Ever been troubled by the blinking sign and didn’t know what to do?
Here’s a handy guide to dashboard symbols so that you’ll never be confused again!
Save them for later and save the trouble!
Why Is Your BMW X3 Hood Not Responding To Release CommandsDart Auto
Experiencing difficulty opening your BMW X3's hood? This guide explores potential issues like mechanical obstruction, hood release mechanism failure, electrical problems, and emergency release malfunctions. Troubleshooting tips include basic checks, clearing obstructions, applying pressure, and using the emergency release.
In this presentation, we have discussed a very important feature of BMW X5 cars… the Comfort Access. Things that can significantly limit its functionality. And things that you can try to restore the functionality of such a convenient feature of your vehicle.
Fleet management these days is next to impossible without connected vehicle solutions. Why? Well, fleet trackers and accompanying connected vehicle management solutions tend to offer quite a few hard-to-ignore benefits to fleet managers and businesses alike. Let’s check them out!
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs AttentionBertini's German Motors
IBS monitors and manages your BMW’s battery performance. If it malfunctions, you will have to deal with an array of electrical issues in your vehicle. Recognize warning signs like dimming headlights, frequent battery replacements, and electrical malfunctions to address potential IBS issues promptly.
Core technology of Hyundai Motor Group's EV platform 'E-GMP'Hyundai Motor Group
What’s the force behind Hyundai Motor Group's EV performance and quality?
Maximized driving performance and quick charging time through high-density battery pack and fast charging technology and applicable to various vehicle types!
Discover more about Hyundai Motor Group’s EV platform ‘E-GMP’!
Things to remember while upgrading the brakes of your carjennifermiller8137
Upgrading the brakes of your car? Keep these things in mind before doing so. Additionally, start using an OBD 2 GPS tracker so that you never miss a vehicle maintenance appointment. On top of this, a car GPS tracker will also let you master good driving habits that will let you increase the operational life of your car’s brakes.
Symptoms like intermittent starting and key recognition errors signal potential problems with your Mercedes’ EIS. Use diagnostic steps like error code checks and spare key tests. Professional diagnosis and solutions like EIS replacement ensure safe driving. Consult a qualified technician for accurate diagnosis and repair.
What Exactly Is The Common Rail Direct Injection System & How Does It WorkMotor Cars International
Learn about Common Rail Direct Injection (CRDi) - the revolutionary technology that has made diesel engines more efficient. Explore its workings, advantages like enhanced fuel efficiency and increased power output, along with drawbacks such as complexity and higher initial cost. Compare CRDi with traditional diesel engines and discover why it's the preferred choice for modern engines.
𝘼𝙣𝙩𝙞𝙦𝙪𝙚 𝙋𝙡𝙖𝙨𝙩𝙞𝙘 𝙏𝙧𝙖𝙙𝙚𝙧𝙨 𝙞𝙨 𝙫𝙚𝙧𝙮 𝙛𝙖𝙢𝙤𝙪𝙨 𝙛𝙤𝙧 𝙢𝙖𝙣𝙪𝙛𝙖𝙘𝙩𝙪𝙧𝙞𝙣𝙜 𝙩𝙝𝙚𝙞𝙧 𝙥𝙧𝙤𝙙𝙪𝙘𝙩𝙨. 𝙒𝙚 𝙝𝙖𝙫𝙚 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙥𝙡𝙖𝙨𝙩𝙞𝙘 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙪𝙨𝙚𝙙 𝙞𝙣 𝙖𝙪𝙩𝙤𝙢𝙤𝙩𝙞𝙫𝙚 𝙖𝙣𝙙 𝙖𝙪𝙩𝙤 𝙥𝙖𝙧𝙩𝙨 𝙖𝙣𝙙 𝙖𝙡𝙡 𝙩𝙝𝙚 𝙛𝙖𝙢𝙤𝙪𝙨 𝙘𝙤𝙢𝙥𝙖𝙣𝙞𝙚𝙨 𝙗𝙪𝙮 𝙩𝙝𝙚 𝙜𝙧𝙖𝙣𝙪𝙡𝙚𝙨 𝙛𝙧𝙤𝙢 𝙪𝙨.
