SlideShare a Scribd company logo
1 of 1
Download to read offline
2.772.702.50
6.10
7.1700
4.2700
7.2700
1.4700
intercapedine
3.50
1.24
0.30
3.90
0.300.30
intercapedine
PIANTA COPERTURA
B
B
2.50
7.2200
6.95
2.70
0.30
intercapedine
SEZIONE B:B
intercapedine
6.90
0.30
3.50
1.4700
SEZIONE A:A
intercapedine
7.2700
4.2700
2.70
0.30
PROSPETTO NORD
PROSPETTO OVEST
PROSPETTO SUD
PROSPETTO EST
3.2700
0.60
0.60
1.30
1.60
2.90
1.90
2.40
4.35
1.60
1.30
1.60
1.30
1.30
2.50
1.30
1.60
7.2700
4.30
2.00
3.30
3.80
5.20
3.00
camera
camera
bagno
B
B
4.00
0.60
2.50
1.30
7.2200
3.80
camera
PIANTA PIANO PRIMO 0.90
1.20
7.65
1.90
0.95
1.15
1.30
2.50
0.90
2.50
1.90
1.95
8.25 arredamento urbano
Gazebo tipo "Uno Piu"
1.4700
box
4.30
7.70
3.50
7.40
4.20
3.10
B
B
B
intercapedine
intercapedine
intercapedine
intercapedine
forzata
areazione
1.30
1.60
1.30
2.50
2.50
1.30
1.30
2.50
2.45
3.35
3.85
2.45
4.90
4.30
2.45
4.00
0.90
1.70
bagno
rip.
0.90
2.70
2.00
pranzo
cucina
intercapedine
2.20
3.00
5.60
3.10
0.704.10
B
8.25
6.30
7.45
intercapedine
intercapedine
intercapedine
1.30
2.50
2.50
1.30
1.30
2.50
3.2700
4.2700
soggiorno
6.20
5.002.20
4.1700
PIANTA PIANO TERRA
cantina
porticato
8.40
PIANTA PIANO INTERRATO

More Related Content

More from Andrea Tarantola

02 STATO DI PROGETTO-Model
02 STATO DI PROGETTO-Model02 STATO DI PROGETTO-Model
02 STATO DI PROGETTO-Model
Andrea Tarantola
 
02 STATO DI PROGETTO-Model1
02 STATO DI PROGETTO-Model102 STATO DI PROGETTO-Model1
02 STATO DI PROGETTO-Model1
Andrea Tarantola
 
02 STATO DI PROGETTO-Model1
02 STATO DI PROGETTO-Model102 STATO DI PROGETTO-Model1
02 STATO DI PROGETTO-Model1
Andrea Tarantola
 
original old furnace proj.1° floor
original old furnace proj.1° floororiginal old furnace proj.1° floor
original old furnace proj.1° floor
Andrea Tarantola
 
original old furnace proj.2° floor
original old furnace proj.2° floororiginal old furnace proj.2° floor
original old furnace proj.2° floor
Andrea Tarantola
 
original old furnace proj.3° floor
original old furnace proj.3° floororiginal old furnace proj.3° floor
original old furnace proj.3° floor
Andrea Tarantola
 
original old furnace proj.basement
original old furnace proj.basementoriginal old furnace proj.basement
original old furnace proj.basement
Andrea Tarantola
 
original old furnace proj.ground floor
original old furnace proj.ground floororiginal old furnace proj.ground floor
original old furnace proj.ground floor
Andrea Tarantola
 
original old furnace proj.prospects
original old furnace proj.prospectsoriginal old furnace proj.prospects
original old furnace proj.prospects
Andrea Tarantola
 
plan gen attuale 24 genn-Model
plan gen attuale 24 genn-Modelplan gen attuale 24 genn-Model
plan gen attuale 24 genn-Model
Andrea Tarantola
 
plan gen attuale 24 genn-Model1
plan gen attuale 24 genn-Model1plan gen attuale 24 genn-Model1
plan gen attuale 24 genn-Model1
Andrea Tarantola
 
planim generale PROGETTO-Model
planim generale PROGETTO-Modelplanim generale PROGETTO-Model
planim generale PROGETTO-Model
Andrea Tarantola
 

More from Andrea Tarantola (20)

