MICHAEL FELDER
Drilling Consultant
Qualifications
• Thirty-eight years of experience in the Oil & Gas Industry.
• Proficient with DIM's, Well View, Wellcore & OpenWells network reporting systems.
Employment History
05/2012-05/2015 BHP Billiton, Drilling Consultant
• Associated with Plaster & Wald Consulting Corp.
• Drill Site Supervisor/ Consultant drilling horizontal Eagleford Shale
wells using oil based muds to 18,000+’ in South Texas.
05/2009-05/2012 Petrohawk Operating / BHP Billiton, Drilling Consultant
• Associated with Plaster & Wald Consulting Corp.
• Day Drilling Forman / Consultant drilling high pressure, horizontal
Haynesville Shale wells using oil based muds to 18,000+’ in North
West Louisiana.
08/2008-02/2009 Devon Energy Inc., Drilling Consultant
• Associated with Straightway Energy Management Inc.
• Drilling Forman / Consultant drilling high pressure, directional wells
with loss zones and multiple casing strings through the Haynesville
Lime @ 12,500' in Shelby County, Texas.
11/2004-08/2008 Patterson – UTI Drilling Company, Rig Manager
• 1200 HP and 1500 HP SCR rigs drilling vertical and horizontal Cotton
Valley wells in North Louisiana and East Texas and horizontal Barnett
Shale wells in North Texas.
2003-11/2004 Delphi Oil Company, Superintendent/ Rig Manager
• Rebuilt & operated two Spencer Harris 7000 Series rigs (doubles), one
rigged for drilling and one rigged for workover and recompletions on
company leases in Mississippi.
• Operated company owned cement unit used for surface jobs and
squeeze jobs.
• Worked as independent mechanic on engines and equipment in early
2003.
P.O. Box 245 Mustang, OK 73064 Phone: 405-376-1428 Fax: 405-376-4656
www.plasterandwald.com
MICHAEL FELDER
Drilling Consultant
1998-2003 Greywolf Drilling Company:
2002-2003 Greywolf Drilling Company, Rig Manager
• 3000 HP SCR rig drilling for Exxon Mobil in Southwestern Wyoming.
01/1998-2002 Greywolf Drilling Company, Rig Manager
• 1000 HP SCR rig drilling in Mississippi and East Texas. Drilled
disposal well for DuPont in their De Lisle, Mississippi facility.
01/1998 Murco Drilling Company was purchased by Greywolf Drilling Company.
1979-1998 Murco Drilling Company:
1996-1998 Murco Drilling Company, Relief Rig Manager/Driller
• Drilling turnkey and day work in Mississippi, South Louisiana and
East Texas.
1985-1996 Murco Drilling Company, Driller
• 1500 HP SCR rig in South Louisiana.
• Turnkey driller and derrick hand, Florida Panhandle, South Alabama,
Mississippi and East Texas.
1979-1985 Murco Drilling, Derrick Hand
• 2000 HP SCR and power rigs in South Louisiana.
1979 Penrod Drilling Company, Floorhand
• 2000 HP power rig near Baton Rouge, Louisiana.
1978 Chevron Oil Company, Roustabout
• West Delta Block 30, Mississippi River delta south west of Venice,
Louisiana.
Industry Training:
• Well Control Card, Supervisor Level - Up to date since 1989
• Petroskills Drilling Supervisor Training, Houston Texas
• K&M Hole Cleaning Practices Training
• Bladestone BOP Equiptment Training, Houston, Texas
P.O. Box 245 Mustang, OK 73064 Phone: 405-376-1428 Fax: 405-376-4656
www.plasterandwald.com
MICHAEL FELDER
Drilling Consultant
• SafeGulf Safety Training
• Hughes manufacturing and Rock Bit/PDC dull grading, Hughes
facility, Houston, Texas
• Dresser Industries Mud School at Dresser Industries - Houston, Texas
• DuPont’s supervisor level STOP training while drilling inside DuPont
facility.
• First Aid and CPR
• Rescue at Heights training
• All standard industry Safety Training
• First Aid and CPR Trainer and First Aid and CPR Trainer/Trainer for
the American Red Cross.
P.O. Box 245 Mustang, OK 73064 Phone: 405-376-1428 Fax: 405-376-4656
www.plasterandwald.com

Felder, Michael Resume

  • 1.
