PROJECT	
  BRIEF	
  
	
  
CONSTRUCTION	
  OF	
  	
  
	
  
“HOME”	
  
	
  
JALAN	
  PJS	
  5/28,	
  PUSAT	
  DAGANGAN	
  PETALING	
  JAYA	
  SELATAN,	
  	
  
SELANGOR,	
  MALAYSIA	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
PREPARED	
  BY	
  NURUL	
  ATIQAH	
  BT	
  MOHD	
  GHAZALI	
  
	
  
(0325630)	
  
	
  
MODULE:	
  INTRODUCTION	
  TO	
  CONSTRUCTION	
  INDUSTRY	
  	
  
	
  
INTAKE:	
  FNBE	
  JULY	
  2015	
  
	
  
LECTURER:	
  PN.	
  HASMANIRA	
  –	
  MISS.	
  ANN	
  	
  
	
  
CONTENTS	
  
	
  
1. Introduction	
  to	
  the	
  Project	
  
a. Project	
  Description	
  
b. Site	
  Analysis	
  and	
  Observation	
  
c. Project	
  Concept	
  and	
  Ideas	
  
d. Visuals:	
  Diagrams,	
  Sketches	
  and	
  Images	
  	
  
e. Project	
  Benefits	
  
2. Project	
  Organization	
  
a. 	
  Overview	
  
b. Project	
  Management	
  Team	
  
c. Team	
  Objective	
  
d. Tasks	
  
	
  
	
  
	
  
	
  
1.	
  INTRODUCTION	
  TO	
  THE	
  PROJECT	
  
	
  
a.	
  Project	
  Description	
  
	
  
The	
  name	
  of	
  this	
  project	
  is	
  “Home”.	
  This	
  project	
  proposes	
  to	
  create	
  a	
  commercial	
  area	
  in	
  the	
  land	
  of	
  3,	
  500	
  meter	
  squared	
  (70m	
  x	
  50m).	
  	
  
It	
  is	
  located	
  in	
  Jalan	
  PJS	
  5/28,	
  Pusat	
  Dagangan	
  Petaling	
  Jaya	
  Selatan,	
  Selangor,	
  Malaysia.	
  This	
  project	
  involves	
  the	
  construction	
  of	
  the	
  
commercial	
  building.	
  The	
  area	
  of	
  the	
  commercial	
  building	
  is	
  810	
  meter	
  squared	
  (30m	
  x	
  27m).	
  It	
  is	
  a	
  3-­‐floor	
  building	
  and	
  it	
  consists	
  of	
  a	
  
hypermarket:	
  ground	
  floor	
  selling	
  agricultural	
  products	
  and	
  food,	
  2nd	
  floor	
  selling	
  clothes	
  and	
  3rd	
  floor	
  selling	
  housing	
  items.	
  There	
  are	
  
also	
  some	
  parking	
  lots	
  available	
  around	
  the	
  commercial	
  building	
  for	
  the	
  people	
  that	
  want	
  to	
  shop	
  there.	
  	
  	
  
	
  
This	
  proposal	
  is	
  estimate	
  to	
  be	
  approved	
  and	
  signed	
  by	
  November	
  20,	
  2015.	
  The	
  construction	
  process	
  would	
  take	
  about	
  12	
  months.	
  
	
  
	
  
	
  
	
  
PLAN	
  VIEW	
  OF	
  EXISTING	
  SITE	
  
Page	
  1	
  
 
LOCATION	
  PLAN	
  OF	
  THE	
  SITE	
  
(The	
  red	
  boundary	
  line	
  is	
  where	
  the	
  commercial	
  area	
  is	
  located)	
  	
  
Page	
  2	
  
b.	
  	
  Site	
  Analysis	
  and	
  Observation	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Observation	
  of	
  the	
  site	
  includes	
  how	
  it	
  is	
  abandoned	
  and	
  that	
  it	
  is	
  securely	
  closed.	
  It	
  has	
  a	
  fence	
  around	
  it	
  to	
  prevent	
  people	
  from	
  going	
  
in.	
  But	
  in	
  the	
  site,	
  the	
  area	
  is	
  covered	
  with	
  mostly	
  grass	
  and	
  trees.	
  	
  
Fence	
  around	
  the	
  site	
  and	
  parking	
  lot	
  near	
  it.	
   Commercial	
  buildings	
  
The	
  entrance	
  door	
  to	
  the	
  site.	
   Commercial	
  buildings	
  with	
  small	
  shops,	
  pharmacies	
  
and	
  restaurants.	
  