Over the 10 years, we have gained a strong foothold in the market due to our range's high quality, competitive prices, and time-lined delivery schedules.
Comprehensive program for Agricultural Finance, the Automotive Sector, and Empowerment . We will define the full scope and provide a detailed two-week plan for identifying strategic partners in each area within Limpopo, including target areas.:
1. Agricultural : Supporting Primary and Secondary Agriculture
• Scope: Provide support solutions to enhance agricultural productivity and sustainability.
• Target Areas: Polokwane, Tzaneen, Thohoyandou, Makhado, and Giyani.
2. Automotive Sector: Partnerships with Mechanics and Panel Beater Shops
• Scope: Develop collaborations with automotive service providers to improve service quality and business operations.
• Target Areas: Polokwane, Lephalale, Mokopane, Phalaborwa, and Bela-Bela.
3. Empowerment : Focusing on Women Empowerment
• Scope: Provide business support support and training to women-owned businesses, promoting economic inclusion.
• Target Areas: Polokwane, Thohoyandou, Musina, Burgersfort, and Louis Trichardt.
We will also prioritize Industrial Economic Zone areas and their priorities.
Sign up on https://profilesmes.online/welcome/
To be eligible:
1. You must have a registered business and operate in Limpopo
2. Generate revenue
3. Sectors : Agriculture ( primary and secondary) and Automative
Women and Youth are encouraged to apply even if you don't fall in those sectors.
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...Autohaus Service and Sales
Learn what "PARKTRONIC Inoperative, See Owner's Manual" means for your Mercedes-Benz. This message indicates a malfunction in the parking assistance system, potentially due to sensor issues or electrical faults. Prompt attention is crucial to ensure safety and functionality. Follow steps outlined for diagnosis and repair in the owner's manual.
2. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 325C EXCAVATOR BKW
Configuration: 325C & 325C L Excavators BKW00001-UP (MACHINE) POWERED BY 3126B Engine
Disassembly and Assembly
325C Excavator Machine Systems
Media Number -RENR5367-11 Publication Date -01/01/2012 Date Updated -17/02/2017
i05453130
Final Drive - Disassemble
SMCS - 4050-015
S/N - BKW1-UP
S/N - BMM1-UP
Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-2420 Transmission Repair Stand 1
B 439-3938 Link Bracket 2
C 154-6181 Forcing Bolt 1
D 439-3940 Link Bracket 2
E
5F-7366 Forcing Bolt 1
1P-5546 Crossblock 1
1U-9889 Crossblock 1
1P-0520 Driver Group 1
6V-7888 Puller Leg 2
1H-3112 Puller Assembly 1
1P-5551 Adjustable Screw Assembly 1
F - Loctite 5127 1
1/11
325C & 325C L Excavators BKW00001-UP (MACHINE) POWERED BY 3126B En...
2020/5/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. Start By:
a. Remove the final drive.
Note: Cleanliness is an important factor. Before the disassembly procedure, thoroughly
clean the exterior of the component. This action will prevent dirt from entering the internal
mechanism.
1. Put an alignment mark across the sections of the final drive for assembly purposes. The
parts must be reinstalled in the original locations.
Illustration 1 g00708089
2. Fasten the final drive to Tooling (A), as shown. The combined weight of the final drive and
final drive sprocket is approximately 312 kg (688 lb).
3. Remove bolts (1) and the washers that hold the cover in position.
Illustration 2 g00708090
4. Remove the setscrews from cover (2), and fasten Tooling (B) and a suitable lifting device to
cover (2), as shown. The weight of cover (2) is approximately 32 kg (70 lb). Remove cover
(2).
