SCHOOL OF ARCHITECTURE, BUILDING & DESIGN
Research Unit for Modern Architecture Studies in Southeast Asia
Foundation of Natural Build Environment (FNBE)
CONSTRUCTED LANDSCAPE [ARC30203]
Prerequisite: None
Lecturers: Shazreene Nurjanna Shamsuddin, Noorul Iffa Mohd Nayan
Project 2A
Design Process: Research & Analysis (20% Group Work) + Graphic Journal (10% Individual)
Submission: 16th June 2015 (Week 11)
Introduction
“For every site, there is an ideal use. For every use, there is an ideal site”
[John Ormsbee Simonds]
The professional works like landscape architecture projects should be developed in systematic process.
Its purpose is to best arrange the elements of any planned development in relation to the natural and
constructed features of a site and its environs. The responsibility of a designer is to guide those involved
in the best solution and to help ensure in all ways possible the project’s success.
Objectives of Project
The objectives of this project:
 To explore the anatomy of landscape project and process involved in every stages.
 To demonstrate the understanding of site selection and site analysis via graphic
communication skills.
Learning Outcomes of this Project
On successful completion of this subject, students will be able to demonstrate the following:
1. Fundamental comprehension on how to conduct site selection and site analysis for better
execution of a landscape project.
Tasks - Methodology
GROUP TASK
In a group of 6 to 7 members, you need to select one landed residence with a compound or an open
space within the boundary. There is no limit of the size of the residence, however the least acceptable
option is a semi-detached house or corner lot house. In order to carry out this project, students are
required to obtain the base plan of the residence itself from the particular owner. If the base plan is
not provided, you need to measure on site and produce the plan with suitable scale on your own.
2
Task 1
As a group, you need to organize a site visit and do a site survey. You are to conduct a site
inventory and analysis of the existing condition based on the following information:
1) Site Location and Context
- Identify location of the house and land uses surrounding it (e.g., next to main road, at the
school, or near to school etc.)
2) Topography
- Identify the existing landform and slope condition (e.g., flat, hilly or steep, gentle slope
etc.)
- Identify the elevation changes (if any) (e.g., steps or retaining walls etc.)
3) Drainage
- Identify location the drainage and water spots on specific area.
4) Vegetation
- Identify existing types of vegetation/softscape (provision of common name or scientific
name is an advantage)
5) Microclimate
- Identify direction of sunrise, sunset and wind direction
6) Existing Structure
- Identify existing structure (e.g., swimming pool, driveway/porch/garage, steps, gazebo,
pergola etc.)
- Identify rubbish bin/dumping spot, cloth line etc.
7) Views
- Observe and identify views from all vantage points;
i. On-site views – from inside of the house looking outside.
ii. Off-site views – from outside (all angle/sides of the house, street) looking inside.
- Identify the good and bad views.
Task 2
After the site inventory and analysis are done, as a group you are required to develop a site synthesis
also known as . to the site. In the site synthesis diagram, you are to scribble/doddle/sketch/draw the
design solutions conceptually. The idea should not be in detail, probably the initial or rough idea about
what do you think would be the best options to improve the existing condition. This interpretation of
design and decision making are based on group reflection or a combination of individual ideas.
You may provide several options to one single problem/circumstance/condition as the solution would
not limit to only one.
*Note:
Examples of all tasks will be showing during project briefing in class.
INDIVIDUAL TASK
Individually, you are required to produce a graphic journal which comprises of a series of element
provided below. The graphic journal plays as a sketch journal of elements in landscape architecture
field. You are free either to trace or to sketch/doodle/draw on your own (all in not to scale) and to
combine as a journal. The elements required for this assignment are as follows;
3
A) Vegetation
i) Plan view of 10 different types of trees (flowering & non flowering), shrubs, palms and
groundcovers/turf.
ii) Elevation drawing of 5 different types of trees (flowering & non flowering), shrubs, palms and
groundcovers/turf.
B) Natural Elements
i) Plan view of rocks and waterways (river/stream/lakes).
ii) Elevation view of above chosen elements.
C) Hardscape
i) Plan view of 5 different patterns of paving (e.g; bricks, concrete, random flagstone, pebbles
etc.)
ii) 3 plan or/and elevation views of building with roof shading, pergola, gazebo, pool/fountain.
*Note:
The exercise on graphic communication skills will be taught in class.
Submission Requirement
GROUP
Each group need to submit the work sheets which would have to meet the following criteria;
1. It must be in a form of A3 booklet, stapled or bound with a cover page. The cover page
should include title block which will be prepared by the lecturer.