Page	
  3	
  
The	
  site	
  is	
  ideal	
  for	
  the	
  commercial	
  area	
  due	
  to	
  the	
  following	
  site	
  analysis:	
  
	
  
• There	
  are	
  many	
  residential	
  areas	
  around	
  there.	
  Many	
  houses	
  are	
  
located	
  on	
  the	
  eastern	
  side	
  of	
  the	
  site.	
  	
  	
  
• There	
  are	
  also	
  some	
  apartments	
  located	
  on	
  the	
  southern	
  and	
  
northern	
  part	
  of	
  the	
  area.	
  
• Northern	
  part	
  of	
  the	
  site	
  has	
  many	
  blocks	
  of	
  commercial	
  buildings:	
  
small	
  shops,	
  restaurants,	
  pharmacies,	
  hotels	
  and	
  mini	
  market.	
  	
  
• There	
  are	
  already	
  many	
  parking	
  lots	
  available	
  near	
  there,	
  so	
  car	
  
parks	
  don’t	
  need	
  to	
  be	
  constructed	
  inside	
  the	
  proposed	
  commercial	
  
area.	
  
• Not	
  much	
  pedestrian	
  path	
  is	
  available	
  around	
  the	
  site.	
  
• Many	
  bus	
  pass	
  by	
  the	
  area	
  of	
  the	
  site.	
  
• There	
  is	
  a	
  lake	
  located	
  about	
  40	
  meter	
  away	
  from	
  the	
  site.	
  	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
Page	
  4	
  
 
MASTER	
  PLAN	
  “HOME”	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  	
  ENTRANCE	
  FOR	
  CAR	
  
ENTRANCE	
  FOR	
  
PEDESTRIAN	
  
	
  ENTRANCE	
  FOR	
  
TRUCKS	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  EXIT	
  FOR	
  BOTH	
  
TRUCKS	
  AND	
  CARS	
  
Page	
  5	
  
 
LOCATION	
  PLAN	
  OF	
  THE	
  SITE	
  
	
  
	
  
c.	
  Project	
  Concepts	
  and	
  Ideas	
  
	
  
After	
  conducting	
  the	
  site	
  analysis,	
  the	
  project	
  plan	
  is	
  to	
  construct	
  a	
  commercial	
  area	
  where	
  residents	
  can	
  go	
  and	
  shop	
  for	
  home	
  materials	
  
such	
  as	
  food,	
  clothing	
  and	
  home	
  furniture.	
  	
  
	
  
The	
  concept	
  and	
  ideas	
  of	
  	
  “Home”	
  are:	
  
• There	
  will	
  be	
  a	
  wall	
  surrounding	
  the	
  land.	
  
• There	
  is	
  2	
  entrance	
  to	
  go	
  in	
  the	
  area.	
  If	
  residents	
  want	
  to	
  come	
  in	
  by	
  car	
  and	
  park	
  inside	
  the	
  area,	
  they	
  have	
  to	
  pass	
  through	
  the	
  
entrance	
  barrier.	
  A	
  payment	
  have	
  to	
  be	
  made	
  in	
  order	
  to	
  park	
  inside	
  the	
  commercial	
  area.	
  	
  Another	
  entrance	
  is	
  only	
  for	
  
pedestrians.	
  This	
  is	
  for	
  people	
  that	
  walked	
  to	
  the	
  hypermarket	
  and	
  it	
  just	
  have	
  gate	
  door.	
  	
  
• There	
  are	
  not	
  many	
  parking	
  inside	
  the	
  area	
  due	
  to	
  many	
  parking	
  already	
  outside	
  the	
  area.	
  So	
  only	
  26	
  parking	
  lots.	
  
• Shrubs	
  and	
  shading	
  trees	
  are	
  located	
  in	
  front	
  of	
  	
  the	
  car	
  parks	
  to	
  give	
  some	
  shading	
  and	
  some	
  nature	
  element.	
  	
  
• The	
  front,	
  and	
  2	
  sides	
  of	
  the	
  commercial	
  building	
  have	
  a	
  pedestrian	
  walkway.	
  	
  
• On	
  the	
  pedestrian	
  walkway,	
  there	
  are	
  some	
  benches	
  to	
  for	
  shoppers	
  to	
  sit	
  on	
  and	
  wait	
  for	
  their	
  family.	
  
• There	
  are	
  also	
  a	
  rest	
  area	
  on	
  the	
  	
  left	
  side	
  of	
  the	
  building.	
  Benches	
  are	
  provided	
  as	
  well	
  as	
  some	
  shading	
  trees.	
  No	
  vehicles	
  are	
  
allowed	
  to	
  pass	
  by	
  here.	
  