    MICHAEL FELDER Drilling Consultant Qualifications •Thirty-eight years of experience in the Oil & Gas Industry. • Proficient with DIM's, Well View, Wellcore & OpenWells network reporting systems. Employment History 05/2012-05/2015 BHP Billiton, Drilling Consultant • Associated with Plaster & Wald Consulting Corp. • Drill Site Supervisor/ Consultant drilling horizontal Eagleford Shale wells using oil based muds to 18,000+’ in South Texas. 05/2009-05/2012 Petrohawk Operating / BHP Billiton, Drilling Consultant • Associated with Plaster & Wald Consulting Corp. • Day Drilling Forman / Consultant drilling high pressure, horizontal Haynesville Shale wells using oil based muds to 18,000+’ in North West Louisiana. 08/2008-02/2009 Devon Energy Inc., Drilling Consultant • Associated with Straightway Energy Management Inc. • Drilling Forman / Consultant drilling high pressure, directional wells with loss zones and multiple casing strings through the Haynesville Lime @ 12,500' in Shelby County, Texas. 11/2004-08/2008 Patterson – UTI Drilling Company, Rig Manager • 1200 HP and 1500 HP SCR rigs drilling vertical and horizontal Cotton Valley wells in North Louisiana and East Texas and horizontal Barnett Shale wells in North Texas. 2003-11/2004 Delphi Oil Company, Superintendent/ Rig Manager • Rebuilt & operated two Spencer Harris 7000 Series rigs (doubles), one rigged for drilling and one rigged for workover and recompletions on company leases in Mississippi. • Operated company owned cement unit used for surface jobs and squeeze jobs. • Worked as independent mechanic on engines and equipment in early 2003. P.O. Box 245 Mustang, OK 73064 Phone: 405-376-1428 Fax: 405-376-4656 www.plasterandwald.com
  • 2.
    MICHAEL FELDER Drilling Consultant 1998-2003Greywolf Drilling Company: 2002-2003 Greywolf Drilling Company, Rig Manager • 3000 HP SCR rig drilling for Exxon Mobil in Southwestern Wyoming. 01/1998-2002 Greywolf Drilling Company, Rig Manager • 1000 HP SCR rig drilling in Mississippi and East Texas. Drilled disposal well for DuPont in their De Lisle, Mississippi facility. 01/1998 Murco Drilling Company was purchased by Greywolf Drilling Company. 1979-1998 Murco Drilling Company: 1996-1998 Murco Drilling Company, Relief Rig Manager/Driller • Drilling turnkey and day work in Mississippi, South Louisiana and East Texas. 1985-1996 Murco Drilling Company, Driller • 1500 HP SCR rig in South Louisiana. • Turnkey driller and derrick hand, Florida Panhandle, South Alabama, Mississippi and East Texas. 1979-1985 Murco Drilling, Derrick Hand • 2000 HP SCR and power rigs in South Louisiana. 1979 Penrod Drilling Company, Floorhand • 2000 HP power rig near Baton Rouge, Louisiana. 1978 Chevron Oil Company, Roustabout • West Delta Block 30, Mississippi River delta south west of Venice, Louisiana. Industry Training: • Well Control Card, Supervisor Level - Up to date since 1989 • Petroskills Drilling Supervisor Training, Houston Texas • K&M Hole Cleaning Practices Training • Bladestone BOP Equiptment Training, Houston, Texas P.O. Box 245 Mustang, OK 73064 Phone: 405-376-1428 Fax: 405-376-4656 www.plasterandwald.com
  • 3.
    MICHAEL FELDER Drilling Consultant •SafeGulf Safety Training • Hughes manufacturing and Rock Bit/PDC dull grading, Hughes facility, Houston, Texas • Dresser Industries Mud School at Dresser Industries - Houston, Texas • DuPont’s supervisor level STOP training while drilling inside DuPont facility. • First Aid and CPR • Rescue at Heights training • All standard industry Safety Training • First Aid and CPR Trainer and First Aid and CPR Trainer/Trainer for the American Red Cross. P.O. Box 245 Mustang, OK 73064 Phone: 405-376-1428 Fax: 405-376-4656 www.plasterandwald.com