Assignment 1: ERM Roadmap
Due Week 3 and worth 125 points
The following material may be useful for the completion of this
assignment. You may refer to the documents titled “Embracing
Enterprise Risk Management: Practical Approaches for Getting
Started” and “Developing Key Risk Indicators to Strengthen
Enterprise Risk Management”, located at http://www.coso.org/-
ERM.htm.
Imagine you are an Information Technology Manager employed by a
business that needs you to develop a plan for an effective Enterprise
Risk Management (ERM) program. In the past, ERM has not been a
priority for the organization. Failed corporate security audits, data
breaches, and recent news stories have convinced the Board of
Directors that they must address these weaknesses. As a result, the
CEO has tasked you to create a brief overview of ERM and provide
recommendations for establishing an effective ERM program that will
be used as a basis to address this area moving forward.
Write a three to four (3-4) page paper in which you:
1. Summarize the COSO Risk Management Framework and COSO’s
ERM process.
2. Recommend to management the approach that they need to take to
implement an effective ERM program. Include the issues and
organizational impact they might encounter if they do not implement
an effective ERM program.
3. Analyze the methods for establishing key risk indicators (KRIs).
4. Suggest the approach that the organization needs to take in order to
link the KRIs with the organization’s strategic initiatives.
5. Use at least three (3) quality resources in this assignment (in
addition to and that support the documents from the COSO Website
referenced in this assignment). Note: Wikipedia and similar Websites
do not qualify as quality resources.
Your assignment must follow these formatting requirements:
• Be typed, double spaced, using Times New Roman font (size 12),
with one-inch margins on all sides; citations and references must
follow APA or school-specific format. Check with your professor for
any additional instructions.
• Include a cover page containing the title of the assignment, the
student’s name, the professor’s name, the course title, and the date.
The cover page and the reference page are not included in the
required assignment page length.
The specific course learning outcomes associated with this
assignment are:
• Describe the COSO enterprise risk management framework.
• Describe the process of performing effective information technology
audits and general controls.
• Use technology and information resources to research issues in
information technology audit and control.
• Write clearly and concisely about topics related to information
technology audit and control using proper writing mechanics and
technical style conventions.
************************************************
CIS 558 Week 4 Case Study 1 Mitigating Cloud
Computing Risks (2 Papers)
For more classes visit
www.snaptutorial.com
This Tutorial contains 2 Papers
Week 4 Case Study 1
Students, please view the "Submit a Clickable Rubric Assignment" in
the Student Center.
Instructors, training on how to grade is within the Instructor Center.
Case Study 1: Mitigating Cloud Computing Risks
Due Week 4 and worth 125 points
Imagine you are an Information Security Manager in a medium-sized
organization. Your CIO has asked you to prepare a case analysis
report and presentation on establishing internal controls in cloud
computing. The CIO has seen several resources online which discuss
the security risks related to Cloud based computing and storage. One
that stood out was located at http://www.isaca.org/Journal/Past-
Issues/2011/Volume-4/Pages/Cloud-Computing-Risk-Assessment-A-
Case-Study.aspx. You are being asked to summarize the information
you can find on the Internet and other sources that are available.
Moving forward, the CIO wants to have a firm grasp of the benefits
and risks associated with public, private, and hybrid cloud usage.
There is also concern over how these systems, if they were in place,
should be monitored to ensure not only proper usage, but also that
none of these systems or their data have been compromised.
Write a three to four (3-4) page paper in which you:
1. Provide a summary analysis of the most recent research that is
available in this area.
2. Examine the risks and vulnerabilities associated with public clouds,
private clouds, and hybrids. Include primary examples applicable
from the case studies you previously reviewed.
3. Suggest key controls that organizations could implement to
mitigate these risks and vulnerabilities.
4. Develop a list of IT audit tasks that address a cloud computing
environment based on the results from the analysis of the case studies,
the risks and vulnerabilities, and the mitigation controls.
5. Use at least three (3) quality resources in this assignment. Note:
Wikipedia and similar Websites do not qualify as quality resources.