2/11
325C & 325C L Excavators BKW00001-UP (MACHINE) POWERED BY 3126B En...
2020/5/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. Illustration 3 g00708091
5. Remove thrust plate (3) from cover (2).
6. Remove plugs (4) from cover (2).
Illustration 4 g00708235
7. Remove O-ring seals (5) from both plugs (4) that were in the cover.
Illustration 5 g00708092
8. Remove spacer (6) from carrier assembly (7).
9. Remove sun gear (8) from carrier assembly (7).
3/11
325C & 325C L Excavators BKW00001-UP (MACHINE) POWERED BY 3126B En...
2020/5/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. 10. Remove carrier assembly (7) by lifting the carrier assembly straight up. The weight of
carrier assembly (7) is approximately 14 kg (30 lb).
Illustration 6 g01304883
11. Disassemble carrier assembly (7), as follows.
a. Drive spring pin (10) into planetary shaft (9) with a hammer and a punch.
Illustration 7 g00708144
b. Remove planetary shaft (9) with spring pin (10) from the carrier assembly.
c. Remove spring pin (10) from planetary shaft (9) with a hammer and a punch.
4/11
325C & 325C L Excavators BKW00001-UP (MACHINE) POWERED BY 3126B En...
2020/5/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. Illustration 8 g00708218
d. Remove thrust washers (11) and planetary gear (13) from the carrier assembly.
e. Remove bearing (12) from planetary gear (13).
12. Repeat Steps 11.a through 11.e in order to remove the remaining planetary gears from the
carrier assembly.
Illustration 9 g00708162
13. Remove sun gear (14) from carrier assembly (15).
Illustration 10 g00708325
14. Remove spacer (16).
5/11
325C & 325C L Excavators BKW00001-UP (MACHINE) POWERED BY 3126B En...
2020/5/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. Illustration 11 g00708184
Note: It will be necessary to pry ring gears (17) away from main housing (18) in order to
install the lifting slings.
15. Fasten a suitable lifting device to ring gears (17), as shown. Remove the ring gears from
main housing (18). The weight of ring gears (17) is approximately 45 kg (100 lb).
Illustration 12 g00708360
16. Use a screwdriver or a chisel in order to separate two ring gears (17).
Note: Two ring gears (17) are held together with Tooling (F). It may be necessary to heat
ring gears (17) in order to soften the sealant. Do not heat over 135 °C (275 °F) for more
than thirty minutes.
6/11
325C & 325C L Excavators BKW00001-UP (MACHINE) POWERED BY 3126B En...
2020/5/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. Illustration 13 g00708172
17. Position a 12.7 mm (0.50 inch) shackle under carrier assembly (15).
18. Fasten a suitable lifting device to the shackle.
19. Slowly lift carrier assembly (15) from the final drive. The weight of carrier assembly (15) is
approximately 39 kg (85 lb).
20. Disassemble carrier assembly (15), as follows.
Illustration 14 g00708175
a. Drive spring pin (20) into planetary shaft (19) with a hammer and a punch.
7/11
325C & 325C L Excavators BKW00001-UP (MACHINE) POWERED BY 3126B En...
2020/5/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. Illustration 15 g00708370
Illustration 16 g00708220
b. Remove planetary shaft (19) with spring pin (20) from the carrier assembly.
c. Remove spring pin (20) from planetary shaft (19) with a hammer and a punch.
d. Remove thrust washers (21) and planetary gear (23) from the carrier assembly.
e. Remove bearings (22) from planetary gear (23).
21. Repeat Steps 20.a through 20.e in order to remove the remaining planetary gears from the
carrier.
Illustration 17 g00708186
22. Remove O-ring seal (24) from main housing (18).
8/11
325C & 325C L Excavators BKW00001-UP (MACHINE) POWERED BY 3126B En...
