Cutting Edge Post Tensioning
As Edgestress Pty Ltd Owner Director, I bring with me, more than 30
years experience in the industry with senior roles in major projects in
Australia and across the world, such as,
Seohae Grand Bridge, Pyeongtaek South Korea (below)
Anzac Bridge, Sydney
Penang Bridge, Malaysia
We might be new to you but…….
We have an experienced Design Team backed
by a very capable Engineering and Site crew to
service your project professionally and
seamlessly.
Our site crews use advanced technology in
tools and equipment, designed internally, to
improve OH&S outcomes as well as
productivity improvements.
Barito twin suspension Bridge,
Kalimantan, Indonesia
Cable Erection
Peter Cole, Project manager
We use only material which meets Australian
Standards and sourced locally wherever possible.
We use Onesteel Strand exclusively, which is
manufactured in Newcastle NSW.
We use Barrels and Wedges manufactured locally in
Melbourne, and our Duct is manufactured in Albury
NSW
The quality of material used in
our work is backed by a
rigorous QA system making
every component traceable,
with testing to Australian
Standards.
SERVICES
Our vision for the future is to provide quality, value added design and construct solutions to
suit your particular requirements.
We provide technical advice and backup, supported by many years practical knowhow.
We know how important time constraints are so we aim to deliver on time, every time.
Alternative Design PT and Reo
Temporary Movement Joints (patented)
PostTensioned Stress Bars
Crane BaseTie Downs
Bridge Bearings and PostTensioning
Civil Engineering
Remedial Grouting
Epoxy Crack Injection
Ettaro Apartments East Brunswick Victoria
EQUIPMENT
Equipment designed internally and
manufactured locally in Melbourne.
30 Tonne Mono Stressing Jack
This is a proven workhorse in Australia and
around the world for the last 10 years. This
jack is light and reliable
Onion Jack Mini Pump
We have developed this battery operated
pump, weighing only 6.2Kg complete with oil
and all accessories. This machine is a game
changer for the Post Tensioning industry.
Lightweight but rugged and reliable, this pump
has been in service for the last 4 years,
saving time and labour whilst reducing fatigue
and OH&S issues. This machine is light and
fast forming onions on strand up to 15.7mm
diameter.
EQUIPMENT
7.5Kw High Power Remote Control Pusher
Cutting Edge Technology is employed here in our
own designed machines to deliver strand to the
tendon ducts in a safe and efficient manner, in
fully enclosed HDPE pipes that can weave
through crowded areas with complete safety, at
the same time reducing fatigue on workers using
radio remote control units, to deliver strand at
the touch of a button.
Bar Stressing Jacks
Bar Jacks are produced locally in Melbourne and
we have a large range at our disposal.
Bridge and Civil PostTensioning (Design and Construct)
Bridge Bearing replacement
Heavy Lift (Design and Construct)
Ground Anchors
Concrete Repair
Transfer Slab Venetian Stage II (400t Post Tensioning)
www.edgestress.com.au

company profile

  • 1.
  • 2.
    As Edgestress PtyLtd Owner Director, I bring with me, more than 30 years experience in the industry with senior roles in major projects in Australia and across the world, such as, Seohae Grand Bridge, Pyeongtaek South Korea (below) Anzac Bridge, Sydney Penang Bridge, Malaysia
  • 3.
    We might benew to you but……. We have an experienced Design Team backed by a very capable Engineering and Site crew to service your project professionally and seamlessly. Our site crews use advanced technology in tools and equipment, designed internally, to improve OH&S outcomes as well as productivity improvements. Barito twin suspension Bridge, Kalimantan, Indonesia Cable Erection Peter Cole, Project manager
  • 4.
    We use onlymaterial which meets Australian Standards and sourced locally wherever possible. We use Onesteel Strand exclusively, which is manufactured in Newcastle NSW. We use Barrels and Wedges manufactured locally in Melbourne, and our Duct is manufactured in Albury NSW The quality of material used in our work is backed by a rigorous QA system making every component traceable, with testing to Australian Standards.
  • 5.
    SERVICES Our vision forthe future is to provide quality, value added design and construct solutions to suit your particular requirements. We provide technical advice and backup, supported by many years practical knowhow. We know how important time constraints are so we aim to deliver on time, every time. Alternative Design PT and Reo Temporary Movement Joints (patented) PostTensioned Stress Bars Crane BaseTie Downs Bridge Bearings and PostTensioning Civil Engineering Remedial Grouting Epoxy Crack Injection Ettaro Apartments East Brunswick Victoria
  • 6.
    EQUIPMENT Equipment designed internallyand manufactured locally in Melbourne. 30 Tonne Mono Stressing Jack This is a proven workhorse in Australia and around the world for the last 10 years. This jack is light and reliable Onion Jack Mini Pump We have developed this battery operated pump, weighing only 6.2Kg complete with oil and all accessories. This machine is a game changer for the Post Tensioning industry. Lightweight but rugged and reliable, this pump has been in service for the last 4 years, saving time and labour whilst reducing fatigue and OH&S issues. This machine is light and fast forming onions on strand up to 15.7mm diameter.
  • 7.
    EQUIPMENT 7.5Kw High PowerRemote Control Pusher Cutting Edge Technology is employed here in our own designed machines to deliver strand to the tendon ducts in a safe and efficient manner, in fully enclosed HDPE pipes that can weave through crowded areas with complete safety, at the same time reducing fatigue on workers using radio remote control units, to deliver strand at the touch of a button. Bar Stressing Jacks Bar Jacks are produced locally in Melbourne and we have a large range at our disposal.
  • 8.
    Bridge and CivilPostTensioning (Design and Construct) Bridge Bearing replacement Heavy Lift (Design and Construct) Ground Anchors Concrete Repair Transfer Slab Venetian Stage II (400t Post Tensioning)
  • 9.