This document summarizes the stages of developing a magazine cover design. It discusses adding a cover model, the magazine title, background colors and textures, the main article headline, additional articles, the issue number, price, and date. At each stage, the designer considers magazine design conventions and how elements can be arranged to draw attention and increase sales. The final stages focus on advertising additional interior articles in a minimal way at the bottom, as is typical for magazines.