KUBAU LGA, HROP FOR DECEMBER, 2012
S/N High              Settlement        Critical    Specific   Activiites to Time  Reponsible                         Indicator        Budget
    risk                            Impediments evidence for overcome the frame    person(s)
    ward                             to achieving impediment  impediments
                                        > 90%
                                       coverage
1       KARGI    Kariya, Masama     Border/HTR       Presence of    1. Border                          STF, LGAF,     Minutes of       #8000
                                    settlement not   WPV in May     planning                           SMC, FV and    border
                                    properly         2012           meeting/                           VCM            planning
                                    coverred by                     immunization                                      meeting; OPV
                                    vaccination                     with Pala ward in                                 coverage data
                                    teams                           Ikara LGA.                                        from the
                                                                    2. Engagement                                     settlement;
                                                                    of two influential                                names of
                                                                                         3-4/12/2012
                                                                    people @ 2000                                     influential
                                                                    each in the                                       person
                                                                    community                                         engaged in
                                                                    during                                            IPDs personnel
                                                                    implementation                                    list for the
                                                                    to ensure                                         settlement
                                                                    settlements are
                                                                    covered properly
2       ANCHAU   LayinSalanke and   12 and 14 HHs    OPV safety     Compound                           LGA SMWG       CDs conducted    nil
                 LayinSarki         NC inNovr        and too many   meeting to be                                     with
                                    round            rounds         conducted with                                    attendance
                                    respectively                    all head of HHs                                   and minutes of
                                                                    in the settlement    5/12/2012                    meetings.
                                                                    - thru the VH of
                                                                    Anchau to be
                                                                    proceded by
                                                                    Individual visit
    3     ZABI           Kosso                                      Effective border                   STF,LGAF,WFP   Border synch
                                                      Border with
                                     Settlement                     synchronization                    and TS         meeting held &
                                                     Dawaki Ward
                                     May not be                     planning &               6-                       plans for
                                                     of Kauru LGA
                                      properly                      implementation       7/12/2012                    synchronized
                                                       in Kaduna
                                      covered                       with bordering                                    implementation
                                                          State
                                                                    IPDs Team of                                      concluded
Dawaki ward in
                                                                     Kauru LGA



                                                                     Deployment of                   WFP, GS, TS   Border plans     #2000
                                                                     LGA level                       and FV        implemented
                                                                     supervisor to                                 as scheduled
                                                                     oversee activity
                                                                     at the border.
4   DAMAU   Maitunku               Settlement not     Settlement     Deployment of                   STF, LGAF,    Personnel        #12000
                                   properly          scattered and   Two special                     WFP           identified,
                                   covered in        hard to reach   teams with                                    engaged &
                                   previous                          1500/day for                                  appropriately
                                   rounds                            four days as                                  deployed
                                                                     transport to
                                                                     cover the area
                                                                     3 Miyettiallah                  LGA Team      Guides           #20000
                                                                     guides deployed                               identified,
                                                                     to assist team                                engaged &
                                                                     movement                                      deployed
            Ang Mal Tukur,         Potential route   Border with     Effective border       10-      STF/WHO       Personnel        #2000
            AngMalamai&HayinLere   for WPV           Doguwa LGA      synchronization    11/11/2012                 identified,
                                   transmission      of Kano State   planning with                                 engaged &
                                                                     IPDs Team 029                                 appropriately
                                                                     of Doguwa LGA                                 deployed
                                                                     in Kano state
                                                                     Deployment of                                 Personnel        #5000
                                                                     LGA level                                     identified &
                                                                     supervisor to                                 engaged.
                                                                     oversee activity                              Funds for
                                                                     at the border.                                transportation
                                                                                                                   support
                                                                                                                   provided.
Deployment of 2                                  Appropriate       nil
                                                                            LGA/State level                                  transportation
                                                                            Supervisors for 2                                provided &
                                                                            days (Days 2 & 3                                 implementation
                                                                            of                                               closely
                                                                            implementation)                                  supervised
5   HASKIYA   49 out of the 82         Possibility of                       Engagement of                     LGA and        Miyetti Allah     #28000
              settlements in Haskiya   settlements to                       10 extra Miyyetti                 Partners       guides
              ward                     be missed in                         Allah guides                      (WHO)          engaged
                                       Dec round.                           /representatives
                                                                            in addition to the
                                                                            6 supported by
                                                                            WHO
                                                         49 settlements
                                                                            Provision of 10                   LGA and        Funds for         #26000
                                                         scattered over
                                                                            extra Motor                       Partners       Motor-bike hire
                                                         vast & difficult
                                                                            bikes to assist                   (WHO)          provided
                                                         terrain -
                                                                            team movement
                                                         several being
                                                                            through the
                                                         HTR,
                                                                            scattered
                                                         scatterred&
                                                                            settlements.
                                                         nomadic
                                                                            Deployment of 5                   LGA and        Senior            #18000
                                                                            LGA/State level      12/11/2012   Partners       Supervisors
                                                                            supervisors with                  (WHO)          engaged, &
                                                                            5 motorbikes for                                 funds for
                                                                            close supervision                                appropriate
                                                                            for 4 days of                                    transportation
                                                                            implementation                                   provided
              Kurunkudawa, Katoge,     Potential route   All settlements    Effective border                  STF,LGAF,WFP   Border synch      #5000
              Janwuro, Yardoka         for WPV           are bordering      synchronization                   and TS         meeting held &
                                       transmission      Doguwa LGA         planning with                                    plans for
                                                         in Kano state      IPDs Team 029                                    synchronized
                                                                            of Doguwa LGA                                    implementation
                                                                            in Kano state                                    concluded
                                                                            Deployment of 4                                  Appropriate       #32000
                                                                            additional 4-                                    transportation
                                                                            Person teams                                     provided &
                                                                            with 8 motor-                                    implementation
bikes                                           closely
                                                                   Deployment of 2                                 supervised
                                                                   LGA/State level
                                                                   Supervisors for 2
                                                                   days (Days 1 & 3
                                                                   of
                                                                   implementation)
6   KARREH   AnguwanMato         likelihood of    Border with      Effective border                 STF,LGAF,WFP   Border synch     #3000
                                 settlement not   Kudaru Ward      synchronization                  and TS         meeting held &
                                 to be convered   of Lere LGA in   planning with                                   plans for
                                 in Dec IPDs      Kaduna State     bordering IPDs                                  synchronized
                                                                   Team in Kudaru                                  implementation
                                                                   Ward of Lere                                    concluded
                                                                   LGA.
                                                                   Full                             WFP, FV, TS    Border plans     nil
                                                                   implementation                                  implemented
                                                                                       13/12/2012
                                                                   of border plans                                 as scheduled