2. The material for paper is bond paper (photostate paper) min 70gsm. You may use butter
paper as progress to be shown during tutorial session but it is not to be as the final
submission.
3. There is no page limit as long as all information outlined above is fulfilled. The page layout for
overall should be orientated consistently.
4. The diagram should be drawn and written manually, except for site images. The diagram
should incorporate standard landscape graphic communication.
5. You are advised to segregate between site inventory, site analysis & site synthesis by
using page separator.
INDIVIDUAL
For individual submission, you are to fulfil the following criteria;
1. The graphic journal should be submitted in A4 format with cover page, using any type of
paper. You are free to design your cover page, however it should contains information such
as; Taylor’s logo, FNBE, Module code & name, project title, name & student ID and
tutor’s name.
2. You can combine all elements in a composition, but you have to label every single of it.
3. The drawings can be all coloured, partially coloured or black and white but it must be
properly done. You can use any medium of colouring and can be a combination of mix
media, water colour, pencil colour or marker. Please plan your journal carefully as not all
medium suits with all types of paper.
Both group and individual work sheets with assessment sheets need to be submitted on 16th JUNE
2015, at class venue LT 19 at 10am. You are advised to scan your work before submission for
uploading purposes in the online portfolio.
4
Assessment Criteria
The assessment criteria for this assignment will be based on:
 Demonstrated understanding of brief
 Relevance, appropriateness and depth of research exhibited in the assignment
 Creative application of graphic communication skills, originality and quality of the work
 Team work and group collaboration
 Individual documentation
Marking Criteria
Marks shall be distributed as follows:
Work will be assessed based on:
TGC
Acquired
Assessment Criteria Marks %
Group Component
Demonstrated understanding of brief 3 %
Relevance, appropriateness and depth of research exhibited in
the assignment
10 %
Creative application of graphic communication skills, originality
and quality of work
5 %
Team work and group collaboration 2 %
TOTAL 20 %
Individual Component
Demonstrated understanding of brief and the effectiveness of
carrying out the tasks given
2 %
Originality, creativity and quality of work 8 %
TOTAL 10 %
GRAND TOTAL (20% group + 10% individual) 30 %
NOTE: PLEASE BE INFORMED THAT INDIVIDUAL COMPONENTS IN GROUP WORKS IS EVALUATED
BASED ON PEER EVALUATION AND INSTRUCTUR’S EVALUATION PERFORMANCE OF A GROUP
MEMBER.
Suggested References
** Refer to slides presentation on project briefing.
5
PROJECT 2
Design Process: Research & Analysis
GROUP NAME: _____________________________________________________________
GROUP ASSESSMENT
No Assessment Marks Comments/Remarks
A Demonstration understanding of brief
(the form and level of execution of understanding
the brief)
Total 3%
1. Understanding of brief and requirement /3
TOTAL: /3
B Relevance, appropriateness and depth of
research exhibited in the assignment
(thorough research and in-depth study related to the
task given)
Total 10%
1. Relevance of analysis & synthesis related to the
site condition
/2
2. Appropriateness of information, images and
analysis of the site condition
/4
3. Depth of research and analysis exhibited in the
assignment
/4
TOTAL: /10
C Creative application of graphic communication
skills, originality and quality of work
(the quality of work, originality and creativity in
demonstrating the graphic communication skill)
Total 5%
1. Creativity in demonstrating the work /3
2. Quality and originality of the work /2
TOTAL: /5
D Team work and group collaboration Total 2%
1. Team work, participation and collaboration to
progress
/2
TOTAL: /2
GRAND TOTAL /20% GRADE:
COMMENTS:
GROUP MEMBERS NAME:
NO STUDENT NAME STUDENT ID
1
PROJECT 2
Design Process: Graphic Journal
NAME: ________________________________________________________________________ Student ID: __________________________________
TUTOR NAME: ______________________________________________________________________________________________________________
INDIVIDUAL ASSESSMENT
No Assessment Marks Comments/Remarks
A Demonstrated understanding of brief and the effectiveness of carrying out the tasks
given
Total 2%
1. Illustrate adequate knowledge and understanding on requirement /1
2. Evidence of extensive study on choosing the right elements and adequate exercises /1
TOTAL: /2
B Originality, creativity and quality of work Total 8%
1. Illustrate good and quality of graphic communication skills in the work /3
2. Creativity and originality of the works, and exploration of various material used /3
3. Quality of workmanship executed on every single artwork. /2
TOTAL: /8
GRAND TOTAL : /10% GRADE:
COMMENTS:
2
GROUP ATTENDANCE FOR TUTORIAL
 Please bring the group attendance sheet during tutorial and to be attached together with the project brief. Only one per group.
TUTORIAL 1 (WEEK 8 ) TUTORIAL 2 (WEEK 9) TUTORIAL 3 (WEEK 10)
COMMENTS BY TUTOR:
SIGNATURE:
COMMENTS BY TUTOR:
SIGNATURE:
COMMENTS BY TUTOR:
SIGNATURE:
3