Your assignment must follow these formatting requirements:
• Be typed, double spaced, using Times New Roman font (size 12),
with one-inch margins on all sides; citations and references must
follow APA or school-specific format. Check with your professor for
any additional instructions.
• Include a cover page containing the title of the assignment, the
student’s name, the professor’s name, the course title, and the date.
The cover page and the reference page are not included in the
required assignment page length.
The specific course learning outcomes associated with this
assignment are:
• Describe the process of performing effective information technology
audits and general controls.
• Describe the various general controls and audit approaches for
software and architecture to include operating systems,
telecommunication networks, cloud computing, service-oriented
architecture and virtualization.
• Use technology and information resources to research issues in
information technology audit and control.
• Write clearly and concisely about topics related to information
technology audit and control using proper writing mechanics and
technical style conventions
************************************************
CIS 558 Week 6 Assignment 2 Software
Engineering, CMMI, and ITIL (2 Papers)
For more classes visit
www.snaptutorial.com
This Tutorial contains 2 Papers
Realizing that an organization’s CMMI level impacts an organization’
s success on requests for proposals (RFPs), your CIO wants to get the
software development processes to CMMI level 3. Your organization
has started developing software applications and database systems for
their customers. The CIO wants to ensure that the software
development and database development processes are being properly
managed and audited, and he wants to ensure that the organization
begins taking the necessary steps to progress to CMMI level 3. In
preparation for your response, review the CMMI information
available at the Carnegie Mellon Website.
IT managers will commonly manage software development and
systems integration activities. Write a 3 page paper in which you:
Describe the software engineering process, the challenges in
managing software development activities, and the potential interface
issues from the software development perspective.
Analyze the CMMI levels and define a roadmap that the organization
will ned to follow in order to get their software development
processes to CMMI level three. Note: This is important because the
CMMI level that an organization achieves impacts their software
development reputation.
Explain the auditing tasks that must be performed in order to achieve
level 3.
Determine the continuous assurance auditing activities that the
organization will need to implement to help achieve CMMI level
three.
Analyze the ITIL service management guidelines and principles.
Examine how ITIL service management practices relate to CMMI
levels and continuous service auditing.
Use at least four (4) quality resources in this assignment.
Note: Wikipedia and similar Websites do not qualify as quality
resources.
************************************************
CIS 558 Week 7 Case Study 2 HIPAA and IT
Audits (2 Papers)
For more classes visit
www.snaptutorial.com
This Tutorial contains 2 Papers
Case Study 2: HIPAA and IT Audits
Due Week 7 and worth 75 points
Imagine you are a CIO at a medium-sized hospital, and you have been
asked by the CEO to provide a case analysis report that will be
provided to the senior leadership in the organization. They are
concerned about the HIPAA Security and Privacy Rules and its
impact on the organization. Unfamiliar with the details of HIPAA,
you begin looking at the information provided by the Department of
Health and Human Services. Specifically, you are asked to provide an
analysis on the summary of the cases.
Section 1. Written Paper
Many organizations have been fined significant amounts for non-
compliance with HIPAA. To help ensure that your organization
remains in compliance with HIPAA regulations you have been asked
to write a three (3) page paper in which you:
1a. Create an overview of the HIPAA Security Rule and Privacy Rule.
Include an explanation of the resolution process when a case is
reported.
1b. Analyze the major types of incidents and breaches that occur
based on the cases reported.
1c. Analyze the technical controls and the non-technical controls that
are needed to mitigate the identified risks and vulnerabilities.
1d. Analyze and describe the network architecture that is needed
within an organization, including a medium-sized hospital, in order to
be compliant with HIPAA regulations.
1e. Analyze how a medium-sized hospital is similar to and different
from other non-medical organizations in regards to HIPAA
compliance.
1f. List the IT audit steps that need to be included in the
organization’s overall IT audit plan to ensure compliance with
HIPAA rules and regulations.
