ProjectName: ConcreteStapling
Client:Mr.MadhukarGundappa
Site:No.MarsEnclave,#1254/46/1,FlatNo.307,BehindRelianceFresh,DoddabommasandraMainRoad,
Vidyaranyapura,Bangalore560097
Project Executed :
D K Associates,
310-B, 10th Cross, I H Township, Rajarajeshwari Nagar, Bangalore 560098
Ph: +91-9845324012, Whatsapp: +91-9113207745, E-Mail: dkassociates2013@gmail.com,
Company Profile: https://drive.google.com/file/d/0B56tZuyiuBp-bUlPUzhQQWZEZzA/view?usp=sharing
Some Project Presentation: http://www.slideshare.net/dkassociates
Preamble:MarsEnclaveisabout5yearsoldResidentialApartmentComplex, FlatNo.307isthetopmostFlat
andhaswaterleakageduringtherainyseason. BuilderandOwnerhastriedmultipletypesofWaterProofingto
arrestleakage.
TherewasaShearCrackthroughandthroughontheRoofSlabwhichwasburiedundertheScreedConcrete.
DuringtheinspectionweDiagnosedtheproblemanddiscussedwiththeOwner.
Methodology:WeopenedthetopscreedandPCCreachedtheMotherSlab. DuringPrePondTestthecrackwas
clearlyvisibletothenakedeye.
DidVGroveCuttingontheCrack,Cleanedthoroughlyusing JetWaterSprayandCompressedAir.
DrilledholeoneithersideofthecrackfilledwithEpoxyandinsertedStaplersandleftfordrying.
NextDaytheentireareawastwicecoatedwithEpoxyandleftfordrying.
PondtestwascarriedontheEpoxyCoatingtoensurethereisnoleakage.
EntireareawasfilledwithscreedmortaraddedwithLiquidWaterProofingChemicalandgiveafinish.
The Proposed Treating area was marked.
Further sliced to avoid the vibration of Chipping.
The Screed Mortar was Chipped using 4 Kg Mechanized Hammer.
Pond Testing before Rectifying the problem to ascertain the Crack Visibility.
Pond Testing before Rectifying the problem to ascertain the Crack Visibility.
Leakage during Pond test
Water Flooded during Pond Test
After Leakage and Drying The Crack was Visible to the naked eye. (White Line)
After Leakage and Drying The Crack was Visible to the naked eye. (White Line)
After Leakage and Drying The Crack was Visible to the naked eye. (White Line)
Staple were placed inside the hole filled with Epoxy.
Epoxy Coating on and the surrounding the Staples
Epoxy Coating on entire area
Final Pond Testing on Epoxy Coating.
Treatment of Crack inside the Flat.
Screeding on treated surface
Curing of Treated area with water.
Final Pond test for 72 hours to confirm the clean work.
Putty and Painting on the interior surface and Project Handover.
Thanks for Watching please mail your Comments, Suggestions and
Enquiry to dkassociates2013@gmail.com
Project done by Ananda Theertha, Proprietor, D K Associates
Ph: +91-9845324012, Whatsapp: +919113207745

Concrete Repair using Concrete Staple Method