More Related Content

Viewers also liked

Acc30205newcourseoutline jan2015semester-151210044427
Acc30205newcourseoutline jan2015semester-151210044427Acc30205newcourseoutline jan2015semester-151210044427
Acc30205newcourseoutline jan2015semester-151210044427
Kenneth Tan
 
Business charity drive report
Business charity drive reportBusiness charity drive report
Business charity drive report
Kenneth Tan
 
Lbs annual report2012
Lbs annual report2012Lbs annual report2012
Lbs annual report2012
Kenneth Tan
 
Lbs annual report2013
Lbs annual report2013Lbs annual report2013
Lbs annual report2013
Kenneth Tan
 
Fnbecourseoutline 151216064811
Fnbecourseoutline 151216064811Fnbecourseoutline 151216064811
Fnbecourseoutline 151216064811
Kenneth Tan
 
business tutorial notes
business tutorial notesbusiness tutorial notes
business tutorial notes
Kenneth Tan
 
Ecn30205 course outline september 2015 semester
Ecn30205 course outline   september 2015 semesterEcn30205 course outline   september 2015 semester
Ecn30205 course outline september 2015 semester
Kenneth Tan
 
English 2. assignment 1 ( kenneth tan)
English 2. assignment 1 ( kenneth tan)English 2. assignment 1 ( kenneth tan)
English 2. assignment 1 ( kenneth tan)
Kenneth Tan
 
Assessment 151212065956 (1)
Assessment 151212065956 (1)Assessment 151212065956 (1)
Assessment 151212065956 (1)
Kenneth Tan
 
Bus30104 intro to biz final project sept 2015
Bus30104 intro to biz final project   sept 2015Bus30104 intro to biz final project   sept 2015
Bus30104 intro to biz final project sept 2015
Kenneth Tan
 
Psychology video presentation slides
Psychology video presentation slidesPsychology video presentation slides
Psychology video presentation slides
Kenneth Tan
 

Viewers also liked (11)

Acc30205newcourseoutline jan2015semester-151210044427
Acc30205newcourseoutline jan2015semester-151210044427Acc30205newcourseoutline jan2015semester-151210044427
Acc30205newcourseoutline jan2015semester-151210044427
 
Business charity drive report
Business charity drive reportBusiness charity drive report
Business charity drive report
 
Lbs annual report2012
Lbs annual report2012Lbs annual report2012
Lbs annual report2012
 
Lbs annual report2013
Lbs annual report2013Lbs annual report2013
Lbs annual report2013
 
Fnbecourseoutline 151216064811
Fnbecourseoutline 151216064811Fnbecourseoutline 151216064811
Fnbecourseoutline 151216064811
 
business tutorial notes
business tutorial notesbusiness tutorial notes
business tutorial notes
 
Ecn30205 course outline september 2015 semester
Ecn30205 course outline   september 2015 semesterEcn30205 course outline   september 2015 semester
Ecn30205 course outline september 2015 semester
 
English 2. assignment 1 ( kenneth tan)
English 2. assignment 1 ( kenneth tan)English 2. assignment 1 ( kenneth tan)
English 2. assignment 1 ( kenneth tan)
 
