1Customer Service 1300 369 233
Energy Projects and Services
Capability Statement
2 Energy Projects and Services Capability Statement
Overview Pages 3-6
Pages 7-11
Project Delivery	
Project Management
Testing, Installation and Commissioning
Capability	
Typical Packages
Project Design
Highlight on E-House and Mobile Substation
Pages 12-13
Services and Life Cycle
Support	
Pages 14-16
Case Studies	 Pages 17-25
3Customer Service 1300 369 233
Integrated solutions that make
energy safe, reliable, efficient,
productive and green.
Schneider Electric is a market leader in
Australia for medium and low voltage power
distribution and automation systems. We provide
both a technical range of components and a
complete project solution, for a wide range of
market sectors.
At Schneider Electric, we believe that our
customer’s success is our success.
Schneider Electric employs a highly skilled
group of designers, application engineers
and service personnel within each of our
business units, including some of the
most experienced electrical engineers in
the industry.
We deliver practical, end-to-end solutions
for our customers. Not only do we draw on
a depth of international experience and
resources, we also deliver comprehensive
locally engineered solutions. This can range
from design, through to the Australian
manufacture of a number of products.
Schneider Electric
has over
experience
delivering
engineered
solutions
throughout
the world.
100 years
> Overview
4 Energy Projects and Services Capability Statement
> Overview
Schneider Electric offers innovative technical
and commercial solutions that provide unique
advantages for projects. We work with our
customers to select appropriate technologies
and equipment, to optimise the balance between
initial capital expenditure and overall life cycle
costs of electrical and automation systems.
On every project, we take time to understand our customers’
exact requirements to deliver an optimised supply chain model,
along with practical, factory tested equipment, suited to its
specific purpose.
Schneider Electric products and solutions are designed for
high reliability, long life and low maintenance. We undertake
extensive testing during the manufacturing process and, when
invited by our clients, perform extensive testing at site.
Schneider Electric has achieved a secure market presence for
pre-fabricated E-house Solutions. These solutions incorporate the
installation, testing and commissioning of our own equipment as
well as that of third party suppliers.
5Customer Service 1300 369 233
The key benefits of Schneider Electric’s
local engineering expertise includes faster
turn around time, lower cost, immediate
and personal engagement by Schneider
Electric engineers providing local witness
testing, and the reassurance of a service
team always being close at hand.
Risk
Reduction
ands
calable
Custo
m
ised
co
sts
Reduc
e
yourSave
timeofs
pace
Bette
ruse
+
+
++
6 Energy Projects and Services Capability Statement
Make the most of
your energyTM
and more...
Solution for all
Infrastructure Utilities Oil and Gas
Data Centre Mining
Hospital Water
Marine Wind Farm
Cement Industry
Building Airport
7Customer Service 1300 369 233
> Capability
Typical Solutions and Packages
Schneider Electric provides a range of systems and
services for a variety of sectors.
High Voltage
■	Kiosk Substation and Skids Solutions
■	Protection Systems
■	Substation SCADA System
■	Protection Relays
■	Power Factor Correction and Harmonic Solutions
Medium Voltage
■	MV Distribution and Power transformers (Dry and Oil Type)
■	33/22/11/6.6/3.3 kV Switchgear
■	MV Ring Main Units
■	Construction Power Supplies
Low Voltage
■	Main Switchboard
■	Motor Control Centres
■	General Distribution Boards
■	Wiring Accessories
■	Protection, Automation and Control Integrated Systems;
hardware and software, including control panels
■	Scalable Design Substation Automation Systems (IEC61850)
from a single bay to network control (bay computer, RTU,
feeder protection, automation, gateway, switches, database,
configuration editor, maintenance tools, protection relays)
Uninterruptible, Emergency Power
Supplies, Earthing and Lightning
Protection
■	UPS Systems
■	Distribution Boards
■	Earthing and Lightning Protection
Systems
■	Battery Chargers
Automation
■	Substation and Automation Systems,
including human machine interface
equipment, gateways and RTUs
■	Protection Panel Design, Engineering,
Setting and Testing
E-House Solutions and Mobile
Substation
E-House Solutions integrate major power
and control equipment into engineered
prefabricated buildings (E-Houses) -
ideal for industrial; large commercial and
utility facilities; mine, mineral and metal
(MMM) industries; oil and gas; utilities; rail;
generation; emergency response mobile
and primary substations. An expanded
description of our E-House Solutions and
mobile substation capabilities is provided
in the following section.
8 Energy Projects and Services Capability Statement
> Capability
Project Design
As part of a turnkey solution, Schneider Electric
Engineers work with customers to assist with
every level of design including:
Electrical Design
■	Electrical system design
■	Single line diagrams
■	General arrangements
■	Panel layout
■	HV and LV electrical schematics
■	System loading analysis
■	Fault level calculations
■	Protection grading reports
■	Protection logic diagrams
■	Insulation coordination
■	Voltage drop calculations
■	Cable scheduling
■	Equipment lists
■	Earthing studies and design
■	Cable block and connection diagrams
■	Performance specifications
■	Lightning protection
■	Protection and discrimination study
Automation Design
■	Overall substation protection, control and automation design
■	Automation system I/O list development and management
■	Automation system functional design specification development
■	Automation system detail view specification development
■	Graphical user interface screen development
■	Automation development (IEC61131-3)
■	Inherently designed for IEC 61850 applications
■	Disturbance record management and waveform oscillography
■	Ethernet networks and gateways (IEC618550)
■	RTU, bay controller, data concentrator
■	Redundant architectures and devices
■	Protection panel design, engineering, setting and testing
Protection panel design, engineering, setting and testing
9Customer Service 1300 369 233
> Capability
Typical Substation Design
Considerations
■	Site area limitations
■	MV/LV segregation
■	Equipment foot print
■	HVAC heat loadings and locations
■	Switchgear positioning – heat distribution
■	Pad-mount systems/ducting/return air
flow
■	Split system mountings
■	Lighting and emergency lighting –
internal and external
■	Fire ratings – wall, floor, etc.
■	Cabling considerations – e.g.
transformer locations
■	Ongoing maintenance – access for
equipment maintenance
■	Pressurisation - use of airlocks
■	Allowances for future equipment
■	Building Code of Australia – e.g. egress
paths and exits
■	Australian Standards – i.e. AS3000
clearance
■	All stakeholders – including operators
and local shire or council
■	Specific customer requirements
10 Energy Projects and Services Capability Statement
Customised and Scalable
E-Houses can be adapted to local and industrial conditions.
Flexible in design, E-Houses can be upgraded with rear access
doors, expandable walls, space saving design and be stackable
(when required), with a robust construction.
Save Time
As all E-House construction is conducted prior to arrival at
the project site, major disruptions to construction and staff on
site is avoided.
Better Use of Space
Our E-House Solutions aim to optimise layout and design,
consuming less area than a traditional block building. Efficiencies
gained by positioning and access considerations for electrical
equipment, allows for easy access to the equipment without the
need for additional building space.
Safety and Quality
Every E-House is pre-assembled in a
controlled environment. Our compliance
to local codes and standards ensures
maximum safety with a quality outcome.
During the design phase, we consider
a projects environmental aspects,
and provide reliable solutions through
compliance to local Australian Standards.
Reduction of Costs
Schneider Electric E-House Solutions
reduce the costs of on-site construction
and electrical equipment installations. All
equipment is pre-installed, tested and
ready to use when it is delivered.
> Capability
Highlight on E-House Solutions and Mobile Substations
Schneider Electric E-Houses can be configured with switchgear, transformers,
motor control, HVAC, lighting and security for a broad range of business operations.
Our mechanical, structural and electrical experts can custom fabricate E-Houses to
offer a “Plug and Play” solution, simplifying the installation process and complying
with local regulations and standards.
11Customer Service 1300 369 233
Schneider Electric mobile substations are completely self-
contained trailer mounted units comprising transformer, cooling
equipment, high voltage and low voltage disconnect, circuit
protection (RCDs and MCBs), metering, relaying,
AC/DC auxiliary power, surge protection and optional cable
reeling equipment.
We use specially designed high-strength custom trailers,
equipped with air ride suspension systems and optional rear
steering when required.
Mobile substations are designed for special applications, such as
isolated areas, emergency power supplies (equipment breakdown
or maintenance), network extensions, temporary switching stations
or transformer stations - thus reducing the capital expenditure
required for larger, more permanent solutions.
Features:
■	maximum transportation flexibility
■	can be used in outdoor conditions
■	quick energy supply without onsite
adaptation
■	small footprint
■	up to 10MVA
■	single move philosophy
■	on-board redundant systems for remote
protection and control
■	on-board generation for Black
start set-up
■	de-reeler and grid connection cables
■	variable primary and secondary
transformer voltage and vector selection,
to integrate into diverse networks.
Energy Whenever and Wherever
Innovative mobile substation
design provides high level
system reliability and flexibility.
12 Energy Projects and Services Capability Statement
> Project Delivery
Project Management
Schneider Electric supplies fully installed and
pre-commissioned substations. Our specialist
teams have large project execution experience,
developed within an Australian Standards
framework. We fit and install equipment sourced
from our global network of manufacturing
facilities as well as our network of third party
partners. Our focus is to reduce project time
frames and our client’s risks.
Project Management Expertise
Complete solution approach, combining all of
the Schneider Electric Businesses as ONE
Long term
relationships with
specialists, including
room-builders and
equipment installers
Principle Design
Engineers in MV
and LV equipment,
switchrooms and
automation
Experience
> 30 years experience
developing Australian
industrial and mining
solutions
The Australian
Projects Team part
of the Schneider
Solutions Community,
with 5,000 Staff
globally
Australian Standards Compliance
Australian Project
Team supports
Schneider
Electric’s Global
Solution Community
around AS
Australian Project
Engineers supervise
of factory compliance
to AS
Membership in 10
Australian Standards
Committees
Partnering with
room-builders and
equipment Installers
Australian based
Solutions Team
Team Competence in
AS & IEC Standards,
and the Project Team
is ISO9001 accredited
Australian
switch-
room
expertise
Large
project
experience
Factory
representative on
Project Team
Schneider Electric.
One Experienced Project Team
	 O	Interface
	 N	 Project Director
	 E	 Project Team
Global expertise + local presence
Project Management Excellence
Factory Representative on Project Team
Schneider Electric.
Professionalism
Project Managers are members of key
professional bodies
Trained
Project Managers
are trained through
Schneider Electric
University according
to PMI principles
Accreditation
Internal and external
under PMIs PMP
program
Optimised Procurement Model
Global + Local + Partner mix
Best suit the clients’ application and specifications
Manufacturing > 250 Factories
Logistics
Minimising risk and
costs, and ensuring
compliance to
specs and standards
Full Life Support
Design, commissioning
training and post
installation support
Partners
Optimising in-house vs external procurement to
best suit the needs of the clients’ application
13Customer Service 1300 369 233
> Project Delivery
Testing, Installation and Commissioning
Schneider Electric has extensive experience
in delivering highly complex, time-critical
projects, through a regime of extensive testing,
installation and commissioning.
Schneider Electric’s installation and
commissioning of electrical distribution
and automation equipment, ensures
the apparatus performs to customer’s,
manufacturer’s and regulator’s
requirements.
We undertake:
■	factory testing of all equipment
■	installation of equipment in substation
and cabling
■	commissioning of switchroom and
equipment delivery on site
■	site testing if installation ensures
equipment is ready for commissioning
■	installation supervision
■	equipment and process commissioning
■	system performance tests.
Benefits:
■	equipment is installed and
commissioned by Schneider Electric
trained technicians
■	peace of mind, knowing equipment is
correctly installed
■	reduced risk of problems with protection
and control systems
■	product warranty is preserved.
Pre-commissioning
to prepare and test
equipment prior to
attaching cables.
14 Energy Projects and Services Capability Statement
> Services and Life Cycle Support
Through Schneider Electric Services team, we
offer the benefits of true life cycle support for our
clients’ electrical distribution systems.
Schneider Electric Services offer you the benefits of true life cycle
support for your electrical distribution systems. Our capabilities
enable us to provide a wide range of services and solutions for
your installations, from initial concept design through to end-of-life
management and renewal programmes.
Our highly trained services team work with you to understand
your needs and offer individually tailored solutions, allowing you
to focus on your core business. Schneider Electric has global
