INTRODUCTION




  » Founded in 1920 – 90 Years of Continuous Service           » Sophisticated Project Delivery System Combining BIM,
                                                                 Project Management and Quality Control
  » Top 140 National Design Firm as Ranked by ENR (Large
    Staff, Personal Attention)                                 » Full Service Professional Firm

  » Project Experience Similar to this A/E Services Contract   » Over 160 LEED® Accredited Professionals

  » Offices Strategically Located to Support Any Project       » Utilizing Building Information Modeling (BIM) for
                                                                 Coordination and Quality Assurance
FULL SERVICE DESIGN FIRM




 » Architecture             » Electrical Engineering        » Waterfront Engineering        » Design/Build Projects

 » Landscape Architecture   » Mechanical Engineering        » Telecommunications            » Computer Imaging/CADD
                                                              Engineering
 » Master Planning          » Structural Engineering                                        » Historic Properties
                                                            » Transportation Engineering      Applications and Research
 » Interior Design          » Environmental Engineering
                                                            » Facilities Management         » Renderings, Models,
 » Civil Engineering        » Fire Protection Engineering                                     Computer/Video
                                                            » Construction Administration     Presentations
PRESENT WORKLOAD




  We Can Provide Multiple A&E Teams for Any Task

  Back Up for a Combined Staff of Over 530 includes:




  - Project Managers                                   - Structural Engineers
  - Architects                                         - Fire Protection Engineers
  - Interior Designers                                 - Landscape Architects
  - Civil Engineers                                    - Communication Engineers
  - Electrical Engineers                               - Planners
  - Mechanical Engineers                               - Commissioning Agents
BUILDING INFORMATION MODELING




                                                    OWNERS




   » Building Information Modeling
                                                        BUILDING
     (BIM) – an Integrated                            INFORMATION
     Workflow Built on               BUILDERS           MODELING        ARCHITECTS
     Coordinated, Reliable
     Information About a Project
     From Design Through
     Construction and into
     Operations.




                                                                    STRUCTURAL
                                      MEP SYSTEMS
                                                                     ENGINEERS
                                       ENGINEERS
CONSTRUCTION ADMINISTRATION




                              » Designer Involvement Throughout Construction

                                 » IN ADDITION

                              » Dedicated Construction Administration Team

                                 » Architecture and Engineering Managers

                                 » Assign a Field Construction Administrator to each Project

                                 » Track of RFI’s and Shop Drawings

                                 » Provide Shop Drawing Review

                                 » Provide Quality Assurance Plans,

                                 » Provide As-Built Documents
PROGRAMMING – PRE-PLANNING PROCESS




  » STEP ONE: Initial Meeting with the Client              » ALTERNATIVES:

  » STEP TWO: Investigate                                    - Based on Client and Stakeholder Input

  » STEP THREE: Determine Stakeholders                     » OPTIONS:

  » STEP FOUR: Programming Charrette                         - Planning and Design Options
                                                             - Focused on Client Needs
  » STEP FIVE: User Break Out Sessions
                    Break-Out
                                                             - Consider Physical and Architectural Implications
  » STEP SIX: Itemize Spaces and Apply Square Footages
                                                           » VISUALIZATION:
  » STEP SEVEN: Develop graphic representation of scale,
                                                             - Sketches/Diagrams/Models/Site Plans
    adjacencies, and massing
                                                             - Can all be Used in Combination
SPACE PLANNING & INTERIOR DESIGN




                                   » Block Planning & Adjacency Analysis

                                   » Functional Use of Space Planning

                                   » Interior Environment Image Design

                                   » Color, Material & Finish Selection

                                   » Casework & Custom Millwork Design

                                   » Furnishings Specification

                                   » Move Relocation Management

                                   » Existing Furnishing & Equipment Inventory
MECHANICAL ENGINEERING




                         » Heating, Ventilating, Air Conditioning (HVAC)

                         » Humidification, Dehumidification

                         » Digital Controls (DDCs)

                         » Plumbing (water & waste)

                         » Compressed Air (high & low pressure)

                         » Interior & Exterior Steam Distribution

                         » Life Cycle Cost Analysis

                         » Energy Management

                         » Building Commissioning
ELECTRICAL ENGINEERING




                         » Lighting, Energy Efficiency

                         » Airfield Lighting

                         » Power Distribution

                           - Interior & Exterior

                           - Power Quality Analysis

                         » Special Systems

                           - Uninterruptible Power Source

                           - Emergency Generators

                         » Communications
FIRE PROTECTION ENGINEERING




                              » Fire Suppression Systems
                                - Sprinkler Systems
                                - Standpipe Systems
                                - Clean Agent Systems
                              » Fire Alarm Systems
                                - Analog Addressable Type
                                - Conventional Zoned Type
                                - Campus or Network Fire Reporting
                              » Life Safety
                                - Means of Egress
                                - Hazard Separation
                                - Code Analysis
STRUCTURAL ENGINEERING




