Critical Lifts of ETHYLENE Project
Fractionator Tower
 Project: ETHYDCO Petrochemical Complex.
(Ethylene Project)
 Weight: 370 ton.
 Total Length :101.3m
 Lifting Crane: Liebherr LR11350 (1350 ton).
 Configuration: SLDB2WV (102+12).
 Crane capacity: 414 ton.
 Capacity utilization: 95.1%
 Auxiliary Crane: Terex CC2000 (300 ton).
 Lifting date: 18th
of March 2014.
 Lifting Engineer: Eng. Mina Labib
 Supervisor: Mohamed abd el-minem
Ethylene Heater
 Project: ETHYDCO Petrochemical Complex
(Ethylene Project)
 Weight: up to 50 ton.
 Lifting Crane: TEREX TC2600 (450 ton).
 Configuration: SWSL (48+42).
 Crane capacity: up to 70 ton.
 Lifting date: From: 14th
of January 2014
 Lifting Engineer: Eng. Mina Labib
 Supervisor: Mohamed abd el-minem
Quench Tower
 Project: ETHYDCO Petrochemical Complex.
(Ethylene Project)
 Weight: 205 ton.
 Total length: 47.3m
 Lifting Crane: Liebherr LR11350 (1350 ton).
 Configuration: S (70).
 Crane capacity: 254 ton.
 Capacity utilization: 85 %
 Auxiliary Crane: Terex CC2000 (300 ton).
 Lifting date: 9th
of April 2014.
 Lifting Engineer: Eng. Mina Labib
 Supervisor: Mohamed abd el-minem
Water Wash Tower
 Project: ETHYDCO Petrochemical Complex.
(Ethylene Project)
 Weight: 180 ton.
 Total Length: 57m
 Lifting Crane: Liebherr LR11350 (1350 ton).
 Configuration: SDB (102).
 Crane capacity: 238 ton.
 Capacity utilization: 84 %
 Auxiliary Crane: Terex CC2000 (300 ton).
 Lifting date: 18th
of February 2014.
 Lifting Engineer: Eng. Mina Labib
 Supervisor: Mohamed abd el-minem
Amine striper Tower
 Project: ETHYDCO Petrochemical Complex.
(Ethylene Project)
 Weight: 106 ton.
 Total Length: 41.8m
 Lifting Crane: Terex CC2000 (300 ton)
 Configuration: SSL (60m).
 Crane capacity: 141 ton.
 Capacity utilization: 78.7 %
 Auxiliary Crane: Manitowic 999 (250 ton).
 Lifting date: 11th
of July 2013.
 Lifting Engineer: Eng. Mina Labib
 Supervisor: Mohamed abd el-minem
Acidic gas Absorber Tower
 Project: ETHYDCO Petrochemical Complex.
(Ethylene Project)
 Weight: 100 ton.
 Total Length: 40m
 Lifting Crane: Terex CC2000 (300 ton)
 Configuration: SSL (60m).
 Crane capacity: 141 ton.
 Capacity utilization: 74 %
 Auxiliary Crane: Manitowic 999 (250 ton).
 Lifting date: 11th
of June 2013.
 Lifting Engineer: Eng. Mina Labib
 Supervisor: Mohamed abd el-minem
Ethylene Cold Box
 Project: ETHYDCO Petrochemical Complex.
(Ethylene Project)
 Weight: 68.3 ton.
 Total Length: 16m
 Lifting Crane: Terex CC2000 (300 ton)
 Configuration: SSL (60m).
 Crane capacity: 110 ton.
 Capacity utilization: 67.2 %
 Auxiliary Crane: Manitowic 999 (250 ton).
 Lifting date: 11th
of January 2014.
 Lifting Engineer: Eng. Mina Labib
 Supervisor: Mohamed abd el-minem

More Related Content

Similar to Critical lifts ethylene brocure

Belt conveyor and Haulage system in the mine
Belt conveyor and Haulage system in the mineBelt conveyor and Haulage system in the mine
Belt conveyor and Haulage system in the mineAnurag Jha
 
Hareket Magazine 28. issue-2018- English
Hareket Magazine 28. issue-2018- EnglishHareket Magazine 28. issue-2018- English
Hareket Magazine 28. issue-2018- EnglishHareket
 
brochure_derrick_barge
brochure_derrick_bargebrochure_derrick_barge
brochure_derrick_bargeAlen Mitrovic
 
REBO general - 2015-10-15
REBO general - 2015-10-15 REBO general - 2015-10-15
REBO general - 2015-10-15 reboostende
 
Russell Ferrier's Resume
Russell Ferrier's ResumeRussell Ferrier's Resume
Russell Ferrier's ResumeRussell Ferrier
 
Lifts footbridge in Metz, France
Lifts footbridge in  Metz, FranceLifts footbridge in  Metz, France
Lifts footbridge in Metz, Franceathmedia
 

Similar to Critical lifts ethylene brocure (8)

Belt conveyor and Haulage system in the mine
Belt conveyor and Haulage system in the mineBelt conveyor and Haulage system in the mine
Belt conveyor and Haulage system in the mine
 
Hareket Magazine 28. issue-2018- English
Hareket Magazine 28. issue-2018- EnglishHareket Magazine 28. issue-2018- English
Hareket Magazine 28. issue-2018- English
 
brochure_derrick_barge
brochure_derrick_bargebrochure_derrick_barge
brochure_derrick_barge
 