and local project teams to manage your electrical distribution and
energy management projects.
With a full range of services encompassing strategic consulting,
design and engineering, maintenance contracts, support and
education, Schneider Electric is the right partner for your projects
and engineering challenges.
Our dedicated team of over 70 highly
trained technicians, supervisors and
support staff are based in seven locations
around Australia.
Complemented by our Projects teams and
specialist technical experts, we provide the
local means to deliver outstanding service
throughout the life cycle of your project.
Examples of our offers within the life cycle
phases are summarised below.
Renew
>	Switchgear retrofits
>	Environmental disposal
>	SF6 gas recovery
Improve
> Protection relay retrofits
>	Transformer refurbishment
>	Installation audits
Design
>	Projects and solutions:
- turnkey projects
- solution design
- portable switch rooms.
Build
>	Project management
>	Project delivery
>	Installation
>	Pre-commissioning
Operate
>	Maintenance contracts
>	Spare parts
>	Diagnostic testing
>	Training
15Customer Service 1300 369 233
> Services and Life Cycle Support
Maintenance Contract
Our asset management programme addresses the criticality of
your equipment by:
■	preventative manufacturers maintenance in accordance with
IEC standards
■	predictive maintenance using our bespoke diagnostic tools
and techniques
■	a customised maintenance plan
■	emergency corrective maintenance within defined service levels
■	24/7 telephone support
■	management of intervention and equipment data using our asset
management tool
■	privileged on-line access to your equipment data and
maintenance reports
■	a contractual package providing you with improved
management of the cost/performance ratio of
your maintenance.
Our maintenance and commissioning offers can also ensure
compliance with the relevant clauses of Australian Standards:
AS 2467-2008, Maintenance of Electrical Switchgear.
Spare Parts Management
While the risk of equipment failure can be substantially minimised,
it can never be entirely removed. Schneider Electric Installed Base
Services is pleased to offer a Spare Parts Management Contract
to suit your needs. The spare parts required for your installation
should be categorised into the following groups:
■	urgent spares kept on site for breakdowns
■	maintenance spares stocked either on-site or dedicated within
Schneider Electric’s distribution centres.
Extended Warranty
By entering into an extended warranty agreement with Schneider
Electric, you no longer have to worry about equipment breakdown
and unknown repair costs – we take care of all that for you.
Customer Training
Schneider Electric can develop and
implement detailed training programmes
covering all aspects of the equipment and
control system design and operation.
We can provide operator/maintenance
training, technical training, on-line training
and customised training.
ECOFIT™
Upgrade to the latest technology with
our pre-engineered ECOFIT solutions,
which allow you to extend the life of your
installation with minimal downtime.
These solutions are factory designed, tested
and approved. Our offers include:
■	circuit breaker retrofit and refurbishment
■	extension cubicles
■	protection relay retrofit
■	transformer and kiosk refurbishment.
16 Energy Projects and Services Capability Statement
> Services and Life Cycle Support
MP4 Installation Risk Assessment
MP4 is an in-depth on-site audit delivered over (typically) one to
two weeks to analyse the link between the electrical distribution
system and the site activity/processes. The conclusion identifies
the business risks in terms of cost of production and safety;
prioritised according to risk. The final report comprises a summary
of corrective actions and four improvement plans:
• maintenance plan
• modernisation plan
• monitoring plan
• management plan.
MP4 benefits:
■	improve installation safety and quality
■	discover the link between the electrical distribution system and
business performance
■	provide a roadmap for maintenance and modernisation activities
■	prioritise electrical installation investments to optimise CAPEX
■	better prevention of electrical risks
■	replicate recommendations at multiple sites
■	predict failures and act before they happen.
End of Life Disposal
As a leading manufacturer of SF6 insulated switchgear, Schneider
Electric has worked closely with specialists and regulators within
Australia to provide an environmentally sound and cost effective
solution for the disposal of your medium voltage switchgear at the
end of its life cycle.
Our environmental disposal offer tracks your equipment through all
phases of the process and provides documentation to confirm the
destruction of the equipment and the quantity of SF6 gas that has
been reclaimed, including the CO² equivalent.
By partnering with Schneider Electric you can benefit from value
throughout your system life cycle.
Legacy Brands of Schneider Electric
Below is a list of legacy brands which
are owned and supported by Schneider
Electric. For many discontinued equipment
ranges we are still able to provide support.
■	Areva (distribution equipment)
■	Alstom (distribution equipment)
■	English Electric
■	GEC (incl. GEC Alsthom)
■	Merlin Gerin
■	Mesa
■	Magrini Galileo
■	Email Westinghouse	
■	Yorkshire Switchgear
17Customer Service 1300 369 233
> Case Study
Boddington Gold Mine (BGM) located 130km south east of Perth,
is the largest gold and copper mine in Australia. Built on the
footprint of the original Boddington Gold Mine, the expansion
mines the hard gold/copper ore that lies beneath depleted oxide
pits. The project value exceeded $2.4 billion and involved open
cut mining from two large pits and is expected to produce an
average 850,000 ounces of gold and 30,000 tonnes of copper a
year for more than 20 years. Requiring a key provider to supply
power distribution and motor control for the site, Boddington
Gold awarded Schneider Electric three contracts worth over $60
million. Schneider Electric supplied three transportable 33kV
sub stations, twelve transportable 1/3.3/.443kV substations,
equipment for existing traditional substations and 36 distribution
transformers from 1.5MVA to 25MVA. The
project included design and manufacture
of portable switch rooms, all cabling within
the switchroom limits as well as distribution
MV and LV switchgear, MV and LV variable
speed drives, DC systems and installation
of third-party free issued equipment.
Benefitting from Schneider Electric’s
global reach, Boddington Gold was able
to access unique systems from all over the
world including 11/3.3kV primary and motor
control switchgear with integrated motor
management systems.
Boddington Gold Mine
One provider of power distribution and
motor control
18 Energy Projects and Services Capability Statement
Providing electricity, water supply and
sewerage services to almost 80,000
customers across the Northern Territory,
Power and Water Corporation has a
commitment to its customers to provide
reliable, uninterrupted power. Looking
for a contingency plan to aid them in the
event of substation equipment downtime,
Power and Water Corporation contacted
Schneider Electric to discuss their needs
for a mobile substation. The brief was
simple: supply a product which was ready-
to-go, easy-to-use, safe and could be used
in a variety of situations.
Solution
Schneider Electric’s NOMAD mobile substation is a solution
that provides electrical distributors with a means to carry out
maintenance and emergency work on substations within an
existing network, while continuing to distribute power.
Designed to be deployed quickly, NOMAD mobile units come
prefabricated from Schneider Electric and are mounted on a
quad axle trailer with multiple transformer combinations. To allow
customers to easily move the units between sites, NOMAD is
designed to enable trucking on main roads without an escort and
the weight of the product has been carefully calculated to comply
with Traffic Authorities’ requirements.
Customer Benefits:
■	ability to perform substation
maintenance without disrupting supply
■	ability to provide reliable power to their
end-users
■	ability to mitigate risk during both
maintenance and emergency situations.
Project at a Glance
Project Type
Supply of NOMAD Emergency Mobile
Substation, featuring:
■	22kV, 630A, 31.5kA/3s WSA Switchgear
■	MiCOM 120, 121 protection relays
■	MiCOM C434 modular bay control unit
■	miniature circuit breakers.
Location
Rocklea, Queensland
> Case Study
Supply of NOMAD Mobile Substation for Power
and Water Corporation
Schneider Electric proves to be ‘upwardly mobile’
with supply of Nomad Mobile Substation.
19Customer Service 1300 369 233
Once on site, a quick substation testing procedure can be
implemented to ensure the integrity of the substation before
connectivity. Connection is made easy using the on-board cable
reel with appropriate terminations.
The mobile substations for Power and Water Corporation have
been fitted out with 22kV, 630A, 31.5kA/3s WSA switchgear as
well as MiCOM 120, 121 protection relays and miniature circuit
breakers. A MiCOM C434 modular bay control unit has also been
installed in the substations. The C434 is designed for the control
and monitoring of up to 24 electrically operated switchgear units
equipped with electrical checkback signalling. During operation,
the user-friendly interface promotes safe operation of the
substation by preventing non-permissible switching operations.
Power and Water Corporation is using one of the mobile
substations, which they have called ‘Nomad B’, to support existing
substations in the Darwin and rural areas to Pine Creek. Equipped
with integrated onboard communication technology, this substation
can be controlled and monitored by a remote operator. The first
assignment of Nomad B was at Humpty
Doo Zone Substation while maintenance
was carried out. Operating as desired,
the use of the mobile substation allowed
maintenance work to be completed without
causing power disruption to customers in
the area.
The mobile substations were joined by a
mobile switch room from Schneider Electric
late in 2012. This further improved Power
and Water Corporation’s contingency ability
and network resilience.
Conclusion
Schneider Electric’s NOMAD mobile
substations are a solution that has allowed
Power and Water Corporation to reduce
costs and improve electricity supply to
their customers. The solution mitigates the
risk in both maintenance and emergency
situations.
“The Schneider Electric NOMAD mobile
substations have provided us greater
capability and flexibility to carry out
essential maintenance on our existing
substations,” Bertram Birk, Power and
Water’s General Manager Power
Networks said.
“These units allow us to completely bypass
affected areas, meaning our customers can
continue to receive an uninterrupted supply
of electricity while works are being
carried out.”
Wendy Minne, Vice President Schneider
Electric Energy Business Unit is pleased
the products are performing well.
“Our NOMAD mobile substations highlight
Schneider Electric’s ability to provide
complete integrated solutions for our
customers,” Wendy said.
“With our extensive product range,
engineering base, project management
experience and synergistic capabilities,
we can provide our clients with a solution
to their business problems. The mobile
substation solution, which has come out
of our Rocklea factory, is a solution we are
particularly proud of.”
20 Energy Projects and Services Capability Statement
In line with this, the company is
undertaking a number of major upgrades
to improve the capacity and reliability of
the Warriewood Sewage Treatment Plant.
Through Transfield Services, Sydney Water
has chosen Schneider Electric to design,
manufacture, supply and install new
switchgear for the project.
A number of requirements were specified
for the project, including the use of
environmentally safe products, connectivity
to the existing SCADA system and safety
features for those using the system.
Schneider Electric was able to fulfill all
of these aspects and come up with a
complete integrated solution.
Switchgear Upgrade for Better
Monitoring and Measurement
While Transfield Services, leading
providers of asset services, was upgrading
other areas of the Warriewood Sewage
Treatment Plant, it was noted that the
11kV high voltage switchboard was in
need of replacement. Transfield Services
contacted Schneider Electric to supply
new product, which would increase the
safety and reliability of the switchgear. With
their extensive product range, engineering
base, project management experience and
synergistic capabilities, Schneider Electric
was well positioned to meet these
replacement needs.
Schneider Electric contracted out the
building of the prefabricated switchroom to
switchroom builder Independent Portable
Buildings. Meeting the requirements of
Sydney Water, the 11KV switchboard
has protection on four sides to withstand
internal arc faults of 25kA for 1 second. If a fault does occur,
VAMP relays (a company of Schneider Electric) detect the danger
and isolate the fault quickly. This restricts the damage, as well as
helping to ensure the outage time is minimised.
Offering maximum user safety, a Schneider Electric MCset
indoor switchgear assembly was chosen for the project. The
switchgear meets all electrical distribution needs up to 17.5kV
and incorporates a set of innovative solutions including digital
protection and control systems. The MCset switchgear is designed
to operate with SF6 gas insulated circuit breakers or vacuum circuit
breakers. In this instance, Schneider Electric’s Evolis vacuum
circuit breakers were specified for the project. They have a long
service life and do not use Sulphur Hexaflouride (SF6) which,
if improperly disposed of, can have an environmental impact.
Schneider Electric 1500KVA Oil Filled Transformers are used to
step the power down from 11kV to 433V. This is a very reliable
system with a high electrical conductivity.
MiCOM P341 and Sepam T40 protection relays are used to provide
flexible and reliable power protection for the system. An ION 7650
> Case Study
Increased Safety and Reliability for Sydney Water
Sydney Water has recently implemented a
Renewable Energy Generation Program, as part
of its commitment to being carbon neutral for