Assessment 151212065956 (1)
Assessment 151212065956 (1)Assessment 151212065956 (1)
Assessment 151212065956 (1)
 
Bus30104 intro to biz final project sept 2015
Bus30104 intro to biz final project   sept 2015Bus30104 intro to biz final project   sept 2015
Bus30104 intro to biz final project sept 2015
 
Psychology video presentation slides
Psychology video presentation slidesPsychology video presentation slides
Psychology video presentation slides
 

Similar to Clproject2designprocessresearchanalysismac2015 150719124630-lva1-app6892-150811093031-lva1-app6892

Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
Leon Lim
 
Cl project 2A design process research analysis
Cl project 2A design process research  analysisCl project 2A design process research  analysis
Cl project 2A design process research analysis
SongKit96
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysisJian Leo
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysischuenmin
 
Project2designprocessresearchanalysis 150624030224-lva1-app6892
Project2designprocessresearchanalysis 150624030224-lva1-app6892Project2designprocessresearchanalysis 150624030224-lva1-app6892
Project2designprocessresearchanalysis 150624030224-lva1-app6892KY Quah
 
Project 2A Brief
Project 2A BriefProject 2A Brief
Project 2A Brief
JunXiang97
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
Amelisa Collins
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
SolomonTangerine
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysisZheng Chee Cham
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysisDameerster
 
CL Project 2 design process research analysis
CL Project 2 design process research  analysisCL Project 2 design process research  analysis
CL Project 2 design process research analysis
ashleyyeap
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
christinelee1996
 
FNBE 0115 - CL PROJECT 2 BRIEF
FNBE 0115 - CL PROJECT 2 BRIEF FNBE 0115 - CL PROJECT 2 BRIEF
FNBE 0115 - CL PROJECT 2 BRIEF
barbaraxchang
 
Project2designprocessresearchanalysis 150624030224-lva1-app6892
Project2designprocessresearchanalysis 150624030224-lva1-app6892Project2designprocessresearchanalysis 150624030224-lva1-app6892
Project2designprocessresearchanalysis 150624030224-lva1-app6892KY Quah
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
Gynie
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
Quo Ming
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysisLouise Foong
 
FNBE0115 - CL PROJECT 2
FNBE0115 - CL PROJECT 2FNBE0115 - CL PROJECT 2
FNBE0115 - CL PROJECT 2
barbaraxchang
 
Cl project 2 design process research analysis
Cl project 2 design process research  analysisCl project 2 design process research  analysis
Cl project 2 design process research analysisstactixzz97
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
Lin Hui
 

Similar to Clproject2designprocessresearchanalysismac2015 150719124630-lva1-app6892-150811093031-lva1-app6892 (20)

Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
 
Cl project 2A design process research analysis
Cl project 2A design process research  analysisCl project 2A design process research  analysis
Cl project 2A design process research analysis
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
 
Project2designprocessresearchanalysis 150624030224-lva1-app6892
Project2designprocessresearchanalysis 150624030224-lva1-app6892Project2designprocessresearchanalysis 150624030224-lva1-app6892
Project2designprocessresearchanalysis 150624030224-lva1-app6892
 
Project 2A Brief
Project 2A BriefProject 2A Brief
Project 2A Brief
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
 
CL Project 2 design process research analysis
CL Project 2 design process research  analysisCL Project 2 design process research  analysis
CL Project 2 design process research analysis
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
 
FNBE 0115 - CL PROJECT 2 BRIEF
FNBE 0115 - CL PROJECT 2 BRIEF FNBE 0115 - CL PROJECT 2 BRIEF
FNBE 0115 - CL PROJECT 2 BRIEF
 
Project2designprocessresearchanalysis 150624030224-lva1-app6892
Project2designprocessresearchanalysis 150624030224-lva1-app6892Project2designprocessresearchanalysis 150624030224-lva1-app6892
Project2designprocessresearchanalysis 150624030224-lva1-app6892
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
 
FNBE0115 - CL PROJECT 2
FNBE0115 - CL PROJECT 2FNBE0115 - CL PROJECT 2
FNBE0115 - CL PROJECT 2
 
Cl project 2 design process research analysis
Cl project 2 design process research  analysisCl project 2 design process research  analysis
Cl project 2 design process research analysis
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
 