2020/5/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. Illustration 18 g00708187
23. Remove bolts (25) from gear (26).
Illustration 19 g00708202
24. Use Tooling (C) in order to remove gear (26) from main housing (18).
Note: The motor housing will separate from main housing (18) once gear (26) is removed.
Make sure that the motor housing is supported.
Illustration 20 g00708211
25. Remove shims (27) from the main housing.
9/11
325C & 325C L Excavators BKW00001-UP (MACHINE) POWERED BY 3126B En...
2020/5/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. Illustration 21 g00708212
26. Fasten Tooling (D) and a suitable lifting device to main housing (18), as shown.
27. Use a hammer and a punch in order to separate main housing (18) and the final drive
sprocket from motor housing (28). The combined weight of main housing (18) and the final
drive sprocket is approximately 82 kg (180 lb).
Illustration 22 g00708214
28. Remove Duo-Cone seal (29) from motor housing (28).
29. Remove alignment pins (30).
10/11
325C & 325C L Excavators BKW00001-UP (MACHINE) POWERED BY 3126B ...
2020/5/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
12. Illustration 23 g00708215
Illustration 24 g00708216
30. Remove Duo-Cone seal (31) from main housing (18).
31. Use Tooling (E) in order to remove bearings (32) and (33) from the main housing.
32. If necessary, remove the final drive sprocket from the main housing.
33. Refer to Disassembly and Assembly, "Final Drive Sprocket - Remove and Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Mon May 18 09:53:15 UTC+0800 2020
11/11
325C & 325C L Excavators BKW00001-UP (MACHINE) POWERED BY 3126B ...
2020/5/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 325C EXCAVATOR BKW
Configuration: 325C & 325C L Excavators BKW00001-UP (MACHINE) POWERED BY 3126B Engine
Disassembly and Assembly
325C Excavator Machine Systems
Media Number -RENR5367-11 Publication Date -01/01/2012 Date Updated -17/02/2017
i04758848
Final Drive - Assemble
SMCS - 4050-016
Assembly Procedure (227-6116)
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-2420 Transmission Repair Stand 1
B 138-7573 Link Bracket 2
C 1P-1863 Retaining Ring Pliers 1
D
194-3878 Spanner Wrench As 1
194-3884 Spacer 1
E 138-7574 Link Bracket 2
H 6V-7030 Micrometer Depth Gauge Group 1
J FT-2770 Leak Down Test Tool 1
K 1U-6396 O-Ring Assembly Compound 1
L 5P-3931 Anti-Seize Compound 1
M 1U-8846 Gasket Sealant 1
N 8T-0531 Duo-Cone Seal Installer As 1
P 5P-3931 Anti-Seize Compound 1
Q 240-1886 Drill Fixture Gp 1
R 9S-3263 Thread Lock Compound 1
1/19
325C & 325C L Excavators BKW00001-UP (MACHINE) POWERED BY 3126B En...
2020/5/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. Note: Cleanliness is an important factor. Before assembly, clean all parts thoroughly in cleaning
fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts. Lint may be
deposited on the parts which may cause later trouble. Inspect all parts. If any parts are worn or
damaged, use new parts for replacement. All disassembly and all assembly procedures must be
performed on a clean work surface and in a clean hydraulic area. Keep cleaned parts covered and
protected at all times.
Note: O-ring seals, gaskets, and seals should always be replaced. A used O-ring seal may not have
the same sealing properties as a new O-ring. Use Tooling (K) during the assembly procedure.
Note: Apply a light film of hydraulic oil to all components before assembly.
Note: Some of the images that are in this procedure do not show the sprocket assembly that is
attached to the final drive housing. If necessary, the weights that are given include the weight of
the sprocket assembly.
Illustration 1 g01147975
1. Apply Tooling (P) to the outer diameter of the bearings.
2. Use a suitable press to Install bearings (40) and (41). Make sure that bearing (41) and
bearing (40) contact the counterbore in housing (36) .
