Hesham Ahmed Mahfouz
10d Sama Cairo - Maadi ring Road – Cairo – Egypt E- mail:
Hesham_ahmed84@hotmail.com , Mobile: +2 0122 2712720 - +2 0100 1685478
Objective A challenging position with a multinational corporation where by my technical and
interpersonal skills can be applied and developed.
Education
2008 BSc of Engineering - Mechanical Power department.
Degree: Pass.
Graduation project: New design of control valve.
Degree: Excellent.
Explanation: Design and manufacture of a new valve contain two valves in
parallel (quick opening valve and slow opening valve) which gives a very wide
range of control.
University: Helwan University.
Work
experience
Dec. 2014 – Present
- Working for Sinai white cement company (AALBORG Co.) Cementir
holding as Raw meal Area section head and Pet coke project manager
deputy reported to both Production Manager and Project Manager.
- Following up the operation and maintenance of raw meal area.
- Providing performance reports about the area includes productivity,
availability and main stoppage reasons and the recommendations for
increasing the performance and efficiency.
- Following up the raw materials (purchasing and quality).
- Responsible for the pet coke project and reporting to the project manager.
- Responsible for Tech. ICB’s (Internal control budget).
- Responsible for Tech. KPI’s.
- Responsible for the packing plan.
- Responsible for the Environmental report.
- Responsible for the Tech. PR’s following and its PO’s with purchasing
dept.
Oct. 2012 – Nov. 2014
- Working for Sinai white cement company (AALBORG Co.) Cementir
holding as Shift leader
- Following up the operation of the plant on shift basis to help ensure the
smooth and efficient operation of the plant.
- Beside all duties of my previous title as Tech. director assistant in the
period from June-10 till Sep-12.
June 2010 – Sep 2012
- Working for Sinai white cement company (AALBORG Co.) Cementir
holding as Technical Director Assistant
- Working on annual production budget (ICB’s) & its updates (monthly).
- Working on monthly packing plan.
- Working on Technical KPI’s.
- Working on Environmental report.
- Working on new projects (Budget- Planning- Offers- Offers comparison
sheets -Constructions).
- Technical reports about performance and operation.
- Beside Day by day tasks.
Feb 2009 – June 2010
- Working for Sinai white cement company (AALBORG Co.) as
Mechanical and Projects Engineer.
- Following up new projects (Business cases- Designs - PR - offers -
erection - punch list).
- Full responsibility of three projects (Ck loading system – Cement recycle
system and Plant new gate and weigh bridge)
- Working on purchasing requests for needed materials.
- Working as preparation & spare parts engineer
- Working on PGT (Performance Grantee Test of line II).
- Daily shift report for stoppages and equipments maintenance.
- Following up new cement mill erection & operation.
- Following up the maintenance & operation of the plant.
- Following up schedule shut down maintenance of the factory.
- Following Gas pipe line erection and system testing and pushing the
natural gas in the system.
- Making 3 different designs for a tool which used with the new packing
machine and manufacturing one of them which work with high
performance.
June 2006 – Summer Internship at Belayim Petroleum CO.
(Petrobel) – Abu-Rudies camp (training).
June 2007 - Summer Internship at Belayim Petroleum CO.
(Petrobel) – Abu-Rudies camp (training)..
Interests and
activities
Computer Skills:
• Maintaining of operating systems concepts (all
versions of windows).
• Internet (Browsing & E-mailing.).
• Hardware computer maintenance.
• Microsoft office programs (Word – Excel – Power
point – Outlook).
• Master in Auto-CAD 2008 (2D-3D), certificate by
Auto-Desk.
• Primavera project management (6) certificate by
AUC (American University in Cairo).
Language Skills:
• Fluent in spoken and written Arabic.
• Very good in spoken and written English.
• Fair in spoken and written Italian.
Courses July 2011 - Primavera project management Course American University in
Cairo (AUC).
April 2011 – Presentation skills course by ASEC center.
July 2010 - Hydraulic course by ASEC CENTER 48hr. (Basics-Pumps-
motors- valves- and cement industry applications)
Sep 2008 - Auto-CAD 2008 course (2d - 3d) by (YAT center - Egypt)
(Auto-desk Certificate) 75hr.
Jan 2008 - ICDL course by Helwan University (Microsoft Certificate).
Personal
Information
Marital status: Married.
Nationality: Egyptian.
Date of birth: 01/05/1984.