More from Kenneth Tan

Accounting project 2
Accounting  project 2Accounting  project 2
Accounting project 2
Kenneth Tan
 
Accounting final project 2
Accounting final project 2Accounting final project 2
Accounting final project 2
Kenneth Tan
 
Acc30205 basic accounting assignment rev september 2015
Acc30205 basic accounting assignment rev   september 2015Acc30205 basic accounting assignment rev   september 2015
Acc30205 basic accounting assignment rev september 2015
Kenneth Tan
 
Psychology report
Psychology reportPsychology report
Psychology report
Kenneth Tan
 
Business project 1 slides
Business project 1 slidesBusiness project 1 slides
Business project 1 slides
Kenneth Tan
 
English report final
English report finalEnglish report final
English report final
Kenneth Tan
 
Eng report final
Eng report finalEng report final
Eng report final
Kenneth Tan
 
econ report
econ reportecon report
econ report
Kenneth Tan
 
economics assignment sept 2015 intake
 economics assignment   sept 2015 intake economics assignment   sept 2015 intake
economics assignment sept 2015 intake
Kenneth Tan
 
econ tutorial
econ tutorialecon tutorial
econ tutorial
Kenneth Tan
 
Tutorial econ exercise 1.0
Tutorial econ exercise 1.0Tutorial econ exercise 1.0
Tutorial econ exercise 1.0
Kenneth Tan
 
business plan sept 2015
  business plan sept 2015  business plan sept 2015
business plan sept 2015
Kenneth Tan
 
Bus30104 new course outline september 2015 semester
Bus30104  new course outline   september 2015 semesterBus30104  new course outline   september 2015 semester
Bus30104 new course outline september 2015 semester
Kenneth Tan
 
psy report brief
psy report briefpsy report brief
psy report brief
Kenneth Tan
 
Social psychology comic presentation (1)
Social psychology comic presentation (1)Social psychology comic presentation (1)
Social psychology comic presentation (1)
Kenneth Tan
 
Psychology journal ( cover)
Psychology journal ( cover)Psychology journal ( cover)
Psychology journal ( cover)
Kenneth Tan
 
Fnbejournalassignment 151216064855
Fnbejournalassignment 151216064855Fnbejournalassignment 151216064855
Fnbejournalassignment 151216064855
Kenneth Tan
 
Presentation slides (1)
Presentation slides (1) Presentation slides (1)
Presentation slides (1)
Kenneth Tan
 
Fnbe january 2015 assignment 2 (1)
Fnbe january 2015 assignment 2 (1)Fnbe january 2015 assignment 2 (1)
Fnbe january 2015 assignment 2 (1)
Kenneth Tan
 
english 2 project 1 brief
english 2 project 1 briefenglish 2 project 1 brief
english 2 project 1 brief
Kenneth Tan
 

More from Kenneth Tan (20)

Accounting project 2
Accounting  project 2Accounting  project 2
Accounting project 2
 
Accounting final project 2
Accounting final project 2Accounting final project 2
Accounting final project 2
 
Acc30205 basic accounting assignment rev september 2015
Acc30205 basic accounting assignment rev   september 2015Acc30205 basic accounting assignment rev   september 2015
Acc30205 basic accounting assignment rev september 2015
 
Psychology report
Psychology reportPsychology report
Psychology report
 
Business project 1 slides
Business project 1 slidesBusiness project 1 slides
Business project 1 slides
 
English report final
English report finalEnglish report final
English report final
 
Eng report final
Eng report finalEng report final
Eng report final
 
econ report
econ reportecon report
econ report
 
economics assignment sept 2015 intake
 economics assignment   sept 2015 intake economics assignment   sept 2015 intake
economics assignment sept 2015 intake
 
econ tutorial
econ tutorialecon tutorial
econ tutorial
 
Tutorial econ exercise 1.0
Tutorial econ exercise 1.0Tutorial econ exercise 1.0
Tutorial econ exercise 1.0
 
business plan sept 2015
  business plan sept 2015  business plan sept 2015
business plan sept 2015
 