3. Use Tooling (N) to install Duo-Cone seal (39B) .
2/19
325C & 325C L Excavators BKW00001-UP (MACHINE) POWERED BY 3126B En...
2020/5/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. Illustration 2 g01147981
4. Use Tooling (N) to install Duo-Cone seal (39A) onto housing (38).
Illustration 3 g01147930
5. Use Tooling (E) and a suitable lifting device to install housing (36) onto housing (38). The
weight of housing (36) is approximately 100 kg (220 lb).
6. Remove Tooling (E) from housing (36) .
3/19
325C & 325C L Excavators BKW00001-UP (MACHINE) POWERED BY 3126B En...
2020/5/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. Illustration 4 g01147724
7. Install stopper plate (35). Do not tighten stopper plate assembly (35) at this time.
Note: Stopper plate (35) will secure housing (36) to housing (38) .
8. Install Tooling (E) and a suitable lifting device to housing (36). The combined weight of
housing assembly (36) and (38) is approximately 120 kg (265 lb). Install housing assembly
(36) and (38) in a suitable press.
9. Remove stopper plate (35) .
Illustration 5 g01147727
10. Assemble Tooling (D), as shown.
Illustration 6 g01147731
11. Install Tooling (D) into housing (36), as shown.
12. Apply a force of 4000 kg (8818 lb) to the top of Tooling (D). Rotate housing (36) in order to
seat the bearings.
13. Reduce the force on the top of Tooling (D) to 1000 kg (2205 lb).
4/19
325C & 325C L Excavators BKW00001-UP (MACHINE) POWERED BY 3126B En...
2020/5/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. Illustration 7 g01147737
14. Use Tooling (H) to take a measurement in three locations. Average the three measurements
and record the average measurement as Dimension (W) .
15. Remove Tooling (D) .
16. Separate Tooling (D) .
Illustration 8 g01147743
17. Use a micrometer in order to measure the thickness at three locations of the spacer from
Tooling (D). Record the average measurement as Dimension (X) .
5/19
325C & 325C L Excavators BKW00001-UP (MACHINE) POWERED BY 3126B En...
2020/5/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
18. Illustration 9 g01147742
18. Use a micrometer in order to measure the thickness at three locations of stopper plate (35).
Record the average measurement as Dimension (Y) .
19. Subtract Dimension (X) from Dimension (Y) and record this figure as Dimension (Z) .
Illustration 10 g01147724
20. Install stopper plate (35) onto housing (38). Do not tighten stopper plate (35) at this time.
Stopper plate (35) will secure the final drive assembly while the final drive assembly is
repositioned onto Tooling (A) .
21. Use Tooling (E) and a suitable lifting device to reposition the final drive assembly onto
Tooling (A). The combined weight of housing assembly (36) and (38) is approximately 120
kg (265 lb).
22. Secure the final drive assembly to Tooling (A) .
6/19
325C & 325C L Excavators BKW00001-UP (MACHINE) POWERED BY 3126B En...
2020/5/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
19. Illustration 11 g01148004
23. Secure the spanner socket from Tooling (D) to stopper plate (35) .
24. In order to determine the final bearing preload, add Dimension (W) to Dimension (Z) and
record this figure as Dimension (V) .
25. Use Tooling (H) to measure the distance in three locations.
26. Tighten stopper plate (35) until the average of the measurements is equal to Dimension (V) .
27. Remove Tooling (D) .
Illustration 12 g01372092
28. Install Tooling (Q) and a suitable vacuum onto stopper plate (35) .
7/19
325C & 325C L Excavators BKW00001-UP (MACHINE) POWERED BY 3126B En...
2020/5/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. Illustration 13 g01147789
29. Use a suitable drill and Tooling (Q) in order to drill a hole to the depth of 15 mm (0.6 inch)
in the stopper palte and in housing (38) .