             AnguwanWasika       Poor team        End process      Replacement of                                  New personel
                                 performance in   monioring        the entire team                                 identified,
                                 Nov IPDs         showed all       with new/trained                                trained and
                                                  HHs were not     personnel                                       depolyed
                                                  Marked by he
                                                  teams during
                                                  Implementaion
             MaiyashinTukwane,   High Number      NC is due to     Compound                         SMO, UNICEF    No of HHs        #12000
             UngBaduku           (>12) NC HHs     OPV safety       meeting with                     LGAC           visited by
                                 in Nov 2012      and Religious    heads of NC                                     responsible
                                 round            belief.          HHs; to be                                      persons; no of
                                                                   preceeded by                                    targetted HHs
    DUTSEN
                                                                   individual          14/12/2012                  attending
     WAI
                                                                   Sensitization                                   compound
                                                                   meetings. To be                                 meeting.
                                                                   facilitated by
                                                                   Imman of
                                                                   Anchau
7              Kuli            Border          Border with        Effective border                STF,LGAF,WFP   Border synch       #3000
                               settlement      Rahama Ward        synchronization                 and TS         meeting held &
                               which may not   of Soba LGA in     planning &                                     plans
                               be properly     Kaduna State       implementation                                 implemented
                               covered                            with IPDs Team                                 as scheduled.
                                                                  of Rahama ward
                                                                  in Soba LGA
                                                                  Full                                           Border plans       nil
                                                                  implementation                                 implemented
                                                                  of border plans                                as scheduled
8   Pambegua   Nassarawa and   high Number     Non                Dialogue with                   STF,LGAF,WFP   a data             nil
               Tsurutawa       (>15) NC HHs    compliance         heads of NC                                    correctly on
                               in Nov 2012     largely due to     HHs through                                    the tally sheet.
                               round           religious belief   village head and
                                               and no felt        ward head.
                                               need.              Sensitization of
                                                                  four town
                                                                                         15-
                                                                  Announcers per     16/12/2012
                                                                  ward. "MAJIGI
                                                                  SHOW"
                                                                  Deployment of                                                     nil
                                                                  senior team
                                                                  supervisor to
                                                                  support ward
                                                                  level training

More Related Content

Viewers also liked

Capítulo V Chicos sobresalientes 1
Capítulo V Chicos sobresalientes 1Capítulo V Chicos sobresalientes 1
Capítulo V Chicos sobresalientes 1alarika
 
Artisan - Modernización de la producción y de la comercialización de producto...
Artisan - Modernización de la producción y de la comercialización de producto...Artisan - Modernización de la producción y de la comercialización de producto...
Artisan - Modernización de la producción y de la comercialización de producto...Fundación Emprende
 
NUTRILITE NATURAL B COMPLEX
NUTRILITE NATURAL B COMPLEXNUTRILITE NATURAL B COMPLEX
NUTRILITE NATURAL B COMPLEXReina Colman
 