energy and electricity use by 2020.
21Customer Service 1300 369 233
intelligent metering and control device is
used on the system to provide accurate
measurements of voltage, current, power
and energy. The ION products have the
capability to provide comprehensive
logging and advanced power quality
measurement.
To ensure the system is working effectively,
Raytek infrared detectors are used to
measure the busbar temperature. The
switchboard installation and testing at the
site was undertaken by Schneider Electric’s
Installed Base Services.
Combined, these elements create a
solution that allows the client to reduce
capital and maintenance costs, avoid
extensive civil construction work, minimise
disturbance to the plant operation during
installation and improve the safety of
equipment and personnel working
in the area.
Capabilities to Take On More
Water Projects
This project was an excellent opportunity
for Schneider Electric to show Sydney
Water their capabilities, particularly in
regards to providing a complete solution
covering design, manufacturing and
delivery of products.
“We are very impressed with how Schneider Electric has met the
needs of the project,” Warren Legg, Project Manager at Transfield
Services said.
“They completed the work in a professional manner and worked
within our required time frame.”
Ask for Project
Reference List
22 Energy Projects and Services Capability Statement
Described as the largest single resource natural gas project in
Australia’s history, the Gorgon Project includes the construction
of a 15 million tones per annum liquefied natural gas (LNG) plant
on Barrow Island and a domestic gas plant with the capacity to
provide 300 terajoules per day to supply gas to Western Australia.
The Gorgon Project is operated by an Australian subsidiary of
Chevron and is a joint venture of the Australian subsidiaries of
Chevron (47.3%), ExxonMobil (25%), Shell (25%), Osaka Gas
(1.25%), Tokyo Gas (1%) and Chubu Electric Power (0.417%).
Schneider Electric will supply equipment to the site to create
an electrical distribution network - providing electricity for the
liquefied natural gas (LNG) plant as well as for the construction
village, which has been established to house workers during the
construction phase of the project.
Schneider Electric was also asked to develop an automation
system for the project, which was able to retrieve information
from the field and make the information available in compliance
with the IEC61850 standard for the design of electrical
substation automation.
Outcome
For the substation component of the job, the client’s priorities were
safety, compliance, innovation and efficiency. Schneider Electric’s
ability to work in a professional and competent manner ensured
these objectives were met.
Another of the client’s requirements was the delivery of the
project on schedule. Schneider Electric was also able to fulfill this
objective. Technical compliance to work at the site was another
factor with, which Schneider Electric has been able to conform to
ensure the ongoing satisfaction of the client.
“Ensuring we are working in an environmentally responsible fashion
will create the best outcome for all involved,” Robert Bagnall said.
> Case Study
Customer Benefits:
■	complete solution from design to
pre-commissioning
■	compliance with strong environmental,
safety and local supply requirements
■	full product testing – onsite and offsite
■	delivery of ‘Plug and Play’
equipment to site
■	full local support during and after
project execution.
Project at a Glance
Project Type
Automation (PACiS System):
■	feeder protection relay (MiCOM P145)
■	line differential protection relay
(MiCOM P545)
■	transformer protection (MiCOM P642)
■	metering unit (Bitronics M571)
■	substation computers (MiCOM C264)
■	PACiS operator interface
(Gorgon Offplot only)
■	ethernet managed switches.
(MiCOM H35-V2)
Substation:
■	transformers
■	medium voltage switchgear
■	low voltage switchgear
■	prefabricated kiosk substations
■	gas and air insulated switchgear
prefabricated substations.
Location:
Barrow Island, Perth, Australia (around
60kms off the north-west coast of
Western Australia).
Gorgon Project, Barrow Island, Perth
Agreement to supply and install substation
equipment and automation system to retrieve
information from the field.
23Customer Service 1300 369 233
Growing with Gorgon
To meet the needs of the Gorgon Project, a significant local
Schneider Electric workforce has been consigned. Local
workers have been employed for tendering, engineering, project
management and manufacturing, and in turn, Schneider Electric
is using their local preferred contractors to supply the project with
general and critical materials and services. Schneider Electric has
been contracted for a period of three years.
Setting Up House
In order to house the workforce needed to complete the project,
The Gorgon Joint Venture is building a ‘construction village’ on
Barrow Island. The village will include resource facilities such as
accommodation, offices, kitchens and a gym for people stationed
to work on the Gorgon Project for a period of time.
To power this area, Schneider Electric is supplying a ‘Plug
and Play’ substation solution with engineered and integrated
33kV, 11kV, 6.6kV, 690V and 400V switchgear, control systems,
HVAC and power management systems. Once completed,
any switchroom sent direct to Barrow Island is cleaned down,
chemically treated and completely wrapped, to avoid any
contaminants entering the packaged units.
24 Energy Projects and Services Capability Statement
> Case Study
Providing a Solution
Equipment within Schneider Electric
E-Houses, transforms and switches
sequentially to ensure maximum power
availability to the network to maintain a
controlled electrical system environment for
the automated systems powering the plant.
“Schneider Electric is providing IEC
standard distribution products including
low and high voltage switchboards,
distribution transformers and prefabricated
substations. Most of this equipment is
being built off-site, including processing
modules - some of which are 30 metres
high and almost cover the same area as a
football pitch,” Robert Bagnall said.
Nine prefabricated Schneider Electric
buildings, measuring between 17 and 25
meters long by 6 metres wide, have been
supplied to power the village electrical
distribution network. The substations have
been constructed with glass reinforced
concrete. This material provides internal
arc protection, impact resistance and high protection resistance
against solar radiation. The substations feature Schneider Electric
HVAC, fire and gas detection, fire suppression, safety equipment,
small light and power, data concentrator, integration and fit-out of
the buildings; including free-issued variable speed drives (VSDs)
to bring generators up to speed and therefore save energy. The
substations have also been fitted with power management systems
to allow the client to keep track of their energy usage.
For the LNG plant, Schneider Electric has been commissioned
to supply 30 prefabricated buildings. These are between 22 and
28 metres long and are 7 metres wide. The buildings feature
Schneider Electric and third party equipment such as HVAC, fire
and gas detection, fire suppression, safety equipment and facilities
for small light and power outlets.
As well as reducing the environmental impact by cutting back the
on-site work required, the technology within the substation allows
Schneider Electric to offer a compact footprint; a design which
promotes hazard reduction, complete automation of the equipment
supplied and compliance to local codes and standards.
Protection, control and interlocking system designs were
customised specifically for the project, and Schneider Electric
Power Management System solutions have been installed to
ensure the LNG plant has continual functionality.
Integrating with the Schneider Electric hardware is a Schneider
Electric PACiS Automation system. The system is designed to
retrieve information from the field. The PACiS Operator Interface
provides The Gorgon Joint Venture operators with access to
information such as the rate of flow, which areas are in operation
at particular times, as well as providing alerts when a problem
occurs. The products were all part of a solution which was
specifically designed for the Gorgon Project.
Gorgon Project,
Barrow Island, Perth
25Customer Service 1300 369 233
> Case Study
Schneider Electric is pleased to announce
that it has entered into an agreement with
Bechtel for the supply of an electrical
control and distribution network solution,
designed to run and monitor critical
equipment, for the Chevron-operated
Wheatstone Project in Western Australia.
The contract value is estimated at
AUD$189 million and commenced
in July 2012.
The contract, one of the largest ever
undertaken by Schneider Electric will
see the majority of the work completed
in Australia and will support over 230
Australian jobs, with around 143 located in
Perth. Over 80 per cent of the Schneider
Electric employees appointed to work
on the project will be part of the ongoing
project management role.
Stephen Coop, Managing Director,
Schneider Electric Pacific Zone said,
“Schneider Electric’s Wheatstone Project
contract win is the culmination of many
years working in the Australian market. We
bring to this project a combination of global
and local expertise that helps power the oil
and gas industry.”
“As part of the agreement, Schneider Electric will supply the
Wheatstone Project with 13 prefabricated, customised and
integrated ‘plug and play’ substations. Prefabricated substations
are a vital element to projects such as Wheatstone due to the
growing complexity and operational requirements of oil and gas
extraction projects. The substations are custom built offsite to
meet the needs of our customers and delivered to any location, no
matter how remote.”
The substation design will take place in Brisbane, with
construction, final integration and testing being carried out in
Perth. The largest substation planned for delivery as a single piece
will be in excess of 70 metres long by 28 metres wide, weighing
around 590 tonnes.
The prefabricated substations will feature leading Schneider
Electric products including medium voltage switchgear, UPS
(Gutor) and low-voltage components. All technology has been
designed and engineered to comply with Australian Standards,
hazardous area standards and the Building Code of Australia. The
13 prefabricated substations, totaling around 9000 square metres,
will each be equipped with a HVAC system, MV and LV control
panels, VESDA fire protection, 230V A UPS, DC batteries and
UPS’s and hazard area related battery rooms. Additionally, a total
of seven MV and 45 LV switchboards and a power management
system will be implemented across the entire site.
Wheatstone Project, Pilbara Region,
Western Australia
Schneider Electric wins landmark AUD$189 million
contract supporting over 230 Australian jobs.
Ask for Project
Reference List
26 Energy Projects and Services Capability Statement
Schneider Electric expertise and know-how
Proven technology from Schneider Electric
Delivery of another successful project
26 Energy Projects and Services Capability Statement
27Customer Service 1300 369 233
All Enquiries (Australia wide)
Email: customercare.au@schneider-electric.com
www.schneider-electric.com.au
Tel: 1300 369 233
Fax: 1300 369 288
Pacific Head Office
Sydney	 t	 78 Waterloo Road, Macquarie Park, NSW 2113
Sales and regional offices
New South Wales
Sydney	 t	 78 Waterloo Road, Macquarie Park, NSW 2113
Newcastle	 t	 76 Munibung Road, Cardiff, NSW 2285
Regional representatives located in: Wollongong
Queensland
Brisbane	 t	 80 Schneider Road, Eagle Farm, QLD 4009
Regional representatives located in: Cairns, Townsville, Mackay,
Rockhampton, Sunshine Coast, Gold Coast and Toowoomba
Australian Capital Territory
Canberra	 t	 8 Brindabella Circuit, Majura, ACT 2609
Victoria
Melbourne 	 t	 296-310 Ferntree Gully Road, Notting Hill, VIC 3168
Regional representatives located in: Geelong, Ballarat and Albury/Wodonga
Tasmania
Hobart 	 t	 309 Liverpool Street, Hobart, TAS 7000
Regional representatives located in: Launceston
South Australia
Adelaide 	 t	 33-37 Port Wakefield Road, Gepps Cross, SA 5094
Western Australia
Perth	 t	 17 Halley Road, Balcatta, WA 6021 (Industrial Automation and Control)
	 t	 Unit 3, 26 Gibberad Road, Balcatta, WA 6021 (Electrical Distribution)
Northern Territory
Darwin 	 t	 16 Albatross Street, Winnellie, NT 0820
Manufacturing sites
Benalla		 Medium voltage switchgear and transformer
		 manufacturing and development
	t	 Sydney Road, Benalla, VIC 3672
Brisbane		 Medium voltage overhead distribution switchgear
		 manufacturing and development
	 t	 80 Schneider Road, Eagle Farm, QLD 4009
Adelaide		 Wiring accessories and low voltage switchgear manufacturing
	 t	 33-37 Port Wakefield Road, Gepps Cross, SA 5094
Rocklea		 Medium voltage switchgear and transportable substations
	 t	 35 Evans Road, Rocklea, QLD 4106
Schneider Electric (Australia) Pty Ltd
Head Office
Postal Address:
Locked Bag 2211
North Ryde B C 1670
Electrical Contractors Licences
Schneider Electric (Australia) Pty Limited is licensed under the
relevant state electrical safety acts: QLD: 66116; NSW: 150195C;
VIC: 17615; SA: PGE210184; WA: EC008813; NT: C2356
Customer Service
Tel: 1300 369 233
Fax: 1300 369 288
Email: customercare.au@schneider-electric.com
www.schneider-electric.com.au
Paper is one of the most sustainable materials that we
have on the planet today. It has a lower CO2 footprint
than electronic communications and remains a powerful
marketing and information tool.
Because of this we would urge you to recycle this
catalogue into your most convenient recycling method
when you have finished using it and contribute to the
ongoing recovery efforts of the paper industry.
Fact: Australians recover 72% of their paper consumption
– one of the highest rates in the world!
As standards, specifications and designs change from time to time, always ask for confirmation
of the information given in this publication.
This document has been printed using FSC Mix Certified paper. ISO 14001 environmental
management system in use at mill.
Information given in this publication was accurate at the time of printing.
SEAU25973