1g. Use at least four (4) quality resources in this assignment. Note:
Wikipedia and similar Websites do not qualify as quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font (size 12),
with one-inch margins on all sides; citations and references must
follow APA or school-specific format. Check with your professor for
any additional instructions.
Section 2. Network Architecture
2a. Create a network architecture diagram (using Visio or an open-
source equivalent to Visio for creating diagrams), based on the
description of the network architecture that you defined above for the
organization to be compliant with HIPAA regulations.
2b. Include in the diagram the switches, routers, firewalls, IDS/IPS,
and any other devices needed for a compliant network architecture.
************************************************
CIS 558 Week 10 Term Paper Managing an IT
Infrastructure Audit (2 Papers)
For more classes visit
www.snaptutorial.com
This Tutorial contains 2 Term Papers
Term Paper: Managing an IT Infrastructure Audit
This assignment consists of four (4) sections: an internal IT audit
policy, a management plan, a project plan, and a disaster recovery
plan. You must submit all four (4) sections as separate files for the
completion of this assignment. Label each file name according to the
section of the assignment it is written for. Additionally, you may
create and /or assume all necessary assumptions needed for the
completion of this assignment.
Imagine you are an Information Security Manager for a large national
retailer. You have been hired to be directly responsible for the
planning and oversight of IT audits. At the request of the Board of
Directors, the CEO has tasked you with developing a plan for
conducting regular audits of the IT infrastructure. The planning and
management aspects of IT audit are critical to the overall success of
the audit, and as a result, the overall success of the systems
implemented within the organization. You must develop a policy for
conducting IT audits and develop a project plan for conducting two
week IT audits.
In addition to the typical networking and Internetworking
infrastructure of a medium-sized organization, the organization has
the following characteristics:
• They have a main office and 268 stores in the U.S.
• They utilize a cloud computing environment for storage and
applications.
• Their IT infrastructure includes Cisco workgroup and core switches,
Cisco routers, Cisco firewalls and intrusion prevention systems, and
servers running Microsoft Windows Server 2012.
• They have over 1000 desktops and approximately 500 organization-
owned laptops in the main headquarters.
• They allow employees to bring their own devices into the
organization; however, they are subject to being searched upon entry
and exit from the building.
• They enable remote access to corporate information assets for
employees and limited access to extranet resources for contractors and
other business partners.
• They enable wireless access at the main office and the stores.
• They process an average of 67.2 credit card transactions per hour
every day at each location and via their corporate Website.
•
Section 1: Internal IT Audit Policy
Write a three to four (3-4) page paper in which you:
1. Develop an Internal IT Audit Policy, which includes at a minimum:
2. Overview
b. Scope
c. Goals and objectives
d. Compliance with applicable laws and regulations
e. Management oversight and responsibility
f. Areas covered in the IT audits
g. Frequency of the audits
h. Use at least two (2) quality resources in this assignment. Note:
Wikipedia and similar Websites do not qualify as quality resources.
Section 2: Management Plan
Write a four to six (4-6) page paper in which you:
2. Explain the management plan for conducting IT audits, including:
3. Risk management
b. System Software and Applications
c. Wireless Networking
d. Cloud Computing
e. Virtualization
f. Cybersecurity and Privacy
g. BCP and DRP
h. Network Security
i. Use at least three (3) quality resources in this assignment. Note:
Wikipedia and similar Websites do not qualify as quality resources.
Section 3: Project Plan
Use Microsoft Project or an Open Source alternative, such as Open
Project to:
3. Develop a project plan which includes the applicable tasks for each
of the major areas listed below for each element of the IT audit
mentioned above; plan for the audit to be a two (2) week audit.
4. Risk management
b. System software and applications
c. Wireless networking
d. Cloud computing
e. Virtualization
f. Cybersecurity and privacy
g. Network security
Section 4: Disaster Recovery Plan
Write a five to seven (5-7) page paper in which you:
4. Develop a disaster recovery plan (DRP) for recovering from a
major incident or disaster affecting the organization.