                         » Field Investigation
                         » Structural System Design
                         » Steel Structures
                         » Concrete Structures
                         » Timber Structures
                         » Structural Evaluations
                         » Structural Analysis
                         » Structural Rehabilitation
                         » Deterioration Modeling
                         » Bridge Design & Inspection
                         » Damage Assessment
CIVIL ENGINEERING




                    » Site Development

                    » Utilities Design/Relocation

                    » Storm Water Management

                    » Infrastructure Condition Assessments

                    » Pavement Design & Rehabilitation

                    » Field Inspections and Inventories

                    » Environmental Assessments

                    » Permitting
TRANSPORTATION ENGINEERING




                             » Roadway Design

                             » Traffic Analysis & Studies

                             » Traffic Signal Design

                             » Travel Demand Modeling

                             » Parking Consulting & Master Planning

                             » Airfield Design

                             » Hydrology & Hydraulics
LEED / SUSTAINABLE DESIGN




                            » Clark Nexsen has 165 LEED accredited professionals in all
                              disciplines
                                   p
                            » Clark Nexsen’s Washington D.C. Office is Gold Certified
                            » Created a Sustainable Design Department to Address our Client’s
                              Needs
                            » Connecting our Internal Sustainable Design Network to Outside
                                       g                              g
                              Sources to Keep up on the Latest SD Practices
                            » Developed Tools and Methods That Ensure a High Degree of
                              Success
                            » EPACT 2005—New Buildings Require a Minimum of 30% Greater
                              Energy Efficiency Than ASHRAE 90.1
                            » EISA 2007—Best Management Practices and Low Impact
                              Development (BMP’s and LID’s), Energy Efficiency and
                              Conservation
LEED GOLD Certified, Commercial Interiors– Clark Nexsen’s Washington, D.C. Office
                   ,                                            g ,




   » Maximized Natural Daylight                         » Within a LEED Gold Certified Core and Shell
   » Direct line of sight to vision glazing               Building
   » Construction materials contained high levels of:   » Innovative Measures
       » Recycled content                                  » Individual controls for lighting
       » Regional properties                               » 100% Green Power
       » Rapid renewable materials                         » Ergonomic Equipment & Education Program
   » Utilized low-emitting materials:
                                                           » Employee walking tours of Sustainable
       » Adhesives and sealants                               Design projects
       » Paints and coatings
                                                           » 95% Construction waste diversion
       » Carpets
CLARK NEXSEN MAKES A DIFFERENCE