• The	
  back	
  of	
  the	
  building	
  is	
  only	
  allowed	
  for	
  trucks	
  that	
  delivered	
  the	
  products.	
  There	
  will	
  be	
  a	
  fenced	
  to	
  cover	
  that	
  part.	
  Trucks	
  
have	
  their	
  own	
  entrance.	
  They	
  also	
  have	
  their	
  own	
  parking	
  lots	
  as	
  well	
  as	
  a	
  big	
  dumpster.	
  	
  
• Dustbins	
  are	
  available	
  at	
  the	
  edge	
  part	
  of	
  the	
  building	
  in	
  front.	
  
• The	
  exit	
  is	
  located	
  near	
  the	
  back	
  of	
  the	
  building.	
  
• The	
  roofs	
  of	
  the	
  building	
  are	
  glass.	
  
• There	
  is	
  a	
  tile	
  flooring	
  for	
  the	
  pedestrian	
  to	
  walk	
  on	
  and	
  push	
  their	
  trolleys	
  on.	
  
	
  
	
  
	
  
	
  
	
  
	
  
Page	
  6	
  
 
d. Visuals:	
  Diagrams,	
  Sketches	
  and	
  Images	
  
	
  
BUBBLE	
  DIAGRAM	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
SEAT	
  
GATHERING	
   REST	
  
PLANTINGS	
  
PEDESTRIAN	
  
PATH	
  
COMMERCIAL	
  
BUILDING	
  
PARKING	
  
LOTS	
  
PLANTINGS	
  
Page	
  7	
  
IMAGES	
  
	
   	
  
Shading	
  Trees	
  
Bushes	
  
Lamppost	
  
Benches	
  
Page	
  8	
  
 
	
   	
  
Entrance	
  Barrier
Car	
  Parks
Pedestrian	
  Walkway	
  
Glass	
  Curve	
  Rooftop	
  
Page	
  9	
  
 
	
   	
  
Dustbin	
  
Dumpster	
  
Supermarket	
  Sign	
  
Board	
  
Page	
  10	
  
SKETCHES	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
  
	
   	
  
Page	
  11	
  
Sketch	
  of	
  the	
  entrance	
  to	
  the	
  
commercial	
  area	
  “Home”	
  
Sketch	
  of	
  the	
  
commercial	
  building	
  
“Home”	
  
Sketch	
  of	
  the	
  car	
  parks,	
  
trees	
  and	
  bushes	
  
3. Project	
  Benefits	
  
	
  
• Residents	
  can	
  gain	
  benefit	
  from	
  this	
  by	
  saving	
  them	
  time	
  from	
  traveling	
  far	
  to	
  grocery	
  shop.	
  They	
  can	
  just	
  go	
  by	
  walking	
  if	
  
their	
  home	
  is	
  near.	
  
• Shoppers	
  might	
  go	
  to	
  near	
  restaurants	
  near	
  there	
  and	
  the	
  restaurants	
  would	
  gain	
  profit.	
  
• The	
  space	
  of	
  the	
  land	
  is	
  perfectly	
  utilized.	
  
• Not	
  much	
  parking	
  lot	
  is	
  available	
  in	
  the	
  land	
  therefore	
  it	
  won’t	
  be	
  too	
  crowded	
  in	
  the	
  commercial	
  area.	
  
• The	
  soft	
  scape	
  and	
  hardscape	
  elements	
  give	
  a	
  nice	
  atmosphere	
  and	
  make	
  the	
  area	
  look	
  more	
  developed	
  with	
  nature.	
  
	
  
2.	
  Project	
  Organization	
  
	
  
a.	
  Overview	
  
	
  
Project	
  Requestor:	
  Jurapat	
  Sdn.	
  Berhad	
  
Project	
  Sponsor:	
  Jurapat	
  Sdn.	
  Berhad	
  
Project	
  Owner:	
  Jurapat	
  Sdn.	
  Berhad	
  
Project	
  Manager:	
  Ar.	
  Nurul	
  Atiqah	
  	
  
	
  
Team	
  Members:	
  
• Architect	
  -­‐	
  Ar.	
  Nurul	
  Atiqah	
  Binti	
  	
  
• Landscape	
  Architect	
  -­‐	
  Ar.	
  Hanis	
  Maisarah	
  	
  	
  
• Quantity	
  Surveyor	
  -­‐	
  Sr.	
  Najmi	
  Afiquddin	
  
• Civil	
  and	
  Structural	
  Engineer	
  –	
  Ir.	
  Mohd	
  Ghazali	
  
• Mechanical	
  and	
  Electrical	
  Engineer	
  –	
  Mr.	
  Mohd	
  Faris	
  
• Contractor	
  –	
  Miss	
  Natasya	
  Jasmin	
  
	
  
Page	
  12	
  
b.	
  Tasks	
  
	
  
Architect:	
  
• Have	
  to	
  translate	
  the	
  site	
  requirements,	
  create	
  a	
  concept	
  and	
  designs	
  and	
  then	
  make	
  it	
  into	
  reality.	
  
