Humboldt WaveConnectTM Pilot Project
     A feasibility study of wave energy in Humboldt County




                 Chet Jamgochian
                 Greg Pfotenhauer
PG&E Wave Energy Study
• Initiated 2007
• Two sites considered
  – Mendocino County
     • Dismissed due to inadequate harbor
  – Humboldt County offshore Manila
Project Scope
•   3 nm offshore, 45m deep
•   Up to 4 arrays, max of 30 generators
•   5MW max total output
•   12kV transmission lines to Fairhaven
    – Gen Tie Infrastructure
    – Power Conditioning Devices (depending in final
      agreement)
    – Subsea Transmission Cable
       • 5 cables, one for each array and one spare
• Environmental monitoring buoys
    – Up to 6 environmental monitoring buoys
    – Up to 6 US Coast Guard approved markers as
      navigational aids
http://cwec.ucdavis.edu/forum2011/proc_open/Forum2011_Caliendo.pdf
http://cwec.ucdavis.edu/forum2011/proc_open/Forum2011_Caliendo.pdf
Technology
• 53 Invitations to WEC manufacturers
  – 14 responses
• Four types of technology selected
  – 1. Attenuators
  – 2. Point Absorber
  – 3. Oscillating Water Column
  – 4. Oscillating Wave Surge Converter
http://teeic.anl.gov/images/photos/hydrokinetic_attenuator.jpg   http://www.greendiary.com/wp-content/uploads/2012/07/1_errgg_22976.jpg




http://cwec.ucdavis.edu/forum2011/proc_open/Forum2011_Caliendo.pdf       http://nnmrec.oregonstate.edu/sites/default/files/Wavebob1.png
Conclusion
•   New technology
•   Developing regulatory framework
•   Uncertainty of environmental effects
•   Conflict with existing uses
•   High Costs

…Project Suspended

Humboldt wave connecttm pilot project2

  • 1.
    Humboldt WaveConnectTM PilotProject A feasibility study of wave energy in Humboldt County Chet Jamgochian Greg Pfotenhauer
  • 2.
    PG&E Wave EnergyStudy • Initiated 2007 • Two sites considered – Mendocino County • Dismissed due to inadequate harbor – Humboldt County offshore Manila
  • 3.
    Project Scope • 3 nm offshore, 45m deep • Up to 4 arrays, max of 30 generators • 5MW max total output • 12kV transmission lines to Fairhaven – Gen Tie Infrastructure – Power Conditioning Devices (depending in final agreement) – Subsea Transmission Cable • 5 cables, one for each array and one spare • Environmental monitoring buoys – Up to 6 environmental monitoring buoys – Up to 6 US Coast Guard approved markers as navigational aids
  • 4.
  • 5.
  • 6.
    Technology • 53 Invitationsto WEC manufacturers – 14 responses • Four types of technology selected – 1. Attenuators – 2. Point Absorber – 3. Oscillating Water Column – 4. Oscillating Wave Surge Converter
  • 7.
    http://teeic.anl.gov/images/photos/hydrokinetic_attenuator.jpg http://www.greendiary.com/wp-content/uploads/2012/07/1_errgg_22976.jpg http://cwec.ucdavis.edu/forum2011/proc_open/Forum2011_Caliendo.pdf http://nnmrec.oregonstate.edu/sites/default/files/Wavebob1.png
  • 8.
    Conclusion • New technology • Developing regulatory framework • Uncertainty of environmental effects • Conflict with existing uses • High Costs …Project Suspended