NUTRILITE PARSELENIUM-E
NUTRILITE PARSELENIUM-ENUTRILITE PARSELENIUM-E
NUTRILITE PARSELENIUM-EReina Colman
 
NUTRILITE TRI IRON FOLIC
NUTRILITE TRI IRON FOLICNUTRILITE TRI IRON FOLIC
NUTRILITE TRI IRON FOLICReina Colman
 
NUTRILITE INVISIFBER
NUTRILITE INVISIFBERNUTRILITE INVISIFBER
NUTRILITE INVISIFBERReina Colman
 
NUTRILITE ACEROLA C MASTICABLE
NUTRILITE ACEROLA C MASTICABLENUTRILITE ACEROLA C MASTICABLE
NUTRILITE ACEROLA C MASTICABLEReina Colman
 
Increase AUM with Marketing Automation: Acquire Clients during Volatile Times
Increase AUM with Marketing Automation: Acquire Clients during Volatile TimesIncrease AUM with Marketing Automation: Acquire Clients during Volatile Times
Increase AUM with Marketing Automation: Acquire Clients during Volatile TimesMarketo
 
Área de Integração - Tema - Identidade Regional Módulo 1
Área de Integração - Tema - Identidade Regional Módulo 1Área de Integração - Tema - Identidade Regional Módulo 1
Área de Integração - Tema - Identidade Regional Módulo 1LilyLx
 

Viewers also liked (14)

Capítulo V Chicos sobresalientes 1
Capítulo V Chicos sobresalientes 1Capítulo V Chicos sobresalientes 1
Capítulo V Chicos sobresalientes 1
 
Pc
PcPc
Pc
 
Artisan - Modernización de la producción y de la comercialización de producto...
Artisan - Modernización de la producción y de la comercialización de producto...Artisan - Modernización de la producción y de la comercialización de producto...
Artisan - Modernización de la producción y de la comercialización de producto...
 
Success at 22!!
Success at 22!!Success at 22!!
Success at 22!!
 
NUTRILITE NATURAL B COMPLEX
NUTRILITE NATURAL B COMPLEXNUTRILITE NATURAL B COMPLEX
NUTRILITE NATURAL B COMPLEX
 
Hero Kit
Hero KitHero Kit
Hero Kit
 
Rd 21-06-2007
Rd 21-06-2007Rd 21-06-2007
Rd 21-06-2007
 
NUTRILITE PARSELENIUM-E
NUTRILITE PARSELENIUM-ENUTRILITE PARSELENIUM-E
NUTRILITE PARSELENIUM-E
 
NUTRILITE TRI IRON FOLIC
NUTRILITE TRI IRON FOLICNUTRILITE TRI IRON FOLIC
NUTRILITE TRI IRON FOLIC
 
NUTRILITE INVISIFBER
NUTRILITE INVISIFBERNUTRILITE INVISIFBER
NUTRILITE INVISIFBER
 
NUTRILITE ACEROLA C MASTICABLE
NUTRILITE ACEROLA C MASTICABLENUTRILITE ACEROLA C MASTICABLE
NUTRILITE ACEROLA C MASTICABLE
 
Increase AUM with Marketing Automation: Acquire Clients during Volatile Times
Increase AUM with Marketing Automation: Acquire Clients during Volatile TimesIncrease AUM with Marketing Automation: Acquire Clients during Volatile Times
Increase AUM with Marketing Automation: Acquire Clients during Volatile Times
 
S.05 Geometría Solar copia
S.05 Geometría Solar copiaS.05 Geometría Solar copia
S.05 Geometría Solar copia
 
Área de Integração - Tema - Identidade Regional Módulo 1
Área de Integração - Tema - Identidade Regional Módulo 1Área de Integração - Tema - Identidade Regional Módulo 1
Área de Integração - Tema - Identidade Regional Módulo 1
 