                                  » Multi-Discipline Project Approach – All Disciplines In-House

                                  » Depth Of Resources - 530 Strong

                                  » Commitment Of Key Senior Personnel

                                  » Strong Central Management

                                  » High Level Of Quality Control

                                  » Multiple US Office Locations

                                  » Similar Project Experience – Over 90 Years

                                  » Can Mobilize And Provide Rapid Response

                                  » The Staff Are Ready To Start
1331 L Street, NW, Suite 600
Washington, DC 20005

202-461-3260

www.clarknexsen.com

Clark Nexsen Architecture and Engineering

  • 2.
    INTRODUCTION »Founded in 1920 – 90 Years of Continuous Service » Sophisticated Project Delivery System Combining BIM, Project Management and Quality Control » Top 140 National Design Firm as Ranked by ENR (Large Staff, Personal Attention) » Full Service Professional Firm » Project Experience Similar to this A/E Services Contract » Over 160 LEED® Accredited Professionals » Offices Strategically Located to Support Any Project » Utilizing Building Information Modeling (BIM) for Coordination and Quality Assurance
  • 3.
    FULL SERVICE DESIGNFIRM » Architecture » Electrical Engineering » Waterfront Engineering » Design/Build Projects » Landscape Architecture » Mechanical Engineering » Telecommunications » Computer Imaging/CADD Engineering » Master Planning » Structural Engineering » Historic Properties » Transportation Engineering Applications and Research » Interior Design » Environmental Engineering » Facilities Management » Renderings, Models, » Civil Engineering » Fire Protection Engineering Computer/Video » Construction Administration Presentations
  • 4.
    PRESENT WORKLOAD We Can Provide Multiple A&E Teams for Any Task Back Up for a Combined Staff of Over 530 includes: - Project Managers - Structural Engineers - Architects - Fire Protection Engineers - Interior Designers - Landscape Architects - Civil Engineers - Communication Engineers - Electrical Engineers - Planners - Mechanical Engineers - Commissioning Agents
  • 5.
    BUILDING INFORMATION MODELING OWNERS » Building Information Modeling BUILDING (BIM) – an Integrated INFORMATION Workflow Built on BUILDERS MODELING ARCHITECTS Coordinated, Reliable Information About a Project From Design Through Construction and into Operations. STRUCTURAL MEP SYSTEMS ENGINEERS ENGINEERS
  • 6.
    CONSTRUCTION ADMINISTRATION » Designer Involvement Throughout Construction » IN ADDITION » Dedicated Construction Administration Team » Architecture and Engineering Managers » Assign a Field Construction Administrator to each Project » Track of RFI’s and Shop Drawings » Provide Shop Drawing Review » Provide Quality Assurance Plans, » Provide As-Built Documents
  • 7.
    PROGRAMMING – PRE-PLANNINGPROCESS » STEP ONE: Initial Meeting with the Client » ALTERNATIVES: » STEP TWO: Investigate - Based on Client and Stakeholder Input » STEP THREE: Determine Stakeholders » OPTIONS: » STEP FOUR: Programming Charrette - Planning and Design Options - Focused on Client Needs » STEP FIVE: User Break Out Sessions Break-Out - Consider Physical and Architectural Implications » STEP SIX: Itemize Spaces and Apply Square Footages » VISUALIZATION: » STEP SEVEN: Develop graphic representation of scale, - Sketches/Diagrams/Models/Site Plans adjacencies, and massing - Can all be Used in Combination
  • 8.
    SPACE PLANNING &INTERIOR DESIGN » Block Planning & Adjacency Analysis » Functional Use of Space Planning » Interior Environment Image Design » Color, Material & Finish Selection » Casework & Custom Millwork Design » Furnishings Specification » Move Relocation Management » Existing Furnishing & Equipment Inventory
  • 9.
    MECHANICAL ENGINEERING » Heating, Ventilating, Air Conditioning (HVAC) » Humidification, Dehumidification » Digital Controls (DDCs) » Plumbing (water & waste) » Compressed Air (high & low pressure) » Interior & Exterior Steam Distribution » Life Cycle Cost Analysis » Energy Management » Building Commissioning
  • 10.
    ELECTRICAL ENGINEERING » Lighting, Energy Efficiency » Airfield Lighting » Power Distribution - Interior & Exterior - Power Quality Analysis » Special Systems - Uninterruptible Power Source - Emergency Generators » Communications
  • 11.
    FIRE PROTECTION ENGINEERING » Fire Suppression Systems - Sprinkler Systems - Standpipe Systems - Clean Agent Systems » Fire Alarm Systems - Analog Addressable Type - Conventional Zoned Type - Campus or Network Fire Reporting » Life Safety - Means of Egress - Hazard Separation - Code Analysis
  • 12.
    STRUCTURAL ENGINEERING » Field Investigation » Structural System Design » Steel Structures » Concrete Structures » Timber Structures » Structural Evaluations » Structural Analysis » Structural Rehabilitation » Deterioration Modeling » Bridge Design & Inspection » Damage Assessment
  • 13.
    CIVIL ENGINEERING » Site Development » Utilities Design/Relocation » Storm Water Management » Infrastructure Condition Assessments » Pavement Design & Rehabilitation » Field Inspections and Inventories » Environmental Assessments » Permitting
  • 14.
    TRANSPORTATION ENGINEERING » Roadway Design » Traffic Analysis & Studies » Traffic Signal Design » Travel Demand Modeling » Parking Consulting & Master Planning » Airfield Design » Hydrology & Hydraulics
  • 15.
    LEED / SUSTAINABLEDESIGN » Clark Nexsen has 165 LEED accredited professionals in all disciplines p » Clark Nexsen’s Washington D.C. Office is Gold Certified » Created a Sustainable Design Department to Address our Client’s Needs » Connecting our Internal Sustainable Design Network to Outside g g Sources to Keep up on the Latest SD Practices » Developed Tools and Methods That Ensure a High Degree of Success » EPACT 2005—New Buildings Require a Minimum of 30% Greater Energy Efficiency Than ASHRAE 90.1 » EISA 2007—Best Management Practices and Low Impact Development (BMP’s and LID’s), Energy Efficiency and Conservation
  • 16.
    LEED GOLD Certified,Commercial Interiors– Clark Nexsen’s Washington, D.C. Office , g , » Maximized Natural Daylight » Within a LEED Gold Certified Core and Shell » Direct line of sight to vision glazing Building » Construction materials contained high levels of: » Innovative Measures » Recycled content » Individual controls for lighting » Regional properties » 100% Green Power » Rapid renewable materials » Ergonomic Equipment & Education Program » Utilized low-emitting materials: » Employee walking tours of Sustainable » Adhesives and sealants Design projects » Paints and coatings » 95% Construction waste diversion » Carpets
  • 17.
    CLARK NEXSEN MAKESA DIFFERENCE » Multi-Discipline Project Approach – All Disciplines In-House » Depth Of Resources - 530 Strong » Commitment Of Key Senior Personnel » Strong Central Management » High Level Of Quality Control » Multiple US Office Locations » Similar Project Experience – Over 90 Years » Can Mobilize And Provide Rapid Response » The Staff Are Ready To Start
  • 18.
    1331 L Street,NW, Suite 600 Washington, DC 20005 202-461-3260 www.clarknexsen.com