• Ascertaining	
  and	
  interpreting	
  the	
  Jurupat	
  Sdn	
  Berhad’s	
  requirement.	
  
• Coordinate	
  necessary	
  environmental	
  and	
  engineering	
  service	
  to	
  building	
  design.	
  
• Clarify	
  client’s	
  requirement	
  in	
  a	
  building	
  project	
  because	
  of	
  their	
  knowledge	
  in	
  site	
  analysis,	
  building	
  regulations	
  and	
  building	
  
design.	
  
• Prepare	
  estimated	
  cost	
  and	
  the	
  project	
  timeline	
  (starting	
  date,	
  duration	
  of	
  the	
  process,	
  etc.)	
  
• Have	
  to	
  submit	
  drawings	
  to	
  authorities	
  for	
  approval.	
  
• Awarding	
  tenders	
  and	
  contract	
  administration.	
  	
  
• Administrating	
  building	
  contract-­‐	
  help	
  resolve	
  problems	
  between	
  clients	
  and	
  contractor.	
  
• Able	
  to	
  handle	
  cost,	
  design	
  issues	
  and	
  consultants	
  appointments.	
  
• Outline	
  proposal	
  and	
  sketch	
  the	
  design	
  of	
  the	
  building.	
  Should	
  know	
  the	
  time	
  and	
  costing.	
  
• Submit	
  design	
  development	
  and	
  product	
  information.	
  
• Supervise	
  the	
  progress	
  on	
  site	
  and	
  advise	
  on	
  insurance	
  required.	
  
• Ensure	
  that	
  the	
  progress	
  on	
  the	
  site	
  is	
  monitored	
  and	
  meet	
  requirements.	
  
• Resolve	
  any	
  contract	
  dispute.	
  
• Submit	
  modification	
  of	
  the	
  design	
  of	
  “Home”	
  to	
  contractor.	
  
• Conduct	
  assessment	
  of	
  “Home”	
  to	
  Jurupat	
  Sdn.	
  Berhad	
  authorities.	
  
• Consider	
  any	
  operations	
  of	
  facilities	
  of	
  “Home”	
  and	
  think	
  about	
  further	
  maintenance.	
  
• Ensure	
  that	
  requirements	
  and	
  dealines	
  are	
  met.	
  
	
  
Landscape	
  Architect:	
  
• Look	
  at	
  the	
  design	
  of	
  “Home”	
  and	
  include	
  some	
  urban	
  schemes	
  and	
  natural	
  characteristics	
  of	
  the	
  given	
  site.	
  
• Establish	
  general	
  landscape	
  requirements	
  with	
  Jurupat	
  Sdn.	
  Berhad.	
  
• Conduct	
  assessment	
  and	
  site	
  analysis	
  of	
  the	
  site	
  for	
  “Home”	
  (soils,	
  buildings).	
  
• Present	
  to	
  clients	
  the	
  proposal	
  and	
  deal	
  with	
  any	
  problems	
  and	
  negotiate	
  with	
  them	
  for	
  the	
  final	
  design.	
  	
  
Page	
  13	
  
• Asses	
  “Home”	
  ‘s	
  potential	
  and	
  meet	
  the	
  client’s	
  requirements	
  and	
  specification.	
  
• Carry	
  out	
  any	
  environmental	
  impact	
  assessment	
  of	
  constructing	
  “Home”.	
  
• Select	
  hardscapes	
  and	
  soft-­‐scapes	
  (materials	
  and	
  plants)	
  to	
  be	
  implement	
  in	
  “Home”.	
  
• Get	
  rid	
  of	
  any	
  existing	
  plants	
  that	
  are	
  not	
  needed	
  anymore	
  or	
  that	
  are	
  not	
  well	
  maintained.	
  	
  	
  
• Prepare	
  and	
  present	
  detailed	
  drawings	
  and	
  plans,	
  including	
  applications,	
  construction	
  and	
  specifications	
  for	
  	
  “Home”.	
  
• Monitor	
  and	
  check	
  on	
  site	
  frequently	
  
• Ensure	
  that	
  the	
  plants	
  are	
  put	
  into	
  the	
  right	
  place.	
  
• Authorizing	
  payment	
  once	
  construction	
  work	
  of	
  “Home”	
  is	
  completed.	
  