December hrop kubau

  • 1. KUBAU LGA, HROP FOR DECEMBER, 2012 S/N High Settlement Critical Specific Activiites to Time Reponsible Indicator Budget risk Impediments evidence for overcome the frame person(s) ward to achieving impediment impediments > 90% coverage 1 KARGI Kariya, Masama Border/HTR Presence of 1. Border STF, LGAF, Minutes of #8000 settlement not WPV in May planning SMC, FV and border properly 2012 meeting/ VCM planning coverred by immunization meeting; OPV vaccination with Pala ward in coverage data teams Ikara LGA. from the 2. Engagement settlement; of two influential names of 3-4/12/2012 people @ 2000 influential each in the person community engaged in during IPDs personnel implementation list for the to ensure settlement settlements are covered properly 2 ANCHAU LayinSalanke and 12 and 14 HHs OPV safety Compound LGA SMWG CDs conducted nil LayinSarki NC inNovr and too many meeting to be with round rounds conducted with attendance respectively all head of HHs and minutes of in the settlement 5/12/2012 meetings. - thru the VH of Anchau to be proceded by Individual visit 3 ZABI Kosso Effective border STF,LGAF,WFP Border synch Border with Settlement synchronization and TS meeting held & Dawaki Ward May not be planning & 6- plans for of Kauru LGA properly implementation 7/12/2012 synchronized in Kaduna covered with bordering implementation State IPDs Team of concluded
  • 2. Dawaki ward in Kauru LGA Deployment of WFP, GS, TS Border plans #2000 LGA level and FV implemented supervisor to as scheduled oversee activity at the border. 4 DAMAU Maitunku Settlement not Settlement Deployment of STF, LGAF, Personnel #12000 properly scattered and Two special WFP identified, covered in hard to reach teams with engaged & previous 1500/day for appropriately rounds four days as deployed transport to cover the area 3 Miyettiallah LGA Team Guides #20000 guides deployed identified, to assist team engaged & movement deployed Ang Mal Tukur, Potential route Border with Effective border 10- STF/WHO Personnel #2000 AngMalamai&HayinLere for WPV Doguwa LGA synchronization 11/11/2012 identified, transmission of Kano State planning with engaged & IPDs Team 029 appropriately of Doguwa LGA deployed in Kano state Deployment of Personnel #5000 LGA level identified & supervisor to engaged. oversee activity Funds for at the border. transportation support provided.
  • 3. Deployment of 2 Appropriate nil LGA/State level transportation Supervisors for 2 provided & days (Days 2 & 3 implementation of closely implementation) supervised 5 HASKIYA 49 out of the 82 Possibility of Engagement of LGA and Miyetti Allah #28000 settlements in Haskiya settlements to 10 extra Miyyetti Partners guides ward be missed in Allah guides (WHO) engaged Dec round. /representatives in addition to the 6 supported by WHO 49 settlements Provision of 10 LGA and Funds for #26000 scattered over extra Motor Partners Motor-bike hire vast & difficult bikes to assist (WHO) provided terrain - team movement several being through the HTR, scattered scatterred& settlements. nomadic Deployment of 5 LGA and Senior #18000 LGA/State level 12/11/2012 Partners Supervisors supervisors with (WHO) engaged, & 5 motorbikes for funds for close supervision appropriate for 4 days of transportation implementation provided Kurunkudawa, Katoge, Potential route All settlements Effective border STF,LGAF,WFP Border synch #5000 Janwuro, Yardoka for WPV are bordering synchronization and TS meeting held & transmission Doguwa LGA planning with plans for in Kano state IPDs Team 029 synchronized of Doguwa LGA implementation in Kano state concluded Deployment of 4 Appropriate #32000 additional 4- transportation Person teams provided & with 8 motor- implementation
  • 4. bikes closely Deployment of 2 supervised LGA/State level Supervisors for 2 days (Days 1 & 3 of implementation) 6 KARREH AnguwanMato likelihood of Border with Effective border STF,LGAF,WFP Border synch #3000 settlement not Kudaru Ward synchronization and TS meeting held & to be convered of Lere LGA in planning with plans for in Dec IPDs Kaduna State bordering IPDs synchronized Team in Kudaru implementation Ward of Lere concluded LGA. Full WFP, FV, TS Border plans nil implementation implemented 13/12/2012 of border plans as scheduled AnguwanWasika Poor team End process Replacement of New personel performance in monioring the entire team identified, Nov IPDs showed all with new/trained trained and HHs were not personnel depolyed Marked by he teams during Implementaion MaiyashinTukwane, High Number NC is due to Compound SMO, UNICEF No of HHs #12000 UngBaduku (>12) NC HHs OPV safety meeting with LGAC visited by in Nov 2012 and Religious heads of NC responsible round belief. HHs; to be persons; no of preceeded by targetted HHs DUTSEN individual 14/12/2012 attending WAI Sensitization compound meetings. To be meeting. facilitated by Imman of Anchau
  • 5. 7 Kuli Border Border with Effective border STF,LGAF,WFP Border synch #3000 settlement Rahama Ward synchronization and TS meeting held & which may not of Soba LGA in planning & plans be properly Kaduna State implementation implemented covered with IPDs Team as scheduled. of Rahama ward in Soba LGA Full Border plans nil implementation implemented of border plans as scheduled 8 Pambegua Nassarawa and high Number Non Dialogue with STF,LGAF,WFP a data nil Tsurutawa (>15) NC HHs compliance heads of NC correctly on in Nov 2012 largely due to HHs through the tally sheet. round religious belief village head and and no felt ward head. need. Sensitization of four town 15- Announcers per 16/12/2012 ward. "MAJIGI SHOW" Deployment of nil senior team supervisor to support ward level training