REBO general - 2015-10-15
REBO general - 2015-10-15 REBO general - 2015-10-15
REBO general - 2015-10-15
 
CV Helmar 05.03.2015
CV Helmar 05.03.2015CV Helmar 05.03.2015
CV Helmar 05.03.2015
 
Skandi Acergy
Skandi AcergySkandi Acergy
Skandi Acergy
 
Russell Ferrier's Resume
Russell Ferrier's ResumeRussell Ferrier's Resume
Russell Ferrier's Resume
 
Lifts footbridge in Metz, France
Lifts footbridge in  Metz, FranceLifts footbridge in  Metz, France
Lifts footbridge in Metz, France
 

More from mina labib

micro controller
micro controllermicro controller
micro controllermina labib
 
HTI hydraulics
HTI hydraulicsHTI hydraulics
HTI hydraulicsmina labib
 
British council certificate
British council certificateBritish council certificate
British council certificatemina labib
 
leea cirtificate mina
leea cirtificate minaleea cirtificate mina
leea cirtificate minamina labib
 

More from mina labib (6)

SMG
SMGSMG
SMG
 
PLC
PLCPLC
PLC
 
micro controller
micro controllermicro controller
micro controller
 
HTI hydraulics
HTI hydraulicsHTI hydraulics
HTI hydraulics
 
British council certificate
British council certificateBritish council certificate
British council certificate
 
leea cirtificate mina
leea cirtificate minaleea cirtificate mina
leea cirtificate mina
 

Critical lifts ethylene brocure

  • 1. Critical Lifts of ETHYLENE Project
  • 2. Fractionator Tower  Project: ETHYDCO Petrochemical Complex. (Ethylene Project)  Weight: 370 ton.  Total Length :101.3m  Lifting Crane: Liebherr LR11350 (1350 ton).  Configuration: SLDB2WV (102+12).  Crane capacity: 414 ton.  Capacity utilization: 95.1%  Auxiliary Crane: Terex CC2000 (300 ton).  Lifting date: 18th of March 2014.  Lifting Engineer: Eng. Mina Labib  Supervisor: Mohamed abd el-minem
  • 3. Ethylene Heater  Project: ETHYDCO Petrochemical Complex (Ethylene Project)  Weight: up to 50 ton.  Lifting Crane: TEREX TC2600 (450 ton).  Configuration: SWSL (48+42).  Crane capacity: up to 70 ton.  Lifting date: From: 14th of January 2014  Lifting Engineer: Eng. Mina Labib  Supervisor: Mohamed abd el-minem
  • 4. Quench Tower  Project: ETHYDCO Petrochemical Complex. (Ethylene Project)  Weight: 205 ton.  Total length: 47.3m  Lifting Crane: Liebherr LR11350 (1350 ton).  Configuration: S (70).  Crane capacity: 254 ton.  Capacity utilization: 85 %  Auxiliary Crane: Terex CC2000 (300 ton).  Lifting date: 9th of April 2014.  Lifting Engineer: Eng. Mina Labib  Supervisor: Mohamed abd el-minem
  • 5. Water Wash Tower  Project: ETHYDCO Petrochemical Complex. (Ethylene Project)  Weight: 180 ton.  Total Length: 57m  Lifting Crane: Liebherr LR11350 (1350 ton).  Configuration: SDB (102).  Crane capacity: 238 ton.  Capacity utilization: 84 %  Auxiliary Crane: Terex CC2000 (300 ton).  Lifting date: 18th of February 2014.  Lifting Engineer: Eng. Mina Labib  Supervisor: Mohamed abd el-minem
  • 6. Amine striper Tower  Project: ETHYDCO Petrochemical Complex. (Ethylene Project)  Weight: 106 ton.  Total Length: 41.8m  Lifting Crane: Terex CC2000 (300 ton)  Configuration: SSL (60m).  Crane capacity: 141 ton.  Capacity utilization: 78.7 %  Auxiliary Crane: Manitowic 999 (250 ton).  Lifting date: 11th of July 2013.  Lifting Engineer: Eng. Mina Labib  Supervisor: Mohamed abd el-minem
  • 7. Acidic gas Absorber Tower  Project: ETHYDCO Petrochemical Complex. (Ethylene Project)  Weight: 100 ton.  Total Length: 40m  Lifting Crane: Terex CC2000 (300 ton)  Configuration: SSL (60m).  Crane capacity: 141 ton.  Capacity utilization: 74 %  Auxiliary Crane: Manitowic 999 (250 ton).  Lifting date: 11th of June 2013.  Lifting Engineer: Eng. Mina Labib  Supervisor: Mohamed abd el-minem
  • 8. Ethylene Cold Box  Project: ETHYDCO Petrochemical Complex. (Ethylene Project)  Weight: 68.3 ton.  Total Length: 16m  Lifting Crane: Terex CC2000 (300 ton)  Configuration: SSL (60m).  Crane capacity: 110 ton.  Capacity utilization: 67.2 %  Auxiliary Crane: Manitowic 999 (250 ton).  Lifting date: 11th of January 2014.  Lifting Engineer: Eng. Mina Labib  Supervisor: Mohamed abd el-minem