5. The organization must have no data loss.
b. The organization must have immediate access to organizational
data in the event of a disaster.
c. The organization must have critical systems operational within 48
hours.
d. Include within the DRP the audit activities needed to ensure that
the organization has an effective DRP and will be able to meet the
requirements stated above.
e. Use at least three (3) quality resources in this assignment. Note:
Wikipedia and similar Websites do not qualify as quality resources.
Your assignment must follow these formatting requirements:
• Be typed, double spaced, using Times New Roman font (size 12),
with one-inch margins on all sides; citations and references must
follow APA or school-specific format. Check with your professor for
any additional instructions.
• Include a cover page containing the title of the assignment, the
student’s name, the professor’s name, the course title, and the date.
The cover page and the reference page are not included in the
required assignment page length.
******************************************************************************

CIS 558 Enhance teaching / snaptutorial.com

  • 1.
    CIS 558 Week3 Assignment 1 ERM Roadmap (2 Papers) For more classes visit www.snaptutorial.com This Tutorial contains 2 Papers CIS 558 Week 3 Assignment 1 ERM Roadmap Week 3 Assignment 1 Students, please view the "Submit a Clickable Rubric Assignment" in the Student Center. Instructors, training on how to grade is within the Instructor Center. Assignment 1: ERM Roadmap Due Week 3 and worth 125 points The following material may be useful for the completion of this assignment. You may refer to the documents titled “Embracing Enterprise Risk Management: Practical Approaches for Getting Started” and “Developing Key Risk Indicators to Strengthen Enterprise Risk Management”, located at http://www.coso.org/- ERM.htm. Imagine you are an Information Technology Manager employed by a business that needs you to develop a plan for an effective Enterprise Risk Management (ERM) program. In the past, ERM has not been a priority for the organization. Failed corporate security audits, data breaches, and recent news stories have convinced the Board of
  • 2.
    Directors that theymust address these weaknesses. As a result, the CEO has tasked you to create a brief overview of ERM and provide recommendations for establishing an effective ERM program that will be used as a basis to address this area moving forward. Write a three to four (3-4) page paper in which you: 1. Summarize the COSO Risk Management Framework and COSO’s ERM process. 2. Recommend to management the approach that they need to take to implement an effective ERM program. Include the issues and organizational impact they might encounter if they do not implement an effective ERM program. 3. Analyze the methods for establishing key risk indicators (KRIs). 4. Suggest the approach that the organization needs to take in order to link the KRIs with the organization’s strategic initiatives. 5. Use at least three (3) quality resources in this assignment (in addition to and that support the documents from the COSO Website referenced in this assignment). Note: Wikipedia and similar Websites do not qualify as quality resources. Your assignment must follow these formatting requirements: • Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions. • Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length. The specific course learning outcomes associated with this assignment are: • Describe the COSO enterprise risk management framework. • Describe the process of performing effective information technology audits and general controls. • Use technology and information resources to research issues in information technology audit and control.
  • 3.
    • Write clearlyand concisely about topics related to information technology audit and control using proper writing mechanics and technical style conventions. ************************************************ CIS 558 Week 4 Case Study 1 Mitigating Cloud Computing Risks (2 Papers) For more classes visit www.snaptutorial.com This Tutorial contains 2 Papers Week 4 Case Study 1 Students, please view the "Submit a Clickable Rubric Assignment" in the Student Center. Instructors, training on how to grade is within the Instructor Center. Case Study 1: Mitigating Cloud Computing Risks Due Week 4 and worth 125 points Imagine you are an Information Security Manager in a medium-sized organization. Your CIO has asked you to prepare a case analysis report and presentation on establishing internal controls in cloud computing. The CIO has seen several resources online which discuss the security risks related to Cloud based computing and storage. One that stood out was located at http://www.isaca.org/Journal/Past- Issues/2011/Volume-4/Pages/Cloud-Computing-Risk-Assessment-A- Case-Study.aspx. You are being asked to summarize the information
  • 4.