Bus30104 new course outline september 2015 semester
Bus30104  new course outline   september 2015 semesterBus30104  new course outline   september 2015 semester
Bus30104 new course outline september 2015 semester
 
psy report brief
psy report briefpsy report brief
psy report brief
 
Social psychology comic presentation (1)
Social psychology comic presentation (1)Social psychology comic presentation (1)
Social psychology comic presentation (1)
 
Psychology journal ( cover)
Psychology journal ( cover)Psychology journal ( cover)
Psychology journal ( cover)
 
Fnbejournalassignment 151216064855
Fnbejournalassignment 151216064855Fnbejournalassignment 151216064855
Fnbejournalassignment 151216064855
 
Presentation slides (1)
Presentation slides (1) Presentation slides (1)
Presentation slides (1)
 
Fnbe january 2015 assignment 2 (1)
Fnbe january 2015 assignment 2 (1)Fnbe january 2015 assignment 2 (1)
Fnbe january 2015 assignment 2 (1)
 
english 2 project 1 brief
english 2 project 1 briefenglish 2 project 1 brief
english 2 project 1 brief
 

Recently uploaded

Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs  Consulting SMEs.pptxEmpowering Limpopo Entrepreneurs  Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
Precious Mvulane CA (SA),RA
 
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
eygkup
 
Ec330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdfEc330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdf
Excavator
 
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
Autohaus Service and Sales
 
Ec460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdfEc460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdf
Excavator
 
What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?
Hyundai Motor Group
 
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
mymwpc
 
Things to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your carThings to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your car
jennifermiller8137
 
What Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It WorkWhat Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It Work
Motor Cars International
 
Tyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEATTyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEAT
kshamashah95
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
daothibichhang1
 
Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?
jennifermiller8137
 
Antique Plastic Traders Company Profile
Antique Plastic Traders Company ProfileAntique Plastic Traders Company Profile
Antique Plastic Traders Company Profile
Antique Plastic Traders
 
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtycccccccccccccccccccccccccccccccccccccccccccccccccccccccgtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
4thzenzstar
 
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
Bertini's German Motors
 
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptxStatistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
coc7987515756
 
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out HereWhy Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Masters European & Gapanese Auto Repair
 
欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】
欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】
欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】
ahmedendrise81
 
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
European Service Center
 
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Hyundai Motor Group
 

Recently uploaded (20)

Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs  Consulting SMEs.pptxEmpowering Limpopo Entrepreneurs  Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
 
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
一比一原版(AIS毕业证)奥克兰商学院毕业证成绩单如何办理
 
Ec330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdfEc330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdf
 
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
 
Ec460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdfEc460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdf
 
What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?What do the symbols on vehicle dashboard mean?
What do the symbols on vehicle dashboard mean?
 
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
一比一原版(AUT毕业证)奥克兰理工大学毕业证成绩单如何办理
 
Things to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your carThings to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your car
 
What Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It WorkWhat Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It Work
 
Tyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEATTyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEAT
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
 
Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?Digital Fleet Management - Why Your Business Need It?
Digital Fleet Management - Why Your Business Need It?
 
Antique Plastic Traders Company Profile
Antique Plastic Traders Company ProfileAntique Plastic Traders Company Profile
Antique Plastic Traders Company Profile
 
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtycccccccccccccccccccccccccccccccccccccccccccccccccccccccgtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
 
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
 
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptxStatistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
 
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out HereWhy Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
 
欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】
欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】
欧洲杯比赛投注官网-欧洲杯比赛投注官网网站-欧洲杯比赛投注官网|【​网址​🎉ac123.net🎉​】
 
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
 
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
 

Clproject2designprocessresearchanalysismac2015 150719124630-lva1-app6892-150811093031-lva1-app6892

