Building Information Mod
eling Services
A futuristic way of planning, designing, and managing building
development with world-class 3D BIM modeling, Revit services, and
comprehensive building solutions.
Our Core BIM Service Branches
Architectural BIM
Pixel-accurate 3D building models using Revit, SketchUp, and BIM 360 to transform ideas into detailed visualizations.
Structural BIM
Strategic foundation plans analyzing safety standards, materials, and site conditions for reliable structural support.
MEP BIM
Detailed plans for plumbing, HVAC, and mechanical systems ensuring functional water supply and air regulation.
Fabrication Services
3D models for off-site component production and on-site assembly with high-quality panel fittings.
Specialized BIM Solutions
BIM Coordination
Improve communication between project teams, ensuring
every member stays synchronized with the project's journey
and timeline.
BIM Consulting
Guide clients in productive BIM technology use, helping plan,
manage, and solve building design challenges effectively.
Clash Detection
Find and fix design conflicts in 3D models before
construction, preventing costly errors and saving valuable
time.
Shop Drawings
Create detailed 2D and 3D drawings with sizes, materials,
and installation steps for optimal construction results.
BIM Applications Across Project Lifecycle
0
1
Project Planning &
Management
4D BIM services create detailed schedules, helping engineers track completion and ensuring clear task
coordination.
0
2
Cost Estimation & Budgeting
5D BIM services accurately estimate costs and manage budgets, tracking materials, labor, and preventing
overspending.
0
3
Facility & Asset Management
6D BIM services help track equipment condition, schedule repairs, and maintain everything in optimal
shape.
0
4
Renovation & Maintenance
As-built BIM services provide accurate digital models for renovation planning and future maintenance
strategies.
Why Choose Us?
16+
Years Experience
Proven expertise in BIM
services across global
markets
500+
Projects Completed
Successfully delivered
complex BIM solutions
worldwide
200+
Happy Clients
Trusted by AEC
professionals globally
50+
Qualified Staff
Expert BIM consultants and
Revit specialists
Advanced BIM Solutions
Revit Family Creation
Custom, reusable models for walls, windows, furniture,
and components to enhance productivity and workflow
efficiency.
Level of Development (LOD)
LOD 200-500 services meeting project needs at every
stage, ensuring coordination and preventing
misunderstandings.
Mass Timber Buildings
Detailed 3D timber models creating sustainable,
strong, eco-friendly structures that are efficient and
beautiful.
Scan to BIM Services
Transform 3D scans and point cloud data into detailed
BIM models for renovation and retrofitting projects.
Our Revit Services Advantages
Accuracy Guaranteed
100% accuracy in all 3D models with zero tolerance for
mistakes in our deliverables.
Enhanced Design Understanding
Fully reliable models enabling workers to follow
instructions without engineering assistance.
Faster Clash Resolution
Navisworks-powered clash resolution reducing
construction risks and maximizing ROI.
Energy Analysis
Autodesk Revit energy analysis creating pathways to
greener, sustainable infrastructure.
Our BIM Process
Workflow
Data Collection
Gather project information, measurements, and designs
to create comprehensive building plans.
Model Creation
Create detailed 3D models with walls, windows, doors,
and all architectural elements.
Clash Detection
Identify and resolve system conflicts before construction
begins, preventing costly errors.
Model Handover
Deliver finished models and provide ongoing support for
updates during construction.
Why Outsource BIM Services to Us
Expert Team
Qualified BIM consultants proficient
in Revit, Tekla, SketchUp,
Navisworks, and Inventor software.
Proactive Support
Early problem-solving approach
keeping projects on track with
continuous monitoring and
assistance.
Economic Value
High-quality services at competitive
rates, far below in-house staff
expenses with guaranteed timely
delivery.
Ready to Transform Your
Project?
Talk to us about your project and discover how our Revit BIM services and 3D
modeling can guide your entire process to achieve your dream architecture.
Global Reach
Serving clients across USA, UK,
Australia, UAE, Canada, New
Zealand, and worldwide with 24/7
support.
Proven Results
16+ years of BIM expertise
delivering deadline-focused,
under-budget solutions with
superior quality.