    you can findon the Internet and other sources that are available. Moving forward, the CIO wants to have a firm grasp of the benefits and risks associated with public, private, and hybrid cloud usage. There is also concern over how these systems, if they were in place, should be monitored to ensure not only proper usage, but also that none of these systems or their data have been compromised. Write a three to four (3-4) page paper in which you: 1. Provide a summary analysis of the most recent research that is available in this area. 2. Examine the risks and vulnerabilities associated with public clouds, private clouds, and hybrids. Include primary examples applicable from the case studies you previously reviewed. 3. Suggest key controls that organizations could implement to mitigate these risks and vulnerabilities. 4. Develop a list of IT audit tasks that address a cloud computing environment based on the results from the analysis of the case studies, the risks and vulnerabilities, and the mitigation controls. 5. Use at least three (3) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources. Your assignment must follow these formatting requirements: • Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions. • Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length. The specific course learning outcomes associated with this assignment are: • Describe the process of performing effective information technology audits and general controls. • Describe the various general controls and audit approaches for software and architecture to include operating systems, telecommunication networks, cloud computing, service-oriented architecture and virtualization.
  • 5.
    • Use technologyand information resources to research issues in information technology audit and control. • Write clearly and concisely about topics related to information technology audit and control using proper writing mechanics and technical style conventions ************************************************ CIS 558 Week 6 Assignment 2 Software Engineering, CMMI, and ITIL (2 Papers) For more classes visit www.snaptutorial.com This Tutorial contains 2 Papers Realizing that an organization’s CMMI level impacts an organization’ s success on requests for proposals (RFPs), your CIO wants to get the software development processes to CMMI level 3. Your organization has started developing software applications and database systems for their customers. The CIO wants to ensure that the software development and database development processes are being properly managed and audited, and he wants to ensure that the organization begins taking the necessary steps to progress to CMMI level 3. In preparation for your response, review the CMMI information available at the Carnegie Mellon Website. IT managers will commonly manage software development and systems integration activities. Write a 3 page paper in which you:
  • 6.
    Describe the softwareengineering process, the challenges in managing software development activities, and the potential interface issues from the software development perspective. Analyze the CMMI levels and define a roadmap that the organization will ned to follow in order to get their software development processes to CMMI level three. Note: This is important because the CMMI level that an organization achieves impacts their software development reputation. Explain the auditing tasks that must be performed in order to achieve level 3. Determine the continuous assurance auditing activities that the organization will need to implement to help achieve CMMI level three. Analyze the ITIL service management guidelines and principles. Examine how ITIL service management practices relate to CMMI levels and continuous service auditing. Use at least four (4) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources. ************************************************ CIS 558 Week 7 Case Study 2 HIPAA and IT Audits (2 Papers) For more classes visit www.snaptutorial.com This Tutorial contains 2 Papers
  • 7.
    Case Study 2:HIPAA and IT Audits Due Week 7 and worth 75 points Imagine you are a CIO at a medium-sized hospital, and you have been asked by the CEO to provide a case analysis report that will be provided to the senior leadership in the organization. They are concerned about the HIPAA Security and Privacy Rules and its impact on the organization. Unfamiliar with the details of HIPAA, you begin looking at the information provided by the Department of Health and Human Services. Specifically, you are asked to provide an analysis on the summary of the cases. Section 1. Written Paper Many organizations have been fined significant amounts for non- compliance with HIPAA. To help ensure that your organization remains in compliance with HIPAA regulations you have been asked to write a three (3) page paper in which you: 1a. Create an overview of the HIPAA Security Rule and Privacy Rule. Include an explanation of the resolution process when a case is reported. 1b. Analyze the major types of incidents and breaches that occur based on the cases reported. 1c. Analyze the technical controls and the non-technical controls that are needed to mitigate the identified risks and vulnerabilities. 1d. Analyze and describe the network architecture that is needed within an organization, including a medium-sized hospital, in order to be compliant with HIPAA regulations. 1e. Analyze how a medium-sized hospital is similar to and different from other non-medical organizations in regards to HIPAA compliance. 1f. List the IT audit steps that need to be included in the organization’s overall IT audit plan to ensure compliance with HIPAA rules and regulations.