	
  
Quantity	
  Surveyor:	
  
• Go	
  to	
  site	
  visit	
  with	
  the	
  Architect,	
  Landscape	
  Architect	
  and	
  Clients.	
  
• Estimate	
  the	
  define	
  project	
  budget	
  of	
  “Home”.	
  
• Analyze	
  the	
  effect	
  of	
  design	
  changes	
  on	
  the	
  project	
  budget	
  of	
  “Home”.	
  
• Create	
  order	
  of	
  cost	
  and	
  estimate,	
  then	
  obtain	
  strategy	
  of	
  “Home”.	
  
• Negotiate	
  with	
  both	
  the	
  Architect	
  and	
  Landscape	
  Architect	
  regarding	
  the	
  cost	
  of	
  “Home”.	
  
• Prepare	
  Bill	
  of	
  Quantities	
  to	
  assist	
  in	
  tender	
  process.	
  
• Provision	
  of	
  cost	
  control	
  service	
  during	
  construction	
  process.	
  
• Asses	
  contractor’s	
  progress	
  and	
  variation	
  claims	
  while	
  constructing	
  “Home”.	
  
• Negotiate	
  and	
  settle	
  things	
  during	
  construction	
  process..	
  
• Carry	
  out	
  monthly	
  predictions	
  and	
  report	
  the	
  costs	
  during	
  construction	
  process.	
  
• Carry	
  out	
  monthly	
  negotiations	
  and	
  agreements	
  of	
  payment	
  for	
  “Home”.	
  
• Prepare	
  tax	
  depreciation	
  reports	
  for	
  Jurupat	
  Sdn.	
  Berhad.	
  
• Prepare	
  detailed	
  cost	
  analysis	
  and	
  Statement	
  of	
  Final	
  Account.	
  
	
  
Civil	
  and	
  Structural	
  Engineer	
  
• Design	
  structures	
  to	
  ensure	
  that	
  the	
  building,	
  the	
  floors	
  withstands	
  stresses	
  and	
  pressure	
  
• Able	
  to	
  construct	
  a	
  building	
  that	
  would	
  stand	
  for	
  a	
  long	
  period	
  of	
  time.	
  
• Choose	
  appropriate	
  materials	
  to	
  meet	
  specifications	
  of	
  the	
  design	
  for	
  “Home”.	
  	
  
Page	
  14	
  
• Analyze	
  the	
  roads	
  and	
  parking	
  lots.	
  
• Conduct	
  analysis	
  for	
  stress	
  and	
  pressure	
  and	
  make	
  sure	
  that	
  each	
  component	
  of	
  structures	
  in	
  “Home”	
  will	
  experience	
  due	
  to	
  
human	
  or	
  environmental	
  factors.	
  
• Ensure	
  the	
  safety	
  and	
  risks	
  of	
  “Home”	
  .	
  
• Include	
  a	
  safety	
  plan	
  when	
  there	
  is	
  a	
  fire.	
  
	
  
Mechanical	
  and	
  Electrical	
  Engineer	
  
• Collaborate	
  with	
  Architect	
  and	
  landscape	
  Architect	
  for	
  a	
  plan	
  for	
  electrical	
  works.	
  
• Specialist	
  in	
  electrical	
  works	
  such	
  as	
  air	
  conditioning,	
  electrical	
  wiring,	
  lights.	
  
• Make	
  sure	
  that	
  the	
  lights	
  are	
  bright	
  enough	
  to	
  see	
  clearly	
  and	
  not	
  too	
  dim	
  when	
  at	
  night.	
  
• Make	
  sure	
  fire	
  alarms	
  are	
  installed.	
  
	
  
Contractor	
  
• Tender	
  for	
  the	
  job	
  of	
  construction	
  “Home”.	
  
• Complete	
  works	
  at	
  a	
  given	
  time	
  and	
  budget	
  when	
  assigned.	
  
• Carry	
  out	
  quality	
  construction	
  of	
  	
  “Home”	
  by	
  giving	
  a	
  multi	
  disciplined	
  workforce.	
  
• Consult	
  and	
  give	
  orders	
  to	
  workers.	
  
• Provide	
  information	
  that	
  is	
  sufficient	
  and	
  relevant	
  for	
  the	
  workers	
  to	
  build	
  “Home”.	
  
• Ensure	
  that	
  “Home”	
  is	
  build	
  accurately	
  as	
  the	
  drawings	
  and	
  plans.	
  
• Make	
  agreements	
  with	
  the	
  Architect,	
  Landscape	
  Architect	
  and	
  owners	
  to	
  achieve	
  the	
  goal	
  of	
  “Home”	
  being	
  completed	
  on	
  the	
  
deadline.	
  