More Related Content

Similar to Energy Projects Capability Statement

LCS Capability Statement_Website2
LCS Capability Statement_Website2LCS Capability Statement_Website2
LCS Capability Statement_Website2Grant Croghan
 
Iskra presentation 2016
Iskra presentation 2016Iskra presentation 2016
Iskra presentation 2016
Minka Grdesic
 
Lightning Protection and Earthing/Grounding Solution
Lightning Protection and Earthing/Grounding SolutionLightning Protection and Earthing/Grounding Solution
Lightning Protection and Earthing/Grounding Solution
Jef Techno Solution Private Limited
 
Komax Profile 2015-2016
Komax Profile 2015-2016Komax Profile 2015-2016
Komax Profile 2015-2016Ehab Saleh
 
Discover Siemens Ruggedcom: Rugged communications equipment for harsh environ...
Discover Siemens Ruggedcom: Rugged communications equipment for harsh environ...Discover Siemens Ruggedcom: Rugged communications equipment for harsh environ...
Discover Siemens Ruggedcom: Rugged communications equipment for harsh environ...
Reliserv_Solution
 
Tunnel Car Wash Solution 0106BR0504
Tunnel Car Wash Solution 0106BR0504Tunnel Car Wash Solution 0106BR0504
Tunnel Car Wash Solution 0106BR0504Tom Noble
 
Mseto engineering https://www.entireweb.com/?a=RNN
Mseto engineering https://www.entireweb.com/?a=RNNMseto engineering https://www.entireweb.com/?a=RNN
Mseto engineering https://www.entireweb.com/?a=RNN
Richard Nyangau
 
mseto company profile
mseto company profilemseto company profile
mseto company profile
Richard Nyangau
 
Susol MCCB_LS.pdf
Susol MCCB_LS.pdfSusol MCCB_LS.pdf
Susol MCCB_LS.pdf
quangtrungsangtaotha
 
Windfarm services and grid compliance
Windfarm services and grid complianceWindfarm services and grid compliance
Windfarm services and grid compliance
Premium Power
 
Manufacturing of electronical and electrical equipment
Manufacturing of electronical and electrical equipmentManufacturing of electronical and electrical equipment
Manufacturing of electronical and electrical equipment
Abengoa
 