Place of Birth: Egypt (Cairo)
Car owner: Yes
Driving license: yes
Military status Exempted
References Furnished Upon request

HeshamAhmed-CV

  • 1.
    Hesham Ahmed Mahfouz 10dSama Cairo - Maadi ring Road – Cairo – Egypt E- mail: Hesham_ahmed84@hotmail.com , Mobile: +2 0122 2712720 - +2 0100 1685478 Objective A challenging position with a multinational corporation where by my technical and interpersonal skills can be applied and developed. Education 2008 BSc of Engineering - Mechanical Power department. Degree: Pass. Graduation project: New design of control valve. Degree: Excellent. Explanation: Design and manufacture of a new valve contain two valves in parallel (quick opening valve and slow opening valve) which gives a very wide range of control. University: Helwan University. Work experience Dec. 2014 – Present - Working for Sinai white cement company (AALBORG Co.) Cementir holding as Raw meal Area section head and Pet coke project manager deputy reported to both Production Manager and Project Manager. - Following up the operation and maintenance of raw meal area. - Providing performance reports about the area includes productivity, availability and main stoppage reasons and the recommendations for increasing the performance and efficiency. - Following up the raw materials (purchasing and quality). - Responsible for the pet coke project and reporting to the project manager. - Responsible for Tech. ICB’s (Internal control budget). - Responsible for Tech. KPI’s. - Responsible for the packing plan. - Responsible for the Environmental report. - Responsible for the Tech. PR’s following and its PO’s with purchasing dept. Oct. 2012 – Nov. 2014 - Working for Sinai white cement company (AALBORG Co.) Cementir holding as Shift leader - Following up the operation of the plant on shift basis to help ensure the smooth and efficient operation of the plant. - Beside all duties of my previous title as Tech. director assistant in the period from June-10 till Sep-12.
  • 2.
    June 2010 –Sep 2012 - Working for Sinai white cement company (AALBORG Co.) Cementir holding as Technical Director Assistant - Working on annual production budget (ICB’s) & its updates (monthly). - Working on monthly packing plan. - Working on Technical KPI’s. - Working on Environmental report. - Working on new projects (Budget- Planning- Offers- Offers comparison sheets -Constructions). - Technical reports about performance and operation. - Beside Day by day tasks. Feb 2009 – June 2010 - Working for Sinai white cement company (AALBORG Co.) as Mechanical and Projects Engineer. - Following up new projects (Business cases- Designs - PR - offers - erection - punch list). - Full responsibility of three projects (Ck loading system – Cement recycle system and Plant new gate and weigh bridge) - Working on purchasing requests for needed materials. - Working as preparation & spare parts engineer - Working on PGT (Performance Grantee Test of line II). - Daily shift report for stoppages and equipments maintenance. - Following up new cement mill erection & operation. - Following up the maintenance & operation of the plant. - Following up schedule shut down maintenance of the factory. - Following Gas pipe line erection and system testing and pushing the natural gas in the system. - Making 3 different designs for a tool which used with the new packing machine and manufacturing one of them which work with high performance. June 2006 – Summer Internship at Belayim Petroleum CO. (Petrobel) – Abu-Rudies camp (training). June 2007 - Summer Internship at Belayim Petroleum CO. (Petrobel) – Abu-Rudies camp (training).. Interests and activities Computer Skills: • Maintaining of operating systems concepts (all versions of windows). • Internet (Browsing & E-mailing.). • Hardware computer maintenance. • Microsoft office programs (Word – Excel – Power point – Outlook). • Master in Auto-CAD 2008 (2D-3D), certificate by Auto-Desk. • Primavera project management (6) certificate by AUC (American University in Cairo).
  • 3.
    Language Skills: • Fluentin spoken and written Arabic. • Very good in spoken and written English. • Fair in spoken and written Italian. Courses July 2011 - Primavera project management Course American University in Cairo (AUC). April 2011 – Presentation skills course by ASEC center. July 2010 - Hydraulic course by ASEC CENTER 48hr. (Basics-Pumps- motors- valves- and cement industry applications) Sep 2008 - Auto-CAD 2008 course (2d - 3d) by (YAT center - Egypt) (Auto-desk Certificate) 75hr. Jan 2008 - ICDL course by Helwan University (Microsoft Certificate). Personal Information Marital status: Married. Nationality: Egyptian. Date of birth: 01/05/1984. Place of Birth: Egypt (Cairo) Car owner: Yes Driving license: yes Military status Exempted References Furnished Upon request