Thank you

Explore our Building-Information-Modeling-Services

  • 1.
    Building Information Mod elingServices A futuristic way of planning, designing, and managing building development with world-class 3D BIM modeling, Revit services, and comprehensive building solutions.
  • 2.
    Our Core BIMService Branches Architectural BIM Pixel-accurate 3D building models using Revit, SketchUp, and BIM 360 to transform ideas into detailed visualizations. Structural BIM Strategic foundation plans analyzing safety standards, materials, and site conditions for reliable structural support. MEP BIM Detailed plans for plumbing, HVAC, and mechanical systems ensuring functional water supply and air regulation. Fabrication Services 3D models for off-site component production and on-site assembly with high-quality panel fittings.
  • 3.
    Specialized BIM Solutions BIMCoordination Improve communication between project teams, ensuring every member stays synchronized with the project's journey and timeline. BIM Consulting Guide clients in productive BIM technology use, helping plan, manage, and solve building design challenges effectively. Clash Detection Find and fix design conflicts in 3D models before construction, preventing costly errors and saving valuable time. Shop Drawings Create detailed 2D and 3D drawings with sizes, materials, and installation steps for optimal construction results.
  • 4.
    BIM Applications AcrossProject Lifecycle 0 1 Project Planning & Management 4D BIM services create detailed schedules, helping engineers track completion and ensuring clear task coordination. 0 2 Cost Estimation & Budgeting 5D BIM services accurately estimate costs and manage budgets, tracking materials, labor, and preventing overspending. 0 3 Facility & Asset Management 6D BIM services help track equipment condition, schedule repairs, and maintain everything in optimal shape. 0 4 Renovation & Maintenance As-built BIM services provide accurate digital models for renovation planning and future maintenance strategies.
  • 5.
    Why Choose Us? 16+ YearsExperience Proven expertise in BIM services across global markets 500+ Projects Completed Successfully delivered complex BIM solutions worldwide 200+ Happy Clients Trusted by AEC professionals globally 50+ Qualified Staff Expert BIM consultants and Revit specialists
  • 6.
    Advanced BIM Solutions RevitFamily Creation Custom, reusable models for walls, windows, furniture, and components to enhance productivity and workflow efficiency. Level of Development (LOD) LOD 200-500 services meeting project needs at every stage, ensuring coordination and preventing misunderstandings. Mass Timber Buildings Detailed 3D timber models creating sustainable, strong, eco-friendly structures that are efficient and beautiful. Scan to BIM Services Transform 3D scans and point cloud data into detailed BIM models for renovation and retrofitting projects.
  • 7.
    Our Revit ServicesAdvantages Accuracy Guaranteed 100% accuracy in all 3D models with zero tolerance for mistakes in our deliverables. Enhanced Design Understanding Fully reliable models enabling workers to follow instructions without engineering assistance. Faster Clash Resolution Navisworks-powered clash resolution reducing construction risks and maximizing ROI. Energy Analysis Autodesk Revit energy analysis creating pathways to greener, sustainable infrastructure.
  • 8.
    Our BIM Process Workflow DataCollection Gather project information, measurements, and designs to create comprehensive building plans. Model Creation Create detailed 3D models with walls, windows, doors, and all architectural elements. Clash Detection Identify and resolve system conflicts before construction begins, preventing costly errors. Model Handover Deliver finished models and provide ongoing support for updates during construction.
  • 9.
    Why Outsource BIMServices to Us Expert Team Qualified BIM consultants proficient in Revit, Tekla, SketchUp, Navisworks, and Inventor software. Proactive Support Early problem-solving approach keeping projects on track with continuous monitoring and assistance. Economic Value High-quality services at competitive rates, far below in-house staff expenses with guaranteed timely delivery.
  • 10.
    Ready to TransformYour Project? Talk to us about your project and discover how our Revit BIM services and 3D modeling can guide your entire process to achieve your dream architecture. Global Reach Serving clients across USA, UK, Australia, UAE, Canada, New Zealand, and worldwide with 24/7 support. Proven Results 16+ years of BIM expertise delivering deadline-focused, under-budget solutions with superior quality.
  • 11.