacks of data packet and detect the intruders JD057 2012
58. Privacy-preserving anomaly detection across multi-domain networks JD058 2012
59. Classification and Experimental Analysis for Clone Detection Approaches in JD059 2012
Wireless Sensor Networks
60. Port-based traffic verification as a paradigm for anomaly detection JD060 2012
61. On detecting malicious behaviors in interactive networks: Algorithms and JD061 2012
analysis
62. Genetic algorithm and artificial immune systems: A combinational approach JD062 2012
for network intrusion detection
NETWORK TRAFFIC
63. Network traffic anomaly detection using machine learning approaches JD063 2012
64. Analysis and provisioning of network traffic in cloud environment using JD064 2012
Markov model
65. Traffic clustering and online traffic prediction in vehicle networks: A social JD065 2012
influence perspective
Further more details visit : http://www.temasolution.com/downloads.html
send your request to : info@temasolution.com
4. 28,South Usman Road,, TNagar,
Chennai-17. Ph : 044-43855940
Mobile : +91-9042085008
Web : www.temasolution.com
email : temasolution@gmail.com
66. Detecting anomalies in network traffic using Entropy and Mahalanobis JD066 2012
distance
67. Traffic Engineering for Multicast Connections in Multiservice Cellular JD067 2012
Networks
DATA MINING LATTICE BASED
68. Data Mining method based on Lattice JD068 2012
69. Application of data mining in educational databases for predicting academic JD069 2012
trends and patterns
70. Data mining based network intrusion detection system: A database centric JD070 2012
approach
71. Fuzzy Modeling Built Through a Data Mining Process JD071 2012
72. Visual data mining over a video wall JD072 2012
73. Relevance Matters: Capitalizing on Less (Top-k Matching in JD073 2012
Publish/Subscribe)
74. Multidimensional Analysis of Atypical Events in Cyber-Physical Data JD074 2012
75. The eICU Research Institute - A Collaboration Between Industry, Health- JD075 2012
Care Providers, and Academia
76. Deciphering human language [information extraction] JD076 2012
77. Architecture for the management and presentation of communication JD077 2012
network performance data
78. Smart shopper: an agent-based web-mining approach to Internet shopping JD078 2012
MULTIMEDIA
79. Interactive Video Indexing With Statistical Active Learning JD079 2012
80. Sparse Ensemble Learning for Concept Detection JD080 2012
81. A Matrix-Based Approach to Unsupervised Human Action Categorization JD081 2012
82. Robust Image Coding Based Upon Compressive Sensing JD082 2012
83. Web Video Geolocation by Geotagged Social Resources JD083 2012
BIOMEDICAL
84. Video Distribution Techniques over WiMAX Networks for m-Health JD084 2012
Applications
85. Secure Management of Biomedical Data With Cryptographic Hardware JD085 2012
86. Mobile Medical Visual Information Retrieval JD086 2012
IMAGE PROCESSING
Further more details visit : http://www.temasolution.com/downloads.html
send your request to : info@temasolution.com
5. 28,South Usman Road,, TNagar,
Chennai-17. Ph : 044-43855940
Mobile : +91-9042085008
Web : www.temasolution.com
email : temasolution@gmail.com
87. Scene-Oriented Hierarchical Classification of Blurry and Noisy Images JD087 2012
88. Improving Various Reversible Data Hiding Schemes Via Optimal Codes for JD088 2012
Binary Covers
89. Game-Theoretic Pricing for Video Streaming in Mobile Networks JD089 2012
IMAGE SEGMENTATION
90. Multiple kernel fuzzy C-means algorithm with ALS method for satellite and JD090 2012
medical image segmentation
91. Leap segmentation for recovering image surface layout JD091 2012
92. A Scale-Synthesis Method for High Spatial Resolution Remote Sensing JD093 2012
Image Segmentation
93. Multistage Image Clustering and Segmentation with Normalised Cuts JD093 2012
PARALLEL AND DISTRIBUTED SYSTEMS
94. Autonomic Placement of Mixed Batch and Transactional Workloads JD094 2012
95. An Online Data Access Prediction and Optimization Approach for JD095 2012
Distributed Systems
96. Cost-Driven Scheduling of Grid Workflows Using Partial Critical Paths JD096 2012
SOFTWARE ENGINEERING
97. QoS Assurance for Dynamic Reconfiguration of Component-Based Software JD097 2012
Systems
98. StakeRare: Using Social Networks and Collaborative Filtering for Large- JD098 2012
Scale Requirements Elicitation
99. Comparing Semi-Automated Clustering Methods for Personal Development JD099 2012
100. Invariant-Based Automatic Testing of Modern Web Applications JD100 2012
101. Automatically Generating Test Cases for Specification Mining JD101 2012
102. Aspectizing Java Access Control JD102 2012
DEPENDABLE AND SECURE COMPUTING
103. Automatic Reconfiguration for Large-Scale Reliable Storage Systems JD103 2012
104. Detecting and Resolving Firewall Policy Anomalies JD104 2012
105. DoubleGuard: Detecting Intrusions in Multitier Web Applications JD105 2012
106. JS-Reduce: Defending Your Data from Sequential Background Knowledge JD106 2012
Attacks
107. Incentive Compatible Privacy-Preserving Distributed Classification JD107 2012
Further more details visit : http://www.temasolution.com/downloads.html
send your request to : info@temasolution.com
6. 28,South Usman Road,, TNagar,
Chennai-17. Ph : 044-43855940
Mobile : +91-9042085008
Web : www.temasolution.com
email : temasolution@gmail.com
WEB MINING
108. Web 2.0 content extraction JD108 2012
109. Automated Security Test Generation with Formal Threat Models JD109 2012
110. Improving the Automation of Security Information Management: A JD110 2012
Collaborative Approach
111. Optimal Aviation Security Screening Strategies With Dynamic Passenger JD111 2012
Risk Updates
TOPOLOGY
112. Routing characterization in volatile connectivity environments JD112 2012
113. A Distributed Reliable and Energy-Efficient Topology Control Algorithm in JD113 2012
Wireless Sensor Network
114. A method of tree network topology inference based on hierarchical host table JD114 2012
115. Topology management for mission critical networks: Applying supply and JD115 2012
demand to manage public safety networks
116. SNMP-based network topology discovery algorithm and implementation JD116 2012
117. Overlaid Mesh Topology Design and Deadlock Free Routing in Wireless JD117 2012
Network-on-Chip
118. Topology Enhancements in Wireless Multihop Networks: A Top-Down JD118 2012
Approach
119. A dynamic detective method against ROP attack on ARM platform JD119 2012
120. Countering entropy measure attacks on packed software detection JD120 2012
121. Performance Modeling and Analysis of Network Firewalls JD121 2012
122. Research on Malicious Code Detection Based on Least-squares Estimation JD122 2012
123. Stochastic analysis of horizontal IP scanning JD123 2012
Further more details visit : http://www.temasolution.com/downloads.html
send your request to : info@temasolution.com