  • 8.
    1g. Use atleast four (4) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources. Your assignment must follow these formatting requirements: Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions. Section 2. Network Architecture 2a. Create a network architecture diagram (using Visio or an open- source equivalent to Visio for creating diagrams), based on the description of the network architecture that you defined above for the organization to be compliant with HIPAA regulations. 2b. Include in the diagram the switches, routers, firewalls, IDS/IPS, and any other devices needed for a compliant network architecture. ************************************************ CIS 558 Week 10 Term Paper Managing an IT Infrastructure Audit (2 Papers) For more classes visit www.snaptutorial.com This Tutorial contains 2 Term Papers Term Paper: Managing an IT Infrastructure Audit
  • 9.
    This assignment consistsof four (4) sections: an internal IT audit policy, a management plan, a project plan, and a disaster recovery plan. You must submit all four (4) sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for. Additionally, you may create and /or assume all necessary assumptions needed for the completion of this assignment. Imagine you are an Information Security Manager for a large national retailer. You have been hired to be directly responsible for the planning and oversight of IT audits. At the request of the Board of Directors, the CEO has tasked you with developing a plan for conducting regular audits of the IT infrastructure. The planning and management aspects of IT audit are critical to the overall success of the audit, and as a result, the overall success of the systems implemented within the organization. You must develop a policy for conducting IT audits and develop a project plan for conducting two week IT audits. In addition to the typical networking and Internetworking infrastructure of a medium-sized organization, the organization has the following characteristics: • They have a main office and 268 stores in the U.S. • They utilize a cloud computing environment for storage and applications. • Their IT infrastructure includes Cisco workgroup and core switches, Cisco routers, Cisco firewalls and intrusion prevention systems, and servers running Microsoft Windows Server 2012. • They have over 1000 desktops and approximately 500 organization- owned laptops in the main headquarters. • They allow employees to bring their own devices into the organization; however, they are subject to being searched upon entry and exit from the building. • They enable remote access to corporate information assets for employees and limited access to extranet resources for contractors and other business partners. • They enable wireless access at the main office and the stores.
  • 10.
    • They processan average of 67.2 credit card transactions per hour every day at each location and via their corporate Website. • Section 1: Internal IT Audit Policy Write a three to four (3-4) page paper in which you: 1. Develop an Internal IT Audit Policy, which includes at a minimum: 2. Overview b. Scope c. Goals and objectives d. Compliance with applicable laws and regulations e. Management oversight and responsibility f. Areas covered in the IT audits g. Frequency of the audits h. Use at least two (2) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources. Section 2: Management Plan Write a four to six (4-6) page paper in which you: 2. Explain the management plan for conducting IT audits, including: 3. Risk management b. System Software and Applications c. Wireless Networking d. Cloud Computing e. Virtualization f. Cybersecurity and Privacy g. BCP and DRP h. Network Security i. Use at least three (3) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources. Section 3: Project Plan Use Microsoft Project or an Open Source alternative, such as Open Project to: 3. Develop a project plan which includes the applicable tasks for each of the major areas listed below for each element of the IT audit mentioned above; plan for the audit to be a two (2) week audit. 4. Risk management b. System software and applications
  • 11.
    c. Wireless networking d.Cloud computing e. Virtualization f. Cybersecurity and privacy g. Network security Section 4: Disaster Recovery Plan Write a five to seven (5-7) page paper in which you: 4. Develop a disaster recovery plan (DRP) for recovering from a major incident or disaster affecting the organization. 5. The organization must have no data loss. b. The organization must have immediate access to organizational data in the event of a disaster. c. The organization must have critical systems operational within 48 hours. d. Include within the DRP the audit activities needed to ensure that the organization has an effective DRP and will be able to meet the requirements stated above. e. Use at least three (3) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources. Your assignment must follow these formatting requirements: • Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions. • Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length. ******************************************************************************