Engage with...Dynex Semiconductor
Engage with...Dynex SemiconductorEngage with...Dynex Semiconductor
Engage with...Dynex Semiconductor
KTN
 
Company profile miguns Group
Company profile miguns GroupCompany profile miguns Group
Company profile miguns GroupAkankha Ahmed
 
GE Critical Power fact sheet
GE Critical Power fact sheetGE Critical Power fact sheet
GE Critical Power fact sheet
Mark Szalkus
 
Bảng catalog sản phảm máy cắt không khí ACB Easypact EVS Schneider
Bảng catalog sản phảm máy cắt không khí ACB Easypact EVS SchneiderBảng catalog sản phảm máy cắt không khí ACB Easypact EVS Schneider
Bảng catalog sản phảm máy cắt không khí ACB Easypact EVS Schneider
Công ty cổ phần thiết bị điện Long Nguyễn
 
B-Line from Arcticom LLC
B-Line from Arcticom LLCB-Line from Arcticom LLC
B-Line from Arcticom LLC
Andrea Elizabeth Gilbert
 

Similar to Energy Projects Capability Statement (20)

LCS Capability Statement_Website2
LCS Capability Statement_Website2LCS Capability Statement_Website2
LCS Capability Statement_Website2
 
Iskra presentation 2016
Iskra presentation 2016Iskra presentation 2016
Iskra presentation 2016
 
Lightning Protection and Earthing/Grounding Solution
Lightning Protection and Earthing/Grounding SolutionLightning Protection and Earthing/Grounding Solution
Lightning Protection and Earthing/Grounding Solution
 
Komax Profile 2015-2016
Komax Profile 2015-2016Komax Profile 2015-2016
Komax Profile 2015-2016
 
Discover Siemens Ruggedcom: Rugged communications equipment for harsh environ...
Discover Siemens Ruggedcom: Rugged communications equipment for harsh environ...Discover Siemens Ruggedcom: Rugged communications equipment for harsh environ...
Discover Siemens Ruggedcom: Rugged communications equipment for harsh environ...
 
Tunnel Car Wash Solution 0106BR0504
Tunnel Car Wash Solution 0106BR0504Tunnel Car Wash Solution 0106BR0504
Tunnel Car Wash Solution 0106BR0504
 
Mseto engineering https://www.entireweb.com/?a=RNN
Mseto engineering https://www.entireweb.com/?a=RNNMseto engineering https://www.entireweb.com/?a=RNN
Mseto engineering https://www.entireweb.com/?a=RNN
 
mseto company profile
mseto company profilemseto company profile
mseto company profile
 
Susol MCCB_LS.pdf
Susol MCCB_LS.pdfSusol MCCB_LS.pdf
Susol MCCB_LS.pdf
 
Windfarm services and grid compliance
Windfarm services and grid complianceWindfarm services and grid compliance
Windfarm services and grid compliance
 
Corporate Brochure
Corporate BrochureCorporate Brochure
Corporate Brochure
 
Cat guid een-001-0811
Cat guid een-001-0811Cat guid een-001-0811
Cat guid een-001-0811
 
KPX Promotionnal Catalogue
KPX Promotionnal CatalogueKPX Promotionnal Catalogue
KPX Promotionnal Catalogue
 
Company Profile - Adex
Company Profile - AdexCompany Profile - Adex
Company Profile - Adex
 
Manufacturing of electronical and electrical equipment
Manufacturing of electronical and electrical equipmentManufacturing of electronical and electrical equipment
Manufacturing of electronical and electrical equipment
 
Engage with...Dynex Semiconductor
Engage with...Dynex SemiconductorEngage with...Dynex Semiconductor
Engage with...Dynex Semiconductor
 
Company profile miguns Group
Company profile miguns GroupCompany profile miguns Group
Company profile miguns Group
 
GE Critical Power fact sheet
GE Critical Power fact sheetGE Critical Power fact sheet
GE Critical Power fact sheet
 
Bảng catalog sản phảm máy cắt không khí ACB Easypact EVS Schneider
Bảng catalog sản phảm máy cắt không khí ACB Easypact EVS SchneiderBảng catalog sản phảm máy cắt không khí ACB Easypact EVS Schneider
Bảng catalog sản phảm máy cắt không khí ACB Easypact EVS Schneider
 
B-Line from Arcticom LLC
B-Line from Arcticom LLCB-Line from Arcticom LLC
B-Line from Arcticom LLC
 