Illustration 14 g01147796
30. Install dowel (37) .
Illustration 15 g01147650
8/19
325C & 325C L Excavators BKW00001-UP (MACHINE) POWERED BY 3126B En...
2020/5/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
21. 31. Apply Tooling (R) on bolts (35A). Install plate (35B) and bolts (35A) .
32. Repeat Steps 28 through 31 for the opposite side of stopper plate (35) .
Illustration 16 g00781807
33. Install O-ring seal (34) on housing (36) .
Illustration 17 g00781730
34. Install gear (33) on housing (36).
9/19
325C & 325C L Excavators BKW00001-UP (MACHINE) POWERED BY 3126B En...
2020/5/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. Illustration 18 g00781719
35. Assemble carrier assembly (27), as follows.
Illustration 19 g00781607
a. Use a deburring tool in order to remove the metal burr from the openings in the
carrier.
b. Install two bearings (31) in planetary gear (32) .
c. Install thrust washers (30) and planetary gear (32) in the carrier assembly.
d. Install planetary shaft (28) in the carrier assembly.
e. Align the split in spring pin (29) to the top or to the bottom. Make a stake mark on
each side of the spring pin hole in the carrier. Each stake mark should be
approximately 1.50 mm (0.059 inch) from the outside diameter of the spring pin hole.
10/19
325C & 325C L Excavators BKW00001-UP (MACHINE) POWERED BY 3126B ...
2020/5/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. Illustration 20 g00903073
f. Drive spring pin (29) into planetary shaft (28) with a hammer and a punch.
36. Repeat Steps 35.a through 35.e in order to install the other two planetary gears in the carrier.
Illustration 21 g00781559
37. Use two people to install carrier assembly (27) in gear (33). The weight of carrier assembly
(27) is approximately 38 kg (85 lb).
11/19
325C & 325C L Excavators BKW00001-UP (MACHINE) POWERED BY 3126B ...
2020/5/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
25. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
26. a. Use a deburring tool in order to remove the metal burr from the openings in the
carrier.
b. Install bearing (23) in planetary gear (24) .
c. Install thrust washers (22) and planetary gear (24) in the carrier assembly.
d. Install planetary shaft (21) in the carrier assembly.
Illustration 25 g00903073
e. Drive spring pin (20) into planetary shaft (21) with a hammer and a punch.
Illustration 26 g00879368
f. Align the split in the spring pin to the top or to the bottom. Make a stake mark on
each side of the spring pin hole in the carrier. Each stake mark should be
approximately 1.50 mm (0.059 inch) from the outside diameter of the spring pin hole.
13/19
325C & 325C L Excavators BKW00001-UP (MACHINE) POWERED BY 3126B ...
2020/5/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
27. g. Repeat Steps 39.a through 39.f in order to install the other two planetary gears in the
carrier.
Illustration 27 g01148011
40. Install carrier assembly (19) into gear (33) .
41. Install retaining ring (18) .
Illustration 28 g00781412
42. Install spacer (17). Install gear (16) .
14/19
325C & 325C L Excavators BKW00001-UP (MACHINE) POWERED BY 3126B ...
2020/5/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
28. Illustration 29 g01389598
Note: Make sure that the oil passages in the shafts are oriented toward the center of carrier
assembly (15) .
43. Raise the temperature of carrier assembly (15). Lower the temperature of the shafts. Install
the shafts into carrier assembly (15) until the groove of the shafts is at Dimension (A).
Dimension (A) equals 25.00 ± 0.10 mm (0.984 ± 0.004 inch).
44. Make eight stake marks at distance of Dimension (C) from each shaft. Dimension (C)
equals 2.0 ± 1.0 mm (0.08 ± 0.04 inch). The width of each stake mark should be equal to
Dimension (B). Dimension (B) equals 4.0 ± 1.0 mm (0.16 ± 0.04 inch).
15/19
325C & 325C L Excavators BKW00001-UP (MACHINE) POWERED BY 3126B ...
2020/5/18
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...