	
  
	
  
Page	
  15	
  

FINAL ICI Project : Project Brief

  • 1.
          PROJECT  BRIEF     CONSTRUCTION  OF       “HOME”     JALAN  PJS  5/28,  PUSAT  DAGANGAN  PETALING  JAYA  SELATAN,     SELANGOR,  MALAYSIA                   PREPARED  BY  NURUL  ATIQAH  BT  MOHD  GHAZALI     (0325630)     MODULE:  INTRODUCTION  TO  CONSTRUCTION  INDUSTRY       INTAKE:  FNBE  JULY  2015     LECTURER:  PN.  HASMANIRA  –  MISS.  ANN      
  • 2.
    CONTENTS     1.Introduction  to  the  Project   a. Project  Description   b. Site  Analysis  and  Observation   c. Project  Concept  and  Ideas   d. Visuals:  Diagrams,  Sketches  and  Images     e. Project  Benefits   2. Project  Organization   a.  Overview   b. Project  Management  Team   c. Team  Objective   d. Tasks          
  • 3.
    1.  INTRODUCTION  TO  THE  PROJECT     a.  Project  Description     The  name  of  this  project  is  “Home”.  This  project  proposes  to  create  a  commercial  area  in  the  land  of  3,  500  meter  squared  (70m  x  50m).     It  is  located  in  Jalan  PJS  5/28,  Pusat  Dagangan  Petaling  Jaya  Selatan,  Selangor,  Malaysia.  This  project  involves  the  construction  of  the   commercial  building.  The  area  of  the  commercial  building  is  810  meter  squared  (30m  x  27m).  It  is  a  3-­‐floor  building  and  it  consists  of  a   hypermarket:  ground  floor  selling  agricultural  products  and  food,  2nd  floor  selling  clothes  and  3rd  floor  selling  housing  items.  There  are   also  some  parking  lots  available  around  the  commercial  building  for  the  people  that  want  to  shop  there.         This  proposal  is  estimate  to  be  approved  and  signed  by  November  20,  2015.  The  construction  process  would  take  about  12  months.           PLAN  VIEW  OF  EXISTING  SITE   Page  1  
  • 4.
      LOCATION  PLAN  OF  THE  SITE   (The  red  boundary  line  is  where  the  commercial  area  is  located)     Page  2  
  • 5.
    b.    Site  Analysis  and  Observation                                     Observation  of  the  site  includes  how  it  is  abandoned  and  that  it  is  securely  closed.  It  has  a  fence  around  it  to  prevent  people  from  going   in.  But  in  the  site,  the  area  is  covered  with  mostly  grass  and  trees.     Fence  around  the  site  and  parking  lot  near  it.   Commercial  buildings   The  entrance  door  to  the  site.   Commercial  buildings  with  small  shops,  pharmacies   and  restaurants.   Page  3  
  • 6.
    The  site  is  ideal  for  the  commercial  area  due  to  the  following  site  analysis:     • There  are  many  residential  areas  around  there.  Many  houses  are   located  on  the  eastern  side  of  the  site.       • There  are  also  some  apartments  located  on  the  southern  and   northern  part  of  the  area.   • Northern  part  of  the  site  has  many  blocks  of  commercial  buildings:   small  shops,  restaurants,  pharmacies,  hotels  and  mini  market.     • There  are  already  many  parking  lots  available  near  there,  so  car   parks  don’t  need  to  be  constructed  inside  the  proposed  commercial   area.   • Not  much  pedestrian  path  is  available  around  the  site.   • Many  bus  pass  by  the  area  of  the  site.   • There  is  a  lake  located  about  40  meter  away  from  the  site.                           Page  4  
  • 7.
      MASTER  PLAN  “HOME”                    ENTRANCE  FOR  CAR   ENTRANCE  FOR   PEDESTRIAN    ENTRANCE  FOR   TRUCKS                    EXIT  FOR  BOTH   TRUCKS  AND  CARS   Page  5  
  • 8.
      LOCATION  PLAN  OF  THE  SITE      
  • 9.
    c.  Project  Concepts  and  Ideas     After  conducting  the  site  analysis,  the  project  plan  is  to  construct  a  commercial  area  where  residents  can  go  and  shop  for  home  materials   such  as  food,  clothing  and  home  furniture.       The  concept  and  ideas  of    “Home”  are:   • There  will  be  a  wall  surrounding  the  land.   • There  is  2  entrance  to  go  in  the  area.  If  residents  want  to  come  in  by  car  and  park  inside  the  area,  they  have  to  pass  through  the   entrance  barrier.  A  payment  have  to  be  made  in  order  to  park  inside  the  commercial  area.    Another  entrance  is  only  for   pedestrians.  This  is  for  people  that  walked  to  the  hypermarket  and  it  just  have  gate  door.     • There  are  not  many  parking  inside  the  area  due  to  many  parking  already  outside  the  area.  So  only  26  parking  lots.   • Shrubs  and  shading  trees  are  located  in  front  of    the  car  parks  to  give  some  shading  and  some  nature  element.     • The  front,  and  2  sides  of  the  commercial  building  have  a  pedestrian  walkway.     • On  the  pedestrian  walkway,  there  are  some  benches  to  for  shoppers  to  sit  on  and  wait  for  their  family.   • There  are  also  a  rest  area  on  the    left  side  of  the  building.  Benches  are  provided  as  well  as  some  shading  trees.  No  vehicles  are   allowed  to  pass  by  here.   • The  back  of  the  building  is  only  allowed  for  trucks  that  delivered  the  products.  There  will  be  a  fenced  to  cover  that  part.  Trucks   have  their  own  entrance.  They  also  have  their  own  parking  lots  as  well  as  a  big  dumpster.     • Dustbins  are  available  at  the  edge  part  of  the  building  in  front.   • The  exit  is  located  near  the  back  of  the  building.   • The  roofs  of  the  building  are  glass.   • There  is  a  tile  flooring  for  the  pedestrian  to  walk  on  and  push  their  trolleys  on.               Page  6  
  • 10.
      d. Visuals:  Diagrams,  Sketches  and  Images     BUBBLE  DIAGRAM                                   SEAT   GATHERING   REST   PLANTINGS   PEDESTRIAN   PATH   COMMERCIAL   BUILDING   PARKING   LOTS   PLANTINGS   Page  7  
  • 11.
    IMAGES       Shading  Trees   Bushes   Lamppost   Benches   Page  8  
  • 12.
          Entrance  Barrier Car  Parks Pedestrian  Walkway   Glass  Curve  Rooftop   Page  9  
  • 13.
          Dustbin   Dumpster   Supermarket  Sign   Board   Page  10  
  • 14.
    SKETCHES                                   Page  11   Sketch  of  the  entrance  to  the   commercial  area  “Home”   Sketch  of  the   commercial  building   “Home”   Sketch  of  the  car  parks,   trees  and  bushes  
  • 15.
    3. Project  Benefits     • Residents  can  gain  benefit  from  this  by  saving  them  time  from  traveling  far  to  grocery  shop.  They  can  just  go  by  walking  if   their  home  is  near.   • Shoppers  might  go  to  near  restaurants  near  there  and  the  restaurants  would  gain  profit.   • The  space  of  the  land  is  perfectly  utilized.   • Not  much  parking  lot  is  available  in  the  land  therefore  it  won’t  be  too  crowded  in  the  commercial  area.   • The  soft  scape  and  hardscape  elements  give  a  nice  atmosphere  and  make  the  area  look  more  developed  with  nature.     2.  Project  Organization     a.  Overview     Project  Requestor:  Jurapat  Sdn.  Berhad   Project  Sponsor:  Jurapat  Sdn.  Berhad   Project  Owner:  Jurapat  Sdn.  Berhad   Project  Manager:  Ar.  Nurul  Atiqah       Team  Members:   • Architect  -­‐  Ar.  Nurul  Atiqah  Binti     • Landscape  Architect  -­‐  Ar.  Hanis  Maisarah       • Quantity  Surveyor  -­‐  Sr.  Najmi  Afiquddin   • Civil  and  Structural  Engineer  –  Ir.  Mohd  Ghazali   • Mechanical  and  Electrical  Engineer  –  Mr.  Mohd  Faris   • Contractor  –  Miss  Natasya  Jasmin     Page  12  
  • 16.
    b.  Tasks     Architect:   • Have  to  translate  the  site  requirements,  create  a  concept  and  designs  and  then  make  it  into  reality.   • Ascertaining  and  interpreting  the  Jurupat  Sdn  Berhad’s  requirement.   • Coordinate  necessary  environmental  and  engineering  service  to  building  design.   • Clarify  client’s  requirement  in  a  building  project  because  of  their  knowledge  in  site  analysis,  building  regulations  and  building   design.   • Prepare  estimated  cost  and  the  project  timeline  (starting  date,  duration  of  the  process,  etc.)   • Have  to  submit  drawings  to  authorities  for  approval.   • Awarding  tenders  and  contract  administration.     • Administrating  building  contract-­‐  help  resolve  problems  between  clients  and  contractor.   • Able  to  handle  cost,  design  issues  and  consultants  appointments.   • Outline  proposal  and  sketch  the  design  of  the  building.  Should  know  the  time  and  costing.   • Submit  design  development  and  product  information.   • Supervise  the  progress  on  site  and  advise  on  insurance  required.   • Ensure  that  the  progress  on  the  site  is  monitored  and  meet  requirements.   • Resolve  any  contract  dispute.   • Submit  modification  of  the  design  of  “Home”  to  contractor.   • Conduct  assessment  of  “Home”  to  Jurupat  Sdn.  Berhad  authorities.   • Consider  any  operations  of  facilities  of  “Home”  and  think  about  further  maintenance.   • Ensure  that  requirements  and  dealines  are  met.     Landscape  Architect:   • Look  at  the  design  of  “Home”  and  include  some  urban  schemes  and  natural  characteristics  of  the  given  site.   • Establish  general  landscape  requirements  with  Jurupat  Sdn.  Berhad.   • Conduct  assessment  and  site  analysis  of  the  site  for  “Home”  (soils,  buildings).   • Present  to  clients  the  proposal  and  deal  with  any  problems  and  negotiate  with  them  for  the  final  design.     Page  13  
  • 17.
    • Asses  “Home”  ‘s  potential  and  meet  the  client’s  requirements  and  specification.   • Carry  out  any  environmental  impact  assessment  of  constructing  “Home”.   • Select  hardscapes  and  soft-­‐scapes  (materials  and  plants)  to  be  implement  in  “Home”.   • Get  rid  of  any  existing  plants  that  are  not  needed  anymore  or  that  are  not  well  maintained.       • Prepare  and  present  detailed  drawings  and  plans,  including  applications,  construction  and  specifications  for    “Home”.   • Monitor  and  check  on  site  frequently   • Ensure  that  the  plants  are  put  into  the  right  place.   • Authorizing  payment  once  construction  work  of  “Home”  is  completed.     Quantity  Surveyor:   • Go  to  site  visit  with  the  Architect,  Landscape  Architect  and  Clients.   • Estimate  the  define  project  budget  of  “Home”.   • Analyze  the  effect  of  design  changes  on  the  project  budget  of  “Home”.   • Create  order  of  cost  and  estimate,  then  obtain  strategy  of  “Home”.   • Negotiate  with  both  the  Architect  and  Landscape  Architect  regarding  the  cost  of  “Home”.   • Prepare  Bill  of  Quantities  to  assist  in  tender  process.   • Provision  of  cost  control  service  during  construction  process.   • Asses  contractor’s  progress  and  variation  claims  while  constructing  “Home”.   • Negotiate  and  settle  things  during  construction  process..   • Carry  out  monthly  predictions  and  report  the  costs  during  construction  process.   • Carry  out  monthly  negotiations  and  agreements  of  payment  for  “Home”.   • Prepare  tax  depreciation  reports  for  Jurupat  Sdn.  Berhad.   • Prepare  detailed  cost  analysis  and  Statement  of  Final  Account.     Civil  and  Structural  Engineer   • Design  structures  to  ensure  that  the  building,  the  floors  withstands  stresses  and  pressure   • Able  to  construct  a  building  that  would  stand  for  a  long  period  of  time.   • Choose  appropriate  materials  to  meet  specifications  of  the  design  for  “Home”.     Page  14  
  • 18.
    • Analyze  the  roads  and  parking  lots.   • Conduct  analysis  for  stress  and  pressure  and  make  sure  that  each  component  of  structures  in  “Home”  will  experience  due  to   human  or  environmental  factors.   • Ensure  the  safety  and  risks  of  “Home”  .   • Include  a  safety  plan  when  there  is  a  fire.     Mechanical  and  Electrical  Engineer   • Collaborate  with  Architect  and  landscape  Architect  for  a  plan  for  electrical  works.   • Specialist  in  electrical  works  such  as  air  conditioning,  electrical  wiring,  lights.   • Make  sure  that  the  lights  are  bright  enough  to  see  clearly  and  not  too  dim  when  at  night.   • Make  sure  fire  alarms  are  installed.     Contractor   • Tender  for  the  job  of  construction  “Home”.   • Complete  works  at  a  given  time  and  budget  when  assigned.   • Carry  out  quality  construction  of    “Home”  by  giving  a  multi  disciplined  workforce.   • Consult  and  give  orders  to  workers.   • Provide  information  that  is  sufficient  and  relevant  for  the  workers  to  build  “Home”.   • Ensure  that  “Home”  is  build  accurately  as  the  drawings  and  plans.   • Make  agreements  with  the  Architect,  Landscape  Architect  and  owners  to  achieve  the  goal  of  “Home”  being  completed  on  the   deadline.       Page  15