The document outlines a waterproofing project for flat no. 307 in the Mars Enclave residential complex, addressing severe water leakage issues due to a shear crack in the roof slab. The methodology included removing the top layer to access the crack, applying epoxy and staples for repair, and conducting thorough pond tests to ensure leak prevention. The project was completed by D K Associates, with final touches including putting and painting of the interior surface.