  • 1. 1 SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Research Unit for Modern Architecture Studies in Southeast Asia Foundation of Natural Build Environment (FNBE) CONSTRUCTED LANDSCAPE [ARC30203] Prerequisite: None Lecturers: Shazreene Nurjanna Shamsuddin, Noorul Iffa Mohd Nayan Project 2A Design Process: Research & Analysis (20% Group Work) + Graphic Journal (10% Individual) Submission: 16th June 2015 (Week 11) Introduction “For every site, there is an ideal use. For every use, there is an ideal site” [John Ormsbee Simonds] The professional works like landscape architecture projects should be developed in systematic process. Its purpose is to best arrange the elements of any planned development in relation to the natural and constructed features of a site and its environs. The responsibility of a designer is to guide those involved in the best solution and to help ensure in all ways possible the project’s success. Objectives of Project The objectives of this project:  To explore the anatomy of landscape project and process involved in every stages.  To demonstrate the understanding of site selection and site analysis via graphic communication skills. Learning Outcomes of this Project On successful completion of this subject, students will be able to demonstrate the following: 1. Fundamental comprehension on how to conduct site selection and site analysis for better execution of a landscape project. Tasks - Methodology GROUP TASK In a group of 6 to 7 members, you need to select one landed residence with a compound or an open space within the boundary. There is no limit of the size of the residence, however the least acceptable option is a semi-detached house or corner lot house. In order to carry out this project, students are required to obtain the base plan of the residence itself from the particular owner. If the base plan is not provided, you need to measure on site and produce the plan with suitable scale on your own.
  • 2. 2 Task 1 As a group, you need to organize a site visit and do a site survey. You are to conduct a site inventory and analysis of the existing condition based on the following information: 1) Site Location and Context - Identify location of the house and land uses surrounding it (e.g., next to main road, at the school, or near to school etc.) 2) Topography - Identify the existing landform and slope condition (e.g., flat, hilly or steep, gentle slope etc.) - Identify the elevation changes (if any) (e.g., steps or retaining walls etc.) 3) Drainage - Identify location the drainage and water spots on specific area. 4) Vegetation - Identify existing types of vegetation/softscape (provision of common name or scientific name is an advantage) 5) Microclimate - Identify direction of sunrise, sunset and wind direction 6) Existing Structure - Identify existing structure (e.g., swimming pool, driveway/porch/garage, steps, gazebo, pergola etc.) - Identify rubbish bin/dumping spot, cloth line etc. 7) Views - Observe and identify views from all vantage points; i. On-site views – from inside of the house looking outside. ii. Off-site views – from outside (all angle/sides of the house, street) looking inside. - Identify the good and bad views. Task 2 After the site inventory and analysis are done, as a group you are required to develop a site synthesis also known as . to the site. In the site synthesis diagram, you are to scribble/doddle/sketch/draw the design solutions conceptually. The idea should not be in detail, probably the initial or rough idea about what do you think would be the best options to improve the existing condition. This interpretation of design and decision making are based on group reflection or a combination of individual ideas. You may provide several options to one single problem/circumstance/condition as the solution would not limit to only one. *Note: Examples of all tasks will be showing during project briefing in class. INDIVIDUAL TASK Individually, you are required to produce a graphic journal which comprises of a series of element provided below. The graphic journal plays as a sketch journal of elements in landscape architecture field. You are free either to trace or to sketch/doodle/draw on your own (all in not to scale) and to combine as a journal. The elements required for this assignment are as follows;
  • 3. 3 A) Vegetation i) Plan view of 10 different types of trees (flowering & non flowering), shrubs, palms and groundcovers/turf. ii) Elevation drawing of 5 different types of trees (flowering & non flowering), shrubs, palms and groundcovers/turf. B) Natural Elements i) Plan view of rocks and waterways (river/stream/lakes). ii) Elevation view of above chosen elements. C) Hardscape i) Plan view of 5 different patterns of paving (e.g; bricks, concrete, random flagstone, pebbles etc.) ii) 3 plan or/and elevation views of building with roof shading, pergola, gazebo, pool/fountain. *Note: The exercise on graphic communication skills will be taught in class. Submission Requirement GROUP Each group need to submit the work sheets which would have to meet the following criteria; 1. It must be in a form of A3 booklet, stapled or bound with a cover page. The cover page should include title block which will be prepared by the lecturer. 