02 STATO DI PROGETTO-Model
02 STATO DI PROGETTO-Model02 STATO DI PROGETTO-Model
02 STATO DI PROGETTO-Model
 
02 STATO DI PROGETTO-Model1
02 STATO DI PROGETTO-Model102 STATO DI PROGETTO-Model1
02 STATO DI PROGETTO-Model1
 
02 STATO DI PROGETTO-Model1
02 STATO DI PROGETTO-Model102 STATO DI PROGETTO-Model1
02 STATO DI PROGETTO-Model1
 
albergo 20 nov-Model
albergo 20 nov-Modelalbergo 20 nov-Model
albergo 20 nov-Model
 
original old furnace proj.1° floor
original old furnace proj.1° floororiginal old furnace proj.1° floor
original old furnace proj.1° floor
 
original old furnace proj.2° floor
original old furnace proj.2° floororiginal old furnace proj.2° floor
original old furnace proj.2° floor
 
original old furnace proj.3° floor
original old furnace proj.3° floororiginal old furnace proj.3° floor
original old furnace proj.3° floor
 
original old furnace proj.basement
original old furnace proj.basementoriginal old furnace proj.basement
original old furnace proj.basement
 
original old furnace proj.ground floor
original old furnace proj.ground floororiginal old furnace proj.ground floor
original old furnace proj.ground floor
 
original old furnace proj.prospects
original old furnace proj.prospectsoriginal old furnace proj.prospects
original old furnace proj.prospects
 
plan gen attuale 24 genn-Model
plan gen attuale 24 genn-Modelplan gen attuale 24 genn-Model
plan gen attuale 24 genn-Model
 
plan gen attuale 24 genn-Model1
plan gen attuale 24 genn-Model1plan gen attuale 24 genn-Model1
plan gen attuale 24 genn-Model1
 
planim generale PROGETTO-Model
planim generale PROGETTO-Modelplanim generale PROGETTO-Model
planim generale PROGETTO-Model
 
progetto 280-Model
progetto 280-Modelprogetto 280-Model
progetto 280-Model
 
progetto 280-Model1
progetto 280-Model1progetto 280-Model1
progetto 280-Model1
 
progetto 281-Model
progetto 281-Modelprogetto 281-Model
progetto 281-Model
 
progetto 282-Model
progetto 282-Modelprogetto 282-Model
progetto 282-Model
 
PROPOSTE 04-10-Model
PROPOSTE 04-10-ModelPROPOSTE 04-10-Model
PROPOSTE 04-10-Model
 
prove 30 mag-Model
prove 30 mag-Modelprove 30 mag-Model
prove 30 mag-Model
 
Tipo Caled-Model
Tipo Caled-ModelTipo Caled-Model
Tipo Caled-Model
 

DEFINITIVO-Model

  • 1. 2.772.702.50 6.10 7.1700 4.2700 7.2700 1.4700 intercapedine 3.50 1.24 0.30 3.90 0.300.30 intercapedine PIANTA COPERTURA B B 2.50 7.2200 6.95 2.70 0.30 intercapedine SEZIONE B:B intercapedine 6.90 0.30 3.50 1.4700 SEZIONE A:A intercapedine 7.2700 4.2700 2.70 0.30 PROSPETTO NORD PROSPETTO OVEST PROSPETTO SUD PROSPETTO EST 3.2700 0.60 0.60 1.30 1.60 2.90 1.90 2.40 4.35 1.60 1.30 1.60 1.30 1.30 2.50 1.30 1.60 7.2700 4.30 2.00 3.30 3.80 5.20 3.00 camera camera bagno B B 4.00 0.60 2.50 1.30 7.2200 3.80 camera PIANTA PIANO PRIMO 0.90 1.20 7.65 1.90 0.95 1.15 1.30 2.50 0.90 2.50 1.90 1.95 8.25 arredamento urbano Gazebo tipo "Uno Piu" 1.4700 box 4.30 7.70 3.50 7.40 4.20 3.10 B B B intercapedine intercapedine intercapedine intercapedine forzata areazione 1.30 1.60 1.30 2.50 2.50 1.30 1.30 2.50 2.45 3.35 3.85 2.45 4.90 4.30 2.45 4.00 0.90 1.70 bagno rip. 0.90 2.70 2.00 pranzo cucina intercapedine 2.20 3.00 5.60 3.10 0.704.10 B 8.25 6.30 7.45 intercapedine intercapedine intercapedine 1.30 2.50 2.50 1.30 1.30 2.50 3.2700 4.2700 soggiorno 6.20 5.002.20 4.1700 PIANTA PIANO TERRA cantina porticato 8.40 PIANTA PIANO INTERRATO