Energy Projects Capability Statement

  • 1. 1Customer Service 1300 369 233 Energy Projects and Services Capability Statement
  • 2. 2 Energy Projects and Services Capability Statement Overview Pages 3-6 Pages 7-11 Project Delivery Project Management Testing, Installation and Commissioning Capability Typical Packages Project Design Highlight on E-House and Mobile Substation Pages 12-13 Services and Life Cycle Support Pages 14-16 Case Studies Pages 17-25
  • 3. 3Customer Service 1300 369 233 Integrated solutions that make energy safe, reliable, efficient, productive and green. Schneider Electric is a market leader in Australia for medium and low voltage power distribution and automation systems. We provide both a technical range of components and a complete project solution, for a wide range of market sectors. At Schneider Electric, we believe that our customer’s success is our success. Schneider Electric employs a highly skilled group of designers, application engineers and service personnel within each of our business units, including some of the most experienced electrical engineers in the industry. We deliver practical, end-to-end solutions for our customers. Not only do we draw on a depth of international experience and resources, we also deliver comprehensive locally engineered solutions. This can range from design, through to the Australian manufacture of a number of products. Schneider Electric has over experience delivering engineered solutions throughout the world. 100 years > Overview
  • 4. 4 Energy Projects and Services Capability Statement > Overview Schneider Electric offers innovative technical and commercial solutions that provide unique advantages for projects. We work with our customers to select appropriate technologies and equipment, to optimise the balance between initial capital expenditure and overall life cycle costs of electrical and automation systems. On every project, we take time to understand our customers’ exact requirements to deliver an optimised supply chain model, along with practical, factory tested equipment, suited to its specific purpose. Schneider Electric products and solutions are designed for high reliability, long life and low maintenance. We undertake extensive testing during the manufacturing process and, when invited by our clients, perform extensive testing at site. Schneider Electric has achieved a secure market presence for pre-fabricated E-house Solutions. These solutions incorporate the installation, testing and commissioning of our own equipment as well as that of third party suppliers.
  • 5. 5Customer Service 1300 369 233 The key benefits of Schneider Electric’s local engineering expertise includes faster turn around time, lower cost, immediate and personal engagement by Schneider Electric engineers providing local witness testing, and the reassurance of a service team always being close at hand. Risk Reduction ands calable Custo m ised co sts Reduc e yourSave timeofs pace Bette ruse + + ++
  • 6. 6 Energy Projects and Services Capability Statement Make the most of your energyTM and more... Solution for all Infrastructure Utilities Oil and Gas Data Centre Mining Hospital Water Marine Wind Farm Cement Industry Building Airport
  • 7. 7Customer Service 1300 369 233 > Capability Typical Solutions and Packages Schneider Electric provides a range of systems and services for a variety of sectors. High Voltage ■ Kiosk Substation and Skids Solutions ■ Protection Systems ■ Substation SCADA System ■ Protection Relays ■ Power Factor Correction and Harmonic Solutions Medium Voltage ■ MV Distribution and Power transformers (Dry and Oil Type) ■ 33/22/11/6.6/3.3 kV Switchgear ■ MV Ring Main Units ■ Construction Power Supplies Low Voltage ■ Main Switchboard ■ Motor Control Centres ■ General Distribution Boards ■ Wiring Accessories ■ Protection, Automation and Control Integrated Systems; hardware and software, including control panels ■ Scalable Design Substation Automation Systems (IEC61850) from a single bay to network control (bay computer, RTU, feeder protection, automation, gateway, switches, database, configuration editor, maintenance tools, protection relays) Uninterruptible, Emergency Power Supplies, Earthing and Lightning Protection ■ UPS Systems ■ Distribution Boards ■ Earthing and Lightning Protection Systems ■ Battery Chargers Automation ■ Substation and Automation Systems, including human machine interface equipment, gateways and RTUs ■ Protection Panel Design, Engineering, Setting and Testing E-House Solutions and Mobile Substation E-House Solutions integrate major power and control equipment into engineered prefabricated buildings (E-Houses) - ideal for industrial; large commercial and utility facilities; mine, mineral and metal (MMM) industries; oil and gas; utilities; rail; generation; emergency response mobile and primary substations. An expanded description of our E-House Solutions and mobile substation capabilities is provided in the following section.
  • 8. 8 Energy Projects and Services Capability Statement > Capability Project Design As part of a turnkey solution, Schneider Electric Engineers work with customers to assist with every level of design including: Electrical Design ■ Electrical system design ■ Single line diagrams ■ General arrangements ■ Panel layout ■ HV and LV electrical schematics ■ System loading analysis ■ Fault level calculations ■ Protection grading reports ■ Protection logic diagrams ■ Insulation coordination ■ Voltage drop calculations ■ Cable scheduling ■ Equipment lists ■ Earthing studies and design ■ Cable block and connection diagrams ■ Performance specifications ■ Lightning protection ■ Protection and discrimination study Automation Design ■ Overall substation protection, control and automation design ■ Automation system I/O list development and management ■ Automation system functional design specification development ■ Automation system detail view specification development ■ Graphical user interface screen development ■ Automation development (IEC61131-3) ■ Inherently designed for IEC 61850 applications ■ Disturbance record management and waveform oscillography ■ Ethernet networks and gateways (IEC618550) ■ RTU, bay controller, data concentrator ■ Redundant architectures and devices ■ Protection panel design, engineering, setting and testing Protection panel design, engineering, setting and testing
  • 9. 9Customer Service 1300 369 233 > Capability Typical Substation Design Considerations ■ Site area limitations ■ MV/LV segregation ■ Equipment foot print ■ HVAC heat loadings and locations ■ Switchgear positioning – heat distribution ■ Pad-mount systems/ducting/return air flow ■ Split system mountings ■ Lighting and emergency lighting – internal and external ■ Fire ratings – wall, floor, etc. ■ Cabling considerations – e.g. transformer locations ■ Ongoing maintenance – access for equipment maintenance ■ Pressurisation - use of airlocks ■ Allowances for future equipment ■ Building Code of Australia – e.g. egress paths and exits ■ Australian Standards – i.e. AS3000 clearance ■ All stakeholders – including operators and local shire or council ■ Specific customer requirements
  • 10. 10 Energy Projects and Services Capability Statement Customised and Scalable E-Houses can be adapted to local and industrial conditions. Flexible in design, E-Houses can be upgraded with rear access doors, expandable walls, space saving design and be stackable (when required), with a robust construction. Save Time As all E-House construction is conducted prior to arrival at the project site, major disruptions to construction and staff on site is avoided. Better Use of Space Our E-House Solutions aim to optimise layout and design, consuming less area than a traditional block building. Efficiencies gained by positioning and access considerations for electrical equipment, allows for easy access to the equipment without the need for additional building space. Safety and Quality Every E-House is pre-assembled in a controlled environment. Our compliance to local codes and standards ensures maximum safety with a quality outcome. During the design phase, we consider a projects environmental aspects, and provide reliable solutions through compliance to local Australian Standards. Reduction of Costs Schneider Electric E-House Solutions reduce the costs of on-site construction and electrical equipment installations. All equipment is pre-installed, tested and ready to use when it is delivered. > Capability Highlight on E-House Solutions and Mobile Substations Schneider Electric E-Houses can be configured with switchgear, transformers, motor control, HVAC, lighting and security for a broad range of business operations. Our mechanical, structural and electrical experts can custom fabricate E-Houses to offer a “Plug and Play” solution, simplifying the installation process and complying with local regulations and standards.
  • 11. 11Customer Service 1300 369 233 Schneider Electric mobile substations are completely self- contained trailer mounted units comprising transformer, cooling equipment, high voltage and low voltage disconnect, circuit protection (RCDs and MCBs), metering, relaying, AC/DC auxiliary power, surge protection and optional cable reeling equipment. We use specially designed high-strength custom trailers, equipped with air ride suspension systems and optional rear steering when required. Mobile substations are designed for special applications, such as isolated areas, emergency power supplies (equipment breakdown or maintenance), network extensions, temporary switching stations or transformer stations - thus reducing the capital expenditure required for larger, more permanent solutions. Features: ■ maximum transportation flexibility ■ can be used in outdoor conditions ■ quick energy supply without onsite adaptation ■ small footprint ■ up to 10MVA ■ single move philosophy ■ on-board redundant systems for remote protection and control ■ on-board generation for Black start set-up ■ de-reeler and grid connection cables ■ variable primary and secondary transformer voltage and vector selection, to integrate into diverse networks. Energy Whenever and Wherever Innovative mobile substation design provides high level system reliability and flexibility.
  • 12. 12 Energy Projects and Services Capability Statement > Project Delivery Project Management Schneider Electric supplies fully installed and pre-commissioned substations. Our specialist teams have large project execution experience, developed within an Australian Standards framework. We fit and install equipment sourced from our global network of manufacturing facilities as well as our network of third party partners. Our focus is to reduce project time frames and our client’s risks. Project Management Expertise Complete solution approach, combining all of the Schneider Electric Businesses as ONE Long term relationships with specialists, including room-builders and equipment installers Principle Design Engineers in MV and LV equipment, switchrooms and automation Experience > 30 years experience developing Australian industrial and mining solutions The Australian Projects Team part of the Schneider Solutions Community, with 5,000 Staff globally Australian Standards Compliance Australian Project Team supports Schneider Electric’s Global Solution Community around AS Australian Project Engineers supervise of factory compliance to AS Membership in 10 Australian Standards Committees Partnering with room-builders and equipment Installers Australian based Solutions Team Team Competence in AS & IEC Standards, and the Project Team is ISO9001 accredited Australian switch- room expertise Large project experience Factory representative on Project Team Schneider Electric. One Experienced Project Team O Interface N Project Director E Project Team Global expertise + local presence Project Management Excellence Factory Representative on Project Team Schneider Electric. Professionalism Project Managers are members of key professional bodies Trained Project Managers are trained through Schneider Electric University according to PMI principles Accreditation Internal and external under PMIs PMP program Optimised Procurement Model Global + Local + Partner mix Best suit the clients’ application and specifications Manufacturing > 250 Factories Logistics Minimising risk and costs, and ensuring compliance to specs and standards Full Life Support Design, commissioning training and post installation support Partners Optimising in-house vs external procurement to best suit the needs of the clients’ application
  • 13. 13Customer Service 1300 369 233 > Project Delivery Testing, Installation and Commissioning Schneider Electric has extensive experience in delivering highly complex, time-critical projects, through a regime of extensive testing, installation and commissioning. Schneider Electric’s installation and commissioning of electrical distribution and automation equipment, ensures the apparatus performs to customer’s, manufacturer’s and regulator’s requirements. We undertake: ■ factory testing of all equipment ■ installation of equipment in substation and cabling ■ commissioning of switchroom and equipment delivery on site ■ site testing if installation ensures equipment is ready for commissioning ■ installation supervision ■ equipment and process commissioning ■ system performance tests. Benefits: ■ equipment is installed and commissioned by Schneider Electric trained technicians ■ peace of mind, knowing equipment is correctly installed ■ reduced risk of problems with protection and control systems ■ product warranty is preserved. Pre-commissioning to prepare and test equipment prior to attaching cables.