2. The material for paper is bond paper (photostate paper) min 70gsm. You may use butter paper as progress to be shown during tutorial session but it is not to be as the final submission. 3. There is no page limit as long as all information outlined above is fulfilled. The page layout for overall should be orientated consistently. 4. The diagram should be drawn and written manually, except for site images. The diagram should incorporate standard landscape graphic communication. 5. You are advised to segregate between site inventory, site analysis & site synthesis by using page separator. INDIVIDUAL For individual submission, you are to fulfil the following criteria; 1. The graphic journal should be submitted in A4 format with cover page, using any type of paper. You are free to design your cover page, however it should contains information such as; Taylor’s logo, FNBE, Module code & name, project title, name & student ID and tutor’s name. 2. You can combine all elements in a composition, but you have to label every single of it. 3. The drawings can be all coloured, partially coloured or black and white but it must be properly done. You can use any medium of colouring and can be a combination of mix media, water colour, pencil colour or marker. Please plan your journal carefully as not all medium suits with all types of paper. Both group and individual work sheets with assessment sheets need to be submitted on 16th JUNE 2015, at class venue LT 19 at 10am. You are advised to scan your work before submission for uploading purposes in the online portfolio.
  • 4. 4 Assessment Criteria The assessment criteria for this assignment will be based on:  Demonstrated understanding of brief  Relevance, appropriateness and depth of research exhibited in the assignment  Creative application of graphic communication skills, originality and quality of the work  Team work and group collaboration  Individual documentation Marking Criteria Marks shall be distributed as follows: Work will be assessed based on: TGC Acquired Assessment Criteria Marks % Group Component Demonstrated understanding of brief 3 % Relevance, appropriateness and depth of research exhibited in the assignment 10 % Creative application of graphic communication skills, originality and quality of work 5 % Team work and group collaboration 2 % TOTAL 20 % Individual Component Demonstrated understanding of brief and the effectiveness of carrying out the tasks given 2 % Originality, creativity and quality of work 8 % TOTAL 10 % GRAND TOTAL (20% group + 10% individual) 30 % NOTE: PLEASE BE INFORMED THAT INDIVIDUAL COMPONENTS IN GROUP WORKS IS EVALUATED BASED ON PEER EVALUATION AND INSTRUCTUR’S EVALUATION PERFORMANCE OF A GROUP MEMBER. Suggested References ** Refer to slides presentation on project briefing.
  • 5. 5 PROJECT 2 Design Process: Research & Analysis GROUP NAME: _____________________________________________________________ GROUP ASSESSMENT No Assessment Marks Comments/Remarks A Demonstration understanding of brief (the form and level of execution of understanding the brief) Total 3% 1. Understanding of brief and requirement /3 TOTAL: /3 B Relevance, appropriateness and depth of research exhibited in the assignment (thorough research and in-depth study related to the task given) Total 10% 1. Relevance of analysis & synthesis related to the site condition /2 2. Appropriateness of information, images and analysis of the site condition /4 3. Depth of research and analysis exhibited in the assignment /4 TOTAL: /10 C Creative application of graphic communication skills, originality and quality of work (the quality of work, originality and creativity in demonstrating the graphic communication skill) Total 5% 1. Creativity in demonstrating the work /3 2. Quality and originality of the work /2 TOTAL: /5 D Team work and group collaboration Total 2% 1. Team work, participation and collaboration to progress /2 TOTAL: /2 GRAND TOTAL /20% GRADE: COMMENTS: GROUP MEMBERS NAME: NO STUDENT NAME STUDENT ID
  • 6. 1 PROJECT 2 Design Process: Graphic Journal NAME: ________________________________________________________________________ Student ID: __________________________________ TUTOR NAME: ______________________________________________________________________________________________________________ INDIVIDUAL ASSESSMENT No Assessment Marks Comments/Remarks A Demonstrated understanding of brief and the effectiveness of carrying out the tasks given Total 2% 1. Illustrate adequate knowledge and understanding on requirement /1 2. Evidence of extensive study on choosing the right elements and adequate exercises /1 TOTAL: /2 B Originality, creativity and quality of work Total 8% 1. Illustrate good and quality of graphic communication skills in the work /3 2. Creativity and originality of the works, and exploration of various material used /3 3. Quality of workmanship executed on every single artwork. /2 TOTAL: /8 GRAND TOTAL : /10% GRADE: COMMENTS:
  • 7. 2 GROUP ATTENDANCE FOR TUTORIAL  Please bring the group attendance sheet during tutorial and to be attached together with the project brief. Only one per group. TUTORIAL 1 (WEEK 8 ) TUTORIAL 2 (WEEK 9) TUTORIAL 3 (WEEK 10) COMMENTS BY TUTOR: SIGNATURE: COMMENTS BY TUTOR: SIGNATURE: COMMENTS BY TUTOR: SIGNATURE:
  • 8. 3