  • 14. 14 Energy Projects and Services Capability Statement > Services and Life Cycle Support Through Schneider Electric Services team, we offer the benefits of true life cycle support for our clients’ electrical distribution systems. Schneider Electric Services offer you the benefits of true life cycle support for your electrical distribution systems. Our capabilities enable us to provide a wide range of services and solutions for your installations, from initial concept design through to end-of-life management and renewal programmes. Our highly trained services team work with you to understand your needs and offer individually tailored solutions, allowing you to focus on your core business. Schneider Electric has global and local project teams to manage your electrical distribution and energy management projects. With a full range of services encompassing strategic consulting, design and engineering, maintenance contracts, support and education, Schneider Electric is the right partner for your projects and engineering challenges. Our dedicated team of over 70 highly trained technicians, supervisors and support staff are based in seven locations around Australia. Complemented by our Projects teams and specialist technical experts, we provide the local means to deliver outstanding service throughout the life cycle of your project. Examples of our offers within the life cycle phases are summarised below. Renew > Switchgear retrofits > Environmental disposal > SF6 gas recovery Improve > Protection relay retrofits > Transformer refurbishment > Installation audits Design > Projects and solutions: - turnkey projects - solution design - portable switch rooms. Build > Project management > Project delivery > Installation > Pre-commissioning Operate > Maintenance contracts > Spare parts > Diagnostic testing > Training
  • 15. 15Customer Service 1300 369 233 > Services and Life Cycle Support Maintenance Contract Our asset management programme addresses the criticality of your equipment by: ■ preventative manufacturers maintenance in accordance with IEC standards ■ predictive maintenance using our bespoke diagnostic tools and techniques ■ a customised maintenance plan ■ emergency corrective maintenance within defined service levels ■ 24/7 telephone support ■ management of intervention and equipment data using our asset management tool ■ privileged on-line access to your equipment data and maintenance reports ■ a contractual package providing you with improved management of the cost/performance ratio of your maintenance. Our maintenance and commissioning offers can also ensure compliance with the relevant clauses of Australian Standards: AS 2467-2008, Maintenance of Electrical Switchgear. Spare Parts Management While the risk of equipment failure can be substantially minimised, it can never be entirely removed. Schneider Electric Installed Base Services is pleased to offer a Spare Parts Management Contract to suit your needs. The spare parts required for your installation should be categorised into the following groups: ■ urgent spares kept on site for breakdowns ■ maintenance spares stocked either on-site or dedicated within Schneider Electric’s distribution centres. Extended Warranty By entering into an extended warranty agreement with Schneider Electric, you no longer have to worry about equipment breakdown and unknown repair costs – we take care of all that for you. Customer Training Schneider Electric can develop and implement detailed training programmes covering all aspects of the equipment and control system design and operation. We can provide operator/maintenance training, technical training, on-line training and customised training. ECOFIT™ Upgrade to the latest technology with our pre-engineered ECOFIT solutions, which allow you to extend the life of your installation with minimal downtime. These solutions are factory designed, tested and approved. Our offers include: ■ circuit breaker retrofit and refurbishment ■ extension cubicles ■ protection relay retrofit ■ transformer and kiosk refurbishment.
  • 16. 16 Energy Projects and Services Capability Statement > Services and Life Cycle Support MP4 Installation Risk Assessment MP4 is an in-depth on-site audit delivered over (typically) one to two weeks to analyse the link between the electrical distribution system and the site activity/processes. The conclusion identifies the business risks in terms of cost of production and safety; prioritised according to risk. The final report comprises a summary of corrective actions and four improvement plans: • maintenance plan • modernisation plan • monitoring plan • management plan. MP4 benefits: ■ improve installation safety and quality ■ discover the link between the electrical distribution system and business performance ■ provide a roadmap for maintenance and modernisation activities ■ prioritise electrical installation investments to optimise CAPEX ■ better prevention of electrical risks ■ replicate recommendations at multiple sites ■ predict failures and act before they happen. End of Life Disposal As a leading manufacturer of SF6 insulated switchgear, Schneider Electric has worked closely with specialists and regulators within Australia to provide an environmentally sound and cost effective solution for the disposal of your medium voltage switchgear at the end of its life cycle. Our environmental disposal offer tracks your equipment through all phases of the process and provides documentation to confirm the destruction of the equipment and the quantity of SF6 gas that has been reclaimed, including the CO² equivalent. By partnering with Schneider Electric you can benefit from value throughout your system life cycle. Legacy Brands of Schneider Electric Below is a list of legacy brands which are owned and supported by Schneider Electric. For many discontinued equipment ranges we are still able to provide support. ■ Areva (distribution equipment) ■ Alstom (distribution equipment) ■ English Electric ■ GEC (incl. GEC Alsthom) ■ Merlin Gerin ■ Mesa ■ Magrini Galileo ■ Email Westinghouse ■ Yorkshire Switchgear
  • 17. 17Customer Service 1300 369 233 > Case Study Boddington Gold Mine (BGM) located 130km south east of Perth, is the largest gold and copper mine in Australia. Built on the footprint of the original Boddington Gold Mine, the expansion mines the hard gold/copper ore that lies beneath depleted oxide pits. The project value exceeded $2.4 billion and involved open cut mining from two large pits and is expected to produce an average 850,000 ounces of gold and 30,000 tonnes of copper a year for more than 20 years. Requiring a key provider to supply power distribution and motor control for the site, Boddington Gold awarded Schneider Electric three contracts worth over $60 million. Schneider Electric supplied three transportable 33kV sub stations, twelve transportable 1/3.3/.443kV substations, equipment for existing traditional substations and 36 distribution transformers from 1.5MVA to 25MVA. The project included design and manufacture of portable switch rooms, all cabling within the switchroom limits as well as distribution MV and LV switchgear, MV and LV variable speed drives, DC systems and installation of third-party free issued equipment. Benefitting from Schneider Electric’s global reach, Boddington Gold was able to access unique systems from all over the world including 11/3.3kV primary and motor control switchgear with integrated motor management systems. Boddington Gold Mine One provider of power distribution and motor control
  • 18. 18 Energy Projects and Services Capability Statement Providing electricity, water supply and sewerage services to almost 80,000 customers across the Northern Territory, Power and Water Corporation has a commitment to its customers to provide reliable, uninterrupted power. Looking for a contingency plan to aid them in the event of substation equipment downtime, Power and Water Corporation contacted Schneider Electric to discuss their needs for a mobile substation. The brief was simple: supply a product which was ready- to-go, easy-to-use, safe and could be used in a variety of situations. Solution Schneider Electric’s NOMAD mobile substation is a solution that provides electrical distributors with a means to carry out maintenance and emergency work on substations within an existing network, while continuing to distribute power. Designed to be deployed quickly, NOMAD mobile units come prefabricated from Schneider Electric and are mounted on a quad axle trailer with multiple transformer combinations. To allow customers to easily move the units between sites, NOMAD is designed to enable trucking on main roads without an escort and the weight of the product has been carefully calculated to comply with Traffic Authorities’ requirements. Customer Benefits: ■ ability to perform substation maintenance without disrupting supply ■ ability to provide reliable power to their end-users ■ ability to mitigate risk during both maintenance and emergency situations. Project at a Glance Project Type Supply of NOMAD Emergency Mobile Substation, featuring: ■ 22kV, 630A, 31.5kA/3s WSA Switchgear ■ MiCOM 120, 121 protection relays ■ MiCOM C434 modular bay control unit ■ miniature circuit breakers. Location Rocklea, Queensland > Case Study Supply of NOMAD Mobile Substation for Power and Water Corporation Schneider Electric proves to be ‘upwardly mobile’ with supply of Nomad Mobile Substation.
  • 19. 19Customer Service 1300 369 233 Once on site, a quick substation testing procedure can be implemented to ensure the integrity of the substation before connectivity. Connection is made easy using the on-board cable reel with appropriate terminations. The mobile substations for Power and Water Corporation have been fitted out with 22kV, 630A, 31.5kA/3s WSA switchgear as well as MiCOM 120, 121 protection relays and miniature circuit breakers. A MiCOM C434 modular bay control unit has also been installed in the substations. The C434 is designed for the control and monitoring of up to 24 electrically operated switchgear units equipped with electrical checkback signalling. During operation, the user-friendly interface promotes safe operation of the substation by preventing non-permissible switching operations. Power and Water Corporation is using one of the mobile substations, which they have called ‘Nomad B’, to support existing substations in the Darwin and rural areas to Pine Creek. Equipped with integrated onboard communication technology, this substation can be controlled and monitored by a remote operator. The first assignment of Nomad B was at Humpty Doo Zone Substation while maintenance was carried out. Operating as desired, the use of the mobile substation allowed maintenance work to be completed without causing power disruption to customers in the area. The mobile substations were joined by a mobile switch room from Schneider Electric late in 2012. This further improved Power and Water Corporation’s contingency ability and network resilience. Conclusion Schneider Electric’s NOMAD mobile substations are a solution that has allowed Power and Water Corporation to reduce costs and improve electricity supply to their customers. The solution mitigates the risk in both maintenance and emergency situations. “The Schneider Electric NOMAD mobile substations have provided us greater capability and flexibility to carry out essential maintenance on our existing substations,” Bertram Birk, Power and Water’s General Manager Power Networks said. “These units allow us to completely bypass affected areas, meaning our customers can continue to receive an uninterrupted supply of electricity while works are being carried out.” Wendy Minne, Vice President Schneider Electric Energy Business Unit is pleased the products are performing well. “Our NOMAD mobile substations highlight Schneider Electric’s ability to provide complete integrated solutions for our customers,” Wendy said. “With our extensive product range, engineering base, project management experience and synergistic capabilities, we can provide our clients with a solution to their business problems. The mobile substation solution, which has come out of our Rocklea factory, is a solution we are particularly proud of.”
  • 20. 20 Energy Projects and Services Capability Statement In line with this, the company is undertaking a number of major upgrades to improve the capacity and reliability of the Warriewood Sewage Treatment Plant. Through Transfield Services, Sydney Water has chosen Schneider Electric to design, manufacture, supply and install new switchgear for the project. A number of requirements were specified for the project, including the use of environmentally safe products, connectivity to the existing SCADA system and safety features for those using the system. Schneider Electric was able to fulfill all of these aspects and come up with a complete integrated solution. Switchgear Upgrade for Better Monitoring and Measurement While Transfield Services, leading providers of asset services, was upgrading other areas of the Warriewood Sewage Treatment Plant, it was noted that the 11kV high voltage switchboard was in need of replacement. Transfield Services contacted Schneider Electric to supply new product, which would increase the safety and reliability of the switchgear. With their extensive product range, engineering base, project management experience and synergistic capabilities, Schneider Electric was well positioned to meet these replacement needs. Schneider Electric contracted out the building of the prefabricated switchroom to switchroom builder Independent Portable Buildings. Meeting the requirements of Sydney Water, the 11KV switchboard has protection on four sides to withstand internal arc faults of 25kA for 1 second. If a fault does occur, VAMP relays (a company of Schneider Electric) detect the danger and isolate the fault quickly. This restricts the damage, as well as helping to ensure the outage time is minimised. Offering maximum user safety, a Schneider Electric MCset indoor switchgear assembly was chosen for the project. The switchgear meets all electrical distribution needs up to 17.5kV and incorporates a set of innovative solutions including digital protection and control systems. The MCset switchgear is designed to operate with SF6 gas insulated circuit breakers or vacuum circuit breakers. In this instance, Schneider Electric’s Evolis vacuum circuit breakers were specified for the project. They have a long service life and do not use Sulphur Hexaflouride (SF6) which, if improperly disposed of, can have an environmental impact. Schneider Electric 1500KVA Oil Filled Transformers are used to step the power down from 11kV to 433V. This is a very reliable system with a high electrical conductivity. MiCOM P341 and Sepam T40 protection relays are used to provide flexible and reliable power protection for the system. An ION 7650 > Case Study Increased Safety and Reliability for Sydney Water Sydney Water has recently implemented a Renewable Energy Generation Program, as part of its commitment to being carbon neutral for energy and electricity use by 2020.
  • 21. 21Customer Service 1300 369 233 intelligent metering and control device is used on the system to provide accurate measurements of voltage, current, power and energy. The ION products have the capability to provide comprehensive logging and advanced power quality measurement. To ensure the system is working effectively, Raytek infrared detectors are used to measure the busbar temperature. The switchboard installation and testing at the site was undertaken by Schneider Electric’s Installed Base Services. Combined, these elements create a solution that allows the client to reduce capital and maintenance costs, avoid extensive civil construction work, minimise disturbance to the plant operation during installation and improve the safety of equipment and personnel working in the area. Capabilities to Take On More Water Projects This project was an excellent opportunity for Schneider Electric to show Sydney Water their capabilities, particularly in regards to providing a complete solution covering design, manufacturing and delivery of products. “We are very impressed with how Schneider Electric has met the needs of the project,” Warren Legg, Project Manager at Transfield Services said. “They completed the work in a professional manner and worked within our required time frame.” Ask for Project Reference List
  • 22. 22 Energy Projects and Services Capability Statement Described as the largest single resource natural gas project in Australia’s history, the Gorgon Project includes the construction of a 15 million tones per annum liquefied natural gas (LNG) plant on Barrow Island and a domestic gas plant with the capacity to provide 300 terajoules per day to supply gas to Western Australia. The Gorgon Project is operated by an Australian subsidiary of Chevron and is a joint venture of the Australian subsidiaries of Chevron (47.3%), ExxonMobil (25%), Shell (25%), Osaka Gas (1.25%), Tokyo Gas (1%) and Chubu Electric Power (0.417%). Schneider Electric will supply equipment to the site to create an electrical distribution network - providing electricity for the liquefied natural gas (LNG) plant as well as for the construction village, which has been established to house workers during the construction phase of the project. Schneider Electric was also asked to develop an automation system for the project, which was able to retrieve information from the field and make the information available in compliance with the IEC61850 standard for the design of electrical substation automation. Outcome For the substation component of the job, the client’s priorities were safety, compliance, innovation and efficiency. Schneider Electric’s ability to work in a professional and competent manner ensured these objectives were met. Another of the client’s requirements was the delivery of the project on schedule. Schneider Electric was also able to fulfill this objective. Technical compliance to work at the site was another factor with, which Schneider Electric has been able to conform to ensure the ongoing satisfaction of the client. “Ensuring we are working in an environmentally responsible fashion will create the best outcome for all involved,” Robert Bagnall said. > Case Study Customer Benefits: ■ complete solution from design to pre-commissioning ■ compliance with strong environmental, safety and local supply requirements ■ full product testing – onsite and offsite ■ delivery of ‘Plug and Play’ equipment to site ■ full local support during and after project execution. Project at a Glance Project Type Automation (PACiS System): ■ feeder protection relay (MiCOM P145) ■ line differential protection relay (MiCOM P545) ■ transformer protection (MiCOM P642) ■ metering unit (Bitronics M571) ■ substation computers (MiCOM C264) ■ PACiS operator interface (Gorgon Offplot only) ■ ethernet managed switches. (MiCOM H35-V2) Substation: ■ transformers ■ medium voltage switchgear ■ low voltage switchgear ■ prefabricated kiosk substations ■ gas and air insulated switchgear prefabricated substations. Location: Barrow Island, Perth, Australia (around 60kms off the north-west coast of Western Australia). Gorgon Project, Barrow Island, Perth Agreement to supply and install substation equipment and automation system to retrieve information from the field.
  • 23. 23Customer Service 1300 369 233 Growing with Gorgon To meet the needs of the Gorgon Project, a significant local Schneider Electric workforce has been consigned. Local workers have been employed for tendering, engineering, project management and manufacturing, and in turn, Schneider Electric is using their local preferred contractors to supply the project with general and critical materials and services. Schneider Electric has been contracted for a period of three years. Setting Up House In order to house the workforce needed to complete the project, The Gorgon Joint Venture is building a ‘construction village’ on Barrow Island. The village will include resource facilities such as accommodation, offices, kitchens and a gym for people stationed to work on the Gorgon Project for a period of time. To power this area, Schneider Electric is supplying a ‘Plug and Play’ substation solution with engineered and integrated 33kV, 11kV, 6.6kV, 690V and 400V switchgear, control systems, HVAC and power management systems. Once completed, any switchroom sent direct to Barrow Island is cleaned down, chemically treated and completely wrapped, to avoid any contaminants entering the packaged units.
  • 24. 24 Energy Projects and Services Capability Statement > Case Study Providing a Solution Equipment within Schneider Electric E-Houses, transforms and switches sequentially to ensure maximum power availability to the network to maintain a controlled electrical system environment for the automated systems powering the plant. “Schneider Electric is providing IEC standard distribution products including low and high voltage switchboards, distribution transformers and prefabricated substations. Most of this equipment is being built off-site, including processing modules - some of which are 30 metres high and almost cover the same area as a football pitch,” Robert Bagnall said. Nine prefabricated Schneider Electric buildings, measuring between 17 and 25 meters long by 6 metres wide, have been supplied to power the village electrical distribution network. The substations have been constructed with glass reinforced concrete. This material provides internal arc protection, impact resistance and high protection resistance against solar radiation. The substations feature Schneider Electric HVAC, fire and gas detection, fire suppression, safety equipment, small light and power, data concentrator, integration and fit-out of the buildings; including free-issued variable speed drives (VSDs) to bring generators up to speed and therefore save energy. The substations have also been fitted with power management systems to allow the client to keep track of their energy usage. For the LNG plant, Schneider Electric has been commissioned to supply 30 prefabricated buildings. These are between 22 and 28 metres long and are 7 metres wide. The buildings feature Schneider Electric and third party equipment such as HVAC, fire and gas detection, fire suppression, safety equipment and facilities for small light and power outlets. As well as reducing the environmental impact by cutting back the on-site work required, the technology within the substation allows Schneider Electric to offer a compact footprint; a design which promotes hazard reduction, complete automation of the equipment supplied and compliance to local codes and standards. Protection, control and interlocking system designs were customised specifically for the project, and Schneider Electric Power Management System solutions have been installed to ensure the LNG plant has continual functionality. Integrating with the Schneider Electric hardware is a Schneider Electric PACiS Automation system. The system is designed to retrieve information from the field. The PACiS Operator Interface provides The Gorgon Joint Venture operators with access to information such as the rate of flow, which areas are in operation at particular times, as well as providing alerts when a problem occurs. The products were all part of a solution which was specifically designed for the Gorgon Project. Gorgon Project, Barrow Island, Perth
  • 25. 25Customer Service 1300 369 233 > Case Study Schneider Electric is pleased to announce that it has entered into an agreement with Bechtel for the supply of an electrical control and distribution network solution, designed to run and monitor critical equipment, for the Chevron-operated Wheatstone Project in Western Australia. The contract value is estimated at AUD$189 million and commenced in July 2012. The contract, one of the largest ever undertaken by Schneider Electric will see the majority of the work completed in Australia and will support over 230 Australian jobs, with around 143 located in Perth. Over 80 per cent of the Schneider Electric employees appointed to work on the project will be part of the ongoing project management role. Stephen Coop, Managing Director, Schneider Electric Pacific Zone said, “Schneider Electric’s Wheatstone Project contract win is the culmination of many years working in the Australian market. We bring to this project a combination of global and local expertise that helps power the oil and gas industry.” “As part of the agreement, Schneider Electric will supply the Wheatstone Project with 13 prefabricated, customised and integrated ‘plug and play’ substations. Prefabricated substations are a vital element to projects such as Wheatstone due to the growing complexity and operational requirements of oil and gas extraction projects. The substations are custom built offsite to meet the needs of our customers and delivered to any location, no matter how remote.” The substation design will take place in Brisbane, with construction, final integration and testing being carried out in Perth. The largest substation planned for delivery as a single piece will be in excess of 70 metres long by 28 metres wide, weighing around 590 tonnes. The prefabricated substations will feature leading Schneider Electric products including medium voltage switchgear, UPS (Gutor) and low-voltage components. All technology has been designed and engineered to comply with Australian Standards, hazardous area standards and the Building Code of Australia. The 13 prefabricated substations, totaling around 9000 square metres, will each be equipped with a HVAC system, MV and LV control panels, VESDA fire protection, 230V A UPS, DC batteries and UPS’s and hazard area related battery rooms. Additionally, a total of seven MV and 45 LV switchboards and a power management system will be implemented across the entire site. Wheatstone Project, Pilbara Region, Western Australia Schneider Electric wins landmark AUD$189 million contract supporting over 230 Australian jobs. Ask for Project Reference List
  • 26. 26 Energy Projects and Services Capability Statement Schneider Electric expertise and know-how Proven technology from Schneider Electric Delivery of another successful project 26 Energy Projects and Services Capability Statement
  • 27. 27Customer Service 1300 369 233 All Enquiries (Australia wide) Email: customercare.au@schneider-electric.com www.schneider-electric.com.au Tel: 1300 369 233 Fax: 1300 369 288 Pacific Head Office Sydney t 78 Waterloo Road, Macquarie Park, NSW 2113 Sales and regional offices New South Wales Sydney t 78 Waterloo Road, Macquarie Park, NSW 2113 Newcastle t 76 Munibung Road, Cardiff, NSW 2285 Regional representatives located in: Wollongong Queensland Brisbane t 80 Schneider Road, Eagle Farm, QLD 4009 Regional representatives located in: Cairns, Townsville, Mackay, Rockhampton, Sunshine Coast, Gold Coast and Toowoomba Australian Capital Territory Canberra t 8 Brindabella Circuit, Majura, ACT 2609 Victoria Melbourne t 296-310 Ferntree Gully Road, Notting Hill, VIC 3168 Regional representatives located in: Geelong, Ballarat and Albury/Wodonga Tasmania Hobart t 309 Liverpool Street, Hobart, TAS 7000 Regional representatives located in: Launceston South Australia Adelaide t 33-37 Port Wakefield Road, Gepps Cross, SA 5094 Western Australia Perth t 17 Halley Road, Balcatta, WA 6021 (Industrial Automation and Control) t Unit 3, 26 Gibberad Road, Balcatta, WA 6021 (Electrical Distribution) Northern Territory Darwin t 16 Albatross Street, Winnellie, NT 0820 Manufacturing sites Benalla Medium voltage switchgear and transformer manufacturing and development t Sydney Road, Benalla, VIC 3672 Brisbane Medium voltage overhead distribution switchgear manufacturing and development t 80 Schneider Road, Eagle Farm, QLD 4009 Adelaide Wiring accessories and low voltage switchgear manufacturing t 33-37 Port Wakefield Road, Gepps Cross, SA 5094 Rocklea Medium voltage switchgear and transportable substations t 35 Evans Road, Rocklea, QLD 4106
  • 28. Schneider Electric (Australia) Pty Ltd Head Office Postal Address: Locked Bag 2211 North Ryde B C 1670 Electrical Contractors Licences Schneider Electric (Australia) Pty Limited is licensed under the relevant state electrical safety acts: QLD: 66116; NSW: 150195C; VIC: 17615; SA: PGE210184; WA: EC008813; NT: C2356 Customer Service Tel: 1300 369 233 Fax: 1300 369 288 Email: customercare.au@schneider-electric.com www.schneider-electric.com.au Paper is one of the most sustainable materials that we have on the planet today. It has a lower CO2 footprint than electronic communications and remains a powerful marketing and information tool. Because of this we would urge you to recycle this catalogue into your most convenient recycling method when you have finished using it and contribute to the ongoing recovery efforts of the paper industry. Fact: Australians recover 72% of their paper consumption – one of the highest rates in the world! As standards, specifications and designs change from time to time, always ask for confirmation of the information given in this publication. This document has been printed using FSC Mix Certified paper. ISO 14001 environmental management system in use at mill. Information given in this publication was accurate